Loading...
HomeMy WebLinkAboutContract 46312 r CITY SECRETAW , CONTRACT W., Z FORTWORTH Water Main Replacements CONTRACT 2013A City Project No. 02037 TPW / DOE # 7326 WATER PROJECT NO. P253-6011702037 Fo. W rth a . . 4i,i te . � 7 : � N RECORDCRETARYRTH,TX RECEIVED JAN 0 7 Ut CITY OF FORT WORTH, TEXAS WATER DEPARTMENT WATER MAIN REPLACEMENTS CONTRACT 2013 A PROJECT NUMBERS: City Project No. 02037 Water No. P253-6011702037 DOE No. 7326 S. FRANK CRUMB, P.E. ' DIRECTOR WATER DEPARTMENT 2014 APPROVED A REW T. CRONBERG,RE.,ASSISTANT DI CT , WATER DEPAk TMEN APPROVED to AJ o 2 J TONY SHOL OLA,RE., ENGINEERING MANA GER, WATER DEPARTMENT RECOMMENDED DATE PF r FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF _r Water Main Replacements Contract 2013A City Project No. 02037 TPW/DOE # 7326 WATER PROJECT NO. P253-6011702037 r" qp Betsy Price David Cooke Mayor City Manager S. Frank Crumb, P.E. Director, Water Department Prepared for The City of Fort Worth ¢' August 2014 1 FORTWORTH, r City Fort Worth 0 Standard Construction Specification ,_ �. Documents 2 PP PE Adopted September 2011 P" DO DO DO-2 TABLE OF CONTENTS Page 2 of 6 1 SECTION 00 00 00 -� 2 TABLE OF CONTENTS 3 4 00 05 10 Mayor and Council Communication 5 00 05 15 Addenda 6 00 11 13 Invitation to Bidders 7 0021 13 Instructions to Bidders 8 00 35 13 Conflict of Interest Affidavit 9 00 41 00 Bid Form 10 00 42 43 Proposal Form Unit Price 11 00 43 13 Bid Bond 12 00 43 37 Vendor Compliance to State Law Nonresident Bidder 13 00 45 11 Bidders Prequalifications 14 00 45 12 Prequalification Statement 15 00 45 13 Bidder Prequalification Application 16 00 45 26 Contractor Compliance with Workers' Compensation Law �- 17 00 45 40 Minority Business Enterprise Goal 18 00 45 41 Small Business Enterprise Goal 19 00 52 43 Agreement 20 0061 13 Performance Bond 21 00 61 14 Payment Bond 22 0061 19 Maintenance Bond 23 00 61 25 Certificate of Insurance 24 00 72 00 General Conditions 25 00 73 00 Supplementary Conditions 26 27 Division 01 - General Requirements 28 29 01 1100 Summary of Work 30 01 25 00 Substitution Procedures 31 01 31 19 Preconstruction Meeting 32 01 32 33 Preconstruction Video 33 01 33 00 Submittals 34 01 35 13 Special Project Procedures 35 01 45 23 Testing and Inspection Services 36 01 50 00 Temporary Facilities and Controls 37 01 55 26 Street Use Permit and Modifications to Traffic Control 38 01 57 13 Storm Water Pollution Prevention Plan 39 01 60 00 Product Requirements 40 01 66 00 Product Storage and Handling Requirements 41 01 70 00 Mobilization and Remobilization 42 01 71 23 Construction Staking and Survey 43 01 74 23 Cleaning 44 01 77 19 Closeout Requirements 45 01 78 23 Operation and Maintenance Data 46 01 78 39 Project Record Documents CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 000000-3 TABLE OF CONTENTS Page 3 of 6 1 2 Technical Specifications which have been modified by the Engineer 3 specifically for this Project; hard copies are included in the Project's Contract 4 Documents 5 6 Division 02 - Existing Conditions 7 8 0241 14 Utility Removal/Abandonment 9 10 Division 32 - Exterior Improvements 11 12 3201 17 Permanent Asphalt Paving Repair 13 3201 18 Temporary Asphalt.Paving Repair 14 3211 23 Flexible Base Courses 15 3231 13 Chain Fences and Gates 16 3231 26 Wire Fences and Gates 17 32 31 29 Wood Fences and Gates 18 19 Division 33 - Utilities 20 21 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 22 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 23 33 1210 Water Services 1-inch to 2-inch 24 33 1211 Large Water Meters 25 33 1225 Connection to Existing Water Mains 26 33 1230 Combination Air Valve Assemblies for Potable Water Systems 27 33 1240 Fire Hydrants 28 29 Technical Specifications listed below are included for this Project by reference 3o and can be viewed/downloaded from the City's Buzzsaw site at: 31 32 htps://projectpoint.buzzsaw.com/client/fortworthgov/Resources/02%20- F33 %20Construction%2ODocuments/Specifications 34 35 Division 02 - Existing Conditions 36 37 0241 13 Selective Site Demolition 38 0241 14 Utility Removal/Abandonment 39 0241 15 Paving Removal 40 41 Division 03 - Concrete 42 43 03 30 00 Cast-In-Place Concrete 44 0334 13 Controlled Low Strength Material (CLSM) r 45 0334 16 Concrete Base Material for Trench Repair 46 03 80 00 Modifications to Existing Concrete Structures 47 48 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 000000-4 TABLE OF CONTENTS Page 4 of 6 1 2 Division 31 - Earthwork 3 4 31 1000 Site Clearing 5 3123 16 Unclassified Excavation 6 31 23 23 Borrow 7 31 24 00 Embankments 8 31 2500 Erosion and Sediment Control — 9 31 36 00 Gabions 10 31 37 00 Riprap 11 -- 12 Division 32 - Exterior Improvements 13 14 3201 17 Permanent Asphalt Paving Repair 15 32 01 18 Temporary Asphalt Paving Repair 16 32 01 29 Concrete Paving Repair 17 32 11 23 Flexible Base Courses 18 32 11 29 Lime Treated Base Courses 19 32 11 33 Cement Treated Base Courses 20 32 1216 Asphalt Paving .. 21 32 1273 Asphalt Paving Crack Sealants 22 32 13 13 Concrete Paving 23 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 24 32 1373 Concrete Paving Joint Sealants 25 32 14 16 Brick Unit Paving 26 32 1613 Concrete Curb and Gutters and Valley Gutters 27 32 17 23 Pavement Markings 28 32 17 25 Curb Address Painting 29 3231 13 Chain Fences and Gates 3o 32 31 26 Wire Fences and Gates 31 32 31 29 Wood Fences and Gates 32 32 32 13 Cast-in-Place Concrete Retaining Walls 33 3291 19 Topsoil Placement and Finishing of Parkways 34 32 92 13 Hydro-Mulching, Seeding, and Sodding 35 32 93 43 Trees and Shrubs 36 37 Division 33 - Utilities 38 39 33 01 30 Sewer and Manhole Testing ! 4o 33 01 31 Closed Circuit Television (CCTV) Inspection 41 33 03 10 Bypass Pumping of Existing Sewer Systems 42 33 04 10 Joint Bonding and Electrical Isolation 43 33 04 11 Corrosion Control Test Stations 44 33 04 12 Magnesium Anode Cathodic Protection System 45 33 04 30 Temporary Water Services 46 33 04 40 Cleaning and Acceptance Testing of Water Mains 47 33 04 50 Cleaning of Sewer Mains 48 33 05 10 Utility Trench Excavation, Embedment, and Backfill -- CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 �" 000000-5 TABLE OF CONTENTS Page 5 of 6 1 3305 12 Water Line Lowering 2 3305 13 Frame, Cover and Grade Rings 3 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 4 3305 16 Concrete Water Vaults 5 3305 17 Concrete Collars 6 33 05 20 Auger Boring 7 33 0521 Tunnel Liner Plate s 8 33 05 22 Steel Casing Pipe 9 33 05 23 Hand Tunneling to 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 11 33 05 26 Utility Markers/Locators 12 33 05 30 Location of Existing Utilities 13 33 11 05 Bolts, Nuts, and Gaskets g 14 33 11 10 Ductile Iron Pipe 15 33 11 11 Ductile Iron Fittings 16 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 17 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 18 33 11 14 Buried Steel Pipe and Fittings 19 33 12 10 Water Services 1-inch to 2-inch 20 33 12 11 Large Water Meters 21 33 1220 Resilient Seated Gate Valve 22 33 1221 AWWA Rubber-Seated Butterfly Valves 23 33 1225 Connection to Existing Water Mains 24 33 1230 Combination Air Valve Assemblies for Potable Water Systems 25 33 1240 Fire Hydrants 26 33 1250 Water Sample Stations 27 33 1260 Standard Blow-off Valve Assembly 28 3331 12 Cured in Place Pipe (CIPP) 29 3331 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 3o 3331 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 31 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 32 3331 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer Pipe 33 3331 22 Sanitary Sewer Slip Lining 34 3331 23 Sanitary Sewer Pipe Enlargement 35 3331 50 Sanitary Sewer Service Connections and Service Line 36 3331 70 Combination Air Valve for Sanitary Sewer Force Mains 37 3339 10 Cast-in-Place Concrete Manholes 38 33 39 20 Precast Concrete Manholes 39 33 39 30 Fiberglass Manholes 4o 33 39 40 Wastewater Access Chamber (WAC) 41 33 39 60 Epoxy Liners for Sanitary Sewer Structures 42 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 43 3341 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 44 33 46 00 Subdrainage 45 33 46 01 Slotted Storm Drains 46 33 46 02 Trench Drains 47 33 49 10 Cast-in-Place Manholes and Junction Boxes 48 33 49 20 Curb and Drop Inlets CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 000000-6 TABLE OF CONTENTS Page 6 of 6 1 33 49 40 Storm Drainage Headwalls and Wingwalls 2 3 Division 34 - Transportation 4 5 34 41 10 Traffic Signals 6 34 41 11 Temporary Traffic Signals 7 34 41 13 Removing Traffic Signals 8 3441 15 Rectangular Rapid Flashing Beacon 9 3441 16 Pedestrian Hybrid Signal 10 34 41 20 Roadway Illumination Assemblies 11 34 41 30 Aluminum Signs 12 3471 13 Traffic Control 13 14 Appendix 15 16 GC-4.01 Availability of Lands 17 GC-4.02 Subsurface and Physical Conditions 18 GC-4.04 Underground Facilities 19 GC-4.06 Hazardous Environmental Condition at Site 20 GC-6.06.D Minority and Women Owned Business Enterprise Compliance 21 GC-6.07 Wage Rates 22 GC-6.09 Permits and Utilities 23 GC-6.24 Nondiscrimination 24 GR-01 60 00 Product Requirements 25 26 END OF SECTION CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/9/2014 —Ordinance No.21593-12-2014 DATE: Tuesday,December 09,2014 REFERENCE NO.: C-27134 LOG NAME: 60WMR13A—CIRCLEC SUBJECT: Authorize Execution of Contract with William J Schultz Inc. d/b/a Circle "C"Construction Company,in the Amount of$1,000,000.00 for Water Main Replacements Contract 2013A at Various Locations Throughout the City of Fort Worth,Provide for Project Costs and Contingencies for a Project Total in the Amount of $1,149,300.00 and Adopt Appropriation Ordinance(ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council: 1.Authorize the transfer of$1,149,300.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund; 2.Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$1,149,300.00;and 3.Authorize the execution of a contract with William J Schultz Inc.d/b/a Circle"C" Construction Company in the amount of$1,000,000.00 for Water Main Replacements Contract 2013A. DISCUSSION: The work to be performed under this contract consists of replacing and/or relocating water mains,services,and other pertinent construction required to provide water service to individual customers or developers. The bid documents included a stipulation that the total quantities listed may not reflect actual quantities and that the amount budgeted for the projects is$1,000,000.00.Final payments will be made based on actual measured quantities. The project was advertised for bid on August 28,2014 and September 4, 2014 in the Fort Worth Star—Telegram. On September 25,2014 the following bids were received: BIDDERS BID AMOUNT TIME OF CONTRACT William J Schultz Inc. d/b/a Circle C Contracting $2,497,760.00 365 Calendar Days -F Company Conatser Construction TX,LP $2,546,955.00 Atkins Brothers Equipment Company,Inc. $4,405,405.00 In addition to the contract cost, $119,300.00 is required for design engineering,real property acquisition,design survey,construction staking, project management,material testing,inspection and as—built mapping and $30,000.00 is provided for project contingencies. M/WBE Office—William J Schultz Inc. d/b/a Circle"C"Construction Company is in compliance with the City's BDE Ordinance by committing to one percent MBE participation and documenting good faith effort. William J Schultz Inc.d/b/a Circle "C"Construction Company identified several subcontracting and supplier opportunities.However,the MBE's contacted in the areas identified did not submit the lowest bids.The City's MBE goal on this project is 12 percent. This project is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the current capital budget as appropriated,of the Water Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM FundJAccount/Centers 1&2)P253 476045 6011702037ZZ $1.149.300.00 3)P253 $1.000.000.00 2)P253 51.1010 601170203730 $30.000.00 541200 601170203783 2)P253 541100 601170203741 $5.000.00 1)PE45 538040 0609020 $1.149.300.00 2)P253 531350 601170203742 $5.000.00 2)P253 531200 601170203751 $5.000.00 2)P253 531350 601170203751 $3.Q00.00 2)P253 531200 601170203752 $5.000.00 2)P253 531350 601170203752 $10.000.00 2)P253 531350 601170203753 $5.000.00 2)P253 531350 601170203773 $2,000.00 2)P253 511010 601170203780 $5.000.00 2)P253 531350 601170203780 $500.00 22P253 533010 601170203781 $30Q.QQ 2)P253 533030 601170203781 $1.000.00 2)P253 541200 601170203783 $1.030.000.00 2)P253 531200 601170203784 $7.000.00 2)P253 531350 601170203784 $2,000.00 2)P253 531350 601170203785 $30.000.00 2)P253 531350 601170203791 $1.000.00 2)P253 531350 601170203792 $1.000.00 2)P253 511010 601170203793 $1.000.00 2)P253 531350 601170203794 $500.00 CERTIFICATIONS: Submitted for City Manager's Office by: Femando Costa (6122) Originating Department Head: Andy Cronberg (5020) Additional Information Contact: Adolfo Lopez (7829) ATTACHMENTS 1.60W-MR13A—CIRCLEC Compliance Memo.1df 2. 