HomeMy WebLinkAboutContract 29540 3%CITY SECRETARYDcoloT!t!s
CONTRACT NO. COPYiC
---r....._C"IiRACTOR
SPECIFICATION �►#�ACICNt�EONpING CO.
ORIGINAL AM
CITY AIAFIAGWS OFFICE
CONTRACT DOCUMENTS ---.ENGINmNG ay,
FOR DPMI-FILE COPY
H.M.A.C. SURFACE OVERLAY (2004-1)
- AT VARIOUS LOCATIONS
Project No. GS93-020930522520
IN THE CITY OF FORT WORTH, TEXAS
2004
0 12-11- RCVD
MIKE MONCRIEF GARY W. JACKSON
MAYOR CITY MANAGER
ROBERT D. GOODE, P.E. , DIRECTOR
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
A. DOUGLAS RADEMAKER, P.E. , DIRECTOR
DEPARTMENT OF ENGINEERING
PREPARED BY TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ENGINEERING COORDINATION - `oe
EXHIBIT "A° �� S
SUSAN L SCHWINM
•`w...se a+.+.w...s.s...w w.w w
OPIAL
1
CITY OF FORT WORTH, TEXAS
CONTRACT
THE STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF TARRANT
This agreement made and entered into this the 2"d day of December , 20 03 by and
between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and
existing under and by virtue of a special charter adopted by the qualified voters within said City on the
11th day of December, A.D., 1924, under the authority (vested in said voters by the "Home Rule"
provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular
meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed Owner, and
Sutton &Associates, L.P. HEREINAFTER CALLED Contractor.
WITNESSETH: That said parties have agreed as follows:
1.
That for and in consideration of the payments and agreements hereinafter mentioned to be made
and performed by the Owner, and under the conditions expressed in the bond bearing even date
herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
HMAC SURFACE OVERLAY 2004-1
AT VARIOUS LOCATIONS
Designated as project number, GS93-020930522520
2.
That the work herein contemplated shall consist of furnishing as an independent contractor all
labor, tools, appliances and materials necessary for the construction and completion of said project in
accordance with the Plans and Specifications and Contract Documents prepared by the Department of
Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the
City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto
attached and made a part of this contract the same as if written herein.
r_1
3.
The Contractor hereby agrees and binds himself to commence the construction of said work within
ten (10) days after being notified in writing to do so by the Transportation and Public Works Department
of the City of Fort Worth.
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and approval of
the Transportation and Public Works Department of the City of Fort Worth and the City Council of the City
of Fort Worth within a period of 75(Seventy Five) working days.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated, plus any additional time allowed as provided in the
General Conditions, there shall be deducted from any monies due or which may thereafter become due
him, the sum of $ 210.00 per working day, not as a penalty but as liquidated damages, the
Contractor and his Surety shall be liable to the Owner for such deficiency.
5.
Should the Contractor fail to begin the work herein provided for within the time herein fixed or to
carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications, and Contract Documents, then the Owner shall have the right to either demand the surety
to take over the work and complete the same in accordance with the Contract Documents or to take
charge of and complete the work in such a manner as it may deem proper, and if, in the completion
thereof, the cost to the said City shall exceed the contract price or prices set forth in the said Plans and
Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in
writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost.
6.
Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and
agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants
and employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of, the work and services to be
performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or
invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the
neftence or affe-ged nepljQence of Owner, its officers, servants, or employees. Contractor
likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and
all injuries to Owner's officers, servants and employees and any damage, loss or destruction to
C-2
property of the Owner arising from the performance of any of the terms and conditions of this
Contract, whether or not any such iniury or damage is caused in whole or in part by the
negligence or allecyed negligence of Owner, its officers, servants or employees.
In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner
satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or
(b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been
referred to the insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work
performed under a City Contract.
7.
The Contractor agrees, on the execution of this Contract, and before beginning work, to make,
execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
performance of the terms and stipulations of the Contract and for the payment to all claimants for labor
and/or materials furnished in the prosecution of the work, such bonds being as provided and required in
Texas Govemment Code Section 2253, as amended, in the form included in the Contract Documents,
and such bonds shall be 100 percent (100%) of the total contract price, and the said surety shall be a
surety company duly and legally authorized to do business in the State of Texas, and acceptable to the
City Council of the City of Fort Worth.
8.
Said City agrees and binds itself to pay, and the said agrees to receive, for all of the aforesaid
work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by
the successful bidder hereto attached and made a part hereof. Payment will be made in monthly
installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice
from the Contractor. The agreed upon total contract amount (including/excluding) alternates N/A
shall be
FOUR HUNDRED NINETY EIGHT THOUSAND, FOUR HUNDRED SEVENTEEN DOLLARS
AND FIFTY CENTS
$498,417.50
C-3
9.
It is further agreed that the performance of this Contract, either in whole or in part, shall not be
sublet or assigned to anyone else by said Contractor without the written consent of the Director of the
Transportation and Public Works Department.
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is
classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto
and made a part hereof the same as if it were copies verbatim herein.
11.
The Contractor shall procure and shall maintain during the life of this contract insurance as
specified in paragraph 8 of Special Instruction to Bidders of this contract documents.
12.
It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of
the State of Texas with references to and governing all matters affecting this Contract, and the Contractor
agrees to fully comply with all the provisions of the same.
N WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six 6
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through
its duly authorized officers in Six 6 counterparts with its corporate seal attached.
M
C-4
Done in Fort Worth, Texas, this the 2"d day of December , 20 03 .
RECOMMENDED: CITY OF FORT WORTH
Ala F)) A_�
DIRECTOR, DEPARTMENT OFSSI TANT CITY AGER
ENGINEERING
APPROVED:
DIRECTOR, TRANSPORTATION AND
PUBLIC WORKS
cp l�a }�' ATTEST
(Contractor)
CITY' ECRETARY
(SEAL
BY:
Representative)M I dWd contract Authorization
y
we
/9_-9-Date
P
(TITLE)5. - Tit. a
�. APPROVED TO FORM &
(Address) LEG TY-
- (City/State/Zip) A SIS ANT CITY ATTORNEY
November 1960
Revised May 1986
Revised September 1992 a J t�
Revised January 1993 ��'�a , RA
Revised April 1999 � 9
Revised June 1999 �
Revised June 2001
PERFORMANCE BOND Bond#5860688
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, (1) Sutton &Associates. L.P. as Principal herein,
and (2) Great American Insurance Company ,
a corporation organized under the laws of the State of (3) Ohio and who is
authorized to issue surety bonds in the State of Texas, Surety herein, are held and
firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and
Denton Counties, Texas, Obligee herein, in the sum of Four Hundred Ninety Eight
Thousand. Four Hundred Seventeen Dollars and Fifty Cents Dollars ( $498,417.50 )
for the payment of which sum we bind ourselves, our heirs, executors, administrators,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal has entered into a certain written contract with the Obligee
dated the d day of December , 2093-a copy of which is attached hereto and
made a part hereof for all purposes, for the construction of HMAC SURFACE
OVERLAY 2004-1 Project No. GS93-020930522520.
NOW, THEREFORE, the condition of this obligation is such, if the said Principal
shall faithfully perform the work in accordance with the plans, specifications, and
contract documents and shall fully indemnify and hold harmless the Obligee from all
costs and damages which Obligee may suffer by reason of Principal's default, and
reimburse and repay Obligee for all outlay and expense that Obligee may incur in
making good such default, then this obligation shall be void; otherwise, to remain in full
force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of
the Texas Government Code, as amended, and all liabilities on this bond shall be
determined in accordance with the provisions of such statute, to the same extent as if it
were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal
and the Surety have executed this instrument.
SIGNED and SEALED this 2"d day of December , 2001
r
Sutton &Associates LP
PRINCIPALf4 A
w1P� � j� r
ATTEST: By:_ / I
Name-
'4n
ame:
n al)Secretary TGU15uttalil
Title:
(S EA L) Address: 820 N Main Street
Keller- TX 76248
Witness as to Principal
Great American Insurance Company
SURE
ATTEST: B!fI ,v
-- - Name: Staci Gross
Attorney in Fact
(S E A to Address: PO Box 833837
Richardson_ TX 75083
Witness as to Surety Diane Barrow Telephone Number: 800-437-7843
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of
Power of Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
PAYMENT BOND Bond#5860688
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, (1) Sutton & Associates, L.P. , as Principal
herein, and (2) Great American Insurance Company ,
a corporation organized and existing under the laws of the State of(3) Ohio , as
surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation
located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of Four
Hundred Ninety Eight Thousand, Four Hundred Seventeen Dollars and Fifty Cents
Dollars ( $ 498,417.50 ) for the payment whereof, the said Principal and Surety bind
themselves and their heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents:
WHEREAS, the Principal has entered into a certain written contract with the
Obligee dated the 27d day of December , 2003' which contract is hereby referred
to and made a part hereof as if fully and to the same extent as if copied at length, for the
following project: HMAC SURFACE OVERLAY 2004-1 Project No_ CS93-
020930522520.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if
the said Principal shall faithfully make payment to each and every claimant (as defined
in Chapter 2253, Texas Government Code, as amended) supplying labor or materials in
the prosecution of the work under the contract, then this obligation shall be void;
otherwise, to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of
the Texas Government Code, as amended, and all liabilities on this bond shall be
determined in accordance with the provisions of said statute, to the same extent as if it
were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal
and the Surety have executed this instrument.
SIGNED and SEALED this 2"d day of December , 2003.
Sutton &Associates. LP
PRINCIPAL d. _ er
A T TEST: By:—
Y -
--- Name:
(P n ipal) Secre ary UY1 but Uj
Title: �` G1C
(S E A L) Address: 820 N Main Street
'/� Keller_ TX 76248
' F '
Witness as lo Principal
Great American Insurance Company
SURETY
ATTEST: By:
Name: Staci Gross
Attorney in Fact
(S E A L)- - Address: PO Box 833837
Richardson, TX 75083
(� U I-
Witness as to Surety Diane Barrow Telephone Number: 800-437-7843
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of
Power of Attorney shall be attached to Bond by the Attomey-in-Fact.
The date of bond shall not be prior to date of Contract.
II
MAINTENANCE BOND Bond#5860688
THE STATE OF TEXAS §
COUNTY OF TARRANT §
KNOW ALL BY THESE PRESENTS:
That Sutton &Associates, L.P. ("Contractor"), as principal, and,
Great American Insurance Company a
corporation organized under the laws of the State of Ohio ("Surety"), do hereby acknowledge
themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by
virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of Four
Hundred Ninety Eight Thousand, Four Hundred Seventeen Dollars and Fifty Cents Dollars
($498,417.50), lawful money of the United States, for payment of which sum well and truly be made unto said
City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors,
administrators, assigns and successors,jointly and severally.
This obligation is conditioned, however,that:
WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth,
dated the 2nd of December , 20-0-La copy of which is hereto attached and made a part hereof, for the
performance of the following described public improvements: HMAC SURFACE OVERLAY 2004-1 AT
VARIOUS LOCATIONS the same being referred to herein and in said contract as the Work and being
designated as project number(s) GS93-020930522520 and said contract, including all of the specifications,
conditions, addenda, change orders and written instruments referred to therein as Contract Documents being
incorporated herein and being made a part hereof; and,
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work
that it will remain in good repair and condition for and during a period of after the date of the final acceptance of
the work by the City; and
WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term
Of 2(Two)Years ; and
WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time
within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be
necessary; and,
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or
reconstruct said Work as herein provided.
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or
reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be
null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and
�r
the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said
Contract.
This obligation shall be a continuing one and successive recoveries may be had hereon for successive
breaches until the full amount hereof is exhausted.
IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each of which shall be
rdeemed an original, this 2"4 day of December_,A.D. 2003.
Sutton &Associates LP
PRINCIPAL UV
'TTEST: By:
. 77
Name: V 16&V %*0
(P ' ci al) Secretary reNdal
Title:
(S E A L) Address: 820 N Main Street
_ Keller, TX 76248
Witness as to Prinapal
Great American Insurance Company
SURETY
ATTEST:
Lk49'u
Name: Staci Gross
ry" = Attorney in Fact
(S E A L) Address: PO Box 833837
Richardson, TX 75083
r L
rWitness as to Surety Diane Barrow Telephone Number: 800-437-7843
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of Power of
Attorney shall be attached to Bond by the Attorney-in-Fact.
VW The date of bond shall not be prior to date of Contract.
h
t
�- GREAT AMERICAN INSURANCE COMPANY@
Administrative Office: 580 WALNUT STREET • CINCINNATI,OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than FOUR
No.016486
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY,a corporation organized and existing under
and by virtue of the laws of the State of Ohio,does hereby nominate.constitute and appoint the person or persons named below its true and lawful attomey-in-fact,
for it and in its name,place and stead to execute in behalf of the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other
written obligations in the nature thereof:provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under
rt this authority shall not exceed the limit stated below.
Name Address Limit of Power
DONAL BOLEY ALL OF ALL
STEVE DEAL WICHITA FALLS,TEXAS UNLIMITED
STACI GROSS
JANET KAISER
This Power of Attorney revokes all previous powers issued in behalf of the attorneys)-in-fact famed above.
IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunto affixed this 6TH day of DECEMBER 1 2002
Attest GREAT AMERICAN INSURANCE COMPANY
STATE OF OHIO.COUNTY OF HAMILTON-ss:
On this 6TH day of DECEMBER,2002 before me personally appeared DOUGLAS R.BOWEN,to me known,
being duly sworn,deposes and says that he resides in Cincinnati,Ohio,that he is the Divisional Senior Vice President of the Bond Division of Great American
Insurance Company,the Company described in and which executed the above instrument;that he knows the seal of the said Company:that the seal affixed to the
FIN said instrument is such corporate seal;that it was so affixed by authority of his office under the By-Laws of said Company,and that he signed his name thereto by
like authority.
v T _
OF Jrt
J 1
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company
by unanimous written consent dated March 1. 1993.
