Loading...
HomeMy WebLinkAboutContract 45392-CO2 cITY sECRETA RY��392•COQ. FORT WORTH. City of Fort Worth COMRACT NO° Change Order Request Breakdown Project Namel North Fort Worth Intersection Improvements-Phase 1 City Sec# Client Project#(s)l DOE 7003;File No. K-2990; City Project 01652 Change Order Submittal# 0 Date 9/2/2014 Dept. T/PW Contract Time Totals CD Original Contract Amount $451,106.89 $451,106.89 180 Extras to Date $25,214.33 $25,214.33 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $476,321.22 $476,321.22 180 Amount of Proposed Change Order $58,2FO.34 $58,280.34 Revised Contract Amount $534,601.56 $534,601.56 180 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $58,280.34 $58,280.34 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 18.51 MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $563,883.61 JUSTIFICATION(REASONS)FOR CHANGE ORDER Change order reflects design changes at the Alta Vista/SH 170 intersection. Additionally,there were some errors in the quantities processed under change order 1 that needed to be fixed. M C-1 rT- rT G z C 0 CA OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX FORT WORTH City of Fort Worth I,,-- Change Order Deletions Project Name North Fort Worth Intersection Improvements-Phase 1 City Sec# 0 Client Project# DOE 7003;File No.K-2990;City Project 01652 Change Order Submittal# 0 Date 9/2/2014 DELETIONS --1TEM— —DESCRIPTION-- DEPT ty Unit Unit Cost I I o a sp a t Pvmt Type 62 2"Wedge Milling T/PW 204.00 SY $30.00 63 Butt Milling T/PW 51.00 LF $30.00 T/PW $14,611.80 Sub Total Deletions $14,611.8UI Change Order Deletions Page 1 of 1 FORT�WORTH City of Fort Worth Change Order Additions Project Name North Fort Worth Intersection Improvements-Phase 1 City Sec# 0 Client Project# DOE 7003;File No.K-2990;City Project 01652 Change Order Submittal# 0 Date 9/2/2014 ADDffIONS Qty Unit Unit Cost I ota Remove ADA Ramp . 3 Remove Conc Pvmt T/PW 4.00 SY 6.75 4 Remove Asphalt Pvmt T/PW 264.00 SY $7.30 10 Unclassified Excavation T/PW 144.00 CY $28. 20 q"SLD Pvmt Marking HAS(W) T/PW 1,425.00 LF $0.73 21 "SLD Pvmt Marking HAS(Y) T/PW 131.00 LF $0.73 34 Remove Raised Marker T/PW 105.00 EA $0.28 56 Install 40'Wood Light Pole T/P 0.00 EA 2,800.00 66 66° Remove Sidewalk T/PW 93.00 SF $1.00 c' §8 8"Flexbase T/PW 412.00 SY 14.25 70 67- Remove Curb&Gutter T/PW 276.00 LF $8.00 i 69 10"Concrete Pavement T PW 382.00 SY $82.00 70 4"Concrete Sidewalk T/PW 100.00 SF $7.00 7 3 71 ADA Ramp T/PW 2.00 EA $1,000.00 7 ,1 72 12"SLD Pvmt Marking W T/PW 200.00 LF $4.00 7 73 Ground Box,Type D w/apron T/PW 1.00 EA $2,500.00 j -74- Monolithic Curb T/PW 273.00 LF $4.00 ? 75 TxDOT HMAC T/PW 35.00 TN $160.00 76' HMAC Curb T/PW 750. 0 LF $10.00 77 Remove Fence T/PW 385.00 LF 27 78' Barbed Wire Fence,Metal Posts T/PW 385.00 LF $12.00 I T/PW $72,892.14 Sub Total Additions $72,892.1 Change Order Additions Page 1 of 1 CFW Change Order Approval St-COApp02 Page 2 of 3 FORT WORTH, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: St-COApp02 Date Started: ',2014-10-02 City Sec. No.: 45392 Date Due: 2014-11-21 Project Name: 2010 Intersection Improvements Contract 1 01652 DOE Numbers: Project Numbers: .7003 Project Intersection Improvements at 3 intersection. Change order is Description: for pavement changes on Alta Vista @ 170 Project Manager: 'Lissette Acevedo City Inspector: !Mike Collier Contractor: JLB Contracting LLC COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 58,280.34 C295-541200-202390165280 Total Cost: $ 58,280.34 Total Requested Days:'0 Approval Status: https://projeetpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Site1d=51500&Proces... 12/24/2014 ,CFW Change Order Approval St-COApp02 Page 3 of 3 Approved: Yes Comments: User: Sam Davis Date: 2014-10-03 10:48 AM Approved: Yes Comments: User: Todd Estes Date: 2014-10-16 12:00 PM Approved: Yes Comments: User: Andy Anderson Date: 2014-10-28 11:19 AM Approved: Yes Comments: User: Doug Wiersig Date: 2014-10-28 11:51 AM Approved: Yes Comments: User: Doug Black Date: 2014-11-07 1:23 PM Approved: Yes OFFICUAL RECORD Comments: User: Fernando Costa CIVY 5ECRL- RV Date: 2014-11-07 11:02 PM Action Required: 0� 60o "V O�p4� Att�4, W by Ay Ron Id P. Gonzales,Ass ity Secretary ��� r) 04090°° a https:Hprojcctpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 12/24/2014 CFW Change Order Approval St-COApp02 Page 2 of 3 FORT WORTH, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: St-COApp02 Date Started: 2014-10-02 City Sec. No.: 45392 Date Due: 2014-11-21 Project Name: 2010 Intersection Improvements Contract 1 Project Numbers: 01652 DOE Numbers: 7003 Project Intersection Improvements at 3 intersection. Change order is Description: for pavement changes on Alta Vista @ 170 Project Manager: Lissette Acevedo City Inspector: Mike Collier Contractor: JLB Contracting LLC COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 58,280.34 C295-541200-202390165280 Total Cost: $ 58,280.34 Total Requested Days: 0 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Proces... 12/24/2014 CFW Change Order Approval St-COApp02 Page 3 of 3 Approved: Yes Comments: User: Sam Davis Date: 2014-10-03 10:48 AM Approved: Yes Comments: User: Todd Estes Date: 2014-10-16 12:00 PM Approved: Yes Comments: User: Andy Anderson Date: 2014-10-28 11:19 AM Approved: Yes Comments: User: Doug Wiersig Date: 2014-10-28 11:51 AM Approved: Yes Comments: User: Doug Black Date: 2014-11-07 1:23 PM Approved: Yes Comments: User: Fernando Costa Date: 2014-11-07 11:02 PM Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Site1d=51500&Proces... 12/24/2014 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Cowtown Redimix Concrete Supplier $10,000.00 Total $10,000.00 Previous Change Orders CO# DATE AMOUNT 1 5/28/2014 -$18,834.00 Total -$18,834.00