60WMR 1 3A—CIRCLEC P253 A015.docx 3.FAR-00001 CIP#02037 P253.12df 4.PE45-538040-0609020.docx 000515-1 ra ADDENDA f Page 1 of 1 1 SECTION 00 05 15 2 ADDENDA 3 4 5 6 7 8 9 10 11 r 12 13 14 r 15 r 16 17 18 19 20 21 END OF SECTION l CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised July 1,2011 0011 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 3 oft 4 RECEIPT OF BIDS 5 Sealed bids for the construction of Water Main Replacements Contract 2013A, Water 6 Project No. P253-6011702037, City Proj. No. 02037 will be received by the City of Fort 7 Worth Purchasing Office: 8 9 City of Fort Worth 10 Purchasing Division 11 1000 Throckmorton Street 12 Fort Worth, Texas 76102 v 13 until 1:30 P.M. CST, Thursday, September 25, 2014, and bids will be opened publicly 14 and read aloud at 2:00 PM CST in the Council Chambers. 15 - 16 GENERAL DESCRIPTION OF WORK 17 The major work will consist of the (approximate) following: 6"- 24"water mains and 18 water services. 19 20 PREQUALIFICATION 21 The improvements included in this project must be performed by a contractor who is 22 pre-qualified by the City at the time of bid opening. The procedures for qualification and 23 pre-qualification are outlined in the Section 00 2113 — INSTRUCTIONS TO BIDDERS. 24 25 DOCUMENT EXAMINATION AND PROCUREMENTS 26 The Bidding and Contract Documents may be examined or obtained on-line by visiting 27 the City of Fort Worth's Purchasing Division website at 28 http://www.fortworthgov.org/purchasing/ and clicking on the Buzzsaw link to the 29 advertised project folders on the City's Buzzsaw site. The Contract Documents may be 3o downloaded, viewed, and printed by interested contractors and/or suppliers. 31 32 Copies of the Bidding and Contract Documents may be picked up from Fort Worth Water 33 Dept., Design Services Section, 927 Taylor St., Fort Worth, Texas, 76102 34 35 There is no cost for the Bidding and Contract Documents 36 37 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 38 City reserves the right to waive irregularities and to accept or reject bids. 39 40 INQUIRIES 41 All inquiries relative to this procurement should be addressed to the following: 42 Attn: Adolfo Lopez, City of Fort Worth 43 Email: adolfo.lopez@fortworthtexas.gov 44 Phone:817-392-7829 45 AND/OR 46 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised July 1,2011 r OR 0011 13-2 INVITATION TO BIDDERS Page 2 of 2 1 Attn: Jim Deeter, City of Fort Worth 2 Email: jim.deeter@fortworthtexas.gov .. 3 Phone:817-392-7803 4 5 ADVERTISEMENT DATES 6 7 August 28, 2014 8 September 4, 2014 M 9 10 END OF SECTION CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised July 1,2011 002113- 1 INSTRUCTIONS TO BIDDERS Page 1 of 11 1 SECTION 00 21 13 2 INSTRUCTIONS TO BIDDERS 3 1. Defined Terms 4 5 1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 6 00 72 00 - GENERAL CONDITIONS. 7 8 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural 10 thereof. 11 12 1.2.1. Bidder: Any person, firm, partnership, company, association, or 13 corporation acting directly through a duly authorized representative, 14 submitting a bid for performing the work contemplated under the Contract 15 Documents. 16 17 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, 18 or corporation acting directly through a duly authorized representative, 19 submitting a bid for performing the work contemplated under the Contract 20 Documents whose principal place of business is not in the State of Texas. 21 22 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to 23 whom City (on the basis of City's evaluation as hereinafter provided) makes 24 an award. 25 26 2. Copies of Bidding Documents 27 28 2.1. Neither City nor Engineer shall assume any responsibility for errors or 29 misinterpretations resulting from the Bidders use of incomplete sets of Bidding 30 Documents. 31 32 2.2. City and Engineer in making copies of Bidding Documents available do so only 33 for the purpose of obtaining Bids for the Work and do not authorize or confer a 34 license or grant for any other use. ` 35 36 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 37 38 3.1. All Bidders and their subcontractors are required to be prequalified for the work 39 types requiring prequalification at the time of bidding. Bids received from 40 contractors who are not prequalified (even if inadvertently opened) shall not be 41 considered. Prequalification requirement work types and documentation are as 42 follows: 43 44 45 46 47 CIN OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised November 27,2012 002113-2 INSTRUCTIONS TO BIDDERS Page 2 of 11 1 3.1.1. Water and Sanitary Sewer— Requirements document located at; 2 https://projectpoint.buzzsaw.com/fortworthgov/Resources/02%20- 3 %20Construction%2ODocuments/Contractor%2OPrequalification/Water%20 4 and%20Sanitary%2OSewer%2OContractor%2OPrequalification%2OProgram 5 /WSS%20prequal%20requirements.doc?public 6 7 3.2. Each Bidder unless currently prequalified, must be prepared to submit to City 8 within seven (7) calendar days prior to Bid opening, the documentation 9 identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 10 11 3.3. Submission of and/or questions related to prequalification should be addressed 12 to the City contact as provided in Paragraph 6.1. 13 14 The City reserves the right to require any pre-qualified contractor who is the 15 apparent low bidder(s) for a project to submit such additional information as the 16 City, in its sole discretion may require, including but not limited to manpower 17 and equipment records, information about key personnel to be assigned to the 18 project, and construction schedule, to assist the City in evaluating and assessing 19 the ability of the apparent low bidder(s) to deliver a quality product and 20 successfully complete projects for the amount bid within the stipulated time 21 frame. Based upon the City's assessment of the submitted information, a 22 recommendation regarding the award of a contract will be made to the City 23 Council. Failure to submit the additional information, if requested, may be 24 grounds for rejecting the apparent low bidder as non-responsive. Affected 25 contractors will be notified in writing of a recommendation to the City Council. 26 27 3.4. In addition to prequalification, additional requirements for qualification may be 28 required within various sections of the Contract Documents. 29 3.5. 30 Special qualifications required for this project include the following: 31 The Time of Completion of each individual work order in an essential element of 32 this contract. Each work order issued will have the maximum allowed number of 33 calendar days allowed for the completion of that specific work. 34 Single or several Work Orders may be issued at one time. The Contractor shall 35 initiate work within seven (7) working days of the date the Work Order is issued 36 to the Contractor, and continue work on the Work Order until it has been 37 completed, not including paving. The Contractor shall furnish and supply 38 sufficient equipment and personnel to complete the Work Order in the amount of 39 time provided for in the Work Order. Should the Contractor fail to start any Work 40 Order within the time specified, he shall add the necessary work crews and 41 equipment to prosecute the work to complete the Work Order or Work Orders in 42 the time provided therefore. Should the contractor fail to complete an individual 43 work order in the given amount of calendar days as specified on each individual 44 work order, liquidated damage charges will be subtracted from the final pay 45 estimate of that particular work order. The estimated amount for each particular 46 work order will be used for determining the amount of damages charged per 47 calendar day of time exceeding the specified amount. 48 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised November 27,2012 002113-3 INSTRUCTIONS TO BIDDERS Page 3 of 11 1 4. Examination of Bidding and Contract Documents, Other Related Data, and 2 Site 3 4 4.1. Before submitting a Bid, each Bidder shall: s r 6 4.1.1. Examine and carefully study the Contract Documents and other related 7 data identified in the Bidding Documents (including "technical data" referred s to in Paragraph 4.2. below). No information given by City or any 9 representative of the City other than that contained in the Contract 10 Documents and officially promulgated addenda thereto, shall be binding I I upon the City. 12 13 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, 14 local and site conditions that may affect cost, progress, performance or 15 furnishing of the Work. 16 17 4.1.3. Consider federal, state and local Laws and Regulations that may affect 18 cost, progress, performance or furnishing of the Work. 19 20 4.1.4. Study all: (i) reports of explorations and tests of subsurface conditions 21 at or contiguous to the Site and all drawings of physical conditions relating 22 to existing surface or subsurface structures at the Site (except Underground 23 Facilities) that have been identified in the Contract Documents as containing 24 reliable "technical data" and (ii) reports and drawings of Hazardous 25 Environmental Conditions, if any, at the Site that have been identified in the 26 Contract Documents as containing reliable "technical data." 27 28 4.1.5. Be advised that the Contract Documents on file with the City shall 29 constitute all of the information which the City will furnish. All additional 30 information and data which the City will supply after promulgation of the 31 formal Contract Documents shall be issued in the form of written addenda 32 and shall become part of the Contract Documents just as though such 33 addenda were actually written into the original Contract Documents. No 34 information given by the City other than that contained in the Contract 35 Documents and officially promulgated addenda thereto, shall be binding 36 upon the City. 37 38 4.1.6. Perform independent research, investigations, tests, borings, and such 39 other means as may be necessary to gain a complete knowledge of the 40 conditions which will be encountered during the construction of the project. 41 On request, City may provide each Bidder access to the site to conduct such 42 examinations, investigations, explorations, tests and studies as each Bidder 43 deems necessary for submission of a Bid. Bidder must fill all holes and 44 clean up and restore the site to its former conditions upon completion of 45 such explorations, investigations, tests and studies. 46 CITY of FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised November 27,2012 002113-4 INSTRUCTIONS TO BIDDERS Page 4 of 11 1 4.1.7. Determine the difficulties of the Work and all attending circumstances 2 affecting the cost of doing the Work, time required for its completion, and 3 obtain all information required to make a proposal. Bidders shall rely 4 exclusively and solely upon their own estimates, investigation, research, 5 tests, explorations, and other data which are necessary for full and 6 complete information upon which the proposal is to be based. It is 7 understood that the submission of a proposal is prima-facie evidence that 8 the Bidder has made the investigation, examinations and tests herein 9 required. Claims for additional compensation due to variations between 10 conditions actually encountered in construction and as indicated in the 11 Contract Documents will not be allowed. 