RESOLVED: That the Division President, the several Division Vice Presidents and Assistant Vice Presidents.or any one of them,be and hereby is
authorized,from time to time,to appoint one or more Attorneys-in-Fact to execute on behalf of the Company,as surety,any and all bonds, undertakings and
contracts of suretyship,or other written obligations in the nature thereof;to prescribe their respective duties and the respective limits of their authority:and to
revoke any such appointment at any time.
RESOLVED FURTHER: That the Compan'v seal and the signature of any of the aforesaid officers and anv Secretary or Assistant Secretary of the
Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond undertaking.contract or suretvship,or
other written obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original signature of such officer
and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed.
rCERTIFICATION
1,RONALD C.HAYES,Assistant Secretary of Great American Insurance Company,do hereby certify that the foregoing Power of Attorney and the
Resolutions of the Board of Directors of March 1, 1993 have not been revoked and are now in full force and effect.
Signed and sealed this 21101 day of December 2003
S 1029T(11/0 1)
TERRORISM COVERAGE RIDER
NOTICE-DISCLOSURE OF TERRORISM COVERAGE AND PREMIUM
The Terrorism Risk Insurance Act of 2002 establishes a program within the Department
of the Treasury,under which the federal government shares, with the insurance industry,
the risk of loss from future terrorist attacks. The Act applies when the Secretary of the
Treasury certifies that an event meets the definition of an Act of Terrorism. The Act
provides that,to be certified, an Act of Terrorism must cause losses of at least five
million dollars and must have been committed by an individual or individuals acting on
behalf of any foreign person or foreign interest to coerce the government or population of
the United States.
To be attached to and form part of Bond No. 5860688, effective December 2, 2003.
In accordance with the Terrorism Risk Insurance Act of 2002, we are providing this
disclosure notice for bonds on which Great American Insurance Company, its affiliates
(including but not limited to Great American Alliance Insurance Company, Great
American Insurance Company of New York and Great American Assurance Insurance
Company) is the surety.
The United States Government, Department of the Treasury, will pay a share of terrorism
losses insured under the terms of the Act. The federal share equals 90%of that portion of
the amount of such insured losses that exceeds the applicable insurer retention.
This coverage Part/Policy covers certain losses caused by terrorism. In accordance with
the Federal Terrorism Risk Insurance Act of 2002, we are required to provide you with a
notice disclosing the portion of your premium, if any, attributable to the coverage arising
from losses for Terrorist Acts Certified under that Act.
The portion of you annual premium that is attributable to coverage for Terrorist Acts
Certified under the Act is : $:00.
Great American Insurance Company of New York
GREAT,, F C Great American A111ance Insurance Company
INJUU.4c[GROUP Great American Insurance Company
LMPORTANT NOTICE:
To obtain ititormation or make a complaint:
You may contact the Texas Department of Insurance to obtain information on companies,
coverages,rights or complaints at:
1-800-252.3439
You may write the Texas Department of Insurance at:
P.O.Box 149104
Austin,TX 78714-9104
FAX#1-512-475-1771
Your notice of claim against the attached bond may be given to the surety company that issued
the bond by sending it to the following address:
Mailing Address: Great American Insurance Company Claim
P.O.Box 2575
Cincinnati,Ohio 45201
Physical Address: Great American Insurance Company Claim
580 Walnut Street
7th Floor
Cincinnati.Ohio 45201
Yat;r.a-. alio contact the Great Americas+.Insurance Company Cla:rn office by telephone a::
Telephone Number: 1-513-369-5069
PR.E>UUM OR CLAL•`1 DISPUTES:
If you have x dispute concerning a premium,you should contact the agent first.If you have a
dtsrut:concerning a claim, you should contact the company first.If the dispute is not resolved.
you may eorimct the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and docs nor become a pert or condition of Lhe attached
document.
F.9667^0 11
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 12/2/2003 -Ord. 15764 & Ord. 15765
DATE: Tuesday, December 02, 2003
LOG NAME: 20HMAC04-1 REFERENCE NO.: **C-19867
SUBJECT:
Appropriation Ordinance and Award of Contract to Sutton & Associates, L.P. for HMAC Surface
Overlay 2004-1 at Various Locations
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to transfer$9,966,113.00 from the General Fund to the Contract Street
Maintenance Fund; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Contract Street Maintenance Fund in the amount of$9,966,113.00 from available funds to fund a
portion of the FY2003-2004 Street Maintenance Program; and
3. Authorize the City Manager to transfer$271,708.75 from the Water and Sewer Operating Fund to the
Water Capital Project Fund; and
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriation in the
Water Capital Project Fund in the amount of$271,708.75, from available funds; and
5. Authorize the City Manager to execute a contract with Sutton & Associates, L.P. in the amount of
$498,417.50 for 75 working days for HMAC (Hot Mix Asphaltic Concrete) Surface Overlay 2004-1
at various locations.
DISCUSSION:
In the FY2003-2004 Contract Major Maintenance Program, various types of street maintenance techniques
are grouped into specific contract packages. The transfer of $9,966,113.00 will provide $9,216,113.00 for
anticipated street maintenance programs, and $750,000.00 for anticipated bridge maintenance programs
for FY2003-2004. 'Transfers are done on an annual basis.
HMAC Surface Overlay 2004-1 at various locations provides for surface and base rehabilitation,
replacement of failed curb and gutter, and driveway approaches for asphalt streets.
The streets included in this contract are planned for the replacement of water and/or sewer lines under
separate contracts. The Transportation and Public Works Department has determined that curb-to-curb
restoration of the pavement surface is the best option for the repair of these streets.
Cost for repair of these streets will be shared equally (50/50) between the Fort Worth Water Department
and Transportation and Public Works Department.
The following list details the limits for each of the streets included in this project:
Street From To Mapsco
Anchorage Court Skylake Drive N.E. Cul-de-sac 31M
Anvil Court S.E. Cul-de-sac Skylake Drive 31 M
Cascade Court N.W. Curie-sac Golf Club Drive 32N
Funtier Court S.W. Cul-de-sac Glen Hollow Drive 32J
Golf Club Drive Cascade Court Lake Country Drive 32P
Granite Court S.E. Cul-de-sac Skylake Drive 31M
Iron Gate Court Woodharbor Drive S.E. Cul-de-sac 31R
Regatta Court S.E. Cul-de-sac Random Road 31 M
Skylake Drive Lake Country Drive Woodharbor Drive 31 M
Skylake Court Lake Country Drive S.E. Cul-de-sac 32J
Treetop Court Golf Club Drive N.W. Cul-de-sac 32N
Westwind Court Lake Country Drive S.E. Cul-de-sac 32J
Woodharbor Drive Crosswind Drive S.W. Cul-de-sac 31M
The City also reserves the right to increase or decrease quantities of individual pay items within the
contract, provided that the total contract amount remains within plus or minus 25% of the contract award.
This project was advertised on July 3 and 10, 2003. On August 7, 2003, the following bids were received:
Bidders Amount
Sutton &Associates, LP $498,417.50
Peachtree Construction, Ltd. $571,620.00
Austin Bridge & Road, LP $573,500.00
JLB Contracting, LP $596,479.50
Sutton & Associates, L.P. is in compliance with the City's M/WBE Ordinance by committing to 22% M/WBE
participation. The City's goal on this project is 14%.
Funding in the amount of $12,500.00 for project contingency and $10,000 for construction inspection for
water_
This project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon approval and completion of recommendation No. 1 and 4, and
adoption of the attached appropriation ordinances, funds will be available in the current capital budgets, as
appropriated, of the Water Capital Project Fund and the Contract Street Maintenance Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
1&2) 1) GG01 538070 0201001 $9,216,113.00
GS93 472001 020930578010 $9966,113.00
1) GG01 538070 0201001 $750,000.00
2) $9,966,113.00 3) PE45 538070 0609020 $271,708.75
GS93 541200 020930578010
3&4) $271,708.75 PW53 541200 060530176440 $249,208.75
PW53 472045 060530176440
PW53 531350 030530176440
$10,000.00 S93 541200 020930522520 $249,208.75
PW53 541200 060530176440 $261,708.75
Submitted for City Manager's Office by: Marc Ott (8476)
Originating Department Head: Robert Goode (7804)
Additional Information Contact: George Behmanesh (7914)
Ordinance No.
AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE CONTRACT STREET MAINTENANCE FUND IN
THE AMOUNT OF $9,966,113.00 FROM AVAILABLE FUNDS FOR THE
PURPOSE OF FUNDING A PORTION OF THE FISCAL YEAR 2003-2004
STREET MAINTENANCE PROGRAM; MAKING THIS ORDINANCE
CUMULATIVE OF PRIOR ORDINANCES IN CONFLICT HEREWITH; AND
PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2003-
2004 in the Budget of the City Manager, there shall also be increased estimated receipts and
appropriations in the Contract Street Maintenance Fund in the amount of $9,966,113.00 from
available funds for the purpose of funding a portion of the FY 2003-2004 Street Maintenance
Program.
SECTION 2.
i
That should any portion, section or part of a section of this ordinance be declared invalid,
inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or
judgment shall in no way impair the remaining portions, sections, or parts of sections of this
ordinance,which said remaining provisions shall be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance No. 15636 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance
are in direct conflict with such other ordinances and appropriations, in which instance said
conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY:
Assistant City Attorney
ADOPTED AND EFFECTIVE: 7- 12- ID3
w
Ordinance No. to 5
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS
IN THE WATER CAPITAL PROJECT FUND IN THE AMOUNT OF $271,708.75 FROM
AVAILABLE FUNDS FOR THE PURPOSE OF FUNDING A CONTRACT WITH SUTTON
AND ASSOCIATES, L.P. FOR HMAC SURFACE OVERLAY (2004-1) AT VARIOUS
LOCATIONS; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES
AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HE=RE=WITH; AND
PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2003-2004 and
#. . in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in
the Water Capital Project Fund in the amount of $271,708.75 from available funds for the purpose of
funding a contract with Sutton and Associates, L.P. for HMAC Surface Overlay (2004-1) at various
locations.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way
impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining
provisions shall be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance No. 15636 and all other ordinances and appropriations
amending the same except in those instances where the provisions of this ordinance are in direct conflict
W with such other ordinances and appropriations, in which instance said conflicting provisions of said prior
ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
r APPROVED AS TO FORM AND LEGALITY:
ssistant City Attorney
rADOPTED AND EFFECTIVE: 12- 1 o3
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
H.M.A.C. SURFACE OVERLAY (2004-1)
- AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930522520
IN THE CITY OF FORT WORTH, TEXAS
2004
7 Lo
3
A. DOUGLAS EMAKER, P.E. DATE
DIRECTOR DEPARTMENT OF ENGIN}3ERING
t(33
GEORGE A. BEHMANESH, P.E. DATE
ASSISTANT DIRECTOR
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
7-a-02
DO0 KIM, P.E. DATE
CAPITAL PROJECT ENGINEER WATER DEPARTMENT
TABLE OF CONTENTS
1. Notice to Bidders
2. Special Instructions to Bidders
3. Prevailing Wage Rates
4. Proposal
5. Vendor Compliance
6. Disadvantaged Business Enterprise
7. Special Provisions
8. Contractor Compliance with Worker's Compensation Law
9. Certificate of Insurance
10. Performance Bond
11. Payment Bond
12. Maintenance Bond
13. Contract
14. Project Designation Signs
15. Details
r
16. Soil Reports
17. Street Locations
NOTICE TO BIDDERS
Sealed proposals for the following project :
H.M.A. C. SURFACE OVERLAY (2004-1)
AT VARIOUS LOCATIONS
Project No. GS93-020930522520
Addressed to Mr. Gary W. Jackson, City Manager of the City of
Fort Worth, Texas will be received at The Purchasing Office until
1:30 P.M. , August 7, 2003 and then publicly opened and read aloud
at 2 :00 P.M. Plans, Specifications and Contract Documents for
this project may be obtained at the office of the Department of
Engineering, Municipal Office Building, 1000 Throckmorton Street,
Fort Worth, Texas, 76102 .
A pre-bid conference will be held at 10:30 A.M. , July 15, 2003,
in the Transportation and Public Works Conference Room 270, 2nd
floor, Municipal Building.
One set of documents will be provided to prospective bidders for
a deposit of twenty dollars ($20. 00) : such deposit will be
refunded if the document is returned in good condition within 10
days after bids are opened. Additional sets may be purchased on
a non-refundable basis for twenty dollars ($20 . 00) per set .
For additional information contact Ms. Susan L. Schwinger, P.E.
at (817) 871-6529 .
GARY W. JACKSON Robert D. Goode, Director
City Manager Transportation and Public Works
PUBLICATION: By:.�'o!
July 3, 2003 Najib N. Fares, P.E. ,
July 10, 2003 Street Program Manager, TPW
P-1
F&
SPECIAL INSTRUCTIONS TO BIDDERS
1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of
Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid
submitted must accompany the bid, and is subject to forfeit in the event the successful
bidder fails to execute the contract documents within ten days after the contract has been
awarded.
To be an acceptable surety on the bid bond, the surety must be authorized to do business
in the state of Texas. In addition, the surety must (1) hold a certificate of authority from
the Untied States secretary of the treasury to qualify as a surety on obligations permitted
or required under federal law; or (2) have obtained reinsurance for any liability in excess
of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of
Texas and is the holder of a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal law.
