HomeMy WebLinkAboutContract 30964 AMENDMENT NO. 2
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.
2�")
(No M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and Malcom Pirnie,
Inc. , (Engineer) made and entered into City Secretary Contract No.
26804, (the Contract) which was authorized by the City Council by
M&C C-18578 on the 1st day of May 2001; and subsequently revised by
one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Design of Westside IV Pump Station, Elevated Tank and
Transmission Main
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated October
25, 2004 , a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $22, 160 .00 .
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $493,450.00.
I
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the S� day of 2004, in
Fort Worth, Tarrant County, Texas.
ATTEST: IL L
041v�- cntract Authori.zatiOR
Marty Hendri
City Secretary
at
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P.E. Marc AlOtt
Director, Department of Assistant City Manager
Engineering
MALCOM P E INC.
ENGINES
By: C
Name: Jrt ek-A—. -RmTf- o &eKk -ft6jjj ,1
Vice President
900 Monroe Street, Suite 102
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
IRNI MALCOLM PIRNIE, INC.
INDEPENDENT ENVIRONMENTAL ENGINEERS,SCIENTISTS&CONSULTANTS
October 25, 2004
Rakesh Chaubey, P.E.
Department of Engineering
City of Fort Worth
1000 Throckmorton
Fort Worth, Texas 76102
Re: West Side IV Project
Amendment No. 2 to West Side IV, City Secretary Contract No. 26808
Dear Mr. Chaubey:
Malcolm Pirnie Inc. is providing engineering services for the West Side IV Project that includes a
30-inch and 16-inch Water Transmission Main. The construction of these pipelines was to be
included with the construction of the pump station. Therefore,the engineering documents were
developed according to the Water Department standards and the plans approved on April 14,
2003. The pump station project proceeded, however the pipeline projects were delayed.
The bid and construc5on of the Water Transmission Mains will now proceed through the Fort
Worth Department of Engineering. The engineering pians and specifications will be updated to
proceed through the Depart of Engwannng_ In admen a pq)ebr,,e coffosividy study and
designs will be provided (Exhibit 1).These project changes result in a project Amendment No.2
request totaling $22,160, revising the total contract value from $479,290 to$493,450.
The engineering services fee breakdown for Amendment No. 2 is as follows:
Pipefine Corrosivity Study& Design Exhibit 1 ......................$ 9,780
Subconsultant Coordination...................................................................................$978
Stormwater Pollution Prevention Plan................................................................$3,500
Plan-Profile Drawing Updates
Engineering (30 hours x $150/hour)...........................................................$ 4,500
Technician (40 hours x $75/hour)...............................................................$ 3,000
Administration (4 hours x $50/hour)...............................................................$ 200
Expenses .......................................................................................................$ 202
TOTAL...............................................................................................................$22,160
900 MONROE STREET SUITE 102 FORT WORTH, TX 76102 817-877-9978 fax 817-885-8676 http//www.pirnie.com
RECYCLED PAPER
IRNI
Rakesh Chaubey October 25, 2004
City of Fort Worth Page 2
This above work can be completed quickly to meet your required bidding and construction
schedules. If you have any questions, please contact me at(817) 877-9978.
Original Contract Amount........................................................ $ 357,200
Amendment No. 1 ................................................................... $ 114,090
Amendment No. 2..................................................................... $ 22,160
Revised Contract Cost To Date.............................................. $ 493,450
Sincerely,
MALCOLM PIRNIE, INC.
cvlt "'C' r�
Randy McIntyre, PE
Associate