HomeMy WebLinkAboutContract 32160 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No 3p)(00 WHEREAS, KB Homes Lonestar, L.P., hereinafter called "Developer", desires to make certain improvements to The Villages of Marine Creek, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Sue Blankenship, its duly authorized Director of Land Development, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section H,paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. i? -V iGC CFA VILLAGES OF MARINE CREEK 1 CITY �, "�IN H Y EK, F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleeed negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: r CFA VILLAGES OF MARINE CREEK 2 Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (B- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, Bl, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $973,931.00. Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ 864,152.00 $ - $ 864,152.00 2. Storm Drainage $ 58,722.00 $ - $ 58,722.00 3. Street Lights $ - $ 31,500.00 $ 31,500.00 4. Street Name Signs $ - $ 1,100.00 $ 1,100.00 B. Engineering Design $ - $ - C. Construction Engineering and Management by DOE 2% $ 18,457.00 '' $ 18,457.00 TOTALS $ 941,331.00 $ 32,600.00 $ 973,931.00 Notes: 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents two percent (2%) cost for construction inspection fees and materials testing less 10% for contingency cost. (*) Represents City participation for construction fees based on actual cost. 3. City not preparing plans and specifications. CFA VILLAGES OF MARINE CREEK 3 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed,, and d said Dev Loper has executed this instrument in triplicate, at Fort Worth, Texas this the )day of 2005 Approval Recommended: Transportation and Public Works Department N4 M&C UQUIUD 0 Robert Coode, P. E. Director City Of Fort Worth By: /000' WC,r}`3 14 ar,'k Marc Ott �Se-c-f;e- cartJ Assistant City Manager App v d as to Fo Assist Cit ttorney ATTEST: DEVELOPER KB Home Lonesttar, L.P. By: L5k e- J/62 kz Corporate Secretary Sue Blankenship Ire la- B� 4�/ �7, T Cir CFA VILLAGES OF MARINE CREEK 4 F1. E. STREET LIGHTS: 1. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS S EA $ 2 , 000 $16, 000 .00 MID-BLOCK RESIDENTIAL 11 EA $ 2, 000 $22 , 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 2 EA $ 2 , 000 $4, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2 , 200 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2 , 200 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $42 , 000 . 00 City' s Cost $31, 500 . 00 Developer' s Subtotal $0, 000 . 00 10% Contingencies $0, 000 . 00 Project Total $42, 000 . 00 Adjacent Developer' s Cost $0 , 000 . 00 Developer' s Cost $0, 000 . 00 20-. Inspection Fee $0, 00 . 00 Developer' s Responsibility See PG III-1, "Line 7" THE VILLAGES OF MARINE CREEK April 21, 2003 Fort Worth, Texas April 21, 2003 gg .nn MK III- 1 2 . STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 4 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities" . 5 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational. 6 . A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points . 7 . Street light conduit and footings shall be installed by the developer' s contractor as part of and at the time of street construction. The city will obtain electric service and complete the street light construction in accordance with approved plans . 8 . The developer or their contractor shall contact City' s street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-8100 to insure proper inspection of work. 9 .The procedure for installing conduit and footings will be with the inspector on the job site or you can request a copy by calling 817- 871-6596 . THE VILLAGES OF MARINE CREEK April 21, 2003 III- 2 "STREETLIGHTS" INTERSECTIONS ESTRELLA ST & ORCAS ST 1 ESTRELLA ST & VENERA ST 1 ESTRELLA ST & ESTRELLA CT 1 CALAMAR ST & MANTIS ST 1 CALAMAR ST & TIBURON ST 1 VENERA ST & VENERA CT 1 TIBURON ST & MANTIS ST 1 MANTIS ST & ORCAS ST 1 MID- BLOCK ESTRELLA CT 1 VENERA CT 1 VENERA ST 2 MANTIS ST 5 TIBURON ST 2 CHANGE OF DIRECTIONS ESTRELLA CT 1 VENERA CT 1 THE VILLAGES OF MARINE CREEK IV STREET NAME SIGNS 1 . The City will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City. 2 . The City will pay for the street name sign installations required for this development to the extent of $100 . 