Satisfactory proof of any such reinsurance shall be provided to the City upon request.
The City, in its sole discretion, will determine the adequacy of the proof required herein.
2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be
tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the
application of such formulas or other methods of bringing items to a common basis as
may be established in the Contract Documents.
The total obtained by taking the sum of the products of unit prices quoted and the
estimated quantities plus any lump sum items and such other quoted amounts as may
enter into the cost of the completed project will be considered as the amount of the bid.
Until the award of the contract is made by the Owner, the right will be reserved to reject
any or all proposals and waive technicalities,to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for the best interest of the
Owner.
The quantities of work and materials to be famished as may be listed in the proposal
forms or other parts of the Contract Documents will be considered as gpproximate only
and will be used for the purpose of comparing bids on a uniform basis. Payment will be
P_ made to the Contractor for only the actual quantities of work performed or materials
furnished in strict accordance with the Contract Documents and Plans. The quantities of
work to be performed and materials to be furnished may be increased or decreased as
OW hereinafter provided,without in any way invalidating the unit prices bid or any other
requirements of the Contract Documents.
On 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract
Documents prior to the bid receipt. Information regarding the status of addenda may be
obtained by contacting the Department of Engineering Construction Division at(817)
871-7910. Bids that do not acknowledge all applicable addenda will be rejected as non-
responsive.
SPECIAL INSTRUCTIONS TO BIDDERS
- 1-
4. AWARD OF CONTRACT: The contract, if awarded,will be awarded to the lowest
responsive bidder. The City reserves the right to reject any or all bids and waive any or
all irregularities. No bid may be withdrawn until the expiration of forty-nine(49) City
business days from the date that the M/WBE UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM
("Documentation") is received by the City.
5. PAYMENT,PERFORMANCE AND MAINTENANCE BONDS: The successful bidder
entering into a contract for the work will be required to give the City surety in a sum
equal to the amount of the contract awarded. The successful bidder shall be required to
furnish bonding as applicable in a sum equal to the amount of the contract awarded. The
form of the bond shall be as herein provided and the surety shall be acceptable to the
City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the
Texas Government Code, as amended.
A. If the total contract price is$25,000 or less,payment to the contractor shall be
made in one lump sum. Payment shall not be made for a period of 45 calendar
days from the date the work has been completed and accepted by the City.
B. If the contract amount is in excess of$25,000, a Payment Bond shall be
00 executed, in the amount of the contract, solely for the protection of all claimants
supplying labor and material in the prosecution of the work.
�. C. If the contract amount is in excess of$100,000, a Performance Bond shall be
executed, in the amount of the contract conditioned on the faithful performance of
the work in accordance with the plans, specifications, and contract documents.
Said bond shall solely be for the protection of the City of Fort Worth.
D. A Two-year Maintenance Bond is required for all projects to insure the prompt,
PM full and faithful performance of the general guarantee as set forth in Paragraph 7
of the Special Provisions.
«� To be an acceptable surety on the performance, payment and maintenance bonds, the
surety must be authorized to do business in the state of Texas and meet all requirements
of Texas Insurance Code, section 7.19-1. In addition, the surety must (1) hold a
certificate of authority from the Untied States secretary of the treasury to qualify as a
surety on obligations permitted or required under federal law; or (2) have obtained
reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and
admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority
from the Untied States secretary of the treasury to qualify as a surety on obligations
permitted or required under federal law. Satisfactory proof of any such reinsurance shall
be provided to the City upon request. The City, in its sole discretion, will determine the
adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on
any bonds or which are interested in any litigation against the City. Should any surety on
the contract be determined unsatisfactory at any time by the City,notice will be given to
the contractor to that effect and the contractor shall immediately provide a new surety
satisfactory to the City
r
SPECIAL INSTRUCTIONS TO BIDDERS
-2-
6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 - General
Provisions, Item 8,Paragraph 8.6, Standard Specifications for Street and Storm Drain
Construction of the City of Fort Worth,Texas, concerning liquidated damages for late
completion of projects.
7. EMPLOYMENT AND NON-DISCRIMINATION• The Contractor shall not
discriminate against any person(s)because of sex,race,religion, color or national origin
and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of
the City of Fort Worth(1986), as amended,prohibiting discrimination in employment
practices.
JM 8 WAGE RATES: All bidders will be required to comply with provision 5159a of
"Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of
prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in
P, Contract Documents for this project.
9. FINANCIAL STATEMENT: A current certified financial statement may be required by
the Department of Engineering Director for use by the CITY OF FORT WORTH in
determining the successful bidder. This statement, if required, is to be prepared by an
independent Public Accountant holding a valid permit issued by an appropriate State
Licensing Agency.
10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor
F— must provide, along with executed contract documents and appropriate bonds,proof of
insurance for Workers Compensation(statutory); Comprehensive General Liability
($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance
($1,000,000 each accident on a combined single basis or$250,000 property
damage/$500,000 bodily injury per person per occurrence. A commercial business
policy shall provide coverage on"any auto", defined as autos owned,hired, and non-
owned). Additional lines of coverage may be requested. If such a request is made after
bid opening, Contractor shall be entitled to additional compensation equal to 110%of the
additional premium cost. For worker's compensation insurance requirements, see Special
Instructions to Bidders- Item 16.
ADDITIONAL INSURANCE REQUIREMENTS:
A. The City, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
coverage under Contractor's workers'compensation insurance policy.
B. Certificates of insurance shall be delivered to the City of Fort Worth, contract
~" administrator in the respective department as specified in the bid documents, 1000
Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on
the contracted project.
C. Any failure on part of the City to request requirei I inks do nt tion shall
not constitute a waiver of the insurance requireme its", o "
I I y , .
D. Each insurance policy shall be endorsed to pro ' um thirty
days notice of cancellation, non-renewal, and/or material change in policy terms
SPECIAL INSTRUCTIONS TO BIDDERS
-3-
or coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
E. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
F. Deductible limits, or self-funded retention limits, on each policy must not exceed
$10,000.00 per occurrence unless otherwise approved by the City.
G. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
H. Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
I. City shall not be responsible for the direct payment of insurance premium costs
for contractor's insurance.
J. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
K. In the course of the project, Contractor shall report, in a timely manner, to City's
officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property
loss.
L. Contractor's liability shall not be limited to the specified amounts of insurance
�+ required herein.
M. Upon the request of City, Contractor shall provide complete copies of all
insurance policies required by these contract documents.
11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the
City of Fort Worth will not award this contract to a non-resident bidder unless the non-
resident's bid is lower than the lowest bid submitted by a responsible Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a
op non-resident bidder to obtain a comparable contract in the state in which the non-
resident's principal place of business is located.
"Non-resident bidder" means a bidder whose principal place of business is not in
this state,but excludes a contractor whose ultimate parent company of majority
owner has its principal place of business in this state.
SPECIAL INSTRUCTIONS TO BIDDERS
-4-
"Texas resident bidder" means a bidder whose principal place of business is in this
state, and includes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state.
This provision does not apply if the project is funded in whole or in part with federal
funds.
The appropriate blanks of the Proposal must be filled out by all non-resident bidders in
order for its bid to meet specifications. The failure of a non-resident contractor to do so
will automatically disqualify that bidder.
12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort
Worth Ordinance No. 11923, as amended by Ordinance No. 13471,the City of Fort
Worth has goals for the participation of minority business enterprises and women
business enterprises in City contracts. You may obtain a copy of the Ordinance from the
Office of the City Secretary.
Aft The M/WBE Utilization Form,Prime Contractor Waiver Form and the Good Faith Effort
Form, as applicable, must be submitted no later than 5:00 p. in. five(5) City business
days after the bid opening date, exclusive of the bid opening date. The bidder shall
submit the documentation at the reception area of the Department of Engineering
("Managing Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to
comply shall render your bid non-responsive.
f
Upon contract execution between the City of Fort Worth and the successful bidder, now
known as Contractor, a pre-construction meeting will be scheduled at which time the
Contractor is required to submit either Letters of Intent or executed agreements with the
M/WBE firms)to be utilized on this project. Such Letters of Intent or executed
agreements shall include the following information:
1. Name of Contract
2. Name of M/WBE firm utilized
r 3. Scope of Work to be performed by the M/WBE firm
4. Monetary amount of work to be performed by the M/WBE firm
5. Signatures of all parties
dw
A notice to proceed will not be issued until the signed letter(s) or executed
agreement(s) have been received.
Throughout the duration of this project,the Contractor comply with the M/WBE
Ordinance by complying with the following procedures:
• A M/WBE Participation Report Form must be submitted monthly until the contract is
completed. The first report will be due 30 days after commencement of work. The
�► monthly report MUST have an original signature to ensure accountability for audit
purposes.
a Reports are to be submitted monthly to the M/WBE Office, regardless of whether or
not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a
particular month,place a"0" or"no participation" in the spaces provided, and provide
SPECIAL INSTRUCTIONS TO BIDDERS
-5-
a brief explanation.
• The Contractor shall provide the M/WBE Office proof of payment to the M/WBE
subcontractors and suppliers only. The M/WBE Office will accept the following as
proof of payment:
1. Copies of submitted invoices with front and back copies of canceled check(s), OR
2. A notarized letter explaining, in detail:
a Subcontractor/supplier Scope of Work
b. Date when services were received from subcontractor/supplier
c. Amounts paid to the subcontractor/supplier
d. Original signatures from both parties must be included on this letter.
' • If the Contractor foresees a problem with submitting participation reports and/or
proof of payment on a monthly basis,the M/WBE Office should be notified.
If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere
to the following:
1. Immediately submit a Request for Approval of Change Form to the M/WBE
Office explaining the request for the change or deletion.
2. If the change affects the committed M/WBE participation goal, state clearly how
and why in documentation.
a. All requests for changes must be reviewed and pre-approved by the M/WBE
Office.
b. If the Contractor makes change(s)prior to approval, the change will not be
considered when performing a post compliance review on this project.
�. • Upon the Contractor's successful completion of this project, and within ten days after
receipt of final payment from the City of Fort Worth, The Contractor will provide the
M/WBE Office with a Final Participation Report Form to reflect the total
participation from ALL subcontractors/suppliers utilized on the project.
a
• All forms are available at the M/WBE Office, 3rd floor-City Hall. For additional
information regarding compliance to the M/WBE Ordinance, call(817) 871-6104.
Upon request, Contractor agrees to provide to Owner Complete and accurate information
regarding actual work performed by a Minority/Women Business Enterprise(M/WBE)
on the contract and payment therefore. Contractor further agrees to permit an audit and/or
examination of any books,records or files in its possession that will substantiate the
W actual work performed by an M/WBE. The misrepresentation of facts (other than a
negligent misrepresentation)and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under deral,
PL state or local laws or ordinances relating to false statements; further;any-su94
misrepresentation(other than a negligent misrepresentation) and/or commis Vf fraud
SPECIAL INSTRUCTIONS TO BIDDERS
a
-6-
will result on the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time of not less than three years.
13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the
proposal, the City reserves the right to adopt the most advantagegus construction thereof
or to reject the proposal.
14. PROGRESS PAYMENTS,FINAL PAYMENT PROJECT ACCEPTANCE AND
WARRANTY:
a. The contractor will receive full payment(less 5%retainage) from the city for each pay
period.
b. Payment of the retainage will be included with the final payment after acceptance of the
project as being complete.
c. The project shall be deemed complete and accepted by the City as of the date the final
punch list has been completed, as evidenced by a written statement signed by the
contractor and the City.
d. The warranty period shall begin as of the date that the final punch list has been
completed.
e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment
becoming due and payable.
f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the
city and there is a dispute regarding(i) final quantities, or(ii) liquidated damages, city
shall make a pr-egr-ess payment in the amount that city deems due and payable.
g. In the event of a dispute regarding either final quantities or liquidated damages, the
parties shall attempt to resolve the differences within 30 calendar days.
P
15. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the
following guidelines relating to working on City construction sites on days designated as
PW "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON,within the
Metroplex area,runs from May 1,through October 31,with 6:00 a.m. - 10:00 a.m. being
critical because emissions from this time period have enough time to bake in the hot
,ft atmosphere that leads to early afternoon ozone formation.
The Texas Commission on Environmental Quality(TCEQ), in coordination with the
pa National Weather Service, will issue the AIR POLLUTION WATCH by 3:00 p.m. on the
afternoon prior to the WATCH day. On designated AIR POLLUTION WATCH DAYS,
the Contractor shall bear the responsibility of being aware that such days have been
designated AIR POLLUTION WATCH DAYS and as such shall not begin work until
10:00 a.m.whenever construction phasing requires the use of motorized equipment for
periods in excess of 1 hour.
However,the Contractor may begin workprior to 10:00 a.m. if use of motorized
equipment is less than 1-hour, or if equipment is new and certified by EPA as"Low
SPECIAL INSTRUCTIONS TO BIDDERS
-7-
Emittinlr", or equipment burns Ultra Low Sulfur Diesel (UCSD), diesel emulsions or
alternative fuels such as CNG.
Pift If the Contractor is unable to perform continuous work for a period of at least seven hours
between the hours of 7:00 a.m. - 6:00 p.m., on a designated AIR POLLUTION WATCH
DAY, that day will be considered as a weather day and added onto the allowable weather
PW days of a given month.
16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance
with Workers Compensation shall be as follows:
A. Definitions:
Certificate of coverage("certificate")-A copy of a certificate of insurance, a
certificate of authority to self-insure issued by the commission, or a coverage
r agreement(TWCC-81,TWCC-82,TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity employees
providing services on a project, for the duration of the project.
