Loading...
HomeMy WebLinkAboutContract 29969 AMENDMENT NO. 12 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Lopez Garcia, (Engineer) made and entered into City Secretary Contract No. 24883, (the Contract) which was authorized by the City Council by M&C C- 17334 on the 23rd day of March, 1999; and subsequently revised by eleven previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Line Relocation for Rosedale Street (U.S. Highway 287 to Forest Park Boulevard) . WHEREAS, it has become necessary to execute Amendment No. 12 ti'- Gai Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 4 , 2004 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $13,955.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $593,921 .50. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2004, in Fort Worth, Tarrant County, Texas. ATTEST: Contract Authorization Sylv Glover Acting City Secretary Date APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E . Marc A. Ott Director, Department of Assistant City Manager Engineering LOPEZ GARCIA GROUP ENGINE R By: Name: Don M. Treude Lopez Garcia Group 6850 Manhattan Blvd. , Suite 300 Fort Worth, TX 76120 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney -2- March 4, 2004 Mr. Liam Conlon Project Manager City of Fort Worth - Engineering Department Engineering Services 900 Monroe Street, Suite 201 Fort Worth, Texas 76102 RE: Request for Supplemental Agreement (Amendment No. 12) Rosedale Street Improvements Contract No. 2, UNIT I, UNIT II & UNIT III Water and Sanitary Sewer Replacements Water Project No. PW77-060770153580 Sewer Project No. PS46-070460133440 D.O.E. No. 3140, 3807 & 3808 LOPEZGARCIA GROUP Project No. 198005.00 Dear Mr. Conlon: This letter is in response to the following design changes and scope modifications that have been requested by the City of Fort Worth for the above mentioned project. Descriptions of the requested design changes are as follows: Contract No. 2, UNIT I • Modify design of proposed 30" and 36" water line in Mistletoe Blvd. • Modify design of proposed 36" water line to connect and incorporate 36" water line designed by Kimley-Horn and Associates. • Increase the size of the proposed water line in 12th Ave., as shown on Plan sheet 14, from 8" to 12" in diameter. Move horizontal alignment to the west, modify end connections and - vertical alignment as shown on sketch provided by the City of Fort Worth. Contract No. 2, UNIT II • Relocate proposed 30" water line in W. Rosedale Street between 8th and 9th Ave. to the intersection of 8" Ave. and Oleander St. to allow for connection of Kimley-Horn and Associates proposed 30" water line in Oleander St. • Extend 16" water line design in 9th Ave., south of W. Rosedale Street, to connect to proposed 16" water line designed by Kimiey-Horn and Associates. • Storm Water Pollution Prevention Plan (SWPPP) TEX lope=_garciagroup.com 6850 Manhattan Blvd.,Suite 300 Fort Worth,texas 76120 (817}446-1800 $17;446-1113 Fax Mr. Liam Conlon City of Fort Worth March 4, 2004 Page 2 Contract No. 2, UNIT III • Increase the size of the proposed water line in Hemphill St. from 8" to 12" diameter. • Decrease the size of the proposed water line in Jennings Ave. from 16" to 12" diameter. • Design of an 8" sanitary sewer (Line "A") from Sta. 8+00 (M-14) to the west in W. Rosedale St. to Alston Ave. and south in Alston Ave. to beyond the future paving replacement limits (322 LF). -for Magnolia Green development • Design of an 8" sanitary sewer (Line "B") from Sta. 5+38.55 (L-355) to the south in Hemphill St. beyond the future paving replacement limits (421 LF). - for Magnolia Green development • Add cross-connections to the proposed 16" water line in W. Rosedale St. at May St. and Oak Grove St. • Storm Water Pollution Prevention Plan (SWPPP) The additional fees to provide the above mentioned design changes are as follows- • Contract No. 2, UNIT I - $ 1,660.00 • Contract No. 2, UNIT II - $ 3,323.00 • Contract No. 2, UNIT III - $ 3,472.00 The additional fees to provide the above mentioned increases in scope are as follows: • Contract No. 2, UNIT II (SWPPP) - $ 3,000.00 • Contract No. 2, UNIT III (SWPPP) - $ 2,500.00 These additional fees total $ 13,955.00 and should be divided as follows.- 0 ollows:• Water (PW77-060770153580) - 59% ($8,233.00) • Sanitary Sewer (PS46-070460133440) - 41% ($5,722.00) „I Mr. Liam Conlon City of Fort Worth March 4, 2004 Page 3 Contract Summary Original Contract Amount $412,908.00 Amendment No. 1 - Approved 3/06/00 $ 40,765.00 Amendment No. 2 - Approved 8/08/01 $ 9,830.00 Amendment No. 3 - Approved 8/20/01 $ 3,660.00 Amendment No. 4 - Approved 10/19/01 $ 12,500.00 Amendment No. 5 - Approved 2/20/02 $ 14,775.00 Amendment No. 6 - Approved 3/13/02 $ 23,203.00 Amendment No. 7 - Approved Unknown $ 10,742.00 Amendment No. 8 - Approved 8/19/02 $ 12,076.00 Amendment No. 9 - Approved 9/04/02 $ 5,034.75 Amendment No. 10 - Approved 9/26/02 $ 23,415.00 Amendment No. 11 - Approved 10/18/02 $ 11,057.75 Amendment No. 12 - Requested herein $ 13,955.00 Total Revised Amount $593,921.50 If you have any questions or need additional information concerning this request, please feel free to call me at (817) 446-1800. Sincerely, LOPEZGARCCIIA GROUP Brent E. Lewis, P.E. Project Manager QED