HomeMy WebLinkAboutContract 32359 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.3py WHEREAS, _Centex Homes, a Nevada General Partnership., hereinafter called "Developer", desires to make certain improvements to _Presidio Village, Phase I, DOE #4348, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Centex Homes Real Estate Corporation, a Nevada Corporation, its duly authorized _Managing General Partner and acting through Bret Pedigo, its duly authorized Vice President, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. CFA REVISED FORMAT WITH 4% 1 09= 14--05 E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. _ J . CFA REVISED FORMAT WITH 4% 2 - - L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water(A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (13- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, 131, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $_1,592,799.70`. Item Developer City Cost Total Cost Cost A. Construction 1. Streets $1,118,095.60 $ 0.00 $1,118,095.60 2. Storm Drainage $ 329,308.10 $ 0.00 $ 329,308.10 3. Street Lights $ 85,800.00 $ 0.00 $ 85,800.00 4. Street Name Signs $ 1,700.00 $ 0.00 $ 1,700.00 B. Engineering Design $ 0.00 $ 0.00 $ 0.00 C. Construction Engineering and Management by DOE 4% $ 57,896.00 $ 57,896.00 TOTALS $1,592,799.00 $ 0.00 $1,592,799.70 Notes: 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction CFA REVISED FORMAT WITH 4% 3 inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate sea] of the City affixed' d said D eloper Wly has executed this instrument in triplicate,at Fort Worth,Texas this the of i 200/5 Approval Recommended: Transportation and Public Works Department f E NO M&C REQUIRED Goode, P. E. NO M&C REQUIRED Director ATTEST: CityAlf Fort Worth pit- f X M rc t City Secretary Assistant City Manager Approved;as to Form: Assist i Attorney ATTEST: DEVELOPER Centex Homes A Nevada General Partnership By: Centex Homes Real Estate Corp. A Nevada Corporation Managin rtner By: Corporate Secretary B t Pedigo, Vice fresident ill CFA REVISED FORMAT WITH 4% 4 1 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 8. 28 EA. ADA Sidewalk Ramps, complete in place for the sum of Five Hundred Fifty Dollars & No Cents per Each $550.00 $15,400.00 9. 8,162 S.F. 4' Sidewalks, complete in place for the sum of Two Dollars & Seventy Five Cents per Square Foot $2.75 $22,445.50 10. 1 L.S. Pavement Markings per Plans, complete in place for the sum of Four Thousand Nine Hundred Dollars & No Cents per Lump Sum $4,900.00 $4,900.00 11. 2 EA. End of Road Barricade, complete in place for the sum of One Thousand Five Hundred Dollars & No Cents per Each $1,500.00 $3,000.00 12. 1 L.S. Payment, Performance and Maintenance Bonds Eleven Thousand Dollars & No Cents per Lump Sum $11,000.00 $11,000.00 TOTAL STREET IMPROVEMENTS --- $863,771.60 City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. N:\JOB\011995\specs\01199501.00B.doc P-3 ?EC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION C - STORM DRAIN SYSTEM 440 1. 