Duration of the project- includes the time from the beginning of the work on the
OW project until the contractor's/person's work on the project has been completed and
accepted by the governmental entity.
00 Persons providing services on the project("subcontractor" in, 406.096) -includes all
persons or entities performing all or part of the services the contractor has undertaken
to perform on the project,regardless of whether that person has employees. This
includes, without limitation, independent contractors, subcontractors, leasing
companies,motor carriers, owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project.
"Services" include,without limitation,providing,hauling, or delivering equipment or
materials,or providing labor, transportation, or other service related to a project.
"Services" does not include activities unrelated to the project, such as food/beverage
ON vendors, office supply deliveries, and delivery of portable toilets.
B. The contractor shall provide coverage,based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements,which meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project, the contractor must,prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The contractor shall obtain from each person providing services on a project, and
provide to the City:
SPECIAL INSTRUCTIONS TO BIDDERS
-8-
PM
(1) a certificate of coverage,prior to that person beginning work on the project, so
the City will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage,if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
E. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within ten days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers'Compensation Commission,informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project,to:
(1) provide coverage,based on proper reporting on classification codes and payroll
amounts and filing of any coverage agreements,which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
r providing services on the project, for the duration of the project;
(2) provide to the contractor,prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
(3) provide the contractor,prior to the end of the coverage period, a new certificate
of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(4) obtain from each other person or entity with whom it contracts, and provide to
the contractor:
(a) a certificate of coverage,prior to the other person or entity beginning work
on the project; and
(b) a new certificate of coverage showing extension of coverage,prior to the end
of the coverage period,if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter.
SPECIAL INSTRUCTIONS TO BIDDERS
-9-
I
(6) notify the governmental entity in writing by certified mail or personal delivery,
within ten days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(7) contractually require each person with whom it contracts, to perform as required
by paragraphs (1) -(7),with the certificates of coverage to be provided to the
person for whom they are providing services.
J. By signing this contract or providing or causing to be provided a certificate of
coverage, the contractor is representing to the governmental entity that all employees
of the contractor who will provide services on the project will be covered by workers'
compensation coverage for the duration of the project,that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a self-
insured,with the commission's Division of Self-Insurance Regulation. Providing
false of misleading information may subject the contractor to administrative penalties,
criminal penalties, civil penalties or other civil actions.
K. The contractor's failure to comply with any of these provisions is a breach of contract
by the contractor which entitles the City to declare the contract void if the contractor
does not remedy the breach within ten days after receipt of notice of breach from the
City.
"The contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Workers'
Compensation Act or other Texas Workers'Compensation commission rules. This
notice must be printed with a title in at least 30 point bold type and text in at least 19
point normal type, and shall be in both English and Spanish and any other language
common to the worker population. The text for the notices shall be the following
• text,without any additional words or changes:
REQUIRED WORKERS'COMPENSATION COVERAGE
,1' "The law requires that each person working on this site or providing services related
to this construction project must be covered by workers'compensation insurance.
This includes persons providing,hauling,or delivering equipment or materials, or
providing labor or transportation or other service related to the project,regardless of
the identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at(512)440-3789 to receive
information on the legal requirement for coverage,to verify whether your employer
has provided the required coverage, or to report an employer's failure to provide
a coverage."
■` 17. AGE DISCRIMINATION: In accordance with the policy("Policy") of the Executive
Branch of the federal government, contractor covenants that neither it nor any officers,
members, agents or employees who engage in the performance of this contract shall,in
ON
SPECIAL INSTRUCTIONS TO BIDDERS
-10-
r
" connection with such employment, advancement or discharge of employees or in
connection with the terms, conditions or privileges of their employment, discriminate
against any person because of their age except on the basis of a bona fide occupational
qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers,members, agents or employees
*` acting on their behalf, shall specify in solicitations or advertisements for employees to
work on those contract a maximum age limit for such employment unless the specified
maximum age limit is based upon a bona fide occupational qualification,retirement plan` or statutory requirement.
Contractor warrants that it will fully comply with the Policy and will defend, indemnify
and hold City harmless against any and all claims or allegations filed by third parties
against City arising out of Contractor's alleged failure to comply with the Policy in the
performance of this contract.
18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the
Americans with Disabilities Act of 1990("ADA'), Contractor warrants that it will not
unlawfully discriminate on the basis of disability in the provision of services to the
general public,nor in the availability,terms or conditions of employment for applicants
for employment with, or current employees of, Contractor. Contractor warrants that it
will fully comply with the ADA's provisions and any other applicable federal, state,or
local laws concerning disability and will defend,indemnify and hold City harmless
against any and all claims or allegations filed by third parties against City arising out of
Contractor's alleged failure to comply with the ADA in the performance of this contract.
END OF SECTION
4
1&
tl
SPECIAL INSTRUCTIONS TO BIDDERS
-11-
CITY OF FORT WORTH
HIGHWAY CONSTRUCTION
PREVAILING WAGE RATES FOR 2000
ASPHALT RAKER S10.332
ASPHALT SHOVELER 9.75
BATCHING PLANT WEIGHER 9.65
CARPENTER(ROUGH) 13.64
CONCRETE FINISHER-PAVING 10.16
CONCRETE FINISHER HELPER(PAVING) 9,70
CONCRETE FINISHER-STRUCTURES 13.44
FLAGGER 7.00
FORM BUILDER-STRUCTURES 13.44
FORM SETTER-PAVING&CURB 10.25
FORM SETTER-STRUCTURES 9,75
LABORER-COMMON 7.64
LABORER-UTILITY 8.64
MECHANIC 13.25
SERVICER 10.13
PIPE LAYER 7.35
PIPE LAYER HELPER 6.75
t ASPHALT DISTRIBUTOR OPERATOR 11.45
ASPHALT PAVING MACHINE OPERATOR 11.09
CONCRETE PAVING SAW 10.53
CRANE,CLAMSHELL,BACKHOE,DERRICK,DRAGLINE,SHOVEL(<I 'h CY) 10.00
CRANE,CLAMSHELL,BACKHOE,DERRICK,DRAGLINE,SHOVEL(<1 %CY) 11.52
FRONT END LOADER(2 1/.2 CY&Less) 9.94
FRONT END LOADER(over 2'/2 CY) 9.32
MILLING MACHINE OPERATOR 8.00
MIXER 11.00
MOTOR GRADER OPEATOR(FINE GRADE) 12.31
MOTOR GRADER OPERATOR 13.75
PAVEMENT MARKING MACHINE 11.00
ROLLER,STEEL WHEEL PLANT-MIX PAVEMENTS 9.88
ROLLER,STEEL WHEEL OTHER FLATWHEEL OR TAMPING 12.12
ROLLER,PNEUMATIC,SELF-PROPELLED SCRAPER 8.02
TRAVELING MIXER 10.00
REINFORCING STEEL SETTER(PAVING) 9.75
TRUCK DRIVER-SINGLE AXLE(LIGHT) 8.00
TRUCK DRIVE TANDEM AXLE SEMI-TRAILER 10.22
TRUCK DRIVER-LOWBOY/FLOAT 10.54
TRUCK DRIVER-TRANSIT MIX 10.63
TRUCK DRIVER-WINCH 9.80
u
P R O P O S A L
TO: MR. GARY W. JACKSON Fort Worth, Texas
City Manager
Fort Worth, Texas
FOR: H.M.A.C. SURFACE OVERLAY (2004-1)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930522520
Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly
examined the plans, specifications and the site, understands the amount of work
to be done, and hereby proposes to do all the work and furnish all labor,
equipment, and materials necessary to fully complete all the work as provided
in the plans and specifications, and subject to the inspection and approval of
the Director of the Department of Engineering of the City of Fort Worth.
Total quantities given in the bid proposal may not reflect actual quantities;
however, they are given for the purpose of bidding on and awarding the
contract. The City also reserves the right to increase or decrease quantities
of individual pay items within the contract provided that the total contract
amount remains within plus or minus (t) 25% of the contract award. The
contractor is not entitled to any additional compensation or renegotiation of
individual pay item bid prices.
Upon acceptance of this proposal by the City Council, the bidder is bound to
execute a contract and furnish Performance, Payment and Maintenance Bonds
acceptable to and approved by the City of Fort Worth for performing and
completing the said work within the time stated and for the following sums,
to-wit:
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID
S.P. 1 2 EA. Project Designation Sign
Two Hundred Dollars &
No Cents Per EA. $ 200.00 $ 400.00
S.P. 2 LUMP SUM Utility Adjustment 0
Six Thousand Dollars &
No Cents Per L.S. $ 6,000.00 $ 6,000.00
406 3 3S EA. Manhole Adjustment
450 Three-Hundred and Fifty Dollars
S.P. & No Cents Per EA. $ 350.00 $ 12,250.00
406 4 67 EA. Water Valve Boxes Adjustment
450 Two-Hundred and Fifty Dollars &
S.P. Na Cents Per EA. $ 250.00 $ 16,750.00
S.P. 5 3 EA. Water Meter Boxes Adjustment @
Thirty-Five Dollars &
No CpnLs Per EA. $ 35.00 $ 105.00
P-1
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID
104 6 5,810 L.F. Removal and Replacement of
502 Concr to rb and Gutter 0
S.P. _Dollars & _ 010
-
-Cents Per L.F. $ I $
104 7 200 S.Y. Removal and Replacement of 6"
504 Co rate D vewa
S.P. writz Dollars & po C5
Cents Per S.Y.
104 8 100 S.Y. Removal and Replacement of 4-
504 Con!;retje Sijjwalks 0
S.P. Dollars & do
Cents Per S.Y. $ $ 3500
300 9 10 C.Y. Removal and Replacement of
304 H.M.A.C. Pavement and
312 Bas (Base Rep$ir
S.P. Dollars & 00
7671:18 Per C.Y.
208 10 150 C.Y. Gradgd-Crushed Stones
S.P. Dollars & ap
Cents Per C.Y. $ c;2_0 $ -:?Ono
S.P. 11 3,150 L.F. Wedge Milling 2" to 0" Depth
5.0' .Wide
Dollars & o j SQ
eats Per L.F. $ $
S.P. 12 4 EA. Butt Joi t-� llec�/,�
.�uT,� Dollars & $ CPR $
IJJ� C nt Per EA.
300 13 7 TON H MA.C. Leve
312 �.
D Dollars & o,
/Its Cents Per TON $ Z�Q0
312 14 50,000 S.Y. 2"H.M.A.C. Surface Course
S.P. Z
,. Mix) @
Dollarsn��OD�
Cents Per S.Y. y
104 15 100 S.Y. Removal and Replacement of 7"
314 C •re a Va ley Gutter 0 ,,,,pp
S.P. Dollars f�i
& DO
65'
'
Cents Per S.Y. $ 5 $
P-2
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID
314 16 100 S.Y. New 7" ncrete Valley Gutter @
S.P. Dollars & dp
Cents Per S.Y. $ / $ �'�
104 17 40 S.Y. Standard 4" Reinforced Concrete
505 Wh c air amp
S.P. _ Z Dollars & pO
Cents Per S.Y. $ $ Sim
402 18 800 L.F. 6" PVCforated Pipe Subdrain @
500 �-- Dollars &
620 LJD Cents Per L.F. / ap
S.P. $
502 19 100 L.F. NewL ncre a Curb and Gutter @
Dollars &
/!ln Cents Per L.F.
504 20 100 S.Y. New 4" o r to Sidewalk @
bF Dollars &
Cents Per S.Y. Q / �
$ / $ �%SV
214 21 45,000 S.Y. 8" Pavem t Pulverization @
S.P. Dollars & 6s
ents Per S.Y. $ $ do
214 22 585 TON Ceme @
jt
Dollars &
i7ents Per TON $ 45� $ �COD-
a L7
S.P. 23 5 EA. Remobilization @
Five Hundred Dollars &
No Cents Per EA. $ 500.00 $ 2,500.00
106 24 100 C.Y. IInc a f ed Street Excavation
S.P. Dollars & 49,61Cents Per C.Y. $ ��
S.P. 25 5,000 S.Y. 2" Su=*lling @
Dollars & d0
/Jta Cents Per S.Y. $ $
4 Total Bid: L/ / y 7 / ►`
P-3
This contract is issued by an organization which qualifies for exemption
pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales,
Excise and Use Tax Act.
Taxes. All equipment and materials not consumed by or incorporated into the
project construction, are subject to State sales taxes under House Bill 11,
enacted August 15, 1991.
The Contractor shall comply with City Ordinance 7278, as amended by City
Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29) ,
prohibiting discrimination in, employment practices.
The undersigned agrees to complete all work covered by these contract documents
within Seventy-five 75 Working Days from and after the date for commencing
work as set forth in the written Work order to be issued by the Owner, and to
pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility
Construction" as established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the
undersigned will execute the formal contract and will deliver an approved
Surety Bond for the faithful performance of this contract. The attached deposit
check in the sum of
Dollars ($ )
is to become the property of the City of Fort Worth, Texas, or the attached
Bidder's Bond is to be forfeited in the event the contract and bond are not
executed within the time set forth, as liquidated damages for delay and
additional work caused thereby.
The Contractor shall mobilize within ten (10) calendar days of the notice
given by the Construction Engineer for any locations. If the contractor fails
to begin the work within ten (10) calendar days, a $200 dollars liquidated
damage will be assessed per Block per day.
