HomeMy WebLinkAboutContract 45939-A1 cup '4,MMMVi"," AMENDMENT No. 1 (1- Nrl - — - TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Wade Trim, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45939, (the CONTRACT) which was authorized by M&C 26960 on the 9th day of September, 2014 in the amount of $227,220 .00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2014, WSM-D WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 7, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $39,069. 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and rT services performed under the Contract, as amended, so that the <° total fee paid by the City for all work and services shall be an r W- amount of $266,289. 00 . R 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT® WORTH,TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth EN ER W d m, I Fernando Costa avid Spei , P.E. Assistant City Manager Vice President DATE: / DATE: APPROV COM ENDE Andrew T. Cronberg, P Interim Director, Wate epartment APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Douglas W. Black Assistant City Attorney xy �o'° ag�� • 460 °a p n o�� / r-7')�n CL_ d C 3 2�CtRly �� apo a°*�Y QysaOaoaaa° pd OFFICIAL RECORD CITY SECRETARY FT- WORTH,TX Page -2- WADETFJM November 7, 2014 City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Attention: Mr. John Kasavich, PE Project Manager Re: Water and Sanitary Sewer Replacement Contract 2014 WSM-D Amendment 1 City Secretary No. 45939 City Project No. 02385 Dear Mr. Kasavich: The City of Fort Worth has requested Wade Trim, Inc. to perform additional water and sanitary sewer line design services. Wade Trim will perform the work outlined as follows: Catherine Street— 8-inch water and 8-inch sanitary sewer; Weiler Boulevard— 12-inch water and 8-inch sanitary sewer;and, Duff Court—Service line reconnect into existing 6-inch water main. (See table below for limits.) The services associated with this item include survey and the preparation of plans for water and sanitary sewer improvements. The design will include plan and profile sheets as applicable, traffic control, erosion control, and associated sheets necessary to complete the construction. These services will be provided as the General Scope of Services of the original contract. Design Design Description Water Linear Sanitary Linear Cost Cost Feet Sewer feet Water Sewer Catherine Street 8-inch 650 $9,100 From E. Lancaster Ave.to Panola Ave. 8-inch 332 $4,648 Weiler Boulevard 12-inch 750 $10,500 From Hiett Court to Old Handley Road 8-inch 400 $5,600 Duff Court Serv. lines 4 ea. $9,221 From Grande Court to Duff Cul-De Sac TOTAL $28,821 $10,248 (See Exhibit B-1, B-1A, B-1B, B-2 and B-3 fora further breakdown of cost of expenses.) Wade Trim,Inc. 682.237.7718 Direct 105-C North Oak Street 877.533.9873 Toll Free Roanoke,TX 76262 682.237.7719 Fax www.wadetrim.com 6 City of Fort Worth November 7, 2014 Page 2 Work Phase Water Fee Sewer Fee Total Fee 31 $5,848 $1,501 $7,349 32 $5,848 $1,500 $7,348 33 $7,798 $2,000 $9,798 51 $9,327 $5,247 $14,574 TOTAL $28,821 $10,248 $39,069 Revised Contract Contract/Amendment Water Fee Sewer Fee Survey Fee Total Fee Amount Original Contract $98,841 $55,598 $72,781 $227,220 N/A Amendment No. 1 $19,494 $5,001 $14,574 $39,069 $266,289 TOTAL $118,335 $60,599 $87,355 $266,289 $266,289 This amendment will revise our current contract by$39,069 and will bring our new contract amount total to $266,289. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, Wade Trim, Inc. David T. Speicher, PE Vice President DTS:ka AAA 8140-13 Fort Worth Amendment Prop Ltr 11-7-14.docx Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract 2014 WSM•D-Amendment 1 City Project No.02385 Labor a Ex e Task No. Task Descrtptbn Principal Project Mana00r Project rs EIT CADD Admkdsiragve Total tabor Bubcanzultant nse Total Expense Tazk hub Total En m Cost Travel Reproduction Coz/ $220 $160 $120 $100 580 $60 MME M.41- to Pmj" tManagement 4 4 4 0 10 16 $3,720 $0 SO $0 $0 $o $3.720 1.1 fAmug'ug iho Team 1.12 OAIOC 4 10 10 10 $4.300 SO $4.380 12 P.-M siu aM Re o 12.1 Pra-Dos n Coordwtlon MeaS 4 4 $1.060 $0 $1.OE0 1123 Desgn 6ubmltal Reviewhteetings 8 8 $2,160 $0 32,14 12.3 Pre reBaseGw SChedub 4 2 8 31,320 SO 31,320 12A Pre ra Mont Pro ass RS wgh 8 4 6 52,160 30 32.160 1.2.5 Pre reMOM MSUSBE Re rts 8 4 $1.680 $01 31,680 2.0 Conce Dal-1 9,30-Pemen! 0 0 4 4 2 0 $1,040 $0 $0 $o SO $0 $1,030 2.1 Data COOed$an 4 34N $0 $480 22 Come al Oaz'nPacka $0 30 2.2.1 Cover Sheet 4 3400 M 5400 221 EaN aMS- $0 $0 $0 2.23 Phasn9 SO $0 30 21A Consfmction ESN,uta 2 $160 $0 3160 3.0 PreOmina -i n 60 Percent 6 3 18 41 48 42 $12,370 $0 $0 $0 $100 $100 $12,470 3.1 P,.D .a Package 2 4 10 12 12 $100 $IN $100 3.1.1 cover / 21 3 3550 30 $560 112 0-1 La ut 1 4 e 16 $2,710 30 $2,710 3.1.3 M-M M-ft6ta Sheets 1 2 10 $1.260 $01 51.260 3.1.4 S dfio8ans 2 $440 $0 $440 3.1.5 ComWdbn ESWate 1 14 31.620 Wl 31,620 3.2 CanzWCd Ravfew 1 $220 $0 $220 13 U cW.- ] 7 7 $2,100 50 32,100 4.0 Final Design 3 16 5 0 10 0 $4,310 SO $0 So SiN $100 $4410 41 Final Oran 4%ConsWgion Plans aM 1 1 2 $500 $100 $IN 5600 42 -I 14%)PlansandS �lions 1 5 1 7 $1,650 $0 $1.650 4.3 Pro' -ktl L s 90%end 100% 5 2 3990 30 $990 4.3 DonstmtSOn EW-t..(90%aM 14%) 1 5 1 1 $1,170 $0 $111]0 6.0 Btd Phase 0 0 2 0 8 8 $1,360 $0 $0 $0 $160 $160 51,310 5.1 MswNd 5.1.1 U ad DOCUmaMSto BVIISaW 1 380 $0 580 5.12 SN C.Z DOCV T8.nd M...h 2 2 32W $100 $100 $380 5.12 Issue AddeMa 1 2 2 5400 M. $50 344 SAA AReM E3d vs $0 30 $0 5.15 Tabulate BM aMR-M Award t 2 4 3520 30 5520 52 t '-. s 1 380 $0 360 6.0 ConztmcBOn Phase Services 0 2 3 1 3 4 $1,240 $0 SO 50 $25 $26 $1,265 6.1 ConsWcSOn Sa rt 6.1.1 -PrawnsW nCOnkrence 1 1 t 2 $470 $25 325 $495 8.12 AMWNU Mee€g 1 1 2 3390 50 $390 62 R.-OrewvgLAS BUID 1 1 2 3380 SO $380 TO Ro$Y/Easement$en4ces 0 0 0 0 1 0 $80 So SO SO $o $0 $80 7.1 R h.f-En Doanknls 1 580 SO 380 72 RlghW-W /Eesennnt Pre ratlonaM SO 30 $0 7J T­q Rlghtof En by Subr ltaI $0 $0 30 840 S.-Y 0 0 0 0 0 0 $0 $13.249 $0 $0 SO $13,249 $13,249 e.f Des- Bone 0 $0 $13,249 M 8.2 Teqw-y Right of En 8ubmdtal $0 $0 30 8.3 natmc['an Sane $0 30 30 9.0 Pwmlfing 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 50 9.1 s-PP $0 30 $0 9.2 Emkamrental Sarviws $0 30 $0 9.3 FbM mServkes $0 54 30 9.4 Tx DOT $0 $0 SO 95 ReOroatl 50 SD 30 9.6 TDLR gp SD $0 9.] SD 50 50 Mater Line Footage 1,400 80% Pm-tt[fiummary Serer tune-a 732 2" IN,NOUfs 240 2,132 100% Toil Lebo, 524,120 Total Ex n 513.624 069 (A) Total Fee 339, MBESBESUbw-.. $13,249 (B) Sway F. .$14,574 tton-hI6E/SBE Subconzu3aM 30 Tdai Fee-swe Fea $24,495 10% Sub Ma 31,325 r K3ter Fee(80%of C) Serer Fea(36%of C) hIBEISBE Padidpa 33.9% $19,494.00 35,41.4 Total P.J.1 Cost- $39,069.00 Daaa ray-._"- -wP avatar sower Conce I Desgn N%) 31 35,848.00 51,501.00 Preli 1 Design(6) 32 $5,648.4 $1,500.00 Flnal Da-(100%) 53 $],798.00 $2,47.0 Sava 51 1 $9.32744 $5147.4 Subtatai $28,821.4 310,243.4 Tobl 339,069.4