Loading...
HomeMy WebLinkAboutContract 25708 CITY SECRETARY , _ 03-;11 -00PO4 :38 RCVF' CONTRACT No. STATE OF TEXAS § COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO. 24661 WHEREAS, the City of Fort Worth ("City") and Mateo Consulting Engineers, Inc. ("Consultant") made and entered into City of Fort Worth City Secretary Contract No. 24661, ("Contract"); and WHEREAS, the Contract involves professional services for the following project: Roadway and parking improvements at three park sites (Lincoln Park, Oakland Lake Park and Trinity Park) and WHEREAS, it has become necessary to amend the Contract to include an increased scope of work and a revised maximum fee. NOW, THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the contract: 1. Article 1 , Section A of the Contract is amended to include the additional engineering services specified in a letter dated March 1, 2000, a copy of which is attached hereto and incorporated herein. 2. Article II of the Contract is amended to provide for an increase in the maximum fee in the amount of$ 5,168.00, which is to be paid to Consultant for all work and services under the contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$ 74,018.00. 3. All other provisions of the Contract that are not expressly amended herein shall remain in full force and effect. Executed on this the � day of �'G ,-��-�• • . OOO 111 H 00 ATTEST: CITY OF FORT WORTH lona Pears Lib y Watson City Secretary Assistant City Manager ICCQUO ichard Zavala, Director P rks and Community APPROVED AS TO FORM CONSULTANT: Mateo Co t'Ag /fngingprs, Inc. By: Assistant rty Attorney Name: Title: I t� ✓�Ln/Gi�tJ /�iG (Co!wany Address � S_ � , C 7S2 �b �G regi r ire Contract Autho ization ��a3�D0 Date K�E MATEO CONSULTING ENGINEERS INC. March 1, 2000 Mr. Mike Ficke Landscape Architect Supervisor Park and Community Services Department City of Fort Worth 4200 South Freeway, Suite 2200 Fort Worth, TX 76115 Subject: MCE Project No. 98108-99 City of Fort Worth 1998 Capital Improvements Project No. 11 Trinity, Oakland Lake, and Lincoln Parks Re: Proposal for revised design of Oakland Lake Park Dear Mike, Per your request, MCE is submitting a fee proposal for the re-design of the Parking and Driveway Improvements to Oakland Lake Park. We have received your recommended conceptual layout for the revisions to the Oakland Lake Park Improvements and have based our manhour projections accordingly. MCE estimates the cost for the re-design of Oakland Lake Park to be$5168.00. Attached is a fee projection by tasks, with estimated manhours required to complete the project. MCE is aware of the sensitive nature of this project to the surrounding homeowners, and will be available to meet as needed during the review process, and to help facilitate the communication of the design. As per our conversation, no landscaping design will be necessary for this project amendment. It is anticipated that this re-design will be a supplemental agreement to the original City of Fort Worth Contract No. 24661, and that all other items and conditions of the Contract shall remain unchanged. We appreciate this opportunity to be of continuing service to the City of Fort Worth. If have any questions, please call. Sincerely, M�4ird, LTING ENGINEERS, INC. RiP.E. VP Civil Engineering 5580 Peterson Lane • Suite 225 • Da las, Texas 75240 • 972 233-6700 • Fax 972 233-7709 MANHOUR AND FEE PROJECTION CITY OF FORT WORTH ROADWAY AND PARKING IMPROVEMENTS REVISED DESIGN OF OAKLAND LAKE PARK PARKING AREA MCE PROJECT 98108-99 F:198108-MOAKLAND\CORRESISUPPH RS.WK1 MCE MANHOURS PROJ PROJ CADD DESCRIPTION OF ACTIVITY MGR ENG TECH TOTALS BASIC SERVICES Mtg/discussions to finalize recommended revsions 2 0 0 2 Prepare prelim pvmt/parking layout for review 2 24 4 30 Prepare prelim grading/drainage plan for review 8 16 2 26 Review meeting of preliminary plans 2 0 0 2 incorporate review comments for final submittal 2 4 0 6 Prepare revised x-sects,quantities,and specs 2 4 0 6 TOTAL HOURS 18 48 6 72 BILLING RATE/HOUR $95.00 $65.00 $48.00 SUBTOTAL FEE $1,710.00 $3,120.00 $288.00 $5,118.00 DIRECT COSTS-NON SALARY EXPENSES: 2 Vellum plots @ $3.00 $6.00 2 Mylar plots @ $12.00 $24.00 2 Outside printing @ $10.00 $20.00 TOTAL AMOUNT $5,168.00 Mar- 02 00 05: 14p MCE, Inc. ti"ie- eau W/ut] p. 1 MATEO CONSULTING ENGINEERS INC. March 2, 2000 VIA FAX Mr. Mike Ficke Landscape Architect Supervisor Park and Community Services Department City of Fort Worth 4200 South Freeway, Suite 2200 Fort Worth, TX 76115 Fax#817-871-5724 Subject: MCE Project No. 98108-99 City of Fort Worth 1998 Capital Improvements Project No. 11 Trinity, Oakland Lake, and Lincoln Parks Re: Schedule for revised design of Oakland Lake Park Dear Mike, Per your request, the following is an anticipated design schedule for the revisions to Oakland Lake Park, based on the manhour projection that was submitted (by fax) on 3/1/00. Event Duration (wrking days) Target date for completion Notice to Proceed ............. 3/6/00—3/8/00 Preliminary layout/grading plans 10-15 3/24/00 Review of preliminary plans 3-5 3/31/00 Preparation of final PS&E 3-5 4/7/00 The draft contract amendment has been reviewed and appears acceptable to MCE.As discussed previously, our projected manhour estimate includes a revised cost estimate and bid proposal. Let me know if you need any more information. Sincerely, MATEO C;Laird, LTING ENGINEERS, INC. Richar . P.E. 5.580 Petersen Lane. - Suite 225 - Dallas. Texas 75240 - 972 233-6700 - Fax 972 233-7709