I (we) , acknowledge receipt of the following addenda to the plans and
specifications, all of the provisions and requirements of which have been taken
into consideration in preparation of the foregoing bid:
espectfully,submitt
Addendum No. 1 (Initials) 31&A Ux• ° �l�►`��rW"
Addendum No. 2 (Initials) Company N
Addendum No. 3 (Initials) By: -7-T A
Signature
n- ex#
Printed Name of Principal
R Address: 010"17
Ku"17 rW9
� /� (Seal)
Date: J Telephone: ~(-3-7Q'557" I
P-4
VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of
contracts to non-resident bidders. This law provides that, in order to be awarded a contract as
a low bidder, non-resident bidders(out-of-state contractors whose corporate offices or principal
place of business are outside the state of Texas) bid projects for construction, improvements,
supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the
same amount that a Texas resident bidder would be required to underbid a non-resident bidder
in order to obtain a comparable contract in the state in which the non-resident's principal place
of business is located. The appropriate blanks in Section A must be filled out by all out-of-state
or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state
or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Non-resident vendors in (give state), our principal place
of business, are required to be percent lower than resident
bidders by state law. A copy of the statute is attached.
Non-resident vendors in (give state), our principal
place of business are not required to underbid resident bidders.
B. Our principal place of business or corporate offices are in the State of Texas.
Bidder:
AM ICSA00
Company By (Plea a Pri t)
Address Signature
kat T(t4.4aof
City�Zip Title (Please Print)
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
i
FORT WORTH
f� city of Fort worth RECEIVED AUG 13 2003
I�
Minority and Women Business Enterprise Specifications
+ SPECIAL INSTRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
If the total dollar value of the contract is$25,000 or more,the MMBE goal is applicable.
If the total dollar value of the contract is less than$25,000, the MMBE goal is not applicable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business
Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements
and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid.
MMBE PROJECT GOALS
The City's MBEMBE goal on this project is %of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's MMBE Ordinance by
either of the following:
1. Meet or exceed the above stated MMBE goal,or
2. Good Faith Effort documentation,or;
°I 3. Waiver documentation, or;
4. Joint Venture.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department,within the following times allocated, in order
for the entire bid to be considered responsive to the specifications.
{�) 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid
U met or exceeded: opening date,exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
rte} Utilization Form,if participation is less than opening date,exclusive of the bid opening date.
IUP statedgoal:
3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
� + Utilization Form, if no MMBE participation: opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid
perform all subcontracting/supplier work: opening date,exclusive of the bid opening date.
5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid
to met or exceed goal. opening date,exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S MMBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED
NON-RESPONSIVE TO SPECIFICATIONS
Any questions, please contact the M/WBE Office at(817)871.6104.
Rev.5/30/03
ATTACHMENT IA
i
Page 1 of 4
FORT WORTH City of Fort Worth
Subcontractors/Suppliers Utilization Form
PRIME COMPANY NAME: —(- Check applicable block to describe prime
5Aon4,ASC.�5oL,P S.A. .Lf'1�.. 1 ij�,4rcei-' M/W/DBE NON-M/W/DBE
PROJECT NAME: �� C . c ,�Q� x4.�
/ BID DATE
A , rIJ
City's M/WBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER
t % % X13-0 05 0
Identify all subcontractors/suppliers you will use on this project
Failure to complete this form, in its entirety with requested documentation, and received by the Managing
Department on or before 5:00 p.m, five (5) City business days after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this
utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional
and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the
bid being considered non-responsive to bid specifications
M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or
currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,
Parker,Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 161 tier, a payment by a subcontractor to
its supplier is considered 2"d tier
ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have
been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification
Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business
Enterprise(DBE) is synonymous with MinorityNVomen Business Enterprise(MNVBE).
If hauling services are utilized, the prime will be given credit as long as the MNVBE listed owns and
operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease
trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The
M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for.the
Fees and commissions earned by the MNVBE Gs outlined in the lease agreement.
,p
' Rev.5/30/03
Q i
ATTACHMENT IA
FORT WORTH Page 2 of 4
Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e., Minority,Women and non-MAMBEs.
Please list M/WBE firms first,use additional sheets if necessary.
Certification N
(check one)
SUBCONTRACTORISUPPLIER T n
i Company Name i N T Detail Detail
Address e M W C X M Subcontracting Work Supplies Purchased Dollar Amount
T D W
Telephone/Fax r B B R O B
E E C T E
'w A
/oda/uJ, he
a9'7 A1601
fat
F,
bp-�ro7-�I a1�1o0�`1
r Po.�X 4-a"
U51TX ?5-J4 2
r goo
i
Qtro
C258s uE
Worq*jTK 7�r1
j "Qr44-
017-331-1W3
Jaw um
f
r
Rev.5/30/03
ATTACHMENT 1A
FORTWORTHf Page 3 of
I Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e., Minority,Women and non-MNVBEs.
Please list MNVBE firms first,use additional sheets if necessary.
i_
I Certification
(check one)
SUBCONTRACTOR/SUPPLIER T r
N T Detail Detail
F
CompanyAddress e M W C X p Subcontracting Work Supplies Purchased Dollar Amount
Telephone/Fax r B B R O E
E E C T E
Ir— A
r
I
Rev.5/30/03
ATTACHMENT 1A I
FORT WORTH Page 4 of 4
Total Dollar Amount of M/WBE Subcontractors/Suppliers $
Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $
The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval
of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a
Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of
I contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor
shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed
M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination.
By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including
!�. M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or
f examination of any books, records and files held by their company. The bidder agrees to allow the
transmission of interviews with owners, principals, officers, employees and applicable
subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work
performed by the MNV/DBE(s) on this contract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
from City work for a period of not less than three (3) years and for initiating action under Federal, State or
Local laws concerning false statements. Any failure to comply with this ordinance and create a material
breach of contract may result in a rmination of an irresponsible Offeror and barred from participating in
City work for a period of time ess than one (1)year.
A16' udlA'an
Authorized Signatur Printed Stpnnture
ri
ff)�
Title
l. Contact Name/Title(if different)
r-ene"a
• .. r r 617-371-55-W /6i7-37q-49g5:
Compa y Name Telephone and/or Fax
�•O �1l t(! i
riAddress E-mail Address
K .lcif T� cad7-4- A7 9003
[1 Clty/Strump Date
Rev.5/30/03
�dD
I
ATTACHMENT 1 B
FORT «O RT H Page 1 of 1
City of Fort Worth
Prime Contractor Waiver Form
PRIME COMPANY NAME: ((�� Y•_ I' Check applicable block to describe
`n�'f1 ?Q t(,f TGA Y. �• f'Yl�(Ct Pcl f ter
rim
M/W/DBE NON-MNWDBE
PROJECT NAME: J''��� t /� �,�,r�
1T�l�L7tA �U 'lu,u� BID DATE
AT Varlod-6 Loftfi4r) 1! � ' 'u � 7
City's M/WBE Project Goal: PROJECT NUMBER
i If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on
this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is
NO, then you must complete ATTACHMENT 1 C. This form is only applicable if bD-tll answers are yes.
Failure to complete,th s';form in;its entiretyand'be received by the`Mana4ina-Department on=or bef6re,5 00
p.m.,five(51-CitV;business days:after�bid,openino,exclusive of°the:bid opening date,will:result in'the bid.,
being considered non- responsive.to�.bid.specifications:
Will you perform this entire contract without subcontractors? YES
If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO
this is your normal business practice and provide an o erational profile of your business.
Will you perform this entire contract without suppliers? YES
If yes, please provide a detailed explanation that proves based on the size and scope of this project,
this is your normal business practice and provide an inventory profile of your business. NO
The bidder further agrees to provide, directly to the City upon request, complete and accurate information
regarding actual work performed by all subcontractors, including M/WBE(s)on this contract, the payment therefore
and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also
agrees to allow an audit and/or examination of any books, records and files held by their company that will
substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of
the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or
debarment from City work for a period of not less than three (3)years and for initiating action under Federal, State
or Local laws concerning fals nts. Any failure to comply with this ordinance creates a material breach of
contract may result in a termination of an irresponsible offeror and barred from participating in City work for a
period of tim not le s t an one 1 year.
151
onzed S• n lure
!I I Printed Signature
T'tle Contact Name(f different)
/b1-7_.37q_WX
Comparty Name Phone Number Fax Number
iN-eClx 07
Address _ E ail Address
1Y %IC94 A un w,,,! 7
City/State2i Date
Rev.5/30103
I
ATTACHMENT 1C
Page 1 of 3
FORT WORTH City of Fort Worth
Good Faith Effort Form
PRIME COMPANY NAME: n I' Check applicable block to describe
��aCC S �-.�'` bt` �.� -UZE �#IE�r�tt �1L1 M/W/DBE prime NON-M/W/DBE
PROJECT NAME: otvq, I)1 /�
I �/Yl�J `ru BID DATER. LT6J
Tillb
City's M/WBE Project Goal: PROJECT NUMBER
If you have failed to secure MNVBE participation and you have subcontracting and/or supplier opportunities or if your
DBE participation is less than the City's project goal,you must complete this form.
If the bidder's method of compliance with the MNVBE goal is based upon demonstration of a
"good faith effort", the bidder will have the burden of correctly and accurately preparing and
submitting the documentation required by the City. Compliance with each item, 1 thru 6 below,
shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or
knowing misrepresentation the facts or intentional discrimination by the bidder.
Failure to complete this form, in its entirety with supporting documentation, and received by the
Managing Department on or before 5:00 p.m.five(5) City business days after bid opening, exclusive of bid
opening date,will result in the bid being considered non-responsive to bid specifications.
1.) Please list each and every subcontracting and/or supplier opportunity) for the completion of this
ri project, regardless of whether it is to be provided by a M/WBE or non-M/WBE. (DO NOT LIST NAMES
OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the
FT-tier.
(Use additional sheets, if necessary)
List of Subcontracting Opportunities List of Supplier Opportunities
n
Rev.05/30/03
ef.
ATTACHMENT 1C
Page 2 of 3
2.) Obtain a current(not more than three(3)months old from the bid open date) list of M/WBE
subcontractors and/or suppliers from the City's MIWBE Office.
Yes Date of Listing I I
No
3.) Did you solicit bids from MIWBE firms,within the subcontracting and/or supplier areas previously
listed,at least ten calendar days prior to bid opening by mail,exclusive of the day the bids are
opened?
Yes (If yes,attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.)
No
4.) Did you solicit bids from MIWBE firms, within the subcontracting and/or supplier areas previously
listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are
� ^ opened?
Yes (If yes,attach list to include name of M/WBE firm,person contacted,phone number and date and time of contact.)
No
NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile
is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and
f documentation faxed.
NOTE: If the list of MIWBEs for a particular subcontracting/supplier opportunity Is ten (10) or less, the
bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M/WBEs for a
particular subcontracting/supplier opportunity Is ten (10) or more, the bidder must contact at least two-
thirds (213) of the list within such area of opportunity, but not less than ten to be in compliance with.
questions 3 and 4.
5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of
plans and specifications in order to assist the MfWBEs?
Yes
No
6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in
the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any
supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide
dispute concerning quotes,the bidder will provide for confidential in-camera access to and inspection
of any relevant documentation by City personnel.
Please use additional sheets, if necessa ,and attach.
bbb
Company Name Telephone Contact Person Scope of Work Reason for Rejection
Rev.05/30/03
ATTACHMENT 1C
Page 3 of 3
ADDITIONAL INFORMATION:
Please provide additional information you feel will further explain your good and honest efforts to obtain
Mf BE participation on this project.
The bidder further agrees to provide, directly to the City upon request, complete and
accurate information regarding actual work performed on this contract, the payment
thereof and any proposed changes to the original arrangements submitted with this bid.
The bidder also agrees to allow an audit and/or examination of any books, records and
files held by their company that will substantiate the actual work performed on this
contract, by an authorized officer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be grounds for
terminating the contract or debarment from City work for a period of not less than three
(3) years and for initiating action under Federal, State or Local laws concerning false
statements. Any failure to comply with this ordinance and creates a material breach of
contract may result in a determination of an irresponsible offeror and barred from
participating in City work for a period of time not less than one (1) year.
The undersigned certifies that the information provided and the M/WBE(s) listed
was/were contacted o faith. It is understood that any M/WBE(s) listed in
Attachment IC w' a contacted and the reasons for not using them will be verified by
the City' M Office.
thorized ign ture Printed Signature
Title Contact Name and Title(if different)
379-55WIfJM&M� 7- 17-X79-
. ex
Co !15LA�any amePhone Number Fax Number
0. 6tJC ( 11
Address Email Address
TX �11a 14EALIM41 7. xf)3-
City/Stat ip Date
Rev.05/30/03
1". 001
10821 W.Cleburne Road
Crowley, Texas 76036
Office(817)2974601/Fax(8 17)297-0437
PROPOSAL SUBMITTED TO PHONE DATE
Sutton&Associates (Rodger) 817-379-5577 Fax 817-379-6930 8/7/2003
STREET JOB NAME
PO Box 677 HMAC Surface Overt 2004-1
WY STATE AND ZIP CODE JOB LOCATION J08 PHONE
Keflet Texas 76244 Ft.Worth,Texas
We haaeby Submit specification and estimahea fa:
Unit of Unit Total
Item Description Measure Quantity Price Price
6 R&R Curb and Gutter LF 5,810 $14.00 81,340.00
7 R& R B"Driveway SY 200 $36.00 7,200.00
8 R& R 4"Sidewalk SY 100 $32.00 3,200.00
15 R&R 7"Valley Gutter SY 100 $65.00 6,500.00
16 New 7"Valley Gutter SY 100 $60.00 6,000.00
17 Std.Wheelchair Ramp SY 40 $45.00 1,800.00
19 New Curb&Gutter LF 100 $13.00 1.300.00
h 20 New 4"Sidewalk SY 100 $27.00 2,700.00
-
Total 110,040.00
Includes:Demolition,Disposal, Backfilling,Clean-up.
