Loading...
HomeMy WebLinkAboutContract 33830-A5 CIV SECRV' coWRACT N0. AMENDMENT No.5 TO CITY SECRETARY CONTRACT WHEREA-S, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 33830, (the CONTRACT) which was authorized by M&C C- 21582 on the 25th day of July, 2006 in the amount of $202, 705. 00; and EREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $8,300 . 00 which was administratively authorized on September 24, 2007; and Amendment No. 2 in the amount of $34, 921 . 00 which was administratively authorized by M&C C-23595 on June 16, 2009, and Amendment No. 3 in the amount of $7,500 . 00 which was administratively authorized on September 16, 2010; and Amendment No. 4 in the amount of $3, 600 . 00 which was administratively authorized on June 5, 2012 ; and VMEHEA1S, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXXIV (74) ; and VVIHERE AS, it has become necessary to execute Amendment No.5 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the C-') additional engineering services specified in a proposal dated M December 9, 2014, a copy of which is attached hereto and M incorporated herein. The cost to City for the additional design services to be. performed by Engineer totals $23,480 . 00 . 2 . M LU o� Article II of the CONTRACT is amended to provide for an Q4 LU increase in the fee to be paid to Engineer for all work and v I services performed under the Contract, as amended, so that the IM j. total fee paid by the City for all work and services shall be an amount of $280, 506. 00 . Page -1- 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Teague Nall & Perkins, Inc. i Fernando Costa Ty H lton, P. E. Assistant City Manager Principal i Z —Z DATE: /4 /,S DATE: / APPROVAL RECOMMENDED: Andrew T. Cronberg, Interim Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A L-4 Ass Doug as W. Black Assistant City Attorney ATTEST: nj, Cr �g o� gar'y J. ayser ° d' �0°°°°O°4°0° City Secretary �^ OFFICIAL RECORD CITY SECRETARY F7o WnRTH9 7X Page -2- stn p league hall&perkins www.tnpmc.com engineers surveyors landscape architects December 9, 2014 Ms. Susan Schwinger, P.E. City of Fort Worth Water Department 311 W Tenth Street Fort Worth, Texas 76102 Re: Fee Proposal for Contract Amendment No. 5— Sanitary Sewer Rehabilitation Contract 74 City of Fort Worth Project No. 00360 (TNP Project No. FTW 05313) Dear Ms. Schwinger: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services requested. The City has requested that TNP provide the survey and design of 350 linear feet of alley way along the alignment of sanitary sewer line L-2139 between Pershing Ave. and El Campo Ave. at Bourine St. and the design of 340 linear feet of alley way along the alignment of sanitary sewer line L-2943 between Curzon Ave. and Lovell Ave. at Bryant Irvin Rd.The following is a brief description and cost for the additional services that will be provided on this project: 1. L-2139 Alley The scope of services that are necessary to accomplish the design of the L-2139 alley paving design is addressed below. 1.1 Design 1. Alley paving design shall involve creating a horizontal alignment, vertical profile design, proposed cross sections with both asphalt and concrete pavement alternates, and identification of areas requiring curb/retaining wall. Design will also be provided for the driveway at 5516 Pershing Ave. Deliverables will include one preliminary submittal, one set to be presented to the property owner and contractor after preliminary City comments are addressed, and one final plan submittal that will address any remaining City comments. A cost estimate will also be prepared for the proposed alley improvements. 1.2 Survey 1. An additional approximately 400 linear feet of topographic and design survey will be required within a 16' alley right of way between Pershing Ave. and El Campo Ave. at Bourine St. All adjacent driveways will be tied-in up to the garage, all adjacent yards that are accessible will be surveyed, and the alley will be cross sectioned. 1.3 Site Visits 1. TNP will attend up to four(4)separate meetings on-site with adjacent property owners to discuss pavement and drainage issues and proposed solutions. TNP also will attend one (1) meeting with City of Fort Worth Water Dept. and Stormwater Group to Fort Worth-1100 Macon Streeter Fort Worth,Texas 76102�817.336.5773 Dallas�17304 Preston Road,Suite 1340-Dallas,Texas 75252�214.461.9867 Denlon�1517 Centre Place Drive,Suite 320-Denton,Texas 76205�940.383.4177 Sherman�200 North Travis Street,Suite 500—Sherman,Texas 75090 903.870.1089 Registered by the Texas Board of Professional Engineers,Firm No.F-230� Registered by the Texas Board of Professional Surveyors,Firm No.100116-00 i Ms.Susan Schwinger,P.E. December 9,2014 Page 3 of 3 Sincerely, TEAGUE NALL AND PERKINS, INC. Andrew Luce, P.E. Project Manager t Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for SANITARY SEWER REHABILITATION CONTRACT 74 Ci Project No.00360 abor o Ea n Task DescrlpVOn Prde<t Prdect Paafec[ Enl LArcN Landscape SUE SUE SUE SOrvey 2JAan 9uN. AdmIN Talal labor 3e Total Eapenze Task No. plredof M1ialu er En sneer Desl ne CADD Flamer Deli a hUna er Tech D M Ua RPLS Tech Clerical Cost Subconsutiant T-1 Reproduction Cast Tasksub Total Rate 5190 5140 5125 595 S35 $165 $1. $1. SSS $125 $160 $95 feWM. SS6 hiWeE Non-M1nYBE 1.0 L-21]9 Age 9 10 ]0 22 0 d 0 2 41- 0 0 S1]10 SO 00 $0 dO s 600 $i 210 1.1 a / 3 30 ZO S9.T90 5d 59]90 12 6wv 2 2 4 33 52500 52. 53350 13 6ileK Tsb Med uPa tMnxdC 5 6 $2A70 SO sum 20 L-2913Ape 4 26 23 20 0 0 0 0 0 0 0 S&145 SO SO 50 SO SO 581/5 2.1 a 4 2/ 20 18 ST 30 $T Z3 Geab unq 1 3 2 $595 5595 Trials 13 65 53 42 0 0 0 0 2 / 0 0 524355 SO 52.500 so SO 52.600 523,355 Pr T..l H Trial OUrs s2 Taalla6or 2&— Tot E E2 MWOE SUbc Mani SO NOOlAW9E 5ubwnsuSaN 52500 5% pp lion u 5125 T—Pro—d1- Total ea cost 52],d30 C2yd PodW .T- Alladar.l B-Lea60—SUppbmenl PMO IXfi®I Rekase Daty 5.193010 idt