12 13 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in 14 or between the Contract Documents and such other related documents. The 15 Contractor shall not take advantage of any gross error or omission in the 16 Contract Documents, and the City shall be permitted to make such 17 corrections or interpretations as may be deemed necessary for fulfillment of 18 the intent of the Contract Documents. 19 20 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for 21 identification of: 22 23 4.2.1. those reports of explorations and tests of subsurface conditions at or 24 contiguous to the site which have been utilized by City in preparation of the 25 Contract Documents. The logs of Soil Borings, if any, on the plans are for 26 general information only. Neither the City nor the Engineer guarantee that 27 the data shown is representative of conditions which actually exist. 28 29 4.2.2. those drawings of physical conditions in or relating to existing surface 30 and subsurface structures (except Underground Facilities) which are at or 31 contiguous to the site that have been utilized by City in preparation of the 32 Contract Documents. 33 34 4.2.3. copies of such reports and drawings will be made available by City to any 35 Bidder on request. Those reports and drawings may not be part of the 36 Contract Documents, but the "technical data" contained therein upon which 37 Bidder is entitled to rely as provided in Paragraph 4.02. of the General 38 Conditions has been identified and established in Paragraph SC 4.02 of the 39 Supplementary Conditions. Bidder is responsible for any interpretation or 40 conclusion drawn from any "technical data" or any other data, 41 interpretations, opinions or information. 42 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised November 27,2012 002113-5 INSTRUCTIONS TO BIDDERS Page 5 of 11 1 4.3. The submission of a Bid will constitute an incontrovertible representation by 2 Bidder (i) that Bidder has complied with every requirement of this Paragraph 4, 3 (ii) that without exception the Bid is premised upon performing and furnishing 4 the Work required by the Contract Documents and applying the specific means, 5 methods, techniques, sequences or procedures of construction (if any) that may 6 be shown or indicated or expressly required by the Contract Documents, (iii) 7 that Bidder has given City written notice of all conflicts, errors, ambiguities and s discrepancies in the Contract Documents and the written resolutions thereof by 9 City are acceptable to Bidder, and when said conflicts, etc., have not been 10 resolved through the interpretations by City as described in Paragraph 6., and 11 (iv) that the Contract Documents are generally sufficient to indicate and convey - 12 understanding of all terms and conditions for performing and furnishing the 13 Work. 14 15 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, 16 Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive 17 Material covered by Paragraph 4.06. of the General Conditions, unless is specifically identified in the Contract Documents. 19 20 S. Availability of Lands for Work, Etc. 21 22 5.1.The lands upon which the Work is to be performed, rights-of-way and 23 easements for access thereto and other lands designated for use by Contractor } 24 in performing the Work are identified in the Contract Documents. All additional 25 lands and access thereto required for temporary construction facilities, 26 construction equipment or storage of materials and equipment to be 27 incorporated in the Work are to be obtained and paid for by Contractor. 28 Easements for permanent structures or permanent changes in existing facilities 29 are to be obtained and paid for by City unless otherwise provided in the 30 Contract Documents. 31 32 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City 33 are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event 34 the necessary right-of-way, easements, and/or permits are not obtained, the 35 City reserves the right to cancel the award of contract at any time before the 36 Bidder begins any construction work on the project. F 37 38 5.3. The Bidder shall be prepared to commence construction without all executed 39 right-of-way, easements, and/or permits, and shall submit a schedule to the City 40 of how construction will proceed in the other areas of the project that do not 41 require permits and/or easements. 42 43 44 45 46 47 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised November 27,2012 002113-6 INSTRUCTIONS TO BIDDERS Page 6 of 11 1 6. Interpretations and Addenda 2 3 6.1. All questions about the meaning or intent of the Bidding Documents are to be 4 directed to City in writing on or before 2 p.m., the Monday prior to the Bid 5 opening. Questions received after this day may not be responded to. 6 Interpretations or clarifications considered necessary by City in response to such 7 questions will be issued by Addenda delivered to all parties recorded by City as 8 having received the Bidding Documents. Only questions answered by formal 9 written Addenda will be binding. Oral and other interpretations or clarifications 10 will be without legal effect. 11 12 Address questions to: 13 14 City of Fort Worth 15 1000 Throckmorton Street 16 Fort Worth, TX 76102 17 Attn: Adolfo Lopez, Fort Worth Water Dept. 18 Fax: 817-392-2527 19 Email: adolfo.lopez@fortworthtexas.gov 20 Phone: 817-392-7829 21 22 23 6.2. Addenda may also be issued to modify the Bidding Documents as deemed 24 advisable by City. 25 26 6.3. Addenda or clarifications may be posted via Buzzsaw at: 27 https://projectpoint.buzzsaw.com/client/fortworthgov/Infrastructure 28 Projects/02037-Water Main Replacement Contract 2013A 29 30 6.4. A prebid conference may be held at the time and place indicated in the 31 Advertisement or INVITATION TO BIDDERS. Representatives of City will be 32 present to discuss the Project. Bidders are encouraged to attend and participate 33 in the conference. City will transmit to all prospective Bidders of record such 34 Addenda as City considers necessary in response to questions arising at the 35 conference. Oral statements may not be relied upon and will not be binding or 36 37 7. Bid Security 38 39 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount 40 of five (5) percent of Bidder's maximum Bid price on form attached, issued by a 41 surety meeting the requirements of Paragraphs 5.01 of the General Conditions. 42 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised November 27,2012 "' 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 11 1 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of 2 Award have been satisfied. If the Successful Bidder fails to execute and deliver 3 the complete Agreement within 10 days after the Notice of Award, City may 4 consider Bidder to be in default, rescind the Notice of Award, and the Bid Bond 5 of that Bidder will be forfeited. Such forfeiture shall be City's exclusive remedy 6 if Bidder defaults. The Bid Bond of all other Bidders whom City believes to have 7 a reasonable chance of receiving the award will be retained by City until final 8 contract execution. 9 10 S. Contract Times 11 The number of days within which, or the dates by which, Milestones are to be 12 achieved in accordance with the General Requirements and the Work is to be 13 completed and ready for Final Acceptance is set forth in the Agreement or 14 incorporated therein by reference to the attached Bid Form. 15 16 9. Liquidated Damages 17 Provisions for liquidated damages are set forth in the Agreement. 18 19 10.Substitute and "Or-Equal" Items 20 The Contract, if awarded, will be on the basis of materials and equipment described a. 21 in the Bidding Documents without consideration of possible substitute or "or-equal" 22 items. Whenever it is indicated or specified in the Bidding Documents that a 23 "substitute" or "or-equal" item of material or equipment may be furnished or used by 24 Contractor if acceptable to City, application for such acceptance will not be 25 considered by City until after the Effective Date of the Agreement. The procedure 26 for submission of any such application by Contractor and consideration by City is set 27 forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is 28 supplemented in Section 0125 00 of the General Requirements. 29 3o 11.Subcontractors, Suppliers and Others 31 32 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 33 20020-12-2011 (as amended), the City has goals for the participation of 34 minority business and/or small business enterprises in City contracts. A copy 35 of the Ordinance can be obtained from the Office of the City Secretary. The 36 Bidder shall submit the MBE and SBE Utilization Form, Subcontractor/Supplier 37 Utilization Form, Prime Contractor Waiver Form and/or Good Faith Effort 38 Form with documentation and/or Joint Venture Form as appropriate. The 2 39 Forms including documentation must be received by the City no later than 40 5:00 P.M. CST, five (5) City business days after the bid opening date. The 41 Bidder shall obtain a receipt from the City as evidence the documentation r 42 was received. Failure to comply shall render the bid as non-responsive. 43 44 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other 45 person or organization against whom Contractor has reasonable objection. 46 47 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised November 27,2012 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 11 1 12.Bid Form 2 3 12.1. The Bid Form is included with the Bidding Documents; additional copies may 4 be obtained from the City. 5 6 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid 7 Form signed in ink. Erasures or alterations shall be initialed in ink by the 8 person signing the Bid Form. A Bid price shall be indicated for each Bid item, 9 alternative, and unit price item listed therein. In the case of optional 10 alternatives, the words "No Bid," "No Change," or "Not Applicable" may be 11 entered. Bidder shall state the prices, written in ink in both words and 12 numerals, for which the Bidder proposes to do the work contemplated or 13 furnish materials required. All prices shall be written legibly. In case of 14 discrepancy between price in written words and the price in written 15 numerals, the price in written words shall govern. 16 17 12.3. Bids by corporations shall be executed in the corporate name by the 18 president or a vice-president or other corporate officer accompanied by 19 evidence of authority to sign. The corporate seal shall be affixed. The 20 corporate address and state of incorporation shall be shown below the 21 signature. 22 23 12.4. Bids by partnerships shall be executed in the partnership name and signed by 24 a partner, whose title must appear under the signature accompanied by 25 evidence of authority to sign. The official address of the partnership shall be 26 shown below the signature. 27 28 12.5. Bids by limited liability companies shall be executed in the name of the firm 29 by a member and accompanied by evidence of authority to sign. The state 30 of formation of the firm and the official address of the firm shall be shown. - 31 32 12.6. Bids by individuals shall show the Bidder's name and official address. 33 34 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 35 indicated on the Bid Form. The official address of the joint venture shall be 36 shown. 37 38 12.8. All names shall be typed or printed in ink below the signature. 39 40 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the 41 numbers of which shall be filled in on the Bid Form. 42 43 12.10. Postal and e-mail addresses and telephone number for communications 44 regarding the Bid shall be shown. 