Loading...
HomeMy WebLinkAboutContract 46365 Cmr sECRETAW 4�i3t CONTRACT No. Developer and Project Information Cover Sheet: Developer Company Name: RIVERBEND INVESTMENT,LTD. Address, State,Zip Code: 2550 SOUTH PRECINCT,FORT WORTH, TX 76113 Phone,E-Mail: 817.589.9001, KENNETH @KBNEWELL.COM Authorized Signatory/Title: KENNETH NEWELL/MANAGING PARTNER I Project Name and Brief Description: LAKES OF RIVER TRAILS PHASE 13 WATER, SEWER,PAVING, STORM DRAIN, STREET LIGHTS &NAME SIGNS TO SERVE LAKES OF RIVER TRAILS PHASE 13 a Project Location: TRINITY BLVD(SOUTH)AND WEST OF WHISTLING SWAN Plat Case No.: FP-13-090 Plat Name: LAKES OF RIVER TRAILS PHASE 13 Mapsco: Council District: City Project No: 02284 CFA: 2014-077 DOE: 7228 To be completed by staff Received by: l�' f•►�� Date: 70 n m m v � z C4 0 s 1 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 7V WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as LAKES OF RIVER TRAILS PHASE 13 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ('Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, a Section II, of the Policy and recognizes that there shall be no reduction in the rn collateral until the Project has been completed and the City has officially Kam! p accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof. Water (A) X, Sewer (A-1) X, Paving (B) X, Storm Drain(B-1)X, Street Lights & Signs (C)X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. 4 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its offlicers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. ill. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. 6 iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: LAKES OFF RIVER TRAILS PHASE 13 CFA No.: 2014-077 DOE No.: 7228 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $171,250 2.Sewer Construction $195,390.05 Water and Sewer Construction Total $ 366,640.35 B. TPW Construction 1.Street $ 600,590.63 2.Storm Drain $ 61,855.10 3.Street Lights Installed by Developer $ 52,276.80 TPW Construction Cost Total $ 714,722.53 Total Construction Cost(excluding the fees): $ 1,081,362.88 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 7,332.81 D. Water/Sewer Material Testing Fee(2%) $ 7,332.81 Sub-Total for Water Construction Fees $ 14,665.62 E. TPW Inspection Fee(4%) $ 26,497.83 F. TPW Material Testing(2%) $ 13,248.91 G. Street Light Inspsection Cost $ 2,091.07 H. Street Signs Installation Cost $ 1,470.00 Sub-Total for TPW Construction Fees $ 43,307.81 Total Construction Fees: $ 57,973.43 Financial Guarantee Options(Choose one) Amount Mark choice Bond=100% $ 1,081,362.88 Completion Agreement=100%/Holds Plat $ 1,081,362.88 Cash Escrow Water/Sanitary Sewer=125% $ 458,300.44 Cash Escrow Paving/Storm Drain=125% $ 893,403.16 Letter of Credit=125%w/2 r expiration period $ 1,351,703.60 X 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, and said Developer has execuled this instrument in quadruplicate, at Fort Worth,Texas this day of 20 ' CITY OF FORT WORTH-Recommended by: Water Department Transportatio &P blic orks Department Wendy Chi- bulal, EMBA,P.E. T,l Douglas W. Wiersig,P.E. Developmene Engineering Manager Director Approved as to Form &Legality: Approved by City Manager's Office ,elm Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. Date: �� for? ATTEST: �a r oM lS _ 8� Mary J.Kayser od'° City Secretary �°°°°°°°� AS ATTEST: DEVELOPER: Signature Signature (Print)Name:,G/if)4 ,6115 Print Name:KENNETH NEWELL Title:MANAGING PARTNER OFFICIAL RECORD CITY SECRETARY FT.WORTH TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements [�. Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 W z 4 IF i aL co r � z � o � z � F � S W v � o � � o l ~ � Q J o CU co c r, (U o (U co O fU CCU �D (Y) CLJ 00 0 w o N II z w . J Q Cn --� f Li oG -- Pa F- TT I i ml 4-----i---- i �'- ---� I 3 -- -- 00 o °p ---�---- -- -- -- 1 I I I I e / 04 y 3 Q \ y � 1(r) o o �\ Q Z ~ Lo W Q � I 0 w o N II w J Q U V) F-I-- I L 1 I oc Q I I --�-- F-- - xQ LJ I ---� yr be OC Y �� r--- I I � 1 I rQ ----� r---; I U - ---�R ! I I 4 1 1 S ►,- P J O LU 00 Lu 2 2 Ny LLJ p CL C�l `U Lo V) / cn 0 0 Q I I I , ' z n Q LLJ J 1 YQ�r I I d d F-r7777-r�r� L__1a_L L_I_L L_I�--L—i L_id T F I �-1 —T7 T1— — I I I L ; i——i I__I 4l I 1 Ala L� Ful W 1 Al lo W � W \d\ \ < y 5o � c/j Y Q J N 2 Q W " o Q O O N 2 O O O O i%J% L00- \Voo> I i i Q I I I I I I � I 1 D.,, � `• �� 1 •\ � z W Y Q J w o 6i 1 Cl) a 7-7 r�Tr�T"��Tr�Tj d ��y 1 I I j- -1-L_LJ _LJ f , _IR I I 1 j 1 I Qr 1 � 0 LLJ CS CL \ Q .a � i Ti Ln , d d Cf)� _ _j LJs l_L_I�L_I�LJ L_Id L. , L I Ja. L —�— T I r- i Q f I I I Ln 1- -a Ul � I - I I �N I �\ I � I I cn V- m w W`` � i 00 42 43 DAP-BID PROPOSAL Page 1 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposa' Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price T Bid Value UNIT I:WATER IMPROVEMENTS 1 3311.0263 8"PVC Water Pipe,Select Backfill 33 11 12 LF 3159 $21.50 $67,918.50 2 3312.3003 8"Gate Valve 33 12 20 EA 14 $1,150.00 $1......-___. 6,100.00 __........._. .._........ 3 3312.3002 6"Gate Valve 331220 EA 4 $750.00 $3,000.00 4 3312.0001 Fire Hydrant 331240 EA 4 $2,775.00 $11,100.00 5 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 Ton 2 $4,050.00 $8,100.00 .... ........... ...... . ............... ____............___....._._.._ 6 3312.2003 1"Water Service 33 12 10 EA 94 $650.. ....... 3305.0109 Trench Safety 3305 10 LF 3159 $0.20 $631.80 8 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 4 $825.00 $3,300.00 __..._ .. ......., ... .. ...___.....__,..._........._.....__.__,. __..._... ._._......... .........................._ ....... ... _..... ..... . ...._._... ..... _..... ..........._..._._ ..... ..... _......... ................ _._._._.._—.....__._.........-__._........._._._...........-.....,.... __.._._.._ _.------ -.__N........ --_..._.._.... _..,.,.,_... — ____..............-__ ................ .......___.___.. _.._............._----....__.........._---....... . — ._...... ............. ..._. ..,_.........................,_....... _._----- ........__ _.,_...._. ._ CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUNIENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Copy of 00 42 43—Bid Proposal DAP-Utilities.xls 00 42 43 DAP-BID PROPOSAL Page 2 of 1? SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value TOTAL UNIT I:WATER IMPROVEMENTS1 $171,250.30 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Version April 2,2014 Copy of 00 42 43_Bid proposal_DAP-Utilities.zls Forth SAP-BID PROPOSAL SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 33 11 10,33 31 LF 2165 $25.00 $54,125.00 2 3331.4201 10"Sewer Pipe 33 11 10,3331 LF 1431 $27.75 $39,710.25 3 3339.1001 4'Manhole 33 39 10,33 39 EA 18 $2,500.00 $45,000.00 4 3339.1004 4'Shallow Manhole 33 39 10,33 39 EA 1 $2,500.00 $2,500.00 5 3331.3101 4"Sewer Service 3331 50 EA 95 $430.00 $40,850.00 _.......... ..__......__ _ .. ....... 6 3331.3102 4"2-Way Cleanout 3331 50 EA 95 $30.00 $2,850.00 7 3305.0109 Trench Safety 3305 10 LF 3596 $0.30 $1,078.80 8 3305.0113 Trench Water Stops 3305 15 EA 6 $30.00 $180.00 w ...-_....._ .. 9 3301.0101 Manhole Vacuum Testing 33 01 30 EA 19 $100.00 $1,900.00 10 3301.0002 Post-CCTV Inspection 33 01 31 LF 3596 $1:00 $3,596.00 11 0241.2103 S"Sewer Abandonment Plug 02 41 14 EA 3 $750.00 $2,250.00 _. ..._. ... 