HomeMy WebLinkAboutContract 25717 AMENDMENT NO. 1 CITY SECRETARY
CONTRACT No.
STATE OF TERAS $ CITY SECRETARY CONTRACT NO.
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and Dunaway Associate
Inc. , (Engineer) made and entered into City Secretary Contract No.
23615, (the Contract) which was authorized by the City Council by
MSC C-16586 on the 10th day of February, 1999; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Mains 64, 64R, 180,
180R and 445 Drainage Area Sanitary Sewer System
Rehabilitation and Improvements (Group 3, Contract 2) Part 5.
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the addition-
al engineering services specified in MSC C-17919, adopted by the
City Council on 21st day of March, 2000, and further amplified in a
proposal letter dated January 18, 2000, copies of which are both
attached hereto and incorporated herein. The cost to City for the
additional services to be performed by Engineer total $59,906.78.
2.
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $345,260.78.
CIND(V2FRPV
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the day of 2000,
in Fort Worth, Tarrant County, Texas.
AT T: n A 01
• Contract Authorization
G oria Pear on, City Secretary-15J7-60 3-O*IL 0
City Secretary Date
APPROVAL RECOMMENDED: APPROVED:
-,4• CIS
A. Douglas Rademaker, P.E. Mike Groomer
Director, Department of Assistant City Manager
Engineering
DUNAWAY ASSOCIATES, INC.
Engine r
By:
Name JamsE. DeOtte, P.E. , R.P.L.S.
Vic -President
14M Merrimac Circle, Suite 100
Fort Worth, TX 76107
APPROVED AS O FORM AND LEGALITY:
Gary S inberger
Assistant City Attorney
23615
-2- UMCCIQL PICOED
�rif 5ECEMU
� NyIp TEN
lrL`o rd C:%l: •
DUNAWAY ASSOCIATES, INC.
ENGINEERS • PLANNERS • SFRCEYoNs
DAI No. 9721700
January 18, 2000
Mr. Tony Sholola, P.E.
City of Fort Worth
Department of Transportation
1000 Throckmorton
Fort Worth, Texas 76102
Reference: Amendment No. 1
Mains 64, 64R, 180, 180R, and 445
Sanitary Sewer System Rehabilitation and Improvements
(Group 3, Contract 2), Part 5, Units 1 - 3
Sewer Project No. PS 46-070460410100
D.O.E. Nos. 1821, 2425, and 2525
Dear Mr. Sholola:
Dunaway Associates, Inc. (DAI) is pleased to present this Amendment No. 1 for the following
additional services that were beyond our original scope of services (see Attachment No. 1 for
more detailed breakdown information):
• 3,457 LF of additional design.
• 5,759 LF of additional survey.
• 3 additional bid contracts.
• 17 new permanent easements.
• 6 new temporary easements.
• 47 additional temporary right-of-entry easements
DAI has attempted to avoid an amendment to the contract despite the additional survey and
design services beyond our original scope of services. A summary of the proposed budget
for this revised amendment is as follows:
Special Service
Field Surveys (5,759 LF @ $2.20 x 1.1) $ 13,936.78
Coordination with City and consultants to revise plans and breakout $ 2,400.00
three additional contracts
Additional easements $ 7,900.00
Printing and reproduction $ 1,100.00
Basic Fee
Design of 3,457 LF of sewer($10.00) $34,570.00
TOTAL PROPOSED AMENDMENT 59.906.781
11-J V W
1501 MERRIMAC CIRCLE • SUITE 100 • FORT WORTH,TEXAS 76107-6572 • (817):3.'35-1121 • METRO —ffi335-743,
• Amendment No. 1
January 18, 2000
Page 2
A summary of the total project fees are as follows:
Contract Description Fee
Original Contract 22,950 LF of sewers in three contracts $285,340.60
Amendment No. 1 Additional 3,457 LF of sewers in six contracts $ 59,906.78
TOTAL PROJECT $345,260.78
Please review the enclosed information and do not hesitate to call me if you have any
questions or require additional information regarding this revised proposal and our proposed
M/WBE utilization for the referenced project.
Sincerely,
DUNAWAY ASSOCIATES, INC.
1 .
Ja es E. DeOtte, P.E., R.P.L.S.