45 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised November 27,2012 " 002113-9 INSTRUCTIONS TO BIDDERS Page 9 of 11 1 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the 2 state of Texas shall be provided in accordance with Section 00 43 37 — 3 Vendor Compliance to State Law Non Resident Bidder. 4 5 13.Submission of Bids 6 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding 7 Documents, at the time and place indicated in the Advertisement or INVITATION TO s BIDDERS, addressed to City Manager of the City, and shall be enclosed in an opaque 9 sealed envelope, marked with the City Project Number, Project title, the name and 10 address of Bidder, and accompanied by the Bid security and other required 11 documents. If the Bid is sent through the mail or other delivery system, the sealed 12 envelope shall be enclosed in a separate envelope with the notation "BID 13 ENCLOSED" on the face of it. 14 4 15 14.Modification and Withdrawal of Bids 16 17 14.1. Bids addressed to the City Manager and filed with the Purchasing Office 18 cannot be withdrawn prior to the time set for bid opening. A request for 19 withdrawal must be made in writing by an appropriate document duly 20 executed in the manner that a Bid must be executed and delivered to the 21 place where Bids are to be submitted at any time prior to the opening of 22 Bids. After all Bids not requested for withdrawal are opened and publicly read 23 aloud, the Bids for which a withdrawal request has been properly filed may, 3 24 at the option of the City, be returned unopened. 25 26 14.2. Bidders may modify their Bid by electronic communication at any time prior 27 to the time set for the closing of Bid receipt. 2s 29 15.Opening of Bids 30 Bids will be opened and read aloud publicly at the place where Bids are to be 31 submitted. An abstract of the amounts of the base Bids and major alternates (if 32 any) will be made available to Bidders after the opening of Bids. 33 34 16.Bids to Remain Subject to Acceptance 35 All Bids will remain subject to acceptance for the time period specified for Notice of 36 Award and execution and delivery of a complete Agreement by Successful Bidder. 37 City may, at City's sole discretion, release any Bid and nullify the Bid security prior to 38 that date. 39 40 41 - 42 43 44 45 46 47 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised November 27,2012 0021 13-10 INSTRUCTIONS TO BIDDERS Page 10 of 11 1 17.Evaluation of Bids and Award of Contract 2 3 17.1. City reserves the right to reject any or all Bids, including without limitation 4 the rights to reject any or all nonconforming, nonresponsive, unbalanced or 5 conditional Bids and to reject the Bid of any Bidder if City believes that it 6 would not be in the best interest of the Project to make an award to that 7 Bidder, whether because the Bid is not responsive or the Bidder is unqualified s or of doubtful financial ability or fails to meet any other pertinent standard or 9 criteria established by City. City also reserves the right to waive informalities 10 not involving price, contract time or changes in the Work with the Successful 11 Bidder. Discrepancies between the multiplication of units of Work and unit 12 prices will be resolved in favor of the unit prices. Discrepancies between the 13 indicated sum of any column of figures and the correct sum thereof will be 14 resolved in favor of the correct sum. Discrepancies between words and 15 figures will be resolved in favor of the words. 16 17 17.1.1.Any or all bids will be rejected if City has reason to believe that collusion 18 exists among the Bidders, Bidder is an interested party to any litigation 19 against City, City or Bidder may have a claim against the other or be 20 engaged in litigation, Bidder is in arrears on any existing contract or has 21 defaulted on a previous contract, Bidder has performed a prior contract in 22 an unsatisfactory manner, or Bidder has uncompleted work which in the 23 judgment of the City will prevent or hinder the prompt completion of 24 additional work if awarded. 25 26 17.2. City may consider the qualifications and experience of Subcontractors, 27 Suppliers, and other persons and organizations proposed for those portions 28 of the Work as to which the identity of Subcontractors, Suppliers, and other 29 persons and organizations must be submitted as provided in the Contract 30 Documents or upon the request of the City. City also may consider the 31 operating costs, maintenance requirements, performance data and 32 guarantees of major items of materials and equipment proposed for 33 incorporation in the Work when such data is required to be submitted prior to 34 the Notice of Award. 35 36 17.3. City may conduct such investigations as City deems necessary to assist in the 37 evaluation of any Bid and to establish the responsibility, qualifications, and 38 financial ability of Bidders, proposed Subcontractors, Suppliers and other 39 persons and Organizations to perform and furnish the Work in accordance 40 with the Contract Documents to City's satisfaction within the prescribed time. 41 42 17.4. Contractor shall perform with his own organization, work of a value not less 43 than 35% of the value embraced on the Contract, unless otherwise approved 44 by the City. 45 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised November 27,2012 00 21 13-11 INSTRUCTIONS TO BIDDERS Page 11 of 11 1 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 2 responsive Bidder whose evaluation by City indicates that the award will be in t 3 the best interests of the City. 4 5 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not 6 award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is 7 lower than the lowest bid submitted by a responsible Texas Bidder by the 8 same amount that a Texas resident bidder would be required to underbid a 9 Nonresident Bidder to obtain a comparable contract in the state in which the 10 nonresident's principal place of business is located. 11 12 17.7. A contract is not awarded until formal City Council authorization. If the 13 Contract is to be awarded, City will award the Contract within 90 days after 14 the day of the Bid opening unless extended in writing. No other act of City 15 or others will constitute acceptance of a Bid. Upon the contractor award a 16 Notice of Award will be issued by the City. 17 18 17.8. Failure or refusal to comply with the requirements may result in rejection of 19 Bid. 20 21 18.Signing of Agreement 22 23 When City issues a Notice of Award to the Successful Bidder, it will be accompanied 24 by the required number of unsigned counterparts of the Agreement. Within 14 days 25 thereafter Contractor shall sign and deliver the required number of counterparts of 26 the Agreement to City with the required Bonds, Certificates of Insurance, and all 27 other required documentation. City shall thereafter deliver one fully signed 28 counterpart to Contractor. 29 30 31 32 END OF SECTION CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised November 27, 2012 463513- 1 CONFLICT OF IITER€ST AF=FMVrr ?age 1 of I I SECTION (10 35 13 2 CONFLICT OF INTEREST AFFIDAVIT 3 d Each bidden, offeror, or respondent (herefnafter also referred to as"you'd to a City of 5 Fart Worth (also referred to as "City") procurement are required to complete Conflict of G Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts 7 Disclosure Statement (the attached CIS Form) belcw pursuant to state law. This affidavit x will certify that the Bidder has on file with the City Secretary the required documentation 9 and is eligible to bid on City Work. The referenced farms may be downioaded from the w website links provided below, 12 htto://www.ethics.state?.tx.us/forms/CIO.pdf 13 14 http:Z1www.ethics.state.Lx.uslfarrus/CIS.adf 15 I6 CIQ Form is an file with C[ty Secretary 17 18 ® CIQ Form is being provided to the City Secretary 19 20 L] CIS Form is an File with City Secretary 2l 22 0 CIS Farm is being provided to theCity Secretary 23 ti 24 2S 26 BIDPlER., 27 2 > 29 Company (Pleasp Print) 30 31 Aar ea&2 Signature: r 32 Address 33 34 / 4�,/YO Title: 35 Crty{State/Zlp (Please Print) 36 37 39 END OF SECTION I Cf1Y OF FORT WORTH WF RZC 13A STANDARD CCINSTRUMON SPEKIFICATION❑OCUMFNTS City rmject No, 2037 Rt-vL&d Marrh 27, 2012 A 0041 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The City Manager c/o:The Purchasing Department 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: Water Main Replacements Contract 2013A City Project No.: 2037 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non- competitive levels. d. "coercive practice"means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13 Bid Proposal Workbook.As .14 41 44 BID FTOPJA Page 2 of 3 3. Prequalifi!cation The Hilder acknaw+iedges that the following work iy+pes roust be perfarmed only by prequalified Contractors and su bco ntra cors= a, Water Improvements 4. Time of Completlon 4.1. The Work wiil be complete for Final Acceptance within 366 days days after the date when the the Can tracl Time commannes to run as providad in Paragraph 2.03 of the General Canditibrls. 4.2. Bidder accepts the provislons of the Agreement as to liquidated damages in the event of failure to complete the Work{andlor achlevelraent of Milestones)within The times specified In the Agreement_ 5. Attached to this fold The following documents are attached to and made a part of this Bld. a, This Bid Form, Sedum p0 41 00 1 b. Required Bid Band!, Section 00 43 13 issued by a surety meting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 0G 4243 i d. Vendor Compliance-o State Lava Non Resident Bidder,Section 40 43 37 a. MVVBE Foriras (optional of time of bid) f. Prequalificaticn Statement, Section DU 45 12 g. Conflict of Interest Affidavit,Section 00 3513 '1 necessary,1CIC.t or CIS forms are to be provided directly to City Secretary h. Any additional documents that may he required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bldder will complete The Work in acuurdance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project_ Only this frgure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder In signing this proposal that the total bid amount entered b6ow is subiect to verifr[:atIun andfar modification by rnultipying the unit bid varices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended arnounts. Total Bid$ r " $b,2 40, CITY W FORT VOURTH STANDARD CONSTRUCTrON S"BMFrCATION I20CLIVIE fTS Form Revieed ZD 1203 7 00 41 00,_C*43 131_011 42 43_00 d3 3709 4.5 12_04 35 1 D. Bid Proposal VVorkboa-Lxls 4 a 004100 SM FORM rwift 3 of 3 7, old Submittal This Bid is submittedori .rJ?by the entity narrled below. Respoctfuliy submitted, Receipt is acknowledged of the Initial {� f©Ilowin g,Addenda: By. Addendum No. 1; (Signature) Addundum No.2: Addendum No_3: /{, O.. a lAddendum Nu. 4: (Pr eked Nome) Title: I le e Corporate Seal: State of Incorporation: fdG.s Email; L�flG Gr3lt TILrc�►J• L[ Phone; l7 END OF SECTION I I a CITY OF FORT VoORTH STANDAR❑C0M9TRUinTION SPFCIFrCA710N DO0tiMFN T8 '� Foern RvAsed 20124327 130 41100 (10 43 13 OC 42 49 ®3 43 37800 45 12_OC$5 13 6:d Prgp"af WQfkboQk h46 ITEM BID LIST DESCRIPTION OF ITEMS WXTH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTYI PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT �Y /X-w. er -f Y�.0a w r v 1. 0170.0102 3d Ea. 1NorkOrderl�lcrbifixatian 017000 5 -aga"O- -69668-60 Per Each: 7 Drs,a �07✓ trek wfrr 17� t"ffinosand Dollars and no Cents 2. 0170.0103 5 Ea. AlorkOrderEmergencyh obillzation 017000 2eo." 106.00 -TS-$ 9:gQ 7-5$ f} Per Each: —r_f two thousantf' ' Ftmdfed Dollars and no Cents 3. 3311.0031 200 LF. 4" PVC Water Pipe 3311.12 $ 32.00 $ $6,4KQ0 Per Linear Fact: thiry two paliars and no Cents 4. 33110,0161 800 Lf. 6"PVC Water Pipe 331117 $ 38.00 $ $30,400 00 Per HriBar FnM7 ' thirty 0ght DDallars no Cents N 5. 3311.0251 1600 U. g" PVC Water Pipe 331112 .$45.00 $ $72,004,00 Per Linear Foot. Dollars ends Cents 6. 