Excludes:Bonds,Permils,Testing,Major Traffic Control,Hctmix
hereby to furnish material and labor-complete in accordance with above specifications,for the sum ot:
dollars 110,040.00
Payment to be made as follows
Per City Contract
frra
HMDB19463YO604
II malarint u Woad b bn at apadrrod,Ali wait a ho onmplaled in o
ruo-l:l:a rumor ateerdvy In msdrrd xreer fear. Any alroraka:a Mviodmr
from-tore gMiReatim imokig;alta Say vrill ba ex"ad a dy aaea—k*t Authorized /F,
- erx,and rill heeamo a aka dayc aaet aral-bora tits niirrrare.All Signature `. �j•h����
ly—ru maiopt upm Oka,aeameatt aravaya beyard mramw,r), mo• his wapoeal oey b.xnlWmwn
to tarty ha.ra edo Say edar amen lasses.Our"elm w rally aae;aod by m it mi aaeapral wiwa�dayt.
by gedrasnY rAlapm 0tare inutaraa.
e ahtwe rxiws,rpwi6oatiora and enndiliow arc sadmil'ackxy and are hrahy
coopad. You arosutlrrread to da the wxk an npocified Paymant air be made Signature
ar oudirrW-bac.
oats nrnaeepurea Signature
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
SPECIAL PROVISIONS
FOR: H.M.A.C. SURFACE OVERLAY (2004-1)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930522520
1.SCOPE OF WORK: The work covered by these details and specifications
consists of the removal (only) of all existing traffic buttons, removal
and replacement of existing concrete curb and gutter and driveways and
existing base repair and the addition of a new surface layer of H.M.A.C.
for those streets designated as Mill Overlay (MOL) . For those streets
designated as Pulverized Overlay (POL) , the work consists of the same
removal and replacement items as described above, surface & base
rehabilitation of existing pavement with cement and the addition of a new
surface layer of H.M.A.C. These items are described in the Special
Provisions of these specifications. The work also consists of all other
miscellaneous items of construction to be performed as outlined in the
details and specifications which are necessary to satisfactorily complete
the work.
The Contractor shall mobilize within ten (10) calendar days of the
notice given by the Construction Engineer for any locations. If the
contractor fails to begin the work within ten (10) calendar days, a $200
dollars liquidated damage will be assessed per Block per day.
The contractor is encouraged to conduct site visits and survey all these
possibilities. The contractor shall verify these locations with the
Construction Engineer.
For street locations see list at the back of this document. At the sole
discretion of the City, the City reserves the right to add, delete or
substitute streets in this contract. The City also reserves the right to
increase or decrease quantities of individual pay items within the
contract provided that the total contract amount remains within plus or
minus (t) 25% of the contract award. The contractor is not entitled to
any additional compensation or renegotiation of individual pay item bid
prices.
All short cul-de-sac streets and turnouts that intersect with a street to
be repaired shall be included in this contract, even though they may not
be listed on a Work Order due to their size. The contractor shall mill,
clean, apply tack coat, overlay and adjust facilities.
Total quantities given in the bid proposal may not reflect actual
quantities, but represent the best estimate based on a reasonable effort
of investigation; however, they are given for the purpose of bidding on
and awarding the contract.
SP-1
2. Contract will be awarded to the lowest responsible bidder.
3. The Contractor agrees to complete the Contract within the allotted number
of days. If the Contractor fails to complete the work within the number
of days specified, liquidated damages shall be charged, as outlined in
Part 1, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard
Specification for Construction of the City of Fort Worth, Texas.
4. The City reserves the right to abandon, without obligation to the
Contractor, any part of the project, or the entire project, at any time
before the Contractor begins any construction work authorized by the City.
S. This contract and project are governed by the two following published
specifications, except as modified by these Special Provisions:
STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF
FORT WORTH and STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH
CENTRAL TEXAS. General Provisions shall be those of the Fort Worth
document rather than Division 1 of the North Central Texas document.
A copy of these specifications may be purchased at the office of the
Department of Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal
Building, Fort Worth, Texas 76102. The specifications applicable to each
pay item are indicated in the call-out for the pay item by the designer.
If not shown, then applicable published specifications in any of these
documents may be followed at the discretion of the Contractor.
6. Bidders shall not separate, detach or remove any portion, segment or
sheets from the contract documents at any time. Failure to bid or fully
execute contract without retaining contract documents intact may be
grounds for designating bids as "non-responsive" and rejecting bids or
voiding contract as appropriate and as determined by the Director of the
Transportation and Public Works Department.
7. The Contractor shall be responsible for defects in this project due to
faulty materials and workmanship, or both, for a period of two (2) years
from date of final acceptance of this project by the City of Fort Worth
and will be required to replace at his expense any part or all of the
project which becomes defective due to these causes. See Special
Instructions to Bidders Item No. 14 for further requirements.
8. TRAFFIC CONTROL: The contractor will be required to obtain a "Street Use
Permit" prior to starting work. As part of the "Street Use Permit" a
traffic control plan is required. The Contractor shall be responsible for
providing traffic control during the construction of this project
consistent with the provisions set forth in the "Latest Edition Texas
Manual on Uniform Traffic Control Devices for Streets and Highways" issued
under the authority of the "State of Texas Uniform Act Regulating Traffic
on Highways", codified as Article 6701d Vernon's Civil Statues, pertinent
sections being Section Nos. 27, 29, 30 and 31.
A traffic control Man shall be submitted for review to Mr.. Charles R.
Burkett, City Traffic Engineer 0817-871-8770 at least 10 workina days
SP-2
r
r
Prior to the preconstruction conference. Although work will not begin
until the traffic control panel has been reviewed, the Contractor's time
will begin in accordance with the time frame established in the Notice to
the Contractor.
rThe Contractor will not remove any regulatory sign, instructional sign,
street name sign, or other sign which has been erected by the City. If it
is determined that a sign must be removed to permit required construction,
the Contractor shall contact the Transportation and Public Works Depart-
ment, Signs and Markings Division (phone number 871-7738) , to remove the
sign. In the case of regulatory signs, the Contractor must replace the
permanent sign with a temporary sign meeting the requirements of the above
referenced manual and such temporary sign must be installed prior to the
removal of the permanent sign. if the temporary sign is not installed
correctly or if it does not meet the required specifications, the
permanent sign shall be left in place until the temporary sign
requirements are met. When construction work is completed to the extent
that the permanent sign can be re-installed, the Contractor shall again
contact the Signs and Markings Division to re-install the permanent sign
and shall leave his temporary sign in place until such re-installation is
completed.
The Contractor shall limit his work within one continuous lane of traffic
at a time to minimize interruption to the flow of traffic upon the
approval of the City Engineer.
Work shall not be performed on certain locations/streets during "peak
traffic periods" as determined by the City Traffic Engineer and in
accordance with the applicable provision of the "City of Fort Worth
Traffic Control Handbook for Construction and Maintenance Work Areas."
See Special Instructions to Bidders Item No. 15, for further work time
restrictions on Ozone Alert Days with substantial use of motorized
equipment.
9. PAYMENT: The Contractor will receive bi-weekly payment (minus 5%
retainage) from the City for all work for each pay period. Payment of the
remaining amount shall be made with the final payment, and upon acceptance
of the project. See Special Instructions to Bidders Item No. 14 for
further requirements.
10. DELAYS: The Contractor shall receive no compensation for delays or
hindrances to the work, except when direct and unavoidable extra cost to
the Contractor is caused by the failure of the City to provide information
or material, if any, which is to be furnished by the City. When such
extra compensation is claimed a written statement thereof shall be
presented by the Contractor to the Engineer and if by him found correct
shall be approved and referred by him to the Council for final approval or
disapproval; and the action thereon by the Council shall be final and
binding. If delay is caused by specific orders given by the Engineers to
stop work, or by the performance of extra work, or by the failure of the
City to provide material or necessary instructions for carrying on the
SP-3
work, then such delay will entitle the Contractor to an equivalent
extension of time, his application for which shall, however, be subject to
the approval of the City and no such extension of time shall release the
Contractor or the surety on his performance bond from all his obligations
hereunder which shall remain in full force until the discharge of the
contract.
11. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a
manner as to create a minimum of interruption to traffic and pedestrian
facilities and to the flow of vehicular and pedestrian traffic within the
project area. Contractor shall protect construction, as required by
Engineer, by providing barricades.
Barricades, warning and detour signs shall conform to the Standard
Specifications "Barriers and Warning and/or Detour Signs", Item 524,
and/or as shown on the plans.
Construction signing and barricades shall conform with the latest edition
of the "Texas Manual on Uniform Traffic Control Devices, Vol. No. 11'.
12. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill
material, the Contractor shall advise the Director of the Department of
Engineering acting as the City of Fort Worth's Flood Plain Administrator
("Administrator") , of the location of all sites where the contractor
intends to dispose of such material. Contractor shall not dispose of such
material until the proposed sites have been determined by the
Administrator to meet the requirements of the Flood Plain Ordinance of the
City of Fort Worth (Ordinance No. 10056) and a flood plain permit issued.
All disposal sites must be approved by the Administrator to ensure the
filling is not occurring within a flood plain without a permit. A flood
plain permit can be issued upon approval of necessary engineering studies.
No fill permit is required if disposal sites are not in a flood plain.
Approval of the Contractor's disposal sites shall be evidenced by a letter
signed by the Administrator stating that the site is not in a known flood
plain or by a Flood Plain Fill Permit authorizing fill within the flood
plain. Any expenses associated with obtaining the fill permit, including
any necessary engineering studies, shall be at Contractor's expense. In
the event that the Contractor disposes of spoil/fill material at a site
without a fill permit or a letter from the Administrator approving the
disposal site, upon notification by the Director of the Department of
Engineering, Contractor shall remove the spoil/fill material at its
expense and dispose of such materials in accordance with the Ordinance of
the City and this section.
- 13. During the construction of this project, the Contractor shall comply with
r present zoning requirements of the City of Fort Worth in the use of vacant
property for storage purposes.
14. Final cleanup work shall be done for this project as soon as the work has
been completed. No more than seven days shall elapse after completion of
construction before the roadway and right-of-way is cleaned up to the
satisfaction of the Engineer.
SP-4
15. PROPERTY ACCESS: Access to adjacent property shall be maintained at all
times unless otherwise directed by the Engineer.
16. CONSTRUCTION SCHEDULE: It shall be the responsibility of the Contractor
to furnish the Construction Engineer, prior to construction, a schedule
outlining the anticipated time each phase of construction will begin and
be completed, including sufficient time being allowed for cleanup.
17. SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES: The following
procedures will be followed regarding the subject item on this contract:
(1) A warning sign not less than five inches by seven inches, painted
yellow with black letters that are legible at twelve feet shall be
placed inside and outside vehicles such as cranes, derricks, power
shovels, drilling rigs, pile drivers, hoisting equipment or similar
apparatus. The warning sign shall read as follows:
"WARNING --UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF
HIGH VOLTAGE LINES."
(2) Equipment that may be operated within ten feet of high voltage lines
shall have an insulating cage-type of guard about the boom or arm,
except back hoes or dippers, and insulator links on the lift hood
connections.
(3) When necessary to work within six feet of high voltage electric
N Ir lines, notification shall be given the power company (TU Electric
Service Co.) which will erect temporary mechanical barriers, de-
energize the line, or raise or lower the line. The work done by the
r power company shall not be at the expense of the City of Fort Worth.
The notifying department shall maintain an accurate log of all such
calls to TU Electric Service Company, and shall record action taken
J in each case.
(4) The Contractor is required to make arrangements with the TU Electric
Service Company for the temporary relocation or raising of high
voltage lines at the Contractor's sole cost and expense.
(5) No person shall work within six feet of a high voltage line without
protection having been taken as outlined in Paragraph (3) .
18. RIGHT TO AUDIT:
Contractor agrees that City shall, until the expiration of three (3) years
after final payment under this contract is made by City, have access to
and the right to examine and photocopy any directly pertinent books,
documents, papers and records of Contractor involving transactions
relating to this contract. Contractor agrees that City shall have access
during normal working hours to all necessary Contractor facilities and
shall be provided adequate and appropriate workspace in order to conduct
SP-5
audits in compliance with the provisions of this section.
Contractor further agrees to include in all its subcontracts hereunder a
provision to the effect that the subcontractor agrees that City shall,
until the expiration of three (3) years after final payment under the
subcontract, have access to and the right to examine any directly
pertinent books, documents, papers and shall be provided adequate and
appropriate work space, in order to conduct audits in compliance with the
provisions of this article together with Article VI. City shall give the
subcontractor reasonable advance notice of intended audits.
Contractor and subcontractor agree to photocopy such documents as may be
requested by City. City agrees to reimburse Contractor and/or
subcontractor for the cost of copies at the rates as contained in the
Texas Administrative Code at the time payment is made.
CONSTRUCTION
The City of Fort Worth maintains a "CONFINED SPACE ENTRY PROGRAM" for its
employees and all contractors and their sub-contractors must comply with
this program as a condition of the contract. All active sewer manholes,
regardless of depth, are defined as "permit required confined spaces".
Contractors will be required to complete the "CONFINED SPACE ENTRY PERMIT"
used by the Fort Worth Water Department (Field Operations Division) for
each entry and possess and use the equipment necessary to comply with this
program. The cost of complying with this program will be considered
subsidiary to the pay items involving work in confined spaces (e.g. vacuum
testing, cleaning, televising, construction, etc.) .
