AMENDMENT No.3
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and
Halff Associates, Inc. , (ENGINEER) made and entered into City
Secretary Contract No. 42414, (the CONTRACT) which was
authorized by M&C C-25001 on the 12t" day of July, 2011 in the
amount of $174,972. 00; and
WHEREAS, the CONTRACT was subsequently revised by:
Amendment No. 1 in the amount of $140, 605 . 00 which was
authorized on April 3, 2012; and Amendment No. 2 in the amount
of $12, 684 . 00 which was administratively authorized on January
14, 2012; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Sanitary Sewer Rehabilitation Contract 80 (LXXX) ; and
WHEREAS, it has become necessary to execute Amendment
No.3 to the CONTRACT to include an increased scope of work and
revised fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
M additional engineering services specified in a proposal dated
C--)
M January 8, 2015, a copy of which is attached hereto and
M incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals $49,500 . 00 .
z
2 .
Article II of the CONTRACT is amended to provide for an
cm
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
an amount of $377,761 . 00 .
OFFICIAAT
CITY SE
F'P �IfCR
Page -1-
3 .
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED : ENGINEER
City of Fort Worth Halff Associates, Inc.
Fernando Costa J Roberts, P. E.
Assistant City Manager ' e President
DATE: /s /$' DATE:
IF
APPROVAL RECOMMENDED:
V r
Andrew T. Cronberg, P.
Interim Director, Wate D artment
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
&R I
Date: N/A
Douglas W. Black
Assistant City Attorney
ATTEST: F���'
Mary J. K y er '
City Secr ary
OFFICIAL RECORD
CITY sECRETARY
FT WORTHI TX
Page -2-
Mom
Mom •
January 8, 2015
21755
Mr. Roberto Sauceda, P.E.
City of Fort Worth Water Department
311 W. 10" Street
Fort Worth, Texas 76102
RE: Amendment No. 3— Sanitary Sewer Rehabilitation Contract 80 (LXXX)
City Project No. 01499
City Secretary Contract No. 42414
Dear Mr. Sauceda:
Halff Associates presents this Amendment No. 3 for additional services to City Project
No. 01499. Amendment No. 3 shall include the effort necessary to complete the plans
and project technical specifications for the Walsh Ranch Sanitary Sewer Extension
Phase 2. The plans will be constructed by the developer's contractor so no bidding
documents or services are required. Halff completed the original design of the
approximately 4,700 linear feet of 24-inch diameter sanitary sewer extension in
September 2004. Following is the scope and fee for completing the construction
documents.
SURVEY
Horizontal and Vertical Control—Halff's sub-consultant, Gorrondona &Associates, Inc.
will verify and re-establish the horizontal and vertical control along the proposed
Phase 2 alignment, which is approximately 4,700 linear feet. Vertical and horizontal
control shall be verified /established from the GPS control points that TranSystems
established for the Walsh Ranch Projects.
Topographic Survey— Gorrondona will provide a topographic survey for the new
features along the route. The survey will locate all new features within the
topographic limits including but not limited to power poles, trees or tree lines,
buildings, sanitary sewer cleanouts, paving, fences, driveways, culverts, water
valves, sanitary sewer manholes, and grade breaks. Since the plans were
completed in 2004, the downstream manhole was constructed, a new driveway and
creek crossing was constructed off of Old Weatherford Road at approximately SS
Station 33+00, and a new fence was constructed on the north side of Old
Weatherford Road between SS Stations 40+00 and the 47+00. Halff personnel will
HALFF ASSOCIATES,INC.
4000 FOSSIL CREEK BOULEVARD TEL (817)847-1422 WWW.HALFF.COM
FORT WORTH,TX 76137-2720 FAX (817)232-9784
® ®
®■® HALFF Mr.Roberto Sauceda,P.E,
City of Fort Worth Water Department
MEN Januuy 8,2015
Palen:2
walk the length of the sewer line and identify any other improvements to be tied prior
to the survey.
Wetland Delineation — Halff will walk the proposed Phase 2 alignment to verify the
wetland delineation conducted in January and February 2004 is applicable.
