Change Order Request
Project Name South Pipeline Road Bridge at Post Oak Creek City Sec# 1 42933
Client Project#(s) 00258
Project Description Reconstruction of South Pipeline Road Bridge at Post Oak Creek
Contractorl Humphrey&Morton Construction Co., Inc. Change Order# 0 Date F 12/15/2014
City Project Mgr.1 Michael Weiss, P.E. City Inspector FMark Owen
Dept. TPW Water Sewer Contract Time
Totals CD
Original Contract Amount $499,836.55 $0.00 $0.00 $499,836.55 150
Extras to Date $17,519.98 $0.00 $0.00 $17,519.98 22
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $517,356.53 $0.00 $0.00 $517,356.53 172
Amount of Proposed Change Order $0.00 $10,755.91 $0.00 $10,755.91
Revised Contract Amount $517,356.53 $10,755.91 $0.00 $528,112.44 172
Original Funds Available for Change Orders $0.00 $0.00
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding(if necessary) $10,755.91 $10,755.91
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.66%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $624,795.69
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Repair Existing Valve Stack on east side of bridge(DOE#5406).
V OP
0
OFFICIAL RECORD
Mary 0XA CWY SECRETARY J. f , City Secretary �. FT. WORTHS TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an actor nd satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Co tact r Name nit a Date
Humphrey&Morton Construction Co., 11 1 it Z-1 I /
YI Prq ec Mqn_ er/Progra Ma er Date
.Assst __,,Date_ Direc _.,C,. a ent(Dept) Date
A ' to AtWr gey Date Assistant City Manager Date
VEX
Council Action if required)
M&C Number N/A M&C Date Approved
0
/
Q #
\
# \ G .
8 -
CO
3 \
Cl
/
0
Its \
/
/ a
0
�
/ U /
/ m
o \
/ CL
2 Q� :1) 0
o � \ z »
�
0 / ƒ
@
LL ® \
o0 \ \
� \ /
5 4
0 \
2 \ \
/ \ Q
/
/ \ ! \
\ 2 � \
\ / \ ® \
m / ca- f
/ C:) 4 7 y
= r
e o #
/ \ \ c �_ G
-
w a (D/ / *
m ' y$ c � e
� ®
6
Co C° -
o ui o LO
69, ti 61!)-ti LO
0
c
0
ICL CU
� Q
N
4-
O
N
N
OA
m
a
c
0
Q
L
OD
c
U
e
m °
G
Q #
\
# % �
S ~ E
Cl)
\ \
c
H ƒ
0
# \
\
6 � «
° ° y
co C v
@ 9
e /
t 2 / §
o ¢ )R \
2 � \ % /
LL \ d /
4- o
oa \ e
ƒ \ /
z » 3
U o \ 0
/ 0 %
5 \
m \ \
f \ o
co % / @
/ 0 \ \
k \ ®
_ / a
® _ (D \
)
ƒ y 4 7 2
_
e # § a g
/ (D ± /
x ? /
�5
2
Co Co Co
0 0 0
c
0
F- 3:
CO
CO0
.o
c
N
4-
O
N
N
0.0
m
d
N
C
i-+
N
v
OA
c
M
.0
U
HUMPHREY&MORTON
PO BOX 8057
FORT WORTH,TEXAS 76124
PHONE:(817)478-8088 FAX:(817)561-2368
JOB NAME: RECONST OF SOUTH PIPELINE RD @ POST OAK CREEK
JOB DESCRIPTION: INSTALLATION 2 BBL BOX CULVERT,PAVING
CITY&STATE: FORT WORTH,TX
DATE: NOVEMBER 3,2014
VALVE STACK REPAIR COST BREAKDOWN INVOICE
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
1 PVC VALVE STACK LS 1.00 $ 1,795.00 $ 1,795.00
2 FLOWABLE FILL CY 8.00 $ 245.25 $ 1,962.00
3 CONC PAVING CY 4.00 $ 491.00 $ 1,964.00
4 ROTO ROOTER VACUUM EXCAV LS 1.00 $ 3,924.06 $ 3,924.06
5 TRAFFIC CONTROL LS 1.00 $ 1,110.85 $ 1,110.85
TOTAL BID $ 10,755.91