Loading...
HomeMy WebLinkAboutContract 32260 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 3Xt&-.)1 WHEREAS, Park Development, LLC, hereinafter called "Developer", desires to make certain improvements to The Park at Sycamore School Road, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Rodney F. Triplett, Jr., its duly authorized President, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section Il, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of 1<li Tolicy. CFA THE PARK AT SYCAMORE SCHOOL ROAD.doc 1 i F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. CFA THE PARK AT SYCAMORE SCHOOL ROAD.doc 2 = l.j .. - ...:1� .f�.•: Water (A) None; Sewer(A-1)None; Paving (B) attached; Storm Drain (13- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $69,645.40. Item Developer City Cost Total Cost Cost A. Construction $ - $ 1. Streets $19,607.80 19,607.80 2. Storm Drainage $48,672.00 48,672.00 3. Street Lights $0.00 $ - 4. Street Name Signs $0.00 $ B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 2% 1,365.60 11,365.60 TOTALS 69,645.40 $ - 69,645.40 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents two percent (2%) cost for construction inspection, and materials testing. 3. City not preparing plans and specifications. — Park at Sycamore School Rd. Correction-CFA REVISED FORMAT WITH 2% 08 18 - 05.doc - IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate,at Fort Worth,Texas this thee�d y of Zook-'-:, Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. NO M&C as MD Director ATTEST: City Of Fort Worth 1 Y By: Marc Ott City Secretary Assistant City Manager Approv s to Form: Assistant My A orney ATTEST: DEVELOPER Park Development, LLC By: Corporate Secretary Rodney F. Trip ett, Jr., resident CFA THE PARK ATSYCAMORESCHOOL ROAD.doc 4 j� ��._• `�''_j_u The Park At Sycamore School Road (Fort Worth,Texas) 4/9/2003 Item No. Description Qty/Unit Unit Price Amount I. PAVING 1. 6-Inch 3000 PSI Reinforced Concrete Paving 237 SY 25.00 $ 5,925.00 2. 6-Inch Stabilized Subgrade 280 SY 1.50 $ 420.00 3. Hydrated Lime (Estimated 30 LBS/SY) 4.2 Ton 94.00 $ 394.80 4. 4" 3000 PSI Sidewalk 1,004 LF 12.00 $ 12,048.00 5. ISawcut and Remove Curb and Gutter 164 LF 5.00 $ 820.00 TOTAL - PAVING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 19,607.80 II. STORM DRAINAGE FACILITIES 6. Connect to EAsting Curb Inlet 4 EA 800.00 $ 3,200.00 7. Connect to Existing Drop Inlet 2 EA 800.00 $ 1,600.00 8. 10' Curb Inlet 2 EA 2,400.00 $ 4,800.00 9. 4'x4'Junction Box 1 EA 2,000.00 $ 2,000.00 10. 24" RCP 166 LF 42.00 $ 6,972.00 11. 27" RCP 4 LF 46.00 $ 184.00 12. 33" RCP 154 LF 60.00 $ 9,240.00 13. 36" RCP 224 LF 74.00 $ 16,576.00 14. Remove & Replace Asphalt Pavement 21 SY 90.00 $ 1,890.00 15. Remove& Replace Curb & Gutter 21 ILF 1 10.00 $ 210.00 16. IModification to eAsting Drop Inlet 1 1 EA 1 2,000.00 $ 2,000.00 TOTAL - STORM DRAINAGE FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 48,672.00 III. WATER FACILITIES 17, 8" 90° Bend 2 EA 250.00 $ 500.00 18. Connect to Existing 8"water line 2 EA 600.00 $ 1,200.00 19. 8" Gate Valve 1 EA 800.00 $ 800.00 20. 8"Water Line 52 LF 16.00 $ 832.00 21. Cut& Remove Existing 8" PVC 15 LF 16.00 $ 240.00 22. 2" Irrigation service 2 EA 1,000.00 $ 2,000.00 23. 8" Master Meter 2 EA 11,000.00 $ 22,000.00 TOTAL - STORM WATER FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 27,572.00 IV. SANITARY SEWER FACILITIES 24. Connect to Existing 4-Foot Dia. M.H. 1 EA 2,000.00 $ 2,000.00 25. 4-Foot Dia. M.H. 1 EA 2,200.00 $ 2,200.00 26. 8-Inch PVC 40 LF 16.00 $ 640.00 TOTAL - SANITARY SEWER FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 4,840.00 TOTAL OFF-SITE PRICE: $ 100,691.80 i Z 1108 �. anx,7A v C2 IL U 300 WA o MMY ` o O n m PH O so r- d3 110H 1- 4 L-Li � o � Ll9lAVXo o �Aq o � a CL- M µsq 0 e 61 A irF o i , o 1 I LLJ ii 3,kL QS X C7 I Q off...' S' LLJ 1 Rema AaNnpNng anrW AWM Sad'om z LO rj M' CL LAJ tz mm Avg 1r81ME) I U i 11. o 17 L7 Lj�j Li 1 ' i v f^ _ } - II l�\ C' .. '•'- —` i fill v' CL- Lo LO Ce Lo :rt 2- p = U Of N Y �r eI�r `r r `�l �/ 0 �o Lo m o V- Z 11 N \ Q O cf) s 1\1 I W W m Ct� Co Cf) WEMW GOO 1— 1; y Ct •N •, 0 1 ` `, �. ;tiy:•'„ LLJ dad 9f/ BAIIiQ AQN71DafIH a AWN" ,� ;• T' '�_ _3 f h'zi I c a v b J -' I , saran Ave xamrro 1 > I tir j` I ,jt A r — . i Lo ;v l r WCL cn Z � 1;j t% � W