HomeMy WebLinkAboutContract 30965 AMENDMENT NO. 1
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.�
(No M&C Needed)
COUNTY OF TARRANT 8
WHEREAS, the City of Fort Worth (City) and Stream Water Group,
Inc. , (Engineer) made and entered into City Secretary Contract No.
30209, (the Contract) which was authorized by the City Council by
M&C C-20121 on the 22nd day of June 2004 ; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2004 ; STM-D
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE , City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated November
10, 2004 , a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $9,900.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $95,434 . 00 .
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
\ l
EXECUTED on this ther_ � `t111 day ofLJ�I�IQ12004 , in
Fort Worth, Tarrant County, Texas.
ATTEST: I
Y \ ,
:ontract Authorization
Marty Hendri
City Secretary -lte
APPROVAL RECOMMENDED: APPROVED:
4-9ALVaL26 1
4 1i f✓"
A. Douglas Rademaker, P.E . Mar A.�Ott
Director, Department of Assista t City Manager
Engineering
STREAM WATER GROUP INC.
ENGINEER
BY:
Name:Shamsul Arefin, P.E . , President
6707 Brentwood Stair, Suite 630
Fort Worth, TX 76112
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
STREAM WATER GROUP,INC.
Consulting Engineers
C�Pomp
November 10, 2004
Mr. Rakesh Chaubey, P.E.
Project Manager
Department of Engineering
City of Fort Worth
900 Monroe Street, Suite 201
Fort Worth, TX 76102
Phone: 817 392 6051
RE: Contract Amendment No. 1
Water and Sanitary Sewer Replacement Contract 2004, STM-D
DOE No. 4431
Water Project No. PW53-060530177930
Sewer Project No. PS58-070580176310
Stream Water Group Project No. 17011
Dear Mr. Chaubey:
The following is a summary of additional work requested for Amendment No. 1 to the Water and
Sanitary Sewer Replacement Contract 2004 STM-D, per recent design meetings with City of Fort
Worth officials.
The location and limit of water line design: Glen Garden St(from New York Ave to Mississippi
Ave)
The proposed amendment includes additional topographic survey and design.
Additional Water Line Replacement length =900 L.F.
The total cost to perform the additional services included in Contract Amendment No. 1 is as
follows:
Enzineering Desien and Topojeraphic Surveys (900 L.F. (a,$10 per L.F.) $ 9,900.00
Sub-Total Amendment No. 1 $ 9,900.00
6707 Breut�vond Stair k uttc o30 Y ort. bl nrtIi X 'h! 12 . Phone. R I' -i 1h 1 I"1 ♦
tvww ;.tr,2,am%Natcr rotip.com
Mr. Rakesh Chaubey, P.E.,Project Manager November 10, 2004
RE: Contract Amendment No. 1 Page 2 of 2
Water and Sanitary Sewer Replacement
Contract 2004, STM-D
DOE No. 4431
The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the
Water and Sanitary Sewer Replacement Contract 2004, STM-D is as follows:
Original Contract Amount= $85,534.00
Amendment No. 1 Amount= $9,900.00
Total Contract Amount including Amendment No. 1 = $95,434.00
Please process Amendment No. 1,to the Water and Sewer Replacement Contract 2004, STM-D in
the amount of$9,900.00.
If you require any additional information or have any questions regarding this matter, please do not
to hesitate to call me at 817-446-4171 or my cell phone 972-898-5685. We appreciate the
opportunity to provide Engineering design services for the City of Fort Worth.
Sincerely,
Stream Water GpQpp, Inc.
Shamsul Arefin, P.E.
President
Copy: File
Attachments
67U' Brentt�ond Stair Rd • tiuilc 63U • tort %koith. f 76112 Phune. 17.4--16 41?1 Fa;; ?1-4 ?.'_.:i_71"
,
s t r e a m w a ergroup.com
LL 9L£-VgOZ Ot£9LW890L0-89Sd 'ON TOW WS
�£" 'ON 30d, OOSd` IN dVVY 2131VdM 0£6LL60£9090-£9Md 'ON TOO Jd HIM JNI`d110Z1'JZ13LYA1YVV3LS
10-W1S t;'OOZ lOVliNOO 1N3W30V ld3lb b3M3S ONb bOiVAA
` Aluo jeleM—anuanV Iddlsslsslyy of enuenV)IoA NZN wal3:J-IWII N`JIS30
133b1S N30WE) N319
( S iOIHJ-SIG 1IONf10O )
� 1191HX�
n { c ^\
N I
0
nn
O Q /
_ m 'r
ca
Idd SISSI Dnd,.0{ �Ad.. C
r1V
'o ¢ IddISSISS6Y m
o w g - N -
'
IN
Qj
- t =-t
n
-P9
U-
'sJ d n U
pp.g 00.9 ..9 06.{ 06•b I �!� ..6
)4210 t M3N 0 _ o^ e � 3AV p r A80), 131
IS -
`� Ch
I N N N N PA f ~
C
intio oN ap LC'' -
�2� 14 `rt S in
-T,— u7 J(u^l ¢ s
Lm
C' ^9 64.6 -- Z6 r SI•f 91•c „R
'NVA3
t - u 4 P
- sV
03
r `U U-191
_ m
��'•��--""nom--� -�� ,• I a
'I cs