HomeMy WebLinkAboutContract 32566 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
SQ56
WHEREAS, S.J. Boswell Ridge Development, L.P., by S.J. Boswell Ridge,
L.L.C, a general partner, hereinafter called "Developer", desires to make certain
improvements to Boswell Meadows Addition, an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Wise, and Denton Counties, Texas, hereinafter called "City", to
do certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Steve Hawk
ins, its duly authorized President, and the City, acting herein by and through Marc Ott, its
duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section H, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph �yo
E. The contracts for the construction of the publi `i ` ,f all e
administered in conformance with paragraph 8, Se iaq is
Boswell Meadows
Revised Form per Legal 2/21/03
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged neglikence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
I. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
J. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
K. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
Water (A)attached Sewer (A-1)attached; Paving (B) Storm Drain (B-
1) ; Street Lights and Signs (C).
Boswell Meadows
Revised Form per Legal 2/21/03
E. Water and Sewer Facilities
A. Developer shall install the proposed water line(s), fire line(s) and/or
meters as shown on Exhibit A, the estimated cost of which is $154,841.
The City agrees to record the location of each said service line in respect
to the corner of the lot served, and to retain said records in its possession.
The Developer shall bare the cost of the water improvements as follows:
WATER FACILTIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Mains within $ 111,641 $ -0- $ 111,641
Development
Approach $ -0- $ -0- $ -0-
Easements* $ -0- $ -0- $ -0-
Service (108 x I") $ 43,200 $ -0- $ 43,200
Engineering $ -0- $ -0- $ -0-
Sub-Totals, Water $ 154,841 $ -0- $ 154,841
* To be dedicated by the developer
The costs stated herein may be based upon construction estimates rather
than actual cost.
^r71f
Boswell Meadows
Revised Form per Legal 2/21/03
B. Developer shall install sanitary mains as shown on Exhibit A-1, the
estimated cost of which is $212,343. The City agrees to record the
location of each said service line in respect to the corner of the lot served,
and to retain said records in its possession. The Developer and the City
shall share in the cost of the sewer improvements as follows:
SANITARY SEWER FACILITIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Mains within Development $ 156,760 $ 4,346 $ 161,106
Approach $ -0- $ -0- $ -0-
Easements* $ -0- $ 800 $ 800
Service (108 x 4") $ 47,196 $ -0- $ 47,196
Engineering $ -0- $ 3,241 $ 3,241
Sub-Total Sewer $ 203,956 $ 8,387 $ 212,343
Sub-Total Water $ 154,841 $ -0- $ 154,841
Total of Water and Sewer
Const. $ 358,797 $ 8,387 $ 367,184
Construction Inspection $ 7,176 $ 168 $ 7,344
Grand Total $ 365,973 $ 8,555 $ 374,528
*To be dedicated by the developer.
The costs stated herein may be based upon construction estimates rather
than actual cost. The final cost to Developer and City shall be based upon:
1. Unit prices contained in City of Fort Worth Ordinance No. 14552;
SEWER COST SHARE (Developer pays for 8" sewer pipe. The City pays for
10"/8" sewer pipe and 8" sewer pipe extension for Bryson Lane and
school.
10"/8" sewer pipe ($26-$25)
534 L.F. x $1 = $ 534
8" sewer pipe extension ($25)
152.5 L.F. x $25 = $ 3,812
Engineering cost ($3,241)
1 L.S. x $3,241 = 3,241
$ 7,587
Boswell Meadows
Revised Form per Legal 2/21/03
SEWER
Unit Price from Developer's
Pay Item Unit Description Projects
1 LF 6" Sanitary Sewer Pie $ 24.00
2 LF 8" Sanitary Sewer Pie $ 25.00
3 LF 10" Sanitary Sewer Pie $ 26.00
4 LF 12" Sanitary Sewer Pie $ 27.00
5 LF 15" Sanitary Sewer Pie $ 28.00
6 LF 18" Sanitary Sewer Pie $ 38.00
7 LF 21" Sanitary Sewer Pie $ 45.00
8 LF 24" Sanitary Sewer Pie $ 48.00
9 EA Standard 4' Diameter Manhole $ 1,293.00
10 EA Standard 5' Diameter Manhole $ 3,125.00
h
�,..
Boswell Meadows'
Revised Form per Legal 2/21/03
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Peveloper
C
a ute this instrument in quadruplicate, at Fort Worth, Texas this the a of
00�
Approval Recommended:
Water Department
Contract•. uth ' z tiox
[gate
S. Frank Crumb
Director
ity Fort Worth
4ecetary Assistant City Manager
Marty Hendrix Marc A. Ott
Approv asAo Form:
Assistant ity A�ftorney
DEVELtaad
ATTEST:
Corporate Secretary y:
Boswell Meadows ' ;r;'✓`'1 Ji'� U ',
Revised Form per Legal 2/21/03
I
P
I I
-
�
I
�
I I
� � I
I I I m \\
� I F.1s N /
N
N
N
'u
lur
I _
_ - ru
EAa
N N O O
ry� ;T� W
I ry I I O� P 1 L,
I I o N 1 i a m
\ N - ---
. IL
N I o. N
N
I I m N I I m M
I I N 1 IQ I N
r N I I I Y
311
f I O I N • l , N Cmi
inm
1 I l l y N t7 r N 10
m
" I I Jff
I �
i - -faO-M�t15
II i I Y I
i I i N
I
I
i
I( N N
/
/
N I {
I
Ntn
cu
C/) Cf)
N
" A
N \ H
N O
I
I m 1 1 a Cf)
N pq 4
I N
Y ,
I N i I i o m
I m I I m 0
r ! N I I
I
N
N �► I ,� o
m 1 1 I
I.
Lo
I ' N
I