FINAL CONSTRUCTION PLANS AND SPECIFICAITONS
Aerial Crossing Design — Halff will review the applicable codes and design requirements
for any changes since the 2004 design. Halff will evaluate the Mary's Creek flow
velocities and potential scour at the aerial crossings based on the latest hydraulic
models of Mary's Creek. Halff will update the aerial crossing plans to include any
additional general notes, sections, details and specifications to meet the latest
design standards and channel velocities. Halff will also make any modifications
necessary to accommodate a 30-inch sewer line.
iSWM Plan— Halff will prepare the necessary erosion control and iSWM plan according
to City of Fort Worth Criteria. The plan will be included in the construction drawings
for the contractor to use in the project Stormwater Pollution Prevention Plan
(SWPPP). The Contractor is responsible for the preparation and maintenance of the
project SWPPP.
Construction Plans and Specifications— Halff will update the plans and specifications for
Walsh Ranch Phase 2 (Stations 0+00 to 47+50 +/-) to meet current Fort Worth
Water Department standards. At the City's request, Halff will also increase the size
of the sewer line from 24-inch to 30-inch. The project documents will be prepared to
submit to the developer's engineer for construction once the plans are approved.
Halff will address one set of City comments prior to submitting final construction
plans.
Meetings — Halff will meet with the city staff to discuss the final plan submittal and any
City comments.
SERVICES NOT INCLUDED
The following are not included in the scope of services:
• Easement and Right-of-Entry Documents —The City has acquired the
necessary right-of-way for the project. No additional documents are
required.
• Bidding and Construction Services —The City is providing this design to the
developer's contractor for construction and will not bid the project. No
bidding and construction services are required.
® • Mt Roberto Sauceda,P.E.
■® City of Fort Worth Water Department
Eno January 8,2015
Page 3
• Urban Forestry Permit—This is a city utility project awarded well before the
urban forestry requirements. We assume this project will not require an
urban forestry permit.
• USACE permitting —This project is authorized under the Nationwide Permit
12 Utility Line Activities and should not require USACE preconstruction
notification.
• Services related to development of the CITY's project financing and/or
budget.
• Public meetings
• Services related to damages caused by fire, flood, earthquake or other acts
of God.
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the
project as requested by the CITY.
COMPENSATION
The level of effort breakdown is attached. A summary of the proposed budget for this
revised amendment is as follows:
Design $29,122
Survey $18,852
10% Sub Markup $1,526
TOTAL PROPOSED AMENDMENT NO. 3 $49,500
Following is the project fee summary:
Original Contract $174,972
Amendment No. 1 $140,605
Amendment No. 2 $12,684
Amendment No. 3 $49.500
REVISED CONTRACT AMOUNT $377,761
Gorrondona & Associates, Inc., a MNVBE subcontractor, will conduct the necessary
field survey. Their fee for the surrey is $15,260. This is 30.8% of the amendment. The
amendment brings the total MNVBE fee to $121,260, which is 32.1% of the revised
contract amount. This is above the 23% MNVBE goal set for the original project. A
"Small Business Enterprise Request for Approval of Change/Addition Form" is attached.
While Gorrondona &Associates, Inc. performed the original survey for the Walsh Ranch
SS Extension, they were not previously a subcontractor on this project (SS Rehab
Contract 80) and will need to be added.
■ `
Mt RoUerto Sauceda,P.Ci
■■■ City of frort Worth\Vatcr Dcpartment
MEN January 8,2015
Page 4
SCHEDULE
A detailed schedule will be provided once the amendment is approved. The general
schedule is provided below:
• Survey completed 30 calendar days from Notice to Proceed (NTP)
• Final Plan Design completed 40 calendar days from NTP
• City review of Final Plans 21 calendar days from Final Plan Submittal
® Final Documents completed 14 days after receiving City comments
Please review the enclosed information and do not hesitate to call me if you have any
questions or require additional information regarding this proposal for the referenced
project.
Sincerely,
HALFF ASSOCIATES, INC.
Dennis W. Haar, P.E.
Project Manager