3311.0361 400 Lf. 10"PVC Water Pipe 3311 13 $ $52.00 5 $20,800.00 Per Linear Foot: ,44" /.,e, Dollars and "d Cents T 3311.0451 40C Lf. 12"PVC Water Pipe 331112 $ $65.00 $ 527,200.00 Per Unear Foot: DoiJars and /7ej Cents 8. 3311.05451 500 Lf. 15" PVC Water Pipe 33 1112 $ $70.00 $ 3$,0 .00 Per Linear Foot: —ffyd,n-� J-1 Dollars and Cents 8-1 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NCI. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 9. 3311.0541 500 If, 24"PVC Water Pipe 331112 } r �y ll C��yy}y nna�yy ^P 85,Q� � �hd.,SlfIl.V4 Per Li near Foot: ^^ P/car . Dollars and act Cents 10. 3311.4051 101) Lf. 4"DIP Water as 1.110 S $35.00 $3,5_30.04 Per Linear Foot: 7 .°. •f Dollars and .,A Cents 11. 3311.0151 104 Lf. 5" DIP Water 331110 S $45,010 $ $4,5{10.00 Per Linear Fast: tt3r .% Dollars and .}a Cents 12, 3311.0251 ICO Lf. 8"CIP Water 331110 $48.0 $4,800-Ul0 Per Linear Foot: r "oz Dollars and b0 Cents 13. 3311,0351 1W Lf. 10" DIP Water 33 1110 $ $50,00 $ $S,GC?a.CI] Per Lin ear Foot: -7,LLQ _ _ _ Dollars and Cents 14. 3311.4451 100 Lf. 12" DIP Water -3a 1.110 $ $55.00 Per Linea r Fact 7-f ?G x'16 Dollars r and .00 Cents 15, 3311.6551 100 Lf, 115" DFP water 33 11 1C $ $B5.OD $ $9,54a.00 Per Linear Foot:�^ and J7 t) Cents 16. 3311.0551 100 Lf. 24" DIP Water 331110 $ $ $9,500.00 Per Linear Foot: C � lr Callars and Cents f E3.2 ITEM BID LIST DESCRIPTIDN OF ITEMS UdITH BID SPECIFICATION UNIT TOTAL NO. ITEM TWO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 1T 500 Lf. 15" Pretensioned Conc,Cylinder Pipe $ $100.00 $ $5u,uGo-Qu Per Linear Foot: 40Rt �L`.. � .r .x, Dollars and /70 Cents 15. 500 Lf. 24"Pretensioned Conc.Winder Pipe $120.00 $ $60r000.00 Per Line ar Foo^: Grad fir.,p i e ,w , " Doliars and „a Cents 19, 3305.2002 5+0 LF. 4"Water Carrier Pi pe(DI wl 55 Casing 33 05 24 spacers) _q $40.00 Per Linear Fact: f I�e Dollars and .1740 Cents 20. 3305.2002 50 Lf, 5"Water Carrier Pipe DI wj 5S Casing 33 05 24 Spacers} $ $45.0D $ $2,250,00 Per Linear Foot: • f Dollars and A; a Cents 21, 3305.2042 50 Lf. 8"Warr Carrier Pipe{DI wJ SS Casing 3305 24 spacers) $ $55,00 $ $2,750.00 Per linear Foot: 6� v .9 Dollars and tyro_ Cents 22. 3305.2003 50 Lf. 10"Water Carrier Pipe(Di wf 55 Casing 33 05 24 Spacers) $60.00 $ $3,(100.00 Per Linear Foot: X/;,e __Dollars and Cents 23, 33DS.2004 50 Lf. 12"Water Carrier Pipe(DJ wl S5 Casing 3305 24 spaces) $ $70.00 S $3,500.00 Per Linear Foot: , ►' eDollars and 40 Cents d B-3 ITEM BID LIS"l' DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 2,i. 3305.2005 50 Lf, 15"Water Carrier Pipe(DI wf SS Casing 33 05 24 Spacers) $ $.1,250.00 Per Linear Foot; Dollars and d Cents 25, 3305.2005 50 Lf. 24"Water Carrier Pipe(DI w/SS Casing 33 05 24 Spacers) 5 $iumu $5,000.00 Per Linear Foot: owe rrn�rrc� Dollars and .70 Cents 25. 33{35.1002 50 Lf. 16"Casing By Open Cut(Welded Steel) 33 05 22 $ )70.04 $ $3,500,Cc Per Linear Fact; T . i 0"74 Dollars ani_ /9 Ig Cents 27. 3305.1003 50 Lf. Z0" Cas idig ay Open Gut(Welded Steel} 33 05 22 Per Linear Foot: e l4 ,Z Dollars and a Cents i 28. 3305.10014 50 Lf. 24" Casing gy Open Cut(Welded Steel) 33052-2 $ $90,00 $4,50C.-Di Per Linear Foot. _ I Dollars and , u Cents 29. 33nS.1005 sn Lf. 30"Casing gy Open Cut(Weided SteE1) 33 C-5 22 $ $130.00 $ $5,500.00 Per Linear Foot- Ge j4o7ref"1, •o, Dollars and Cents 3C. 3305.1006 50 J. 35"Casing By Upen Cut(Welded Steel) 3305 22 $ $180.00 $ $9,000.00 Per Llnear root: ,g,y sir e ll,,;gyltr_ D v Ila rs and n Cents B.4 4 ITEM BID LIST DESC RIPTIM OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRTTTEN IN WORDS SECTION NO. 'PRICE AMOUNT X 3305.1102 50 Lf. 16"Casing By Other Than Open Cut 33 05 22 (Welded Steel w/Grout) $ $500.00 $25,00G}00 Per Linear Foo-t: 1C,'r•r ,, .r/ Dollars and J*.7 Cents 32. 3305.1143 50 LP. 2a" Casrng By other Than Open Cut 33 05 22 (Wended Steel vu/Grout} s $600,00 V(0001)0 Per Linear FouV . r X,,0,{,-, Dollars and v C� Cents 33. 3W5,1 1Q4 50 Lf. 24" Casing By Other Than Open Cut 33 05 22 (We Ided Steel wl Gra utj $600.00 $ $30,+300.00 Per Linear Foot; hl", "z Dollars and -1?0 Cents 34. 3305.1105 50 U. 30"Casing By CtherThan Open Cut 3305 22 (Welded Steel wlGrout) $ $700.00 $ $35,000.00 Per Linear Foot: and n Cents 3S. 3305.1105 50 Lf, 36"Casing By Other Than Open Gut 3309 27 (Welded Steel w/Grout) $ $700.00 $ $35,000.00 I r Per Linear Foot: i ,rderl ,x,� .. •/ Dollars a:nd " Cents 36. 3312.3001 20 Ea. 4"Gate Valve 331220 $ $550.00 $ $11,000.00 Per Each: irl-1100 4,Woo al// & dollars a rrd rr a ACents 37, 3312.3002 25 Ea. 6"G2te Valye 331220 $ $750.00 S $18,750.70 Per Each: 1f,rvrn v Dollars and 417.1 Cents 38. 3312,3003 25 E�. 8"Gate Valve 33 12 20 $ $1,200.00 $ $30,0M,00 Per Eac 04e �} 01&sdop� 6'.0h4,a4l,� _ Dollars and �d Cents 39, 3312.3004 10 Ea. 10" Gate Valve 33 12 20 $ $1,60C.00 $ $16,000.00 B-S ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES 1I4 R TTEIN IN WORDS SECTION NO, PENCE AMOUNT Per Each 494{ �I Ow rOr3.� .rl;e 1441,Ole,1-1 Dollars and dyd Cents 4C. 3312.3005 1C Ea, 12"Gate Valve 33 12 20 5 $1,8001.00 $18,0{}0.00 Per Each: Trsgr Dollars and a Cents 41, 3312.30DC S Ea, 16" Gate Vr lve wl Vatilt 33 1220 $ $9,000.00 $ 845,000.40 Per Each: tatterof Dollars and ra 0 Cents 42. 3312.3D06 5 Ea. 24"Gate Valve wl Vault 331220 $ $12,000.00 $W,000.00 Per Each: I..-elee /We4 r o- Dollars and n zj Cents 43. 3312.3101 5 Ea, 4"Cut-in Gate Valve 33 12 2D $ $1,5muo $1,50lma Per Each' rte. . Dollars and Cents 44. 3312.3102 5 Ea. 6"Cut-in Gate valve 33 12 20 S $1,800.+00 $ $9,000.00 Per Each, prr,� �ieurar,� tr3a.i:a+rr Dollar$ ' and Cents 45. 33113103 5 Ea. E3"CLt-in Gate Valve 331220 S $2,500.00 $ $12"500.00 Per Each: Dollars and Cents 46. 3312.3104 5 .Ea. 10"Cut-in Gate Vaive 331220 $ $2,500m^ $13,000.70 Per Each: Dollars and sed Cents 47. 3312.3145 5 Ea. 12" Cut-in Gate VaNe 33 12 2(,' S $z,800.0u $ $14,000,00 PxEac °d l�sls38+y 6 fi Dollars an 44) Cutts 48. 3312.3105 1 Ea. 16 Cut-in Gate Valve wf V'aul t 331720 $ $14,000m $ $14,000.00 6 .6 ITEM BID LI S"T DESCRIPTION OF ITEMS WrM BID SPECIFICATION UNIT TOTAL ND. ITEM NO. (QTY, PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT Per Each; Id'&-/,,- C` �raP Dollars and IV d Cer3_s 40, 3312.3106 1 Ea. 24" Cut-in Gate Velve W/Wu It 33 12 20 ps'now)-c $_ $.18,000.t7D Per Each: i�7 rr s 7'1etr,r y4 Dollars an .2cr Cents 5n. 0241.1301 5 Ea, Remove 4'Water Valve 02 41 14 $ $340.00 $1,500,00 Per Each: .1.0r W.,., D❑llars and ,tea Cents 51. x]241.1302 5 Ea. Remove 6"W3ter VaIve 024114 $ $400.00 $ 12,000.00 Per Each: fGe, ii etiw Dnllar5 and 10,710 Cents 52, 0241.1303 5 Ea. Remove R" Water Valve 02 41 14 $ $500.00 �_ $21500.00 Per Each: rd"s r � _ _ Dollars and 010 Cents 53. 0241.1304 5 Ea. Remove 10" Water'Valve 02 41 14 $ $50100 $ $2,500.00 Per Each:{ '+fr .'Lhao�.e"w/ Dollars and 'y'a Cents 54. 0241.1305 5 Ea. Remove 12"Wvter Valve 024114 $ $600.on $ $3rOQ4.00 Per Each: xxw -- Dollars and ..d Cents 55. 6241.1351 2 Ea. Remove&Salvage 16" Water Valve 02 41 14 $ $1,000.00 S $2,000.00 Per Each: aj71 -,C Dollars and 'f'? Cents 56. 0241.1351 2 Ea. Remove&Salvage 24"Water halve 024114 $ $1,500.00 $ $3,000.00 Per Ea Dollars and APO Cents 57. 3311,0001 10 Tn. Ductlle Iran Water Flttings<16"Dia. 33 1111 $ $5,500.00 $ $55"000,00 0-7 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPFCIFICATIDN "NIT TOTAL NO. ITEM NO. QTY. PIUCES LV PrFrEPI IN WORDS SECTION NO. PRICE AMOUNT Per Ton: +�•rf �,��r�,ra .a rJ 4,-,--w" /-,--� Doilars and 'va Cents 58. 3311.0001 10 Tn7 Ductile Iron Water Fittings 16" Dia.& 331111 Larger $ $fi,500.Gf0 $ $65,D00_7t] Per Ton, •r �.rat� r -,, /,,sem 63allars and nav Cents 59. 1 Ls, 16"Con.c.Cylinder Pipe Fittings{Per Attached list) $ $35,00D.00 35,C4(I.O[J Per Lump Sum: i P /'rn salt..d DOIlars and Cents 6D. I Ls, 24"Coat,Cylinder Pipe Fittings(Per Awiched List) $ $45,000.00 $45,400.0a Per Lump Sum: oollars and .0 Cents 61. 3312.0001 20 Ea. Fire Hydrant 33 12 40 $4,zook 7 $84,000.00 Per Each: lc�ur Aw Dollars and fv-4 Cents 62. 3303,0101 20 Ea. Fire Hydrant Stern Extension 3305 14 $300.00 $6,oco.0d Per Each: _ .r /,` • Dollars and vo Cents 63. 0241.1510 5 Ea. Salvage Fire Hydrant 02 41 14 $ $800.00 $4,000.00 Per Each; eiAI 1.r.ev:�ro, Dollars and Cetlt$ 64. 3312.1.002 1 Ea. 1"Combinatlan Air Valve Assembly for 33 1230 Water $ $2,800.00 $ $2,8000 00 per Each; 11110 ,fir r and cents 55. 3312.1002 1 Ea. 2"Combination Air halve 7Ssembly for 33 1230 y Water $ $3,200.Qa S $3,200.oQ I B-8 ITEM BID LIST DESCRIPTrON OFITEMS WITH BID SPECIiFICATiON UNIT TOTAL NO. ITEM NO, QTY. PRICES WRITTEN IN 1NORDS SECTION NO. PRICE AMOUNT Per Each: :r., 4'sar, 64!�Z_' [Dollars and f9 d Cents 66. 3312,1UO2 1 Ea. 3"CcmbinatlonAir Valve Assembly for 331230 Water $ $3,800.00 $ $3,800.00 tl Per Each: rrt /Xzqu'rdn rf { elg771 A,, Dollars and ^0 Cents I M r67. 3312.6002 1 Ea, 4" Blow Off Valve 3312.6€1 $4,OU0,00 Per Each: I r0'f01j14'.'_1Dollars and Cents 68. 3312.6002 1 Ea. G" Blow Off Valve 331260 $ $S,UOO,OC# $ $5,000,00 Per Each., DolJars and Cents 69. 3312.6042 1 Ea, 8" Blave Off Valve 331260 $6,000.00+ $ 56,000.0.3 Per Each: fir Za ,Po7,pl Dollars and Wy Cents 7[1.. 3312.4001 1 Fa. 6"x 4"Tapping Sleeve&halve 331.225 $ $1,503.0{1 $ $1,500,00 Per Each; pe7e — r .r • c.=r.v } Dollars and Cents 71. 3312.4002 1 Ea. 6"x 6"Tapping S1eove&Valve 33 12 25 $ $1,7C(oo $ $1,700,OD Per Each: 0,7e ,r""0'7 ' a..y r/,r'-, Dollars aQ 447 Cents i 72. 3312AO03 1 Ea. 8"x 4"Tapping Sleeve&Value 331275 $ $1,)00,00 $ $1,700600 Per Each: {i•,,,.y.r #, sena+' and 0 Cents 73. 3312.4004 1 Ea, 8"x 6"Tapping Sleeve&Valve 33 12 25 $ $2,200.00 $ $2,200.40 Per Each: B-9 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT sra A011- y�a�' rm �oa2r� Dollars and Cants 74. 3312.4005 Ea. 8"x 8"Tapping Sleeve&Valve 33 12 25 5 $2,400.00 $ $2,400.00 Per Each:7�,o a", 1'GW.' ,y.1111i11- Collars and �2.v Cents 75. 3312.4101 1 Ea. :1.0"x 4"Tapping Sleeve&Valve 331225 $ $2,600.0(7 $ $2,600.04 Per Each: &* oP&.so-aW - ,r x, „sem +✓ 0nl lars and 070 Cents 76. 3312.4102 1 Ea. 10"x 6"7a p p i rig Sleeve&Vadve 331225 4 $2,804.00 5 $2,800.07 Per Each; Ave j�heo-x-r4rf I �2 d/ A,,,- p? f/ Dollars and 4 a Cents 77. 3312.4103 1 Ea. 10"x S"Tapping Sleeve&.Valve 3312 25 $ $3,000.00 $3,000.O0 Per Each, frr�r .hlaz..,s,r. ,/ Du l l a rs and *0 Cents 78. 3312.4104 1 Ea. 10"x 10"Tapping Sleeve&Va lve 33 12 25 $ $35DO.00 $ g315C{}.00 s r rrre r Dollars s T and Cents 79. 3312.4105 1 Ea. 12"x 4`Tapping Sleeve&Va Ive 33 12 25 $ $23700.()0 $ $2,700.00 Per Each:-,(,pit► //0j,.f 4717 r1 ---- SPA'010 A1141111 / Dollars DO 1170 Cents 31 3312.410£ 1 Ea. 12"x 5"Tapping Sleeve&Valve 33 1225 $ $2,9170.1)0 $ $z,9.00-UO Per Each; 7 w& 1 -rw.sa—r 1?rrrt !{per.rsa� Dollars a0d _12 J Cents 81. 3312.4107 1 Ea. 12"x 8"Tapping Sleeve&Valve 3312 25 $ $3,200.00 $ $3,200.00 Per Each: i rr 7e4,w s-f-"1 — .w1 Dollars and .0 W? Cents 62. 3312.41.08 1 Ea. 12"x 10"Tapping Sleeve&Valve 331225 $ $3,40C.00 $ $3,4-DD.Q0 Per Each; B-14 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY, PRICES WRITTEN IN WORDS SECT10M NO. PRICE AMOUNT DUllars and 090 Cents 83. 3312.4109 1 Ea. 12"x 12"gapping Sleeve&Valve 33 12 25 5 $3,600.00 $ $3,600.60 P r Each: 'Dollars and Cents 84. 3312.4110 1 E, 16"x 4"Tapping Sleeve&Valve 331225 $ $3,200.00 $ $3,200.00 Per Eaeh: -Ave Airs r,&z Dollars and -70 Cents 85. 3312.-4111 1 Ea. 16" x 6"Tapping Sleeve&Valve 33 12 25 $3,500.00 $ $3,500.00 Per Each: f} cs sa,,/ //".. 4" Dollars and r;r Cents 86, 3312.4112 1 Ea. 16"x 8"Tapping Sleeve&Valve 331225 $ $3,600.00 $ 53,600.00 Per Each: Dollars and l,sd Cents 97, 3312.$113 1 Ea. 16"x 10"Tapping,5leeve&Valve 33 12 25 $ $3,800.[10 $ $3,80mo Per Each'�?'_Ae ,. and rev Cents 88. 3312.4114 1 Ea. 16"x 12"Tapping Sleeve&Valve 33 1225 $ $4,200.00 $ $4,200.00 Per Each: rr 1x11 At, Dollars and Cents 489. 3312.4114 1 Ea. 15"x 1s"Tapping Sleeve&halve 3312 25 s9,50O.00 $91500.90 Per Each; i/,o a ?�. 0&4r-m.d . " fir,. { .•✓ Dollars and e9d cents 90. 3312.42.03 1 Eek. 20"x 8"Tapping Sleeve&Valve 331225 $ $3,600.ba $3,604.0() Per Each: yr,.e,,e ¢W J "C-I ie .ter � .✓ Dollars a nd hem _ Cents 91. 1 Ea. 21"x 8"Tapping Sleeve&Valve $3,800,00 5 $3,840,04 Per Each; B- 11 ITEM VIO LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL No. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT 7,4rr , �. r{' fev, s%+rte+ Dolldr5 and .ac" Cents 92. 3312.4209 1 €a. 24"x 6"Tapping5leeve&Valve 33 1225 $ $4,200.00 $ $4,200.00 Per Each:,4,,, 4,e /.,� /",,- Dollars and wV90 Cents V 93. 3312.42{79 1 Ea. 24" X8"Ta pping SleeuE&VaIVE 331225 $ $4,500.00 $ $4,500.00 Per Each! yGwe /,, s Dollars and '47 Cents 94. 3312,4209 1 Ea. 24"x 10"Tapping sleeve&Valve 331-225 $ $4,500.00 P dacha:f T!�L r �gaPl+lsri r ,..n.f.X✓ Dollars and a Cents 95. 3312.4209 1 Ea. 24"x 12"T2pping Sleeve RL Vahee 33 12 25 $4,500.00 $ $4,500:00 Per tach: rr J�srnr��"�✓ Dollars and .40 Cents 35. 3312.4209 1 Ea. 24"x 16"Tappi rig SIeeva&Value 33 12 25 $ $9,000.04 $ $9,000.00 Per Each' ,9"'we .4'.S.0I / Dollars _ and ^a Cents 97. 3312.4212 1 Ea. 24"x 24"Tapping Sleeve&Valve 33 12 25 $15,000,40 $ $15,000.001 T}11"-114 4 u f ry d p4tlars and 'Cents 98. SO Ea_ 3{4" W.aterTap to Plain S $300.00 $ $15,0100,00 Per Each Dollars and . .,r� cents 99. 100 Lf. 1/4"Copper service Lime $18.00 $1,800.00 Per linear Foot: ^ . i_4_0" Collars and "ej Cents 100. 50 Ea. 1" VVaterTap to Main $ $7G0.00 S $35,000.04 Per Each: B-12 ITEM Ell LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION PUO, PRICE AMOUNT _57P-.f0 r�iz..a r• D4lla rs. and Cents 101 10i} LF. 1_"Cop;perService Line $ $22.00 $2,200.00 Per Linear Foot: a! r2 Dollars and 07z' Gents 102. 3312.2004 100 Lf. I" Private 4vater service 331210 $ $55.00 $5,500.00 Per Linear Foot! Arr Dollars and ,s sr Cents 103. 3312.2002 50 J. 1" Bored Water 5ervire 33 1210 $ 575,00 $ $3,750.00 Per Linear boat: X,e"• ,4 Led Dollars and o, d Cents 104, 50 Ea. 11/2"Water Tap to Main $ $80D.00 $ $40,000.00 Per Lack: l ` Dollars a n 4F Cents 105. 100 Lf. 11/2" Copper Service Line $ $25.00 $2,500.00 Per Linear Foot! rf0 Dollars and AJ C':ent& 106. 3312.21D4 100 U. 11/2"°Private water Service 331210 $ $60m $ SfiSO4.00 Per Linear Foot, / y Dolfars and e1 d Cents 102, 3312.2102 50 Lf. 11/2' Bored Water Service 33 12 10 $ $80.00 $ $4,000.00 Per U near Foot: m4_/V Dollars and �7 o Cents 108. 50 Ea. 2"Water Tap Lo Main $ $900.00 $ $45,000.00 Per Each., 2 e i rr�dfie°fl Dollars and wko Cents 149. 100 Lf. 2"Copper Service Llne $ $26.00 $ $2,B00.00 Per Llnear Foch B-13 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATfON UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO, PRICE AMOUNT e.,' Xi' Dollars and ovo Cents 1 tQ. 3312.22(14 100 Lf. 7"Private water Service 33 1210 $ $65.00 $ $6,500.0{} Per Elrlear Fant: Zi ' X DCllars and rid Cents 111. 3312.2202 511 Lf. 2" Bored Water5ervice 331210 _$ $5.d(} S $4,250.00 Per Lirear Foot: s .. Dollars and dF V ej Cents 112. 25 Ea< Class A PVC Meter Box(Furnish &Set) $2N.00 $ $5,000.0{} Per Each: f /Ave Dollars and *cj Cents 113. 25 Ea. Class B PVC Meter Box{Furnish&Selo Per Each: /fr_ r [dollars and Cenk5 114. 10 Ea. Class C PITC Meter Bax j Furnish &Set) $250.00 $ 52,50{}.00 Per Each: 7�d Dollars and �00 If Cents 115, 2 Ea. 1"Multiple Service Brand, Per Each: .!; ,e --- -4-1 Dollars and A>a Cents 116, 2 Ea. 11/2" FAultiple Service Branch $ 74Q,Q[1 4010.00 Per Each: Dollars anci .00 Cents 117. 2 Ea. 2"Multiple Service Branch $ $8{10. � $1,GOd•OIJ Per Each: E-14 ITEM BID LIST DESCRIPTIO14 or ITEMS WITH ISD SPECIFICATION UNIT TOTAL NO. ITEM N4. QTY. PRICES WRITTEN IN WORDS SECTTON NO. PRICE AMOUNT and fa Cents 11:J. 5 Ea. Relocate 3/4"Water Muer $3GU'00 $ �115o�•ap Per Each; � 111 1 .+r r }r De}Ilars and Cents 119, 5 Ea. Relocate 1"Water dieter 5 $350.0€7 $ $1,75D.00 Per Each: Dollars and Cents u 120. 5 Ea. Relaeate 11/2"Water Meter $400.00 $ $2,000.00 Per Each: 1'��6ox rrnrY t Dollars and 92.0 Cents 5 Ea. Relocate 2 Water Meter $ $500.00 $ $2,500m Per Each: 7'�if ,ar rs Dollars and t1 s+ Cents 122. 330 .0102 1500 J. 2"-rem porary Water Services 330430 $ $8.00 $12,000.00 Per Linear Fast: err, ?/ Dollars and Veo Cents 123. 3312.2801 10 Ea. 3"Water Meter and Vault 331211 $8,50x.00 $ _$05,000.00 Per Each: G°I i igpew aN ol ' .tom .✓ Dollars and ren Cents 124. 3312,2802 14 Ea, 4" Water Meter and Vault 331211 $ 191000.OU $ 915,00D.00 Per Each: �t7t 1 '1rrLjra.'c' Dollars II and •77 d Cents 1 -- T'f /�acs{aar J 125. 3312.2843 10 Ea. G"Water Meter and Vault 331 z IL 90.00 Per Each .Dollars and ' Cents eo 126. 3312.2804 5 Ea. 8"Water Meter and Vault 33 1211 Per Earp: 0-]5 ITEM BID LISP IDESCRIPTION Of ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. _ / PRICES WRITTEN IN WORDS SECTYON NO. PRICE AMOUNT �� 1J-7�'sri � dfi�G`.ra d�17011 d rs and Cents 00 0 127. 3312.2805 5 Ea. 10"Water Meter and Vault 33 12 11 ��$ $-1�8f1 � "4 r Ech: dollars and cents 128, 3312.QD02 5 Ea. WeterSampling Station 331250 $800.00 s $4,OnO.00 Per Each. .. rr dollars and/ .07a Cents 129. 0241.1602 5 Ea. Remove Concrete Water Vault 024114 $ $1,500,00 $ $7,500.00 Per Each: &Af? ar•,fna�p I'�1 Dollars and 7.&� Cents 130. 5 Ea. 5prinkIer.6yr5tern DackfIouu Prev enter Relocation $ $300.00 $ $2,500.00 Per Each: ,,rr t hr+ra �� Dollars and rad Cunts 131. 0241.1218 10 Ea. 3/4"-12"Water Pressure Plug 02 41 14 $ $1,000.00 $ $10,000.00 Per Each; Dollars and ra Cents t32. 0241.1218 5 Ea. 16"-24" Water Pressure Plug 024114 $ $2;000.00 $ $10,00100 PerE.ach: — a ?�f/ srfi Dollars and ra 0 Cents 1.33. 3305.0109 1000 Lf, Trench Safety 3305 10 S $1.00 $ $1,000.00 Per Linear Foot; V&le Dollars and .4c Cents 134. 50 i_f. Water Main Extra Depth (than 1') $ $15.00 $ $750.00 Per Linear Forst: 0-16 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO, ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTTON NO. PRICE AMOUNT .11:1 Dollars and 40 Cents 135, 33[]5.0143 5 Ea. Exploratory Fxeavat inn of Existing 13 0-9 3b Utilities(0'-V ) 400.00— Per Each: Baee.-, Dollars. and Cents 136. 3305,0103 S Ea. Exploratory Ucavation of Existing 33 05 30 Util ities(5'-10'} $1,500,00 $ $7,500.00 Per Each: 101A Vol ,+ ,�.," r Dollars and 290 Cents 137, 3305.0103 5 Ea. Exploratory Excavation of Existing 33 05 30 Utilities(14'-20`) $ $2,500.00 $ $12,504.00 Per Each; 2 ve PUnrr---0.011 — 1,1,e L j./,�- Dollars and W .0 Cents 135 3305.0116 25 Cl- Concrete Encaserneintfor Utility Pipes 330510 $ $150.04 $ s3,759.00 Per Cubic Yard: 10,we } Dollars and .+94) Cents 139. 3292.0100 20 Sy, Block Sod Pfacernent 329213 $ $101.04 $200,00 Per Square Yard: . Ion Dollars and 1070 Cents 140. 3292.0400 20 5y. Seeding,Broadcast 32921S $ $i3.00 $ $150.00 Per Square Yard: r [,Dollars and s Cents 141. 3292,0400 20 Sy. Seeding,Hydromulch 32 92 13 $ $8.Q4 $ $160.00 Per Square Yard: r v Dollars ander Cents 142.. 3292.0400 20 SY. Seeding,Sall Reteiitlor Blanket 329213 $ $1.2.00 $ $240.00 Per Square Yard: B-17 ITEM Baa LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECITON NO, PEACE AMOUNT i sr r Dollars and "y40 Cents 143, 3137.0101 20 Cy. Concrete Rlprap 313700 5 $150.00 $3,000.00 Per Cubic Yard; On-e Dollars and '70 Cents 144, 3137.0102 20 Cy. Large 5tana Riprap,dry 313700 $150.00 $ $0,00 Per Cuhle Yard: n .t pollars and 10.J Cents 115. 3137.0103 20 Cy. Large Stone RipraIn,grouted 313700 $ $175.04 $ $0.00 Per CublcYard: and ,r u Cents 146. 33(15.0203 100 Cy. Imported Embedment/Backfill, CLSM 3305 10 (Flowable Fill) $ $150.00 $ $15,000.44 Per Cubic Yard: Dollars and n Cents 147, 3305.0203 50 C,;. Imparted Ern bed ment/Rackf Ill, 33 05 10 Crushed Rock $.25.00 5 $1;250.00 'Per Cubic Yard: .r••.- ► . Dollars and Cents 148. 50 Cy. T+ape B Concrete{#2500) per Cubic Yard rpey.,XCollars and . rav Cents 149. 50 Cy. Type E Concrete(#1500) $ $7,500.04 Per Cubic Yard o�_f J4,,, ....f —Dollars -,� and rra Gents 150. 3213.031}1 S0 5y. 4"Cane Sidewalk 3213 26 $ $75.00 $ $3,000.00 Per 5qu are Yard: B-18 ITEM IIID LIST DESCRIPTION OF ITEMS WITH BID SP'ECIFICATION UNIT TOTAL NO. ITEM NO. QTY PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT � "-• fib. . ,Dollars ander Cents 151. 3213.0351 20 ay. 4"Conc Sidewalk, Exposed Aggregate 32 13 211 Per Square Yard: Da rr DoIl ars and ,+-.Pop CL'r2_s 152. 3213.47401 50 Sy. 6" Concrete Driveway 32 13 20 S $55-00 $ $4,250.00 PerSquare Yard: pec •=r _ Dollars and " Cents 153. 3213.17451 20 Sy. 6" Concrete Driveway, Exposed 32 13 20 Aggregate $ 595.00 $ $1,900.00 Per Square Yard: ;,to Dollars and /,;o Cents 154, 0216.01111 10D J. 6"Can-.Curb and Gutter(replaced) 32 .1613 $ 3Q.Q4 $ $3,000.00 Per Linear Foot: _ Dollars and rr� Dents V 155. 100 Lt_ 6"Cone Curb and iutterAttarheO to Conn. Pvrnt(Ke placed) $ $3t}.B+] $ $3,{]00.0{1 Per Li near Foot; h."4 Dollars and ,r2 61 Cents 156, 3216.0301 20 Sy. 9°Cone Valley Gutter, Residential 321613 $ $75.D0 $ $1,5010.60 Per Square Yard: Sf�`r'r, , Dollars and Cents 151, 3216.0302 20 5y. 11"Caonc Valley Gutter, 32 16 13 Arterial/Industrial $ $B5.00 $ $1,700.00 Par Square Yard: e-14, lr •'+' Collars and n'0 Cents 158. 3201.0151 100 Lf. Asphalt P1jrnt Repair,Water Service 320117 S $44,00 $ $�,fl00.BD Per Linear Font: i B-19 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. (,QTY. PRIGS W11111TEN IN WORDS SECTION NO. PRIC€ AMOUNT and In At Cents 159. 3201.011.1 100 Lf. 4'Wlde Asphalt Pvmt Repair, 320117 Residential $45,D0 $ $4,500.00 Per Linear Foot; aar ?" r":a:d Dollars and a Gents 160, 3201.0112 300 Lf. 5'Wide Asphalt Pvrnt Repair, 320117 Residential $ $50.00 t 515,000.00 Per Lire ear Foot: ! Dollars and Cents 15!. 32iJI.0113 300 Lf. 5'W[de Asphalt Fvlmt Repair, 32 i71 17 Residental $ $55.00 $ $16,500.00 Per Linear Foot: !f a v Dollars and arc Cents 162. 3201.0121 300 J. 4'Wine asphalt Pvmt Repair,Arterial 320117 $16,500-00 Per Linear Fant. Dollars and Certs 163. 3201.0122 300 Lf, 5'Wide Aspha It Pvrnt Repair,Arteria[ 32 01 17 $ $65.00 $ $19,50D.00 Per Linear Fast, ri Dollars andCents 164. 3201.0123 300 Lf. G' Wide Ai phaIt Pvmt Repair,Arte 021 320117 $75.00 $ $22,500.00 Per Urea r Foot: and Cents 9 J 165. 3201,0131 300 Lf, 4'Wide Asphalt Pvmt Repair, Industrial 3217117 Per linear Foot: 5-20 LTEM BID LIST DESCRIPTION OF ITEMS WITH RIO SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WORDS SECTION NO. PRICI= AMOUNT and 420 Cents 156. 3201.0132 300 Lf. 5'W]dP Asphalt evmt Repair, Industrial 320117 Per Linear Foot; ,�r�c� �y� UQllars and ;1 Cents 10. 3201.0133 300 Lf, 61 wide Asphalt Pvmt Repafr,Industrlal 320117 " s $75.00 $22 500.0{1 Per Linear Fout. i jre",y Dollars and ;'d Gents fl 150. 3201,0201 300 Sy. Asphalt Pvmt Repair DeyondDefined 320117 Wldth, Resldentlal $20.00 $ $6,000.00 Per SgAjare Yard: 1'azza 4 dollars and f4--4 Cents 164, 3201.Q202 300 5y. Asphal't Pvmt Repair Beyond Defined 33 0117 Width,Arterial $ $25,00 $7 500.00 - - Per 5qware Yard: t r 1'4�vo Dollars and Cie n is 170. 3209,020:3 300 Sy. Asphalt Pvmt Repair Beyond pefined 340117 Width, Industrial $ $30,00 $ $q,0.0fl.00_ Per Squa re Yard: Dollars and ovd Cents 171. 32D1.0301 100 Sy. 2"Thick Extra Width Asphalt Pavrnent 370117 Repair Per Square Yard: _ 1w eoy 1 Dollars or and Cents 172. 3201.0302 100 Sy. 3"Thick Extra Width Asphalt Pavmeht 320117 Repair $ $22.00 $ $2,20100 Per Square Yard: -- B-21 ITEM BIT] LIST DESCRIPTION OF I'T'EMS WITH BIT7 SPE"CIHCATION UNIT TOTAL NO. ITEM NO, Q`T'y. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT r."'/,- /"., Dollars and .ate Cents 173. 3201,0303 10D Sy. 4"Thick Extra Width Asphaft Pavment 320117 Repair 5 $25.00 $ $2,500.00 Pe r Sq u a re Yard: - — "h Dollars and 1.0 Cents 174. 3201,0400 75 Lf. Temporary Asphalt Paving Repair 320119 $ $15.00 $ 1,125.f7D Per Linear font: a � Dollars and sora _Cents 175. 3211.6211 40 Sy. 6" Flexible Base,Type B,011-1 321123 $ $25..00 $ $1,000.00 Per Square Yard; — vd Dollars and by Cents 176, 3211.0212 40 Sy. 6" Flexible Base,Type B,GR-2 321123 $ $25.00 $1,600.00 Per 5qua re Yaird: ,a 1,�6 Dollars and Cents 177. 3201.0614 300 Sy, Conk Pvmt Repair,Residential 320129 $55.0+0 $ $10,500.00 Per Square Yard: Dollars — and r2 _ Cents i 170. 3201.0616 300 Sy. Canc Pvmt Repair,Arterial/Industrial 32 C°129 Per Square Yard: Guitars and 4.1 Cents 179. 