12 3305.0203 Imported Embedment/Backfill,CLSM 33 05 10 LF 90 $15.00 $1,350.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Copy of 00 42 43-Bid Propowl_DAP-Utilitim.xit 00 42 43 DAP-BID PROPOSAL Page 4 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS1 $195,390.05 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Version April 2,2014 Copy of 00 42 43—Bid Proposal_DAP-U[ilities.zls Forth 00 42 43 DAP-BIDPROPOSAL Page 5 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. I Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3349.5001 10'Curb Inlet 33 49 20 EA 6 $2,650.00 $15,900.00 2 3341.0205 24"RCP,Class 1II 3341 10 LF 670 $48.50 $32,495.00 --. ..,.- .... . 3 3341.0201 21"RCP,Class Ill 33 41 10 LF 47 $45.00 $2,115.00 _ . __-----------_.�__ 4 3349.4105 24"SET, 1 pipe 33 49 40 EA 2 $1,500.00 $3,000.00 5 3349.0001 4'Storm Junction Box 33 49 10 EA 1 . ............ ........._ ...._....__......__......_.......... 6 3305.0109 Trench Safety 33 05 10 LF 7.17 $0.30 $215.10 7 0241.3104 24"Storm Abandonment Plug 0241 14 EA 1 $550.00 $550.00 8 3137 0104 Medium Stone Ri ra 31 37 00 SF 590 $7.00 $4,130.00 ._...._., ........__ ......___ -----.._ .....-..P P.. ---- ___....._..... _._...._..._. .........._._.._...................._ ..___................._._._........_....... CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Copy of 00 42 43—Bid Proposal_DAP-Utilitim.xls 00 42 43 DAP-BID PROPOSAL Page 6 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity TOTAL UNIT III:DRAINAGE IMPROVEMENTS $61,855.11 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Version April 2,2014 Copy of 00 42 43_Bid Proposal_DAP-U[ilities.zls Forth 7AP-BID PROPOSAL SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROV MENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Copy of 00 42 43—Bid Proposal_DAP-Utilities.xis 00 42 43 DAP-BID PROPOSAL Page 8 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity TOTAL UNIT IV: PAVING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Copy of 00 42 43_Bid Proposal_DAP-Utilities.zls Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 9 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Sidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT V:STREET LIG TING IMPROVEMENTS __...................__.,___ .. ....._ ____....... CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fofm Version April 2,2014 Copy of o0 42 43 Bid Proposal_DAP-Utilities.xls 00 42 43 DAP-BID PROPOSAL Page 10 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Capy of 00 42 43 Bid Proposal_DAP-Ulilities.xls Form Version April 2,2014 00 1^_13 DAP BID PROPOSAL Page 1 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No Measure Quantity Unit Price Bid Value UNIT VI:TRAFFIC SIGNAL IMPROVEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Copy of 00 42 43—Bid Proposal_DAP-Utilitim.als 00 42 43 DAP-BID PROPOSAL Page 12 of 13 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Copy of 00 42 43131d Proposal_DAP-Utilities.xls Form Version April 2,2014 )AP-BID PROPOSAL SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I:WATER IMPROVEMENTS _$171,250.30 UNIT II:SANITARY SEWER IMPROVEMENTS $195,390.05 __........._.---- UNIT III:DRAINAGE IMPROVEMENTS _ $61_,855.10 UNIT IV: PAVING IMPROVEMENTS — UNIT V:STREET LIGHTING IMPROVEMENTS UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS _ Total Construction Bid $428,495.45 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 90 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Copy of 00 42 43 Bid Proposal DAP-Utilities.xls Forth Version April 2,2014