HomeMy WebLinkAboutContract 29670 ~!Tv SE RY -20 wo 03-10-04P02 :20 RCVD AMENDMENT NO. 1 STATE OF TEXAS 3 CITY SECRETARY CONTRACT COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Deltatek Engineering (Engineer) made and entered into City Secretary Contract No. 27844 , (the Contract) which was authorized by the City Council by M&C C-19105 on the 28 day of May, 2002 ; and WHEREAS, the Contract involves engineering services for the following project : Design and construction management of the existing digester No. 13 at the Village Creek Wastewater Treatment Plant Project No P172-070172301010 . WHEREAS, it has become necessary to execute Amendment No. l to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 19, 2003 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $7, 800 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $42, 800 . POLINAL r 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . EXECUTED on this the 27 day of January 2004 , in Fort Worth, Tarrant County, Texas . APPROVAL RECOMMENDED: APPROVED: Dale A. Fisseler . E. Marc A.' t Director, Water, DeLDartment Assistant City Manager 6eatek Engineering. ENGINEER A ST: Contract' Authorization xl�-/ . ylvia Glover c ng City Secretary Date By. Name : Bahram Niknam, P.E . 14114 Dallas Parkway, suite 480 Dallas, Tx. 75254 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney TAT', f May 19, 2003 Deltatek Engineering Mr. Seiavash Mir Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, Texas 76102 Reference: Roof Dome Stabilization/Repair for Digester 1 `v'iiiagc `;i eek- `W—asiewaier Treatment Piant City of Fort Worth Dear Mr. Mir: In response to your request, DELTATEK ENGINEERING has conducted an on site observation of this facility and recommends the following temporary repair work. As you requested, the City desires to stabilize the roof dome at this time to prevent collapse of roof into the digester basin. Therefore, the following recommendations address the stabilization of the roof dome and permanent repair to the current condition. The digester dome is structurally unsound and unstable due to failed support brackets. Consequently, no personnel shall be allowed on the roof top. All gas piping shall be valved off or isolated to prevent emission of gases into surrounding areas in the event of roof collapse into the basin. Temporary Stabilization Recommendation • Evacuate combustible gases from digester container and vicinity of this facility • Set up gas detectors and monitoring station during hot work (burning, chipping, grinding, and welding) • Remove roof;nSuI-atilon unli rvvfIng, m.,ter.;a1 to .-4..1 ..bstrate v-41 ? w.,t. ...t,mater.; iv u:::�u. iu.�vucllV `rr`tlVrV .iiiYYvrL brackets to be attached by welding • Install three (3) 1" base plates simply supported on top of concrete basin • Install three (3) roof brackets per Deltatek's detail drawings Permanent Repair • Deltatek shall provide plans and specifications for permanent structural repairs to remove all support brackets and install structurally sound brackets • Remove the existing sealant and install new sealant • Touch up all disturbed areas by welding • Provide construction services during renovation • Review submittals �� - • Attend progress meetings ''fj�'��" 14114 Dallas Parkway,Suite 480, Dallas,Texas 75254 (469)374-9800 Fax(469)374-9801 email:bn@deltatekeng.com Page 2 • Perform substantial completion walk-thru • Assist the City in project close out Total cost proposed to perform above tasks shall be $7,800.00. Should you have any questions, please call me at 469-374-9800. Sincerely, DELTATEK ENGINEERING 401'."eO AWL'/ Bahram Niknam, P.E. a