Vice resident
JED/do
9721700_Ltr_TSholola_00-0118_J ED_Am 1.doc
Enclosure
cc: Mr. Rakesh Chau bey, P.E.-City of Fort Worth,Wet Weather Program
Mr. Peter Fu, P.E.-City of Fort Worth,Wet Weather Program
G'ECC0P�D
Amendment No. 1
Mains 64, 64R, 180, 180R, and 445
Sanitary Sewer System Rehabilitation and Improvements
(Group 3, Contract 2), Part 5, Units 1 - 3
Sewer Project No. PS 46-070460410100
D.O.E. Nos. 1821, 2425, and 2525
ATTACHMENT NO. 1
PART 5
Unit 2:
L-3405 Additional 393 LF of design and survey
Unit 3:
L-1236 Additional 293 LF of design
L-1236 Additional 1,718 LF of survey
L-3403 (& 'A') Additional 1,717 LF of design and survey
Easements 5 permanent/175 TROE
PART 6
Unit 1:
L-1150 Additional 529 LF of design and survey
M-47 Additional 73 LF of design and survey
L-5568 Additional 923 LF of design and survey
M-71 Additional 597 LF of design and survey
Easements 8 permanent/2 temporary/159 TROE
PART 7
L-2967 Additional 388 LF of design and survey
L-2987 Additional 406 LF of design and survey
L-2987 (M-108A) Remove 259 LF of design
L-5186 Additional 1,205 LF of design and survey
L-6037 Remove 618 LF of design
Easements 4 permanent/4 temporary/24 TROE
9721700_Lir_TSholola_00-0118_JED_Amt.doc �o ���,, ,, iH VLSLtio
Amendment No. 1
Mains 64, 64R, 180, 180R, and 445
Sanitary Sewer System Rehabilitation and Improvements
(Group 3, Contract 2), Part 5, Units 1 - 3
Sewer Project No. PS 46-070460410100
D.O.E. Nos. 1821, 2425, and 2525
DESIGN SERVICES: PIPELINE REHABILITATION/REPLACEMENT
Previous
Estimated Increased
Reference Deliverable/Description Expense Expense Total Expense
Construction Estimate $2,156,931.70 $225,843.44 $2,382,775.14
Curve "A" 7.0% in 3 Original Contracts (8.6 in 5 contracts $150,936.47 $53,982.13 $204,918.60
for this addendum)
Less 15% for City Administration $128,296.00 $45,884.81 $174,180.81
Printing/Reproduction and Reimbursable Expenses $14,350.00 $1,500.00 $15,850.00
Survey $55,539.00 $9,263.76 $64,802.76
Easements
Temporary Right-of-Entry (358 @ $50.00 ea.) $15,550.00 $2,350.00 $17,900.00
Permanent Easements (17 @ $300.00 ea.) $0.00 $5,100.00 $5,100.00
Temporary Construction Easements (6 @ $75.00 ea.) $0.00 $450.00 $450.00
Construction Assistance (2 extra contracts) $9,044.00 $6,029.33 $15,073.33
Progress and Design Meetings $15,307.00 $0.00 $15,307.00
Public Meetings $1,575.00 $0.00 $1,575.00
TOTAL FEE $285,340.00 $59,906.78 $345,260.78
�r�E�0'- VDD
9721700_LV_Tsholola_00-0118_JED_Aml.doc CO
City of Fort Worth, Texas
"agog and Council communication
DATE REFERENCE NUMBER LOG NAME PAGE
3/21/00 **C-17919 30M64 1 of 2
SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH DUNAWAY
ASSOCIATES, INC. FOR MAINS 64, 64R, 180, 180R AND 445 DRAINAGE AREA
SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 3,
CONTRACT 2) PART 5
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to
City Secretary Contract (No. 23615) with Dunaway Associates, Inc. in the amount of$59,906.78 to provide
for additional design and survey services, thereby increasing the contract amount to $345,260.78.
DISCUSSION:
On February 10, 1998 (M&C C-16586), the City Council authorized the City Manager to execute an
engineering agreement with Dunaway Associates, Inc. in the amount of $285,354.00 for the
preparations of plans and specifications for Mains 64, 64R, 180, 180R and 445 Drainage Area Sanitary
Sewer System Rehabilitation and Improvements (Group 3, Contract 2) Part 5.
The project is generally bound on the north by Colonial Parkway, on the east by McCart Street, on the
South by Gambrell Avenue and on the west by Overton Park Drive.
It has been determined that an additional 3,500 linear feet of severely deteriorated sewer lines located
within the project area must be replaced in order to alleviate sewer backup problems to customers.
Due to the close proximity of the identified sewer lines to this project, staff recommends that Dunaway
Associates, Inc.'s contract be amended to provide the necessary design services.
The change order will also allow the entire project to be divided into three individual contracts for
advertising purposes in order to expedite construction of the project. In addition, the change order will
allow for the preparation of additional permanent and temporary construction easements and temporary
right-of-entry agreements needed on the project.
Staff considers Dunaway Associates, Inc.'s proposed fee to be fair and reasonable for the additional
services to be provided.
Dunaway Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to an
additional 25% M/WBE participation on this amendment.
City of Fort Worth, Texas
"allor and council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
3/21/00 **C-17919 30M64 2 of 2
SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH DUNAWAY
ASSOCIATES, INC. FOR MAINS 64, 64R, 180, 180R AND 445 DRAINAGE AREA
SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 3,
CONTRACT 2) PART 5
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the State Revolving Fund-Sewer.
MG:j
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to) OIAD
Mike Groomer 6140 Iffy COUNCIL
Originating Department Head:
MAR $1 2000
A.Douglas Rademaker 6157 (from)
PE42 531200 070420417800 $59,906.78 S -bdwj
Additional Information Contact: Set"tary of the
city Qt Fort Worth,To
A.Douglas Rademaker 6157