00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following eleven (11) intersections at a cost to the City of $1, 100. 00 : Street Q and Street T Street Q and Street P Street Q and Court S Street Q and Street O Street Q and Street L Street O and Street P Street H and Street I Street H and Street L Street H and Street J Street J and Court K Street J and Existing Pavement THE VILLAGES OF MARINE CREEK Fort Worth, Texas Date: February 18 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ITEM DESCRIPTION QTY/UNIT PRICE AMOUNT 1. ON SITE SEWER 1 8"Sewer Line all depths) 8,335 ft $25.00 $208,375.00 2 Standard 4' Manholes 42 EA $2,200.00 $92,400.00 3 Additional Depth 216 ft $120.00 $25,920.00 4 4" Sewer Service 182 EA $300.00 $54,600.00 5 Trench Safety 8,3 3 51 ft $1.30 $10,835.50 6 Trench Backfill Testing 8,335 ft $0.55 $4,584.25 7 Post Construction TV Video Inspection 8,3351 ft 1 $1.00 $8,335.00 SUBTOTAL $405,049.75 I. OFF SITE SEWER 1 8" Sewer Line (all depths) 1,436 ft $25.00 $35,900.00 2 Standard 4' Manholes 5 EA $2,200.00 $11,000.00 3 Additional Depth 24 ft $120.00 $2,880.00 4 Trench Safety 1,436 ft $1.30 $1,866.80 5 Trench Backfill Testing 1,436 ft $0.55 $789.80 6 Post Construction TV Video Inspection 1,436 ft $1.00 $1,436.00 SUBTOTAL $53,872.60 11. ON SITE WATER 1 8"Water Line 4,450 ft $17.00 $75,650.00 2 10"Water Line 995 ft $18.00 $17,910.00 3 12"Water Line 2,565 ft $19.50 $50,017.50 4 Fire Hydrant Assemblies 7 EA $1,250.00 $8,750.00 5 1"Water Service 182 EA $325.00 $59,150.00 6 Type "A" Meter Box 182 EA $40.00 $7,280.00 7 Cast Iron Fittings 4.40 TN $2,969.00 $13,063.60 8 8"Valves 7 EA $676.00 $4,732.00 9 10"Valves 2 EA $850.00 $1,700.00 10 12"Valves 5 EA $1,000.00 $5,000.00 11 Trench Backfill Testing 8,010 ft $0.55 $4,405.50 SUBTOTAL $247,658.60 II. OFF SITE WATER 1 8" Water Line 300 ft $17.00 $5,100.00 2 12" Water Line 2,725 ft $19.50 $53,137.50 3 Cast Iron Fittings 0.50 TN $2,969.00 $1,484.50 4 8"Valves 1.00 EA $676.00 $676.00 5 12"Valves 2 EA $1,000.00 $2,000.00 6 Trench Backfill Testing 3,025 ft $0.551 $1,663.75 SUBTOTAL $64,061.75 III. STORM DRAIN SYSTEM 1 24" RCP 481 ft 1 $44.00 2 112.00 2 21" RCP 64 ft $40.00 $2,560.0 3 4 ft. SQ Manhole 1 EA $2,500.00 ;.:$2;500;-q CFA_OPCC_ncb_10903.x(s Page s of ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ITEM DESCRIPTION QTY/UNIT PRICE AMOUNT 4 20' Inlets 1 EA $3,800.00 $3,800.00 5 10' Inlets 2 EA $2,000.00 $4,000.00 6 Temporary Rock Rip Rap 80 yd $50.00 $4,000.00 7 110'x4' RC Box cast in lace 85 ft $350.00 $29,750.00 8 10'x4'Win wall cast in lace 2 EA $5,000.001 $10,000.00 SUBTOTAL $58,722.00 IV. PAVING 1 6" Concrete Paving with 7" Curb 31,200 yd2 $19.10 $595,920.00 2 6" Lime Stabilized Subgrade Preparation 33,450 ye $1.60 $53,520.00 3 Hydrated Lime 301b/SY 502 TN $96:00 $48,192.00 4 4"Sidewalk Paving 6,950 yd $22.50 $156,375.00 5 Testing for Paving -1 LS $10,000.00 $10,000.00 6 Dead End Barricade & Header 5 EA $29.00 $145.00 SUBTOTAL $864,152.00 V. STREET LIGHTS 1 Street Light Conduit and Footings 15 EA $2,000.001 $30,000.00 (Developer cost$500 per Street Light) $7,500.00 SUBTOTAL $7,500.00 VI. CITY INSPECTION FEES WATER DEPARTMENT 1 2%0 of Total Water& Sewer Cost $770,642.70 EA 2.00% $15,412.85 SUBTOTAL $15,412.85 VII. CITY INSPECTION FEES TP/W DEPARTMENT 1 2%of Total Paving & Storm Drain Cost $922,874.00 EA 2.00% $18,457.48 SUBTOTAL $18,457.48 TOTAL PROBABLE DEVELOPER COST $1,701,016.70 CFA_0PCC_ncb_10903.xls Page 2 of 2 820 —� MARINE \ CREEK P°Ae LAKE UI /22o S1 TE K WORT J 4,59 FORT r woRrH Cir" FST MORTH M A 1 �9 �.P J � pAR�J LOCA TION MAP THE VILLAGES OF MARINE CREEK D unawa Engineers Planners4VI SurveyorsAssociates " ,'Inc. Landscape Architects �'` 9k- 1501 Merrimac Circle, Ste, 100 Fart worth, T% 76107 Ph: 817.335.1121 Metro: 817.429.2135 Fox: 817.335.7437 RF, `0 o F � a e = g-18 Q CL (n > & Q mac, r W b w o O Q oa a .v U W 0co b Z W W X I-- N W e U o �l!/ c, cc CL z o W ) , a \ v W o ' Z_ Q CL 0 z W � r--� a � € II 6 R � Lj a o s 4 Q Wsu�6 ° bV) o l a ., WI, r � ' l I W ' r C.5 d 1-1 p' C W O = 0- 0 + a 0 W �Wy i`t I-- La w 1 �\ a \ d J J Ir O LLI CL Z 0 : P� f