300 Sy. con c.Pavrnt Repair Deyc rid fie#fi ned Width, Residential $ $50.00 � $15,D0o.o0 Per Square Yard; '//l/_ Dollars 0 andy Cents 18D. 100 Sir. Conc.Pavmt Repair Beyond ❑-fined Width, Arterial/Industrial $ $70.00 $ $7,000.00 Pe-Square Yard; f1-Z Z p ITE M BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UMIT TOTAL NO. ITEM NO. QT1f. PRICES WRITTEN IN WORDS SECTION NO. PRICE AMOUNT a-e'vr n 141- Dollars and .x,j Cents 181. 3214.03DD 100 Sy. Prick Prank Repair 321416 $70.00 S Per Sq.tare Ya rd, 3rve„A-, Cvl lar$ and nd Cents 182. 3214.0690 100 Sy. Brick Pvmt Repair(City supplled) 321.4 16 $ X50.00 $ $5,000.m IzerSguareYard: �f Vollars and 1,01, Cents 183. 3331.4112 SO J. 6"DIP Sewer Pipe(Repic.At Variable 33 "110 Depth) $85.OD $ $4,250.00 Per Linear Foot: ,✓ ' Dollar and j Cents 184- 50 U. 6" PVC Sewer Pipe{Replc.At Varlable Depth) $ $60.00 $ $3,000.17.1 Per Ll near Faint: - / Dollars and 07 e Cents 185. 3331.4119 50 LF. R" DIP Sewer Pipe('Replc,At Variable 33 11 10 Depth) _ $ $95.0(1 $ $4,750.00 r Per Urea r Foot: &Z�2ela /,' ,,r Dollars and 112 a Cents 186. 5D U. 8"PVC Sewer Pipe(Repic.At Variable Depth) $70.100 $3,500.0D Per Linear Fact: _ Q"ir Dollars and rl j Cents 187. 3331.42015 50 LP. 10" 0 1 P Suver(Re plc.At Variable 331110 Depth) $ $105.00 $ $5,2.50.40 Per Linear root: ,r* - q � A and JP70 Cents 186, 50 Lf, 10"PVC Sewer Pipe{Replc.At Variable Depthl Per Linear Foot: B-23 ITEC^! BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO. ITEM NO. QTY. PRICES WRITTEN IN WURDS SEC11ION NO, PRICE AMOUNT _,�'fGt1'(// Dollars w and Wd Cents V 189. 3331,4212 50 J. 12" DIP Sewer(Replc.At Varia bN 3311--0 V Depthl $115,Q1] $ $5,750.00 Per Linear Foot: o,�vrrf.vs •� a� i, Cao I I a rs andCent'sCents i 190. 50 U. 12" PVC Sewer Pipe(Replc.At Variable Depth, $ $,85.00 $ ",75D.no Per Linear Fosat d & nom. Dollars arid + Cents 191. 3331.4222 50 J. 16" RIP Sewer I RepIC,At Varla We 331110 Depth) $ $125.00 Per Linear Foot, Dollars and .5&2 Cenks i 192. 50 Lf. 15" PVC Sewer Pipe(Replc.At Variable Depth) $ $90,00 Per Li neo r Fant; Dollars and 144 gents 193. 25 Lf, 4"SDR Far San.Sewer Service Rep fc. $ $4(}.fl� $1,f)00.00 Per Linear Foot: Dollars and Rd Cents 194. 25 Lf. U'SDR For San.Sewer Service Replc. $ $45.0U $ $1f125.00 Per Linear Foot: f"d dollars and eg Omts 195. 25 Lf. 8"SUR for San.Sewer Service Repic. $ $5[}.O0 $ $1,250m Per Linear Foot: 11;' Dollars and 'm s Certs 196. 50 Fa, Street Use Permit 75.aQ $ 3758, 0 Per Each: - I 8-24 ITEM BID LIST DESCRIPTION OF ITEMS WITH BID SPECIFICATION UNIT TOTAL NO, ITEM NO. QTY. PRICES WRMEN IN WORDS SECTION NO. PRICE AMOUNT Seventy-Five QQllarsand No Cents 1 197. 3471.DD03 50 Ea. Traffic Contral 34711S $ $750.00 $ $37,500,00 Per Each; ocllars and fJ cent do �v TDTAL AMOU NT BID $ 0 N M I B-25 16" CONCRETE CYLINDER PIPE FiTTINGS FLIRNISHFD AND INSTALLED SIZE TYPE OF Ff TT►NG BID COST 16" 3" BEJEL $ /15--- 16" 6° BEVEL $ 161" 11-114° BEND $ ta 16 22-1/2- BEND $ c� 16" 45� BEND $ ,sem ° o 16" 67-1120 BEND $ fG' 16" 90" BFND $ W� o fl 16" CLEANING VIYE $ o-gZ��"p 16" DISHED 'HEAD PLUG 16" SPLIT BUTT STRAP CLOSURE $ le oro 16" x 16" CONC. TO D.I. ADAPTOR $ 1,5�0 16" x 6' W.J. OUTLET $ / O 0 _ 16" x 8" M.J. OUTLET /lr4Q , 16" x I6" M.J. OUTLET 16" x 12" M.J. OUTLET $ 1 { TOTAL LUMP SUM $ "5-r I 24" CONCRETE CYL)NDER PIPE FITTINGS FURNISHED AND INSTALLED SIZE TYPE OF FITTING DID COST 24" 30 BEVEL s c 0 0 in 2 €" ° BEVEL $ o G 24W 19-1W PENQ $ L D 0 D 24" 22-1/2' BEAD ... 24" 45" SEND '00 24" 67-1120 PEND .5 0 24" 90" EFND $ sc 24" CLEANINGWYE 24" DISHED HEAD PLUG 24`' SPLIT BUTT STRAP CLOSURE $ 24" x 24" GOND. TO D.I, ADAPTOR $ 176-6- 24" x '16" NI.J. {CUTLET $ 17,_5-0 24" x 12" ,UI,J. OUTLET $ 1715-0 � 24" x 10" M.J. OUTLET 27,5-0 24" x 8" M.J. OUTLET $ / t 24" x 6" U.". CUTLET $ / TOTAL LUMP SUM � � VENDOR CC4MPLLANCET4 KATE 1A Page 7 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATS LAIN NON RESVENT BIDDER Texas Goveroment Code Chapter 2M was adapted ror the award at contracts to nonresident bidders. Theis law provides that, In order to ba awarded a contract as low bldder, nonresident bidders (out-of-stale conlMotors whose corporate offices or principal place of business are outside the State ar Texas) bid orolects for M constructiun, irnprovernents, supplies ur services in Texas at ars arrlount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder+gourd be required to underbid F� nonresident bi0der fn order to obtzln a comparable contract In the Stete whfch the nonresident's prinulpai place of busfnu" Is located_ The appmpriate blanks in Section A must be 111fed aut by all nonresident bidders in order for your bid to meal specifications. The failure of nonresident kidders to do so will autorrlatically disquolffy that bidder- ResidenL bidders roust check [he box ir7 Section B. A. N+onresiGent bidders in the State of State Here or Blank , our principal place of business, are required to be %HLra percent Icawer than resident bidders by State Law. A copy sof the statute is attached. Nonresident bidders in the State of Saar HEi re if Bla4 , our principal place of business, are not required :€) underbid resident bidders_ B. The princfpal place of bus cress of our company or our parent company or majority owner is in the State of Texas. i BIDDER: William J Schultz Inc dba Circle C Construction Dy; Tvesa S Skelly l Company i PO Box 40328 � �Slgnatu Fart Worth, Texas 76140 Title; Vice President Data; i I E14D OF SECTION CrrYUF FOH-r V,"i STArvDAR❑CC N87RMI ION SPEC MAIMN 00CUWNr8 Farm OffiAnal 201: M 00 42 37 did Proposa111"Qrkbaok 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 3 4 1. Summary. All contractors are required to be prequalified by the City prior to 5 submitting bids. To be eligible to bid the contractor must submit Section 00 45 12, 6 Prequalification Statement for the work type(s) listed with their Bid. Any contractor 7 or subcontractor who is not prequalified for the work type(s) listed must submit 8 Section 00 45 13, Bidder Prequalification Application in accordance with the 9 requirements below. 10 11 The prequalification process will establish a bid limit based on a technical evaluation 12 and financial analysis of the contractor. The information must be submitted seven 13 (7) days prior to the date of the opening of bids. For example, a contractor wishing 14 to submit bids on projects to be opened on the 7th of April must file the information 15 by the 31st day of March in order to bid on these projects. In order to expedite and 16 facilitate the approval of a Bidder's Prequalification Application, the following must 17 accompany the submission. 18 a. A complete set of audited or reviewed financial statements. 19 (1) Classified Balance Sheet 20 (2) Income Statement 21 (3) Statement of Cash Flows 22 (4) Statement of Retained Earnings 23 (5) Notes to the Financial Statements, if any 24 b. A certified copy of the firm's organizational documents (Corporate Charter, 25 Articles of Incorporation, Articles of Organization, Certificate of Formation, 26 LLC Regulations, Certificate of Limited Partnership Agreement). 27 c. A completed Bidder Prequalification Application. 28 (1) The firm's Texas Taxpayer Identification Number as issued by the 29 Texas Comptroller of Public Accounts. To obtain a Texas Taxpayer 30 Identification number visit the Texas Comptroller of Public Accounts 31 online at the following web address 32 www.window.state.bc.us/taxpermit/ and fill out the application to 33 apply for your Texas tax ID. 34 (2) The firm's e-mail address and fax number. 35 (3) The firm's DUNS number as issued by Dun & Bradstreet. This 36 number is used by the City for required reporting on Federal Aid 37 projects. The DUNS number may be obtained at www.dnb.com. 38 d. Resumes reflecting the construction experience of the principles of the firm 39 for firms submitting their initial prequalification. These resumes should 40 include the size and scope of the work performed. 41 e. Other information as requested by the City. 42 43 44 45 46 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised July 1,2011 004511-2 BIDDERS PREQUALIFICATIONS Page 2 of 3 .� 1 2 2. Prequalification Requirements 3 4 a. Financial Statements Financial statement submission must be provided in 5 accordance with the following: 6 (1) The City requires that the original Financial Statement or a 7 certified copy be submitted for consideration. 8 (2) To be satisfactory, the financial statements must be audited or 9 reviewed by an independent, certified public accounting firm 10 registered and in good standing in any state. Current Texas 11 statues also require that accounting firms performing audits or 12 reviews on business entities within the State of Texas be properly 13 licensed or registered with the Texas State Board of Public 14 Accountancy. AIN 15 (3) The accounting firm should state in the audit report or review 16 whether the contractor is an individual, corporation, or limited 17 liability company. 18 (4) Financial Statements must be presented in U.S. dollars at the 19 current rate of exchange of the Balance Sheet date. 20 (5) The City will not recognize any certified public accountant as 21 independent who is not, in fact, independent. 22 (6) The accountant's opinion on the financial statements of the 23 contracting company should state that the audit or review has 24 been conducted in accordance with auditing standards generally 25 accepted in the United States of America. This must be stated in 26 the accounting firm's opinion. It should: (1) express an 27 unqualified opinion, or (2) express a qualified opinion on the 28 statements taken as a whole. 29 (7) The City reserves the right to require a new statement at any _ 30 time. 31 (8) The financial statement must be prepared as of the last day of 32 any month, not more than one year old and must be on file with 33 the City 16 months thereafter, in accordance with Paragraph 1. 34 (9) The City will determine a contractor's bidding capacity for the 35 purposes of awarding contracts. Bidding capacity is determined by 36 multiplying the positive net working capital (working capital = ` 37 current assets — current liabilities) by a factor of 10. Only those 38 statements reflecting a positive net working capital position will be 39 considered satisfactory for prequalification purposes. 40 (10) In the case that a bidding date falls within the time a new 41 financial statement is being prepared, the previous statement shall 42 be updated with proper verification. 43 b. Bidder Prequalification Application. A Bidder Prequalification Application must 44 be submitted along with audited or reviewed financial statements by firms 45 wishing to be eligible to bid on all classes of construction and maintenance 46 projects. Incomplete Applications will be rejected. CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised July 1,2011 004511-3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 (1) In those schedules where there is nothing to report, the notation 2 of"None"or"N/A"should be inserted. 3 (2) A minimum of five (5) references of related work must be 4 provided. 5 (3) Submission of an equipment schedule which indicates equipment 6 under the control of the Contractor and which is related to the 7 type of work for which the Contactor is seeking prequalification. 8 The schedule must include the manufacturer, model and general 9 common description of each piece of equipment. Abbreviations or 10 means of describing equipment other than provided above will not �. 11 be accepted. 12 13 3. Eligibility to Bid 14 a. The City shall be the sole judge as to a contractor's prequalification. 15 b. The City may reject, suspend, or modify any prequalification for failure by the 16 contractor to demonstrate acceptable financial ability or performance. 17 c. The City will issue a letter as to the status of the prequalification approval. 18 d. If a contractor has a valid prequalification letter, the contractor will be eligible 19 to bid the prequalified work types until the expiration date stated in the 20 letter. 