603 L.F. 5' x 4' R.C. Box Culvert Including 402 Trench Excavation and Backfill, complete in place for the sum of One Hundred Fifty-Five Dollars & No Cents per Linear Foot $155.00 $93,465.00 440 2. 304 L.F. 42". Class III R.C. Pipe Including 402 Trench Excavation and Backfill, complete in place for the sum of Ninety Two Dollars & No Cents per Linear Foot $92.00 $27,968.00 +0 3. 352 L.F. 39" Class III R.C. Pipe Including 402 Trench Excavation and Backfill, complete in place for the sum of Eighty Six Dollars & No Cents per Linear Foot $86.00 $30,272.00 440 4. 473 L.F. 36" Class III R.C. Pipe Including 402 Trench Excavation and Backfill, complete in place for the sum of R4 Sixty Nine Dollars & No Cents per Linear Foot $69.00 $32,637.00 2 71 01199501.00A.doc P-11 r,'EC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT , EM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 440 5. 647 L.F. 33" Class III R.C. Pipe Including 402 Trench Excavation and Backfill, complete in place for the sum of Sixty Two Dollars & No Cents per Linear Foot $62.00 $40,114.00 440 6. 484 L.F. 27" Class III R.C. Pipe Including 402 Trench Excavation and Backfill, complete in place for the sum of Forty Eight Dollars & No Cents per Linear Foot $48.00 $23,232.00 440 7. 203 L.F. 24" Class III R.C. Pipe Including 402 Trench Excavation and Backfill, complete in place for the sum of Forty One Dollars & No Cents per Linear Foot $41 .00 $8,323.00 440 8. 154 L.F. 21" Class III R.C. Pipe, including 402 trench excavation and backfill, complete in place for the sum of Thirty Eight Dollars & No Cents per Linear Foot $38.OD $5,852.00 444 9. 6 Ea. 10' Standard Curb Inlet, complete in place for the sum of Two Thousand Dollars & No Cents per Each $2,000. , _ - - 01199501.00A.doc P-12 F'EC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT EM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 444 10. 3 Ea. 15' Standard Curb Inlet, complete in place for the sum of Two Thousand Five Hundred Dollars & No Cents per Each $2,500.00 $7,500.00 444 11. 1 Ea. 20' Standard Curb Inlet, complete in place for the sum of Three Thousand Eight Hundred Dollars & No Cents per Each $3,800.00 $3,800.00 444 12. 2 Ea. 10' Recessed Curb Inlet, complete in place for the sum of Two Thousand One Hundred Dollars & No Cents per Each $2,100.00 $4,200.00 444 13. 2 Ea. 15' Recessed Curb Inlet, complete in place for the sum of Two Thousand Six Hundred Dollars & No Cents per Each $2,600.00 $5,200.00 410 14. 4 Ea. 4' Square Storm Drain Manhole, complete in place for the sum of Two Thousand Four Hundred Dollars & No Cents per Each $2,400.00 $9,600.00 01199501.00A.doc P-13 PEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ,'EM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 410 15. 2 Ea. 5' Square Storm Drain Manhole, complete in place for the sum of Two Thousand Five Hundred Fifty Dollars & No Cents per Each $2,550.00 $5,100.00 410 16. 