NON-PAY ITEM NO. 1 - SPRINKLING FOR DUST CONTROL:
All applicable provisions of Standard Specifications Item No. 200,
"Sprinkling for Dust Control" shall apply. However, no direct payment
will be made for this item and it shall be considered incidental to this
contract.
NON-PAY ITEM NO. 2 - REMOVAL OF TRAFFIC BUTTONS AND TEMPORARY LANE TAPE:
All traffic buttons shall be removed from the existing asphalt surface
before resurfacing begins. The contractor shall be responsible for the
removal of all buttons. Upon completion of the job the City will install
new buttons after proper notification.
The contractor shall also be responsible for all materials, equipment and
F, labor to place temporary adhesive lane marking tape, at locations as
directed by the Construction Engineer, to direct traffic flow until
permanent markers are installed.
The contractor shall notify the Construction Engineer to arrange for the
1 replacement of the buttons and adhesive lane markers (arrows, etc.) . All
costs to the contractor shall be figured as subsidiary to this contract.
SP-6
NON-PAY ITEM NO. 3 - LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES:
The contractor shall be responsible for locating and marking all
previously exposed manholes and water valves in each street of this
contract before the resurfacing process commences for a particular street.
The contractor shall attempt to include the Construction Engineer (if he
is available) in the observation and marking activity. In any event a
street shall be completely marked a minimum of two (2) working days before
resurfacing begins on any street. Marking the curbs with paint is a
p¢.
recommended procedure.
It shall be the contractors responsibility to notify the utility companies
that he has commenced work on the project. As the resurfacing is completed
(within same day) the contractor shall locate the covered manholes and
valves and expose them for later adjustment. Upon completion of a street
the contractor shall notify the utilities of this completion and indicate
the start of the next one in order for the utilities to adjust facilities
accordingly. The following are utility contact persons:
Company Telephone Number Contact Person
Southwestern Bell Telephone 817-338-6202 Mr. Gary Tillory
Oncor Electric- Downtown 817-215-6424 Mr. Scott Ring
other than Downtown 817-215-6688 Mr. Robert Martinex
Oncor Gas - N. of Trinity River 817-624-6066 Mr. Danny Cleveland
S. of Trinity River 817-215-4306 Mr. Tony Marlow
CFV Street Light and Signal 871-8100 Mr. Edward Whitley
Of course, under the terms of this contract, the contractor shall complete
adjustment of the storm drain and Water Department facilities, one traffic
lane at a time within five (5) working days after completing the laying of
proposed H.M.A.C. overlay adjacent to said facilities.
Any deviation from the above procedure and allotted working days may
result in the shut down of the resurfacing operation by the Construction
Engineer.
The contractor shall be responsible for all materials, equipment and labor
to perform a most accurate job and all costs to the contractor shall be
figured subsidiary to this contract.
PAY ITEM NO. 1 - PROJECT DESIGNATION SIGN:
The Contractor shall construct and install two (2) Project Designation
Signs and it will be the responsibility of the Contractor to maintain the
signs in a presentable condition at all times on each project under
construction. Maintenance will include painting and repairs as directed
by the Engineer.
SP-7
It will be the responsibility of the Contractor to have the individual
project signs lettered and painted in accordance with the enclosed detail.
The quality of the paint, painting, and lettering on the signs shall be
approved by the Engineer.
The height and arrangement of the lettering shall be in accordance with
the enclosed detail.
The sign shall be constructed of 3/4" fir plywood, grade A-C (exterior) or
better.
These signs shall be installed on barricades or as directed by the
Engineer, and in place at the project site upon commencement of construc-
tion.
The work, which includes the painting of the signs, installing and
removing the signs, furnishing the materials, supports and connections to
the support, and maintenance shall be to the satisfaction of the Engineer.
The unit price pre bid per each will be full compensation for all labor,
material, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 2 - UTILITY ADJUSTMENT-
0
This item is included for the basic purpose of establishing a contract
price which will be comparable to the final cost of making necessary
adjustments required due to street improvements to water, sanitary sewer,
and natural gas service lines and appurtenances where such service lines
and appurtenances are the property owner's responsibility to maintain. An
arbitrary figure has been placed in the Proposal; however, this does not
guarantee any payment for utility adjustments, neither does it confine
utility adjustments to the amount shown in the Proposal. It shall be the
Contractor's responsibility to provide the services of a licensed plumber
to make the utility adjustments determined necessary by the Engineer. No
payment will be made for utility adjustments except those adjustments
determined necessary by the Engineer. Should the Contractor damage
service lines due to his negligence, where such lines would not have
required adjustment or repair otherwise, the lines shall be repaired and
adjusted by the Contractor at the Contractor's expense.
The payment to the Contractor for utility adjustments shall be the actual
cost of the adjustments plus ten percent (10%) to cover the cost of bond
and overhead incurred by the Contractor in handling the utility adjust-
ments.
PAY ITEM NO. 3 - MANHOLE ADJUSTMENT:
ft. This item shall include adjusting the tops of existing manhole to match
proposed grade as shown on the plans, in the detail at the back of this
document or as directed by the Engineer., tandard Specification Item Nos.
SP-8
15`,t✓�J
y� y7
450 "Adjusting Manholes and Inlets" and 406 "Concrete for Structures"
shall apply except as herein modified.
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Work shall be completed and street open to
traffic within seven (7) calendar days.
If the contractor fails to complete the work within seven (7) calendar
days, a $100 dollars liquidated damage will be assessed per each manhole
per day.
Prior to beginning of work, the Contractor shall make an inventory of the
condition of existing manholes. The Engineer will field verify this
inventory and provide the Contractor replacements for broken manhole
covers. The contractor shall replace the manhole covers which are damaged
during construction at no cost to the City.
Included as part of this pay item shall be the application of a
cold-applied preformed flexible butyl rubber or plastic sealing compound
for sealing interior and/or exterior joints on concrete manhole sections,
as per current City Water Department Special Conditions.
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 4 - WATER VALVE BOXES ADJUSTMENT:
Contractor will be responsible for adjusting water valve boxes to match
new pavement grade. The water valves themselves will be adjusted by City
of Fort Worth Water Department forces.
Prior to beginning of work, the Contractor shall make an inventory of the
condition of existing water valve boxes. The Engineer will field verify
this inventory and provide the Contractor replacements for broken valve
boxes. The contractor shall replace the valve boxes which are damaged
during construction at no cost to the City.
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Work shall be completed and street open to
traffic within seven (7) calendar days.
If the contractor fails to complete the work within seven (7) calendar
days, a $100 dollar liquidated damage will be assessed per each water
valve box per day.
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessary to complete the
work.
SP-9
PAY ITEM NO. 5 - WATER METER BOX ADJUSTMENT:
This item only apply when the adjacent curb and gutter has been determined
to be removed and replaced as directed by the Engineer. The adjustment
shall include raising or lowering the existing water meter box to the
proper grade.
The unit price pre bid per each will be full compensation for all labor,
materials, equipment, tools, and incidentals necessary to complete the
work.
PAY ITEM NO.6-REMOVAL AND REPLACEMENT OF CONCRETE CURB AND GUTTER:
These provisions require the contractor to remove all failed existing curb
and gutter, as designated by the Construction Engineer, and replace with
standard concrete curb and gutter, laydown curb and gutter, or in like
kind, as governed by the standard City Specifications, Item No. 104
"Removing Old Concrete", Item No. 502 "Concrete Curb and Gutter", and
Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb and gutter
are as shown in Drawing No. S-S5 of the Standard Specifications.
Contractor shall sawcut the curb and gutter and pavement prior to removal.
Included, and figured subsidiary to this unit price, will be the required
sawcut excavation, as per specification Item No. 106 "Unclassified Street
Excavation", into the street to aid in the construction of the curb and
gutter. The pay limit will be 9" out from the gutter lip, with same day
haul-off of the removed material to a suitable dump site. The street void
shall be filled with H.M.A.C. Type I'D" mix as per specification No. 300
"Asphalts, Oils, and Emulsions", Item No. 304 "Prima Coat" and Item No.
312"Hot Mix Asphaltic concrete" and compacted to standard City densities.
Top soil as per specification Item No. 116 "Top Soil", if needed, shall be
added and leveled to grade behind the curb. Existing improvements within
0 the parkway such as water meters, sprinkler system, etc. damaged during
construction shall be replaced with same or better at no cost to the City.
Backfill for curb and gutter shall be completed within fourteen (14)
calendar days from the day of demolition to date of completion. If the
contractor fails to complete the work within fourteen (14) calendar days,
a $100 dollar liquidated damage will be assessed per block per day.
The unit price bid per linear foot shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
-: PAY ITEM NO. 7 -REMOVAL AND REPLACEMENT OF 6" CONCRETE DRIVEWAYS:
This item shall include the removal and replacement of existing concrete
driveways, due to deterioration or in situations where curb and gutter is
replaced to adjust grades to eliminate ponding water with same day haul-
off of the removed material to a suitable dump site. For specifications
governing this item see Item No. 104 "Removing Old Concrete", Item No.
504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway
SP-10
are as shown in Drawing No. S-S5 of the Standard Specifications.
The unit price bid per square yard shall be full compensation for all
_ labor, material, equipment, supplies, and incidentals necessary to
complete the work.
PAY ITEM NO. 8 - REMOVAL AND REPLACEMENT OF 4" CONCRETE SIDEWALK:
This item shall include the removal and replacement of existing concrete
sidewalk due to failure or in situation where curb and gutter is replaced
to adjust grades to eliminate ponding water with same day haul-off of the
removed material to a suitable dump site. For specifications governing
this item see Item No. 104 "Removing Old Concrete", and Item No. 504
"Concrete Sidewalk and Driveways".
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, supplies, and incidentals necessary to
r complete the removal and replacement work.
1
PAY ITEM NO.9-REMOVAL & REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE:
The contractor shall remove all existing deformed H.M.A.C. pavement and/or
bad base material that shows surface deterioration and/or complete
failure. The Engineer will identify these areas upon which time the
contractor will begin work. The failed area shall be saw cut, or other
similar means, out of the existing pavement in square or rectangular
fashion. The side faces shall be cut vertically and all failed and loose
material excavated. As a part of the excavation process, all
unsatisfactory base material shall be removed, if required, to a depth
sufficient to obtain stable sub-base. The total depth of excavation could
range from a couple of inches to include the surface-base-some sub-base
removal for which the Engineer will select the necessary depth. The
i remaining good material shall be leveled and uniformly made ready to
accept the fill material. All excavated material shall be hauled off site,
the same day as excavated, to a suitable dump site.
I
After satisfactory completion of removal as outlined above, the contractor
shall place the permanent pavement patch, with Type "D" surface mix. This
item will always be used even if no base improvements are required. The
proposed H.M.A.C. repair shall match the existing pavement section or the
depth of the failed material, whichever is greater. However, the patch
' thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C.
pavement thickness will not exceed 611. Before the patch layers are
applied, any loose material, mud and/or water shall be removed. A liquid
asphalt tack coat shall be applied to all exposed surfaces. Placement of
the surface mix lifts shall not exceed 3 inches with vibrator compactions
to follow each lift. Compactions of the mix shall be to standard densities
of the City of Fort Worth, made in preparation to accept the recycling
process.
All applicable provisions of Standard Specification Item Nos. 300
"Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot-Mix
SP-11
Asphaltic Concrete" shall govern work.
The unit price bid per cubic yard shall be full compensation for all
materials,labor,equipment and incidentals necessary to complete the work.
PAY ITEM NO. 10 - GRADED CRUSHED STONES:
This item shall be used to repair the failed base material in areas exceed
8" deep as directed by the Engineer. The material shall be graded crushed
stones.
For specifications governing this item see Item No. 208 "Flexible Base".
The unit price bid per cubic yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
PAY ITEM NO. 11 - WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE:
1. Description
This item shall consist of milling the existing pavement from the lip
of gutter at a depth of 2" and transitioning to match the existing
pavement (0" cut) at a minimum width of 51 . The existing pavement to
be milled will either be asphalt, concrete, or brick pavement. The
removal and disposal of the milled materials shall be as directed by
the Engineer. The milled surface shall provide a smooth surface free
from gouges, ridges, oil film, and other imperfections of workmanship
and shall have a uniform textured appearance. In all situations where
the existing H.M.A.C. surface contacts the curb face the wedge milling
shall include the removal of the existing asphalt covering the gutter
up to and along the face of curb.
The wedge milling operations for this project will be performed in a
continuous manner along both sides of the street. Details of milling
locations are at the back of this document. Contractor is required to
begin the overlay, within five (5) calendar days from the date of the
wedge milling completion of any one street. Should the contractor fail
to meet this condition, the wedge milling will be shut down, and
liquidated damage of $500.00 per day per street will be assessed until
all wedge milled streets are overlayed. The overlay, once begun on a
street shall continue uninterrupted until complete.
The Contractor shall haul-off the removed material to a suitable dump
site.
2. Equipment
The equipment for removing the pavement surface shall be a power
operated milling machine or other equal or better mechanical means
capable of removing, in either one pass or two passes, the necessary
pavement thickness in a five-foot minimum width. The equipment shall
SP-12
be self-propelled with sufficient power, traction and stability to
maintain accurate depth of cut and slope.
The machine shall be equipped with an integral loading and reclaiming
means to immediately remove material being cut from the surface of the
roadway and discharge the cuttings into a truck, all in one operation.