21 22 23 24 25 26 END OF SECTION 27 '4 i3 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised July 1,2011 004512-1 PREQUALIFICATION STATEMENT Page 1 of 1 1 SECTION 00 45 12 2 PREQUALIFICATION STATEMENT 3 4 Each Bidder for a City procurement is required to complete the information below 5 by identifying the prequalified contractors and/or subcontractors whom they intend to 6 utilize for the major work type(s) listed. 7 Major Work Contractor/Subcontractor Company Prequalification Type Name Expiration Date Water Ci.a /e C Improvements 8 9 10 The undersigned hereby certifies that the contractors and/or subcontractors ii described in the table above are currently prequalified for the work types listed. 12 13 BI�DIDER: 14 / 'Me a,* J's,4c. /fir .Z1 C 01�cc, 15 L iia f! C CvgsT'u c f o n By: 16 Company (Please Print) 17 18 1410. BDx y 2 8 Signature: �u oc �f: 19 Address 20 21 F�f Y✓�' , %X Arl Yd Title: 22 City/State/Zip (Please Print) 23 24 Date: 25 26 END OF SECTION 27 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised 3uly 1,2011 i 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it Lit. 5 provides worker's compensation insurance coverage for all of its employees employed on 6 City Project No. 02035. Contractor further certifies that, pursuant to Texas Labor Code, 7 Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of 8 Compliance with worker's compensation coverage. 9 10 CONTRACTOR: 12 Z'.'" L'Cas k`a a.Z By: 13 Company (Please Print) 14 15 00 a- 40. GX 6M44f Signature: _411l[ o f� 16 Address 17 _ 18 CYTLs/O iG _ /n ti/T Q Title: !//!♦ XML4_16-2 19 City/State/Zip (Please Print) 2021 22 THE STATE OF TEXAS § Q" Pye` MICHELE S.LANKFORD ='_;�7 �= Notary Public 23 a•,IN .'� STATE OF TEXAS 24 COUNTY OF TARRANT My Comm.Up.oCU)nCT,,2015 25 26 BEFORE ME, the ursrsigned authority, on this day personally appeared 27 b known to me to be the person whose name is 28 subscribed to the foregoing i tr}�ment, nd acknowledged to me that he/she executed the 29 same as the act and deed of U i 'e,� 1 CLO_r,_ for the purposes 30 and consideration therein expressed and in the capacity therein stated. 31 32 GIVEN UNDER MY HAND AND SEAL OF OFFICE this r� day of 33 rim , 20N 34 35 M 1 36 - 37 Notary Public in and for the Sta of Texas 38 39 END OF SECTION 40 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City project No. 2037 Revised July 1,2011 004540-1 ,,.. MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL Page 1 of 1 1 SECTION 00 45 40 2 MINORITY BUSINESS ENTERPRISE GOAL 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal may be 5 applicable. If the total dollar value of the contract is $50,000 or less, the MBE subcontracting goal is not 6 applicable. 7 '4 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business 10 Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in fPk 11 the City's current Business Diversity Enterprise Ordinance apply to this bid. 12 13 MBE PROJECT GOAL 14 The City's MBE goal on this project is 12916' of the total bid (Base bid applies to Parks and Community 15 Services) Note: If both MBE and SBE subcontracting goals are established for this project, then an 16 Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. 17 ,,. 18 COMPLIANCE TO BID SPECIFICATIONS 19 On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required 20 to comply with the intent of the City's Business Diversity Ordinance by one of the following: 21 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or A" 22 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 23 3. Good Faith Effort documentation,or; 24 4. Waiver documentation. 25 Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non- 26 responsive. Any questions, please contact the M/WBE Office at(817) 392-6104. 27 28 SUBMITTAL OF REQUIRED DOCUMENTATION 29 The applicable documents must be received by the Managing Department, within the following times 30 allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall 31 deliver the MBE documentation in person to the appropriate employee of the Managing Department and 32 obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the 33 time allocated. A faxed copy will not be acce ted. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after met or exceeded: the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form, if participation is less than the bid opening date, exclusive of the bid opening statedgoal: date. 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form, if no MBE participation: the bid opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if firm will received by 5:00 p.m., five (5) City business days after perform all subcontracting/supplier work: the bid opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilizing a joint received by 5:00 p.m., five (5) City business days after venture to meet or exceed goal. the bid opening date, exclusive of the bid opening date. 34 END OF SECTION 35 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 005243-1 Agreement Page I of 4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on DEC 0 9 2014 is made by and between the City 4 of Forth Worth, a Texas home rule municipality, acting by and through its duly 5 authorized City Manager, ("City') Circle C Construction _,authorized to do 6 business in Texas, acting by and through its duly authorized representative, 7 ("Contractor'). 8 City and Contractor, in consideration of the mutual covenants hereinafter set forth, 9 agree as follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents 12 for the Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only 15 a part is generally described as follows: 16 Water Main Replacements Contract 2013A 17 I City Project no. 2037, TPW/DOE No. 7326 18 Article 3. CONTRACT TIME 1g 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 365 days after the date 24 when the Contract Time commences to run as provided in Paragraph 2.03 of the 25 General Conditions. y 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that City 28 will suffer financial loss if the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with 30 Article 12 of the General Conditions. The Contractor also recognizes the delays, 31 expense and difficulties involved in proving in a legal proceeding the actual loss 32 suffered by the City if the Work is not completed on time. Accordingly, instead of 33 requiring any such proof, Contractor agrees that as liquidated damages for delay 34 (but not as a penalty), Contractor shall pay City Five Hundred Dollars ($500.011) 35 for each day that expires after the time specified in Paragraph 3.2 for Final 36 Acceptance until the City issues the Final Letter of Acceptance. n CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised August 17,2012 005243-2 Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 City agrees to pay Contractor for performance of the Work in accordance with the 39 Contract Documents an amount in current funds of One million Dollars 40 ($ 1,000,000.00 ). 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between City 44 and Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form 48 1) Proposal Form 49 2) Vendor Compliance to State Law Non-Resident Bidder 50 3) Prequalification Statement 51 4) State and Federal documents (project specific) 52 b. Current Prevailing Wage Rate Table 53 c. Insurance ACORD Form(s) 54 d. Payment Bond 55 e. Performance Bond 56 f. Maintenance Bond 57 g. Power of Attorney for the Bonds 58 h. Worker's Compensation Affidavit 59 i. MBE and/or SBE Commitment Form 60 3. General Conditions. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by 63 attachment or, if not attached,-as incorporated by reference and described - 64 in the Table of Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of 69 the Agreement and, if issued, become an incorporated part of the Contract 70 Documents: 71 a. Notice to Proceed. 72 b. Field Orders. 73 c. Change Orders. 74 d. Letter of Final Acceptance. 75 76 CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 2037 Revised August 17,2012 005243-3 Agreement Page 3 of 4 77 Article 6. INDEMNIFICATION 78 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, 79 at its own expense, the city, its officers, servants and employees, from 80 and against any and all claims arising out of, or alleged to arise out of, the 81 work and services to be performed by the contractor, its officers, agents, 82 employees, subcontractors, licenses or invitees under this contract. This 83 indemnification provision is specifically intended to operate and be 84 effective even if it is alleged or proven that all or some of the damages 85 being sought were caused, in whole or in Rart, by any act, omission or 86 negligence of the city. This indemnity provision is intended to include, 87 without limitation, indemnity for costs, expenses and legal fees incurred 88 by the city in defending against such claims and causes of actions. 89 90 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own 91 expense, the city, its officers, servants and employees, from and against any 92 and all loss, damage or destruction of property of the city, arising out of, or 93 alleged to arise out of, the work and services to be performed by the 94 contractor, its officers, agents, employees, subcontractors, licensees or 95 invitees under this contract. This indemnification provision is specifically 96 intended to operate and be effective even if it is alleged or proven that all or 97 some of the damages being sought were caused, in whole or in part by any 98 act, omission or negligence of the city. 99 loo Article 7. MISCELLANEOUS lol 7.1 Terms. 102 Terms used in this Agreement which are defined in Article 1 of the General Conditions 103 will have the meanings indicated in the General Conditions. 104 7.2 Assignment of Contract. 105 This Agreement, including all of the Contract Documents may not be assigned by the 106 Contractor without the advanced express written consent of the City. 107 7.3 Successors and Assigns. 108 City and Contractor each binds itself, its partners, successors, assigns and legal 109 representatives to the other party hereto, in respect to all covenants, agreements and 110 obligations contained in the Contract Documents. 111 7.4 Severability. 112 Any provision or part of the Contract Documents held to be unconstitutional, void or 113 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 114 remaining provisions shall continue to be valid and binding upon CITY and 115 CONTRACTOR. 116 7.5 Governing Law and Venue. 117 This Agreement, including all of the Contract Documents is performable in the State of 118 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for 119 the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised August 17,2012 005243-4 Agreement Page 4 of 4 120 7.6 Other Provisions. 121 The Contractor agrees to pay at least minimum wage per hour for all labor as the 122 same is classified, promulgated and set out by the City, a copy of which is attached 123 hereto and made a part hereof the same as if it were copied verbatim herein. 124 7.7 Authority to Sign. 125 Contractor shall attach evidence of authority to sign Agreement, if other than duly 126 authorized signatory of the Contractor. 127 128 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 129 counterparts. 130 131 This Agreement is effective as of the last date signed by the Parties ("Effective Date'). 132 Contractor: City of Fort Worth William 1. Schultz, Inc, dba ' Circle C Construction Company � ,/� / BY: �'�sat�� LH.L— Fernando Costa 3 By: S S Assistant City Manager (Signature) Date Teresa S. Skelly Attest: 1)11Z4Q1Y)A1..-2-� (Printed Name) Mary 1. Kayser, F �� City Secretary a- (Seal) a V8� $fir Title: Vice President ° *8 a® A°% Address: P.O. Box 40328 &'�%o M&C C ?-I t 316C S Date: ZT ►G City/State/Zip: Fort Worth, Texas 76140 Approv as to Form and Legality: Date Doug as W. Black Assistant City Attorney 133 134 ' 135 APP L OEND 136 RECORD 137 QFF1C1�- 138 �`r1 8lCRF1?ARY Andrew T. Cronberg, P.E. 139 FT,W0RT11q 1'X Interim Director, 140 Water Department CITY OF FORT WORTH WMR2013A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.2037 Revised August 17,2012