HomeMy WebLinkAboutContract 30272 AMENDMENT NO. 2
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. �1v
(No M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and A.N.A Consultants,
L.L.0 (Engineer) made and entered into City Secretary Contract No.
27918 (the Contract) which was authorized by the City Council by M&C
C-19186 on the 8t'' day of August, 2002 and subsequently revised by
one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2002, STM-B.
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through �
-
their duly authorized representatives, enter into the following
agreement, which amends the Contract:
1 .
Article I of the Contract is amended to indlude the additional
engineering services specified in a proposal letter dated June 8,
2004 , a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $5,900.00 (T&PW Cost) .
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $155,304 .00.
ORIGINAL
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the :; day of ,
2004, in Fort Worth, Tarrant County, Texas.
ATTEST: 1
0
Contract Authorizstioa
Syr is Glover
Acting City Secretary Date
APPROVAL RECOMMENDED: APPRO
6 T—•
A. Douglas Rademaker, P.E . Marc A. Ott
Director, Department of Assistant City Manager
Engineering
A.N.A Consultants , L.L.C.
ENGINEER
Name: Mark N. Assaad, P.E.
Vice President
1701 River Run, Suite 610
Fort Worth, TX 76107
APPRO D AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
-2- I
p
NA N. 1701 River Run
� Suite 610
Consultants Fort Worth,Texas 76107
EVMVEERS, PLANNER�S/,�SURVEYORS (817)335-9900
ammitmant to �rce[Cence Since 1994 Fax(817)335-9955
July 8, 2004
Rakesh Chaubey, P.E., Project Manager
City of Fort Worth - Department of Engineering
900 Monroe Street, Suite 201
Fort Worth, TX 76102
Re: Amendment No. 2
Water and Sanitary Sewer Replacement Contract 2002, STM-13
Water Project No. PW53-060530176430
Sewer Project No. PS58-070580175840
D.O.E. No. 3702
Street Reconstruction for Peak Street(Neal Ave. to Irion St.)
TPW Project No. C115-030115095502
Dear Mr. Chaubey:
At the request of the City, A.N.A. has been requested to provide concrete sidewalks along Peak
Street for the above referenced project. The addition of the concrete sidewalks required the design of
approximately 300 If of combination concrete walk and wall.
The City has also requested the A.N.A. Consultants to replace the existing outfall channel at Peak
Street centerline Station 13+00. The existing brick lined channel drains easterly across lots 2 & 3,
Block 4, Diamond Hill Addition and appears to be brick lined with concrete facing approximately 3'
wide and 3' deep. In several places along the channel metal pipes have been placed across the
channel in an effort to support the channel walls from collapsing. The metal pipes across the channel
are rusted and showing signs of stress. A proposed concrete channel will be designed to
accommodate current design standards and will include a modified flared headwall at the Peak Street
outfall.
This request for additional services is not part of our existing contract and will exceed our current
scope of work for this project. A.N.A. Consultants, L.L.C. is recommending that our current contract
be amended to include this additional service and corresponding fee adjustment. The following
summary for Amendment No. 2 additional design services are being presented for your review:
A. Additional Concrete Walk:
SPECIAL SERVICES:
Revise Construction Plans to Add Sidewalks & Walls $ 1,200.00
Revise X-Sections to Add Sidewalks $ 700.00
SUB-TOTAL(AMENDMENT No. 2, CONCRETE SIDEWALKS) $ 1,900.00
B. Additional Channel Work:
SPECIAL SERVICES:
Additional Survey(400 If) $ 1,000.00
Additional Channel Design $ 3,000.00
SUB-TOTAL(AMENDMENT No. 2, CHANNEL DESIGN) $ 4,000.00
JA02043ftontractlamendment\Amend No 2 w channel.doc
Engineering Excellence
1701 River Rua
111���
! A `, Suite 610
Consultants Fort Worth,Texas 76107
ENGINEERS, PLANNERS, SURVEYORS (817)335-9900
am.mi"-t to G�xceCCence Since 199x! Fax(817)335-9955
TOTAL (AMENDMENT No. 2) $ 5,900.00
The following is a revised Project Fee Summary to include Amendment No. 2:
Original Contract $ 108,200.00
Amendment No. 1 $ 41,204.00
Amendment No. 2 $ 5,900.00
TOTAL $ 155,304.00
All current contractual requirements shall apply to Amendment No.2 services. No additional DBE
participation is anticipated for this additional scope of services.
If you have any questions or require additional information, please contact me.
Sincerely,
R anne L. Pillar, P.E.,
Vice President
A.N.A. Consultants, L.L.C.
JA0204301contract\amendmentlAmend No 2 w_channel.doc - �-