1 Ea. 6' Square Storm Drain Manhole, complete in place for the sum of Two Thousand Eight Hundred Dollars & No Cents per Each $2,800.00 $2,800.00 410 17. 1 Ea. 7' Square Storm Drain Manhole, complete in place for the sum of Three Thousand Four Hundred Dollars & No Cents per Each $3,400.00 $3,400.00 410 18. 1 Ea. 5' x 4' Type 'B' Concrete Headwall, includes Grade to Drain excavation, complete in place for the sum of Four Thousand Three Hundred Dollars & No Cents per Each $4,300.00 $4,300.00 410 19. 1 L.S. Remove & Dispose 36" Concrete Headwall, Six Hundred Dollars & No Cents per Lump Sum $600.00 $600.00 01199501.00A.doc P-14 ,PEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT FEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 410 20. 247 S.Y. Rock Rubble Rip Rap, complete in place for the sum of Twenty Five Dollars & No Cents per Square Yard $25.00 $6,175.00 21. 1 EA. Field Connection to Existing 42" RCP, complete in place for the sum of Two Hundred Fifty Dollars & No Cents per Each $250.00 $250.00 22. 2 EA. Field Connection to Existing 24" RCP, complete in place for the sum of Two Hundred Fifty Dollars & No Cents per Each $250.00 $500.00 525 23. .2,617 L.F. Trench Safety No Dollar & Thirt Cents per Linear Foot $0.30 $785.10 24. 1 L.S. Storm Water Management One Thousand Two Hundred Thirty Five Dollars & +. No Cents per Lump Sum $1 ,235.00 $1,235.00 SECTION C - - - STORM DRAIN SYSTEM: $329,308.10 01199501.00A.doc P-15 No. 011573010 Pagel ........ .... . ....... ...... ... .... ... .. ........ . ... . ............. .... ........ ..... . ...... ........... .0 Tvm M, ...... M-4b .. U0170"' .. ... .. ... .. PRESIDIO VILLAGE PHASE I MAY, 2003 STREET LIGHTS & SIGNS ITEM# IDESCRIPTION QTY UNIT PRICE AMOUNTI 1 ISTREET LIGHT POLE, BASE (& COND. 39 EA. 2,200.00 85,800.00 21STREET SIGNS 17 EA. 100.00 1,700.00 TOTAL STREET LIGHTS/SIGNS $87,500.00 SIDEWALK FOR INTERIOR STREETS ITEM# IDESCRIPTION QTY J UNIT PRICE I AMOUNT 114' SIDEWALK 1 72,664 1 S.F. 1 3.50 1 254,324.00 TOTAL STREET LIGHTS/SIGNS $254,324.0011 G:\JOB\011573\EST\RMCFA.XLS 5/6/2004 PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: CENTEX HOMES Fort Worth, Texas DEVELOPER March 2004 c/o CARTER & BURGESS, INC. FOR: STREET IMPROVEMEIVTS FOR PRESIDIO VILLAGE, PHASE I DEPARTMENT OF ENGINEERING No. 4348 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the site of the project, and understanding the amount of work to be done, and the prevailing conditions hereby proposes to do all the work as provided in the Plans and Contract Documents subject to inspection and approval by the Director of Public Works of the City of Fort Worth, Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond and Payment Bond, and such other bonds as may be required by the Contract Documents, for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and Install, including all appurtenant work, complete in place, the following items): SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID STREET IMPROVEMENTS 210 1. 