Adequate back-up equipment (mechanical street sweepers, loaders, water
truck, etc.) and personnel will also be provided to keep flying dust
to a minimum and to insure that all cuttings are removed from street
surface daily. Stockpiling of planed material will not be permitted on
the project site unless designated by the Engineer. The machine shall
be equipped with means to control dust created by the cutting action
and shall have a manual system providing for uniformly varying the
depth of cut while the machine is in motion thereby making it possible
to cut flush to all inlets, manholes, or other obstructions within the
paved area. The speed of the machine shall be variable in order to
leave the desired grid pattern specified under Surface Texture.
The unit price bid per linear feet shall be full compensation for all
labor, material, equipment, tools, and incidentals necessary to
complete the work.
PAY ITEM NO. 12 - BUTT JOINTS - MILLED:
Description:
This item requires the contractor to mill "butt joints" into the existing
surface, in association with the wedge milling operation (PAY ITEM NO. 11)
to the depth and at locations as described below. The butt joint will
provide a full width transition section, whereby the new overlay shall
maintain constant depth at the point the new overlay is terminated and the
new surface elevation matches the existing pavement. The construction
activities, performance standards and equipment needed for the butt joints
milling operations shall be governed by the special provisions of Pay Item
No. 11 - Wedge Milling. The configuration of the butt joints is described
in more detail below. General details of butt joint locations - along
with wedge milling in general - are shown in plan form at the back of this
document.
Construction Details:
Prior to the milling of the butt joints, the contractor shall consult with
the construction Engineer for proper location of these joints and verify
that the selected limits of the projects street are correct.
The general locations for butt joints are at all beginning and ending
points of streets listed in the project and as more graphically detailed
at the back of this specification book. The joints are also required on
both sides of all railroad tracks and concrete valley gutters, bridge
decks and culverts and all other items which transverse the street and end
the continuity of the asphalt surface. Each butt joint shall be 20 feet
long and milled out across the full width of the street section to a
SP-13
tapered depth of 2". This milled area shall be tapered within the 20 feet
to a depth from 0" to 211 at a line adjacent to the beginning and ending
points or intermediate transverse items. This butt joint - when overlayed
- will consist of an asphalt section that will transition the new overlay
to match the existing pavement elevation.
The contractor shall provide a temporary wedge of asphalt at all butt
joints to provide a smooth ride over the bump.
Measurement and Payment:
Butt joints as prescribed above, will be measured by the unit of each butt
joint milled. The disposal of excess material involved will not be
measured for payment.
Each butt joint-milled, measured as above, complete-in place-in accordance
with these specifications, will be paid for at the unit price shown in the
proposal for "Butt Joints". The unit price bid per each shall be full
compensation for all milling, including material haul-off, tools, labor,
equipment and incidentals necessary to complete the required work.
PAY ITEM NO. 14 - 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) :
All applicable provisions of Standard Specifications, Item Nos. 312 "Hot-
Mix Asphaltic Concrete", 300 "Asphalts, Oils and Emulsions", 304 "Prime
Coat", and 313 "Central Plant Recycling-Asphalt Concrete" shall apply to
the construction methods for this portion of the project.
Standard Specification 312.5 (1) shall be revised as follows: The prime
coat, tack coat, or the asphaltic mixture shall not be placed unless the
air temperature is fifty (50) degrees Fahrenheit and rising, the tempera-
ture being taken in the shade and away from artificial heat. Asphaltic
material shall also not be placed when the wind conditions are unsuitable
in the opinion of the Engineer.
The contractor shall furnish batch design of the proposed hot mix
asphaltic concrete for City approval 48 hours prior to placing the
H.M.A.C. overlay. The City will provide laboratory control as necessary.
The unit price bid per square yard of H.M.A.C, complete and in place,
shall be full compensation for all labor, materials, equipment, tools, and
incidentals necessary to complete the work.
PAY ITEM NO.15-REMOVAL & REPLACEMENT OF 7" CONCRETE VALLEY G MER:
This item shall include the removal and reconstruction of existing
concrete valley gutters at locations to be determined in field:
Removal of existing concrete valley, asphalt pavement, concrete base, curb
and gutter, and necessary excavation to install the concrete valley
gutters all shall be subsidiary to this pay item. Furnishing and placing
of 2:27 concrete base and crushed limestone to a depth as directed by the
Engineer and necessary asphalt transitions as shown in the concrete valley
SP-14 ----
r
J�6 c'SL1 LSU��1�ru
gutter details, shall be subsidiary to this Pay Item.
See standard specification Item No. 314, "Concrete Pavement", Item 312
"Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item
No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base",
Drawing No. S-S6 and detail enclosed. Measurement for final quantities of
valley gutter will be by the square yard of concrete pavement and the curb
and gutter section will be included.
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu
of Crushed Stone at no additional cost. See Item No. 314 "Concrete
Pavement".
Asphalt base material may be required at times as directed by the Engineer
x to expedite the work at locations identified in the field.
R The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Contractor shall work on one-half of
Valley Gutter at a time, and the other half shall be open to traffic. Work
shall be completed on each half within seven (7) calendar days.
If the contractor fails to complete the work on each half within seven (7)
calendar days, a $100 dollars liquidated damage will be assessed per each
half of valley gutter per day.
The unit price bid per square yard for Concrete Valley as shown on the
proposal will be full compensation for materials, labor, equipment, tools
and incidentals necessary to complete the work.
PAY ITEM NO. 16 - NEW 7" CONCRETE VALLEY GUTTER:
" This item shall include the construction of concrete valley gutters at
various locations to be determined in field.
Removal of existing, asphalt pavement, concrete base, curb and gutter, and
necessary excavation to install the concrete valley gutters all shall be
subsidiary to this pay item. Furnishing and placing of 2:27 concrete base
and crushed limestone to a depth as directed by the Engineer and necessary
asphalt transitions as shown in the concrete valley gutter details shall
be subsidiary to this Pay Item.
See standard specification Item No. 314, "Concrete Pavement", Item 312
"Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item
No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base",
Drawing No. S-S6 and detail enclosed. Measurement for final quantities of
valley gutter will be by the square yard of concrete pavement and the curb
and gutter section will be included.
Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu
of Crushed Stone at no additional cost. See Item No. 314, "Concrete
Pavement".
SP-15
The concrete shall be designed to achieve a minimum compressive strength
of 3000 pounds per square inch. Contractor shall work on one-half of
valley gutter at a time, and the other half shall be open to traffic. Work
shall be completed on each half within seven (7) calendar days.
If the Contractor fails to complete the work on each half within seven (7)
calendar days, a $100 dollars liquidated damage will be assessed per each
half of valley gutter per day.
The unit price bid per square yard for Concrete Valley as shown on the
proposal will be full compensation for materials, labor, equipment, tools
and incidentals necessary to complete the work.
PAY ITEM NO. 17 - NEW 4" STANDARD WHEELCHAIR RAMPS
The Contractor shall construct standard concrete wheelchair ramps as shown
on the enclosed details, or as directed by the Engineer.
The removal of existing substandard wheelchair ramps and sidewalk as
required for the installation of new wheelchair ramps shall be subsidiary
to this pay item. The removal and replacement of existing curb and gutter
as required for the installation of new wheelchair ramps shall be included
in Pay Item 6 (Removal and Replacement of Curb and Gutter) . Pay limits for
laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-
1) . The pay limit will extend from 9" outside the lip of gutter to 15"
back from the face of curb. Any asphalt tie-in shall be subsidiary to the
curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will
start 15" back from the face of curb and encompass the remainder of the
ramp and sidewalk.
All applicable provision of standard Specifications Item 104 "Removing Old
Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as
herein modified.
All concrete flared surface shall be colored with LITHOCHROME color
hardener as manufactured by L.M. Scofield Company or equal. The color
hardener shall be brick red color and dry-shake type, and shall be used in
accordance with manufactures instructions. Concrete stain may be applied
after concrete is poured (Product sold by BAER) .
"Contractor shall provide a colored sample concrete panel of one foot by
one foot by three inches dimension, or other dimension approved by the
Engineer, meeting the aforementioned specification. The sample, upon
approval by the Engineer, shall be the acceptable standard to be applied
for all construction covered in the scope of this pay item.
The method of application shall be by screen, sifter, sieve or other means
in order to provide for a uniform color distribution."
The unit price bid per square yard for 4" standard wheelchair ramp as
shown on the proposal will be full compensation for materials, labor,
equipment, tools and incidentals necessary to compete the work.
SP-16
PAY ITEM NO. 18 - 6" PERFORATED PIPE SUBDRAIN:
This item shall consist of furnishing and installing 6" perforated
subdrain and filter material all as shown on the enclosed details, or as
directed by the Engineer.
All applicable provision of standard Specifications Item 500 "SUBDRAINS"
shall apply except as herein modified. The pipe material shall be poly
vinyl chloride (PVC) with the standard dimensional ratio of 35 (SDR35) and
meet the ASTM D 1784. Filter fabric shall have the capability of passing
ground water without transporting the soil placed around the filter
fabric. The fabric shall be constructed exclusively of synthetic
thermoplastic fibers and may be either woven or nonwoven to form a mat of
uniform quality. Fabric fibers may be either continuous or discontinuous
and oriented in either a random or a aligned pattern throughout the
fabric. The fabric shall be mildew resistant, rot proof, shall be
satisfactory for use in a wet soil and aggregate environment, contain
ultraviolet stabilizers and have nonravelling edges.
The fabric shall meet the following requirements when sampled and tested
in accordance with the methods indicated:
Test
Original Physical Properties Method Requirements
Fabric weight, on an ambient SDHPT Test Method 4.0 minimum for under
temperature air-dried tension Tex-616-J"Testing drains and Slope
free sample, expressed in of Construc tion Stabilization, 6.0
oz/sq. yd. Fibers" minimum for Gabions
Revetment
Water flow rate by falling Tex-616-J 80 minimum
head method, 7.9 inches (20
cm) to 3.9 inches (10 cm) on 2
inch ID cylinder with 1 inch
diameter orifice, with flow
rate expressed in gal/sq.
4P ft/minute.
i
Breaking load in either ASTM Designation: D 100 minimum
machine or cross-machine 1682 grab method G
direction, expressed in as modified by
pounds. Tex--616-J
Equivalent opening size (IIS CW-02215, IIS Army 70 to 100
Standard sieve no.) Corps of Engineers,
Civil Works
Construction Guide
Specification.
"Plastic Filter
Fabric", November,
1977.
SP-17
"Apparent elongation" at ASTM Designation: D 100 maximum
breaking load in either 1682 grab method G
machine or cross-machine as modified by
direction, expressed as Tex-616-J
percent.
The "Filter Fabric" shall be installed in accordance with the
manufacturer's recommendations, as indicated or as directed by the
Engineer. When lapping is required, it shall be in accordance with the
manufacturer's recommendations. Backfilling around the Filter Fabric shall
be done in such a way as not to damage the Filter Fabric material during
the placement.
The unit price bid per L.F. shall be full compensation for all labor,
materials, equipments, tools, and incidentals necessary to complete the
work.
PAY ITEM NO. 21 - 8" PAVEMENT PULVERIZATION:
Contractor shall pulverize the existing pavement to a depth of 811. After
pulverization is completed, contractor shall temporarily remove and store
the 8" deep pulverized material, then cut the base 2" to provide place for
the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8"
from the existing pulverized surface. After the undercut operation is
completed, contractor shall spread, mix, and compact the pulverized
material to a 95% compaction per City's Standard Specifications or as
directed by the Engineer in the field. A 3.5% portland cement shall be
used to mix the pulverized material.
If the existing pavement has a combination of 10" H.M.A.0 and crushed
stone/gravel, undercut will not be required, the contractor will pulverize
10" inches, the 2" inch cut will be taken from the 10" pulverized
material. (see soil test report)
Pulverization shall start within (ten) 10 calendar days after all concrete
work has been completed on a street. If the contractor fails to begin the
work within ten (10) calendar days, a $200 dollars liquidated damage will
be assessed per block per day.
After the pulverized material is cured, the contractor shall overlay it
with 2" H.M.A.C. surface within five (5) calendar days. If the contractor
fails to begin the work within five (5) calendar days, a $200 dollars
liquidated damage will be assessed per block per day.
The unit price bid per square yard shall be full compensation for all
labor, material, equipment, tools, and incidentals necessary to pulverize,
remove and store the pulverized material, undercut the base, mixing,
compaction, haul off, sweep, and dispose of the undercut material.
The 2" H.M.A.C. surface will be paid by separate item.
SP-18
PAY ITEM NO. 23 - REMOBILIZATION:
This item shall compensate the Contractor to remobilize personnel,
equipment, supplies, and material to perform an additional work as
directed by the Engineer. Remobilization will be considered when concrete
"Flat-work" has been completed, personnel and equipments were demobilized,
and the street is clean and ready for the overlay. Remobilization shall be
determined by the Engineer. Any Remobilization without the approval of the
Engineer will not be compensated.
The unit price per bid per each will be full compensation for all labor,
equipment, material, tools, and all incidentals necessary to complete the
work.
PAY ITEM NO. 24 - UNCLASSIFIED STREET EXCAVATION:
This item will be used if additional excavation is needed that is not
covered by Pay Item No. 21 - 118" PAVEMENT PULVERIZATION". Additional
Excavation is the removal of the excessive crown and base to bring the new
base to proper grade & City standard specifications for street
reconstruction. All applicable provisions of Item No. 106 "Unclassified
Street Excavation" shall apply, work shall be paid per cubic yard.
PAY ITEM NO. 25 - 2" SURFACE MILLING:
This item shall consist of milling the existing pavement at a depth of 211.
All applicable provisions of Pay Item No. 11 "Wedge Milling" shall apply.
The unit price bid per square yard shall be full compensation for all
materials, labor, equipment and incidentals necessary to complete the
work.
END OF SECTION
���J L �� �+C`_.��� ;iii ioj'•;�j
1' U