HomeMy WebLinkAboutContract 29469 CITY CON RAC1 No Y � 9 AMMENDMENT No. 4 THE STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Alan Plummer Associates, Inc., (Engineer) made and entered into City Secretary Contract No. 27615, (the Contract) which was authorized by the City Council by M&C C-19022 on the 26`h day of March 2002; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the Design of the Wastewater Diversion from the Eagle Mountain Lake Drainage Basin to the Big Fossil Creek Basin and the Lake Worth South Shore Sewer. WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional services specified in the proposal letter dated October 31, 2003, a copy of which is attached hereto and incorporated herein. The cost for the additional professional services to be performed by the Engineer totals $7,700. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid the Engineer for all work and services under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed $1,019,369.78. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. F:\Projects\318\3200\ProjectMgmt\Contracts\Amend4\Amend4_SouthShoreRev.doc EXECUTED on this day of 200 1n Fort Worth, Tarrant County, Texas. C A EST: C Contract Authorization Gloria Pears6n, City Secretary Date APPROVAL RECOMMENDED: APPROVED: �c -.1 -- Z��L 4�'-�- Dale A. Fissele , E. Aarc Ott Director, Water Department Assistant City Manager Alan Plummer Associates, Inc. ENGINEER By: 4 �-- Name: A. Lee Head, III, P.E. Principal 7524 Mosier View Court, Suite 200 Fort Worth, TX 76118 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney F:\Projects\318\3200\Proj ectMgmt\Con tracts\Amend4Wmend4_Sout hS hore Rev.d oc '�.•" t,,it a 5� ALAN • ASSOCIATES, • • him ENVIRONMENTAL ENGINEERS•DESIGNERS•SCIENTISTS JAMES L ALTSTAETTER,PE 318-3200 JEFFREY E.CAFFEY.P.E. /� STEPHEN J.COONAN.P.E. October 31, 2003 PEGGY W GLASS.Ph D. DAVID A.GUDAL.P.E. A.LEE HEAD.III.P.E. Ms. Madelene Rafalko BE L JORDAN.1.RE.RE. Engineering Services CLETUSR MARTIN.PE. LORETTA E.MOKRY Fort Worth Water Department MARK A.PERKINS,P.E. 1 000 Throck Morton ALAN H.PLUMMER.JR..PE..DEE P.O. Box 870 RICHARD H.SMITH,P.E. Fort Worth, Texas 76102 ALAN R.TUCKER,P.E. P.JONATHAN YOUNG.Ph.D..RE. Re: City of Fort Worth South Shore Low Pressure Sewer System City Project Number P171-070171131150 Revised Amendment No. 4 Proposal Dear Ms. RafaIko: This letter describes our proposal to provide additional topographic survey for the above- referenced contract. We have revised the amendment so that the total fee under Article II reflects the $7,700 additional services fee for Amendment No. 4. Our initial scope of work for topographic survey was based on a length of 28,100 linear feet of sewer pipeline. The total amount of sewer line included in the project is 38,400 linear feet, which is an increase of 10,700 linear feet of total pipeline length over the original amount in the contract. LopezGarcia Group was able to provide existing topographic survey from previous City projects for 7,900 of the additional 10,700 linear feet described above. However, to complete the project,LopezGarcia Group provided 2,800 linear feet of extra topographic survey. We respectfully request that the City amend the contract to provide the following additional fees: Task Unit Cost Total Cost 1. 2,800 linear feet of additional topographic $2.5/linear $7,000.00 survey. foot 2. APAI Management and Administration 10% $ 700 TOTAL $7,700.00 q^ �ty 841 WEST MITCHELL f �L=�f"'L )2I -Joh ARLINGTON.TEXAS76013-2506 PHONE 817-461-Ia91 FAX 817-860-3339 F:\Projects\318\3200\PrgectM_nt\Contracts\Amend4\Rafako_Ltr_Amend4ProposaI Rev.doc 1 We appreciate your consideration of this request and this opportunity to serve the City of Fort Worth. Please call me if you have questions. Sincerely, ALAN PLUMMER ASSOCIATES, INC. 9�4�2 A. Lee Head, III, P.E. Principal ALH/hjh Enclosure cc: Mr. Jeffrey E. Caffey, P.E., Alan Plummer Associates, Inc., Ft. Worth, Texas F:\Projects\318\3200\PrgectMgmt\Contracts\P,mend4\Rafako_Ltr Amend4Proposa[Rev.doc 2