41,476 S.Y. 6" Lime Stabilized Subgrade (Includes Preparation of Subgrade), complete in place for the sum of One Dollar & No Cents per Square Yard $1.00 $41,476.00 212 2. 684 Tons Lime for Subgrade (30#/S.Y.)* complete in place for the sum of Eighty One Dollars & Fifty Cents per Ton $81.50 $55,746.00 2.1 N:\JOB\011995\specs\01199501.006.doc P- 1 c� = ^.0 �5`;•' SPEC PAYAPPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT .ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 314 3. 31,599 S.Y. 6" Reinforced Concrete Pavement (Includes Joint Sealer, and 7" STD Attached Concrete Curb), complete in place for the sum of Sixteen Dollars & Twenty Cents per Square Yard $16.20 $511,903.80 314 4. 8,533 S.Y. 8" Reinforced Concrete Pavement (Includes Joint Sealer, and 7" STD Attached Concrete Curb), complete in place for the sum of Twenty Dollars & Sixty Cents per Square Yard $20.60 $175,779.80 5. 512 S.Y. Temporary Transition Pavement, complete in place for the sum of Twenty Five Dollars & No Cents per Square Yard $25.00 $12,800.00 6. 898 L.F. Saw Cut, Remove, and Dispose Concrete Curb and Gutter, complete in place for the sum of Six Dollars & No Cents per Linear Feet $6.Q0 $5,388.00 7. 605 S.Y. Saw Cut, Remove, and Dispose Asphalt Pavement, complete in place for the sum of Six Dollars & Fifty Cents per Square Yard $6.50 $3,932.50 N:\JOB\011995\specs\01199501.00B.doc P-2 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 14 EA $ 2 , 000 $28, 000 . 00 MID-BLOCK RESIDENTIAL 21 EA $ 2, 000 $42, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 4 EA $ 2, 000 $8, 000 .00 MID-BLOCK COLLECTOR 0 EA $ 2 , 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 .00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 .00 Subtotal $78, 000.00 City' s Cost $00, 000 . 00 Developer' s Subtotal $78, 000 .00 10% Contingencies $7,800.00 Project Total $85, 800.00 Adjacent Developer's Cost $0, 000 .00 Developer' s Cost $85, 800 .00 2% Inspection Fee $0, 00.00 DEVELOPER'S COST: $85, 800. 00 PRESIDIO VILLAGE, PHASE I June 17, 2004 Fort Worth, Texas July 7, 2004 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . The City will install all the streetlights that use overhea, r underground conductors on residential, and collector streets. ..ae developer agrees to pay the city the amount shown below prior to the City starting it's design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . S . