AMENDMENT NO. 1
STATE OF TEXAS 3 CITY SECRETARY CONTRACT
COUNTY OF TARRANT 3
WHEREAS, the City of Fort Worth (City) and Deltatek Engineering
(Engineer) made and entered into City Secretary Contract No. 27844 , (the
Contract) which was authorized by the City Council by M&C C-19105 on the
28 day of May, 2002 ; and
WHEREAS, the Contract involves engineering services for the
following project :
Design and construction management of the existing digester No. 13 at the Village Creek
Wastewater Treatment Plant Project No P172-070172301010 .
WHEREAS, it has become necessary to execute Amendment No. l to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly authorized representatives, enter into the following agreement which
amends the Contract :
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated May 19, 2003 , a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional services to be performed by Engineer total
$7, 800 .
2 .
Article II of the Contract is amended to provide for an increase in
the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of $42, 800 .
POLINAL
r
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect .
EXECUTED on this the 27 day of January 2004 ,
in Fort Worth, Tarrant County, Texas .
APPROVAL RECOMMENDED: APPROVED:
Dale A. Fisseler . E. Marc A.' t
Director, Water, DeLDartment Assistant City Manager
6eatek Engineering.
ENGINEER
A ST:
Contract' Authorization xl�-/ .
ylvia Glover c ng City Secretary
Date
By.
Name : Bahram Niknam, P.E .
14114 Dallas Parkway, suite 480
Dallas, Tx. 75254
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
TAT', f
May 19, 2003
Deltatek Engineering
Mr. Seiavash Mir
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, Texas 76102
Reference: Roof Dome Stabilization/Repair for Digester 1
`v'iiiagc `;i eek- `W—asiewaier Treatment Piant
City of Fort Worth
Dear Mr. Mir:
In response to your request, DELTATEK ENGINEERING has conducted an on site
observation of this facility and recommends the following temporary repair work. As you
requested, the City desires to stabilize the roof dome at this time to prevent collapse of
roof into the digester basin. Therefore, the following recommendations address the
stabilization of the roof dome and permanent repair to the current condition. The digester
dome is structurally unsound and unstable due to failed support brackets. Consequently,
no personnel shall be allowed on the roof top. All gas piping shall be valved off or
isolated to prevent emission of gases into surrounding areas in the event of roof collapse
into the basin.
Temporary Stabilization Recommendation
• Evacuate combustible gases from digester container and vicinity of this facility
• Set up gas detectors and monitoring station during hot work (burning, chipping,
grinding, and welding)
• Remove roof;nSuI-atilon unli rvvfIng, m.,ter.;a1 to .-4..1 ..bstrate v-41
?
w.,t. ...t,mater.; iv u:::�u. iu.�vucllV `rr`tlVrV .iiiYYvrL
brackets to be attached by welding
• Install three (3) 1" base plates simply supported on top of concrete basin
• Install three (3) roof brackets per Deltatek's detail drawings
Permanent Repair
• Deltatek shall provide plans and specifications for permanent structural repairs to
remove all support brackets and install structurally sound brackets
• Remove the existing sealant and install new sealant
• Touch up all disturbed areas by welding
• Provide construction services during renovation
• Review submittals �� -
• Attend progress meetings ''fj�'��"
14114 Dallas Parkway,Suite 480, Dallas,Texas 75254
(469)374-9800 Fax(469)374-9801
email:bn@deltatekeng.com
Page 2
• Perform substantial completion walk-thru
• Assist the City in project close out
Total cost proposed to perform above tasks shall be $7,800.00.
Should you have any questions, please call me at 469-374-9800.