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6 . The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $85,800.00 PRESIDIO VILLAGE, PHASE I June 17, 2004 FORT WORTH, TEXAS Page II of Exhibit C .,�s III. "STREETLIGHTS" INTERSECTIONS HERITAGE TRACE PKWY & SILLS WAY 1 VALLEY FORGE TRL & SILLS WAY 1 VALLEY FORGE TRL & POLK AVE 1 FRANKS ST & BRAGG RD 1 FRANKS ST & POLK AVE 1 BIGGS ST & BRAGG RD 1 BIGGS ST & POLK AVE 1 LAIIGHLIN RD & BRAGG ST 1 LAIIGHLIN RD & POLK AVE 1 LAIIGHLIN RD & MANASSAS RD 1 LAIIGHLIN RD & HARMON RD 1 BENNING WAY & BRAGG RD 1 BLISS RD & BRAGG RD 1 BLISS RD & BULL RUN 1 MID - BLOCK VALLEY FORGE TRL 1 HARMON RD 7 BENNING WAY 3 LAIIGHLIN RD 2 FRANK ST 2 BIGGS ST 2 MANASSAS RD 2 BLISS RD 2 CHANGE OF DIRECTIONS VALLEY FORGE TRL 2 BLISS RD 2 PRESIDIO VILLAGE, PHASE I Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2 . The Developer will pay for the street name sign installations required for this development to the extent of $100 .00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following seventeen (17) intersections at a cost to the Developer of $1,700 . 00 : Sills Way & Heritage Trace Pkwy Sills Way & Valley Forge Tr Bragg Rd & Valley Forge Tr Bragg Rd & Franks St Bragg Rd & Biggs St Bragg Rd & Laughlin Rd Bragg Rd & Benning Way Bragg Rd & Bliss Rd Polk Av & Valley Forge Tr Polk Av & Franks St Polk Av & Biggs St Polk Av & Laughlin Rd Manassas Rd & Laughlin Rd Manassas Rd & Valley Forge Tr Bliss Rd & Benning Way Bull Run & Bliss Rd Harmon Rd & Laughlin Rd Presidio Village, Phase 1 CFA code : 2004073 Date: June 18 , 2004 3 A FORT WORTH n O RAY WHITE 0 � a LTA cr ISTA 2 r D J PHERITA TRACE 4. _:,' PK PROJECT HERITAGE-TRACE PK�s � B, LOCATION h = S_ U G`r K I SD W p > _ FORT WORTH 2 0 W D Lu �� D FORT WORTH s ' cr a: z z W 2 7 H 7 LL HAR RD. f NORTH TARRANT PKWY 3 • n 0 GS N NOT TO SCALE . LOCATION MAP PRESIDIO VILLAGE PHASE I Cater Burgess CARTER & BURGESS,INC. 777 AWN STREET FORT WORTH,T%76102 (817)77S6000 PROJECT NO. 011995. 010. 1. 0625 N=pl\]ob\ 011995\civ\ 9951cfa.dgn PACE 1 OF I a� N h �h o�e`�h°�„e�$• SCALE= 1" = 300' I I O 53 56 57 5B 39 60 I I 1 J < 5 6 7 B `9 1p 11 II 51 52 53 I 50 <g N ,1• J4 : JH 37 J6 33 Ja J! JI J/ 70 ?9 7B 77 76 25 ZJ 11 71 - aB �' JJ 47 J7 1 J 56 7 B 9 IO 11 /1 13 /a 15 /6 17 /H r9•Q. I e6 G WI m Jr 30 q$ • r • • •• •. •• • . •• .• • 4e • •aJ •a7••I 40 39 JB 37 36 J5Ja JJ J7 ,o 29 29•�•1B 17 •76 •15 •Za 78 77� 1 2 J a 3 6 7 B 9 10 /l /2�Ql /Jla IS 16 17 IB 19 20 zl 12 23 : I6 LA d D' 25 24 1 7 5 < 3 6 7 H 9 10 11 12 13 14 Z' 2 5 B 12 � 0 J d 19 Q' _ 21 U < I] 20 • 78 27 76 75 24 73 71 21 10 19 IB l7 16 IS p 3 /7 71 ••• • 19 •c�G, �h Q .• • .. .. .. .• ® 6 I I 27 BI $ I F \yti 10 Q� f 7 10 27 • 4h TO I I 2 J a 5 6i 7 B 9 10 11 12 17 la 9 21 • B •I IS I 10 7 � a• 2B 77 76 75 7a 73 71 21 70 19 /8 /7 16 IS a 6 77 J 17 5 28 — 12 17 0 29 1 7 7 a 5 6 7 B 9 IO If 11 IJ 14Q la J JO ® 0. 10 II 15 I 7 Jr C7 I I• , 28 77 76 25 Zn IJ 77 21 20 19 1B 17 16 15�, . 9 6 Jz VAI M G m a 77 ( 18 19 10 2r 11 2J Ze 15 2-6 27 7B ?9 JpL-11J73 ' 1 2 J a 5 HERTTAGE TRACE PARKWAY —— — — —^ STREETS EXHIBIT 'B' LEGEND PRESIDIO VILLAGE PROP. 29' B/B PROP. 2-24' 8/B PHASE I ROADWAY/50' ROWF/0� W/1 2' CENTER MEDIAN ROADWAY/80' ROW PROP. 28' 6/B MEDIAN OPENING : a':=.;`,. '`;` a': �arfer Burgess ROADWAY/1/2 130' ROW �. ;_. CARTER 8 BURGESS,INC. PROP. 4' SIDEWALK io'm OR7WUN X76102 (81 7)735-6000 LIMITS OF PROJECT —— PROJECT NO. 011995.010. 1.0625 ;N=q1\Job\ 011995\cly\ 9951cfia.dgn PAGE 4 OF E .y I Q�•yo``Myr. I a°y N I 5/ 51 57 O 55 56 57 SB 59 60 T I 777 J 1 3 � B '9 77" SCALES 1" = 300' I so 49 � B t � I Je 37 ]6 ]5 J4 JJ J7 JI -7- O 79 18 17 26 25 14 1J 71 21 10 4B JJ m zt 47 p' 32 I I I 4,OMI I 7 J 4 5 6 7 8 9 IO II 12 17 14 15 16 17 IB 19 1 JI 46 1B G w I 45 30 P � I 144 47 41 4/ 40 79 JD 37J6 JS J4 J3732 37 Jr7- - 18 77 76 ?5 14 1� I� O 77 N 21" 7 J , 5 6 7 8 9 10 /4 /5 16 17 18 19 20 11 27 73 76 4'SOW 10' IA G O 1s 10' — — ` 16 17 zJ I I 2 J 4 5 6 7 8 9 10 1r 11 13 14 2 IS 18 OK 72 7 14 19 11 21 II 4 13 20 78 27 16 25 74 3 77 71 70 19 18 17 16 15 p I 5 17 OG n ® 6 11 0 77 BI s OI C Q�'y ,v��I IO 27 I 1 p 7 4 5 6 7 B 9 10 I I 17 1 J 14 17 �`+" �O/�J�h 1 8 v11 9 24 I ® I l6 Jv 9 8 25 IS IB 77 Z6 25 N 2J 77 71 10 19 /8 l7 16 IS _ 1 I0 7 26 g )l SL1 5 241 5 J4 111 6 27 21 7" 2' 512 5 7B 2 21424 1J 4 29 I 23 a 5 6 7 B 9 10 II 17 /J 14 5'SOMH I 1a 5 Jo 24 0 15 10 10,7 30 2B 77 76 75 71�2177 7/ 10 19 l8 17 16 'ALO 10'9 VI I P^, 16 1 71 27' 8 I n 'SOW 5'SON 7 5'SOWN 18 /9 20 7l 72 1J 14 15 16 27 7B z9 JO J1 J1a 2 J , 5 6 L2115® -EX 42' — — — X24" HERITAGE TRACE PARKWAY X4'SBC EX 42'= _ EX 30" EX 10' INLET 0' 0 to EXI NLET STORM DRAIN I NLET EXHIBIT 'B-l' LEGEND PRESIDIO VILLAGE PROP. STORM DRAIN LINE PHASE I PROP. INLET PROP. MANHOLE Carter Burgess PROP. HEADWALL o CARTER 8 BURGESS,INC. EXIST. STORM DRAIN LINE __=u== 777 T,IN H FORE WORTi,TX TX 76107 (in 7)735-6000 LIMITS OF PROJECT PROJECT NO. 011995.010.1.0625 N=pI\Job\ 011995\civ\ 9951cfa.dgn PAGE 5 OF 6 SCALE1 1" = 300' I a. I , T IT ` 33 56 57 38 59 60 61 1 2 J 4 5 I ' 8 10 fl r7 IBWAD J6 JS !4 JJ J2 !I JO 79 78 77 26 25 24 23 22 21 20 48 JJ I 47 12 I 2 J 4 5 s 7' 8 9 IO 71 12 fJ /4 /S 16 /7 IB 19 I 46 9 J/ B G W I JO 45 z9 I 44 4J 42 41 40 J9 J8 J7 36 JS !4 JJ J1 J/ JO 29 2BF27 ?6 25 2s 2o m 7T Ir 1 J 4 5 6 7Llt-1 IO 11 r7�1J14J l5 l6 /7 f8 l9 2021 77 2J G 0 _ _ 25 24 I 6 7 23 I I I 2 J 4 5 6 ) V7 9 IO 71112 IJ I4 2 15 B ® 22 J 14 /9 21 vy I 4 /J 70 28 17 26 25 74 23 22 2/ I ® s 9 lI ® 22 BI IB y�4YQCY O I I 7 I IO A.' ', 1 2 J 4 5 6 7 8 9 IO 11 12 1J 14 r7® I l6 `O' y0�• I SS 9 B 25 I L17p16 71 24 2J�2121 70 /9 18 17 is I5 I IS /0 7 26 R 4 I11 6 27 J 12 5 28 2 I 1J 4 29 1 2 J 4 5 6 7 B 9 /0 11 l2 /J f4 I 11 I 4 J JO 10 1 5 I 7 I 6 3 28 21121 75 74 2J 77 71 20 19 18 17 16 /S 9 _ GTR AM B I 17 7 ]d' IlH l9 70 1l 77 2J 74 75 A 27 2,17- JO J/ • l 2 J 4 5 6 I A 11 � • - - - - - - FMUTAGE TRACE PARKWAY STREET LIGHTS LEGEND EXHIBIT 'C' ROP. SINGLE STREET LIGHT • PRESIDIO VILLAGE <IST. SINGLE STREET LIGHT O PHASE I DN S'fEEL POLE WITH STREET Z STOP SIGNS ATTACHED) �I ROP. STREET SIGN A �Y Carted Burgess <I ST. STREET SIGN Q ':cl<'. = ° CARTER & BURGESS,INC. I M I TS OF PROJECT — - ' ~ - 777&WN FOSTREET 18171 735-6000 tALI PROJECT NO. 0 11995.010.1.0625 zp/\]ob\ 011995\civ\ 9951cfa.dgn PAGE 6 OF 6