HomeMy WebLinkAboutContract 30272 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. �1v (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and A.N.A Consultants, L.L.0 (Engineer) made and entered into City Secretary Contract No. 27918 (the Contract) which was authorized by the City Council by M&C C-19186 on the 8t'' day of August, 2002 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2002, STM-B. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through � - their duly authorized representatives, enter into the following agreement, which amends the Contract: 1 . Article I of the Contract is amended to indlude the additional engineering services specified in a proposal letter dated June 8, 2004 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $5,900.00 (T&PW Cost) . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $155,304 .00. ORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the :; day of , 2004, in Fort Worth, Tarrant County, Texas. ATTEST: 1 0 Contract Authorizstioa Syr is Glover Acting City Secretary Date APPROVAL RECOMMENDED: APPRO 6 T—• A. Douglas Rademaker, P.E . Marc A. Ott Director, Department of Assistant City Manager Engineering A.N.A Consultants , L.L.C. ENGINEER Name: Mark N. Assaad, P.E. Vice President 1701 River Run, Suite 610 Fort Worth, TX 76107 APPRO D AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney -2- I p NA N. 1701 River Run � Suite 610 Consultants Fort Worth,Texas 76107 EVMVEERS, PLANNER�S/,�SURVEYORS (817)335-9900 ammitmant to �rce[Cence Since 1994 Fax(817)335-9955 July 8, 2004 Rakesh Chaubey, P.E., Project Manager City of Fort Worth - Department of Engineering 900 Monroe Street, Suite 201 Fort Worth, TX 76102 Re: Amendment No. 2 Water and Sanitary Sewer Replacement Contract 2002, STM-13 Water Project No. PW53-060530176430 Sewer Project No. PS58-070580175840 D.O.E. No. 3702 Street Reconstruction for Peak Street(Neal Ave. to Irion St.) TPW Project No. C115-030115095502 Dear Mr. Chaubey: At the request of the City, A.N.A. has been requested to provide concrete sidewalks along Peak Street for the above referenced project. The addition of the concrete sidewalks required the design of approximately 300 If of combination concrete walk and wall. The City has also requested the A.N.A. Consultants to replace the existing outfall channel at Peak Street centerline Station 13+00. The existing brick lined channel drains easterly across lots 2 & 3, Block 4, Diamond Hill Addition and appears to be brick lined with concrete facing approximately 3' wide and 3' deep. In several places along the channel metal pipes have been placed across the channel in an effort to support the channel walls from collapsing. The metal pipes across the channel are rusted and showing signs of stress. A proposed concrete channel will be designed to accommodate current design standards and will include a modified flared headwall at the Peak Street outfall. This request for additional services is not part of our existing contract and will exceed our current scope of work for this project. A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include this additional service and corresponding fee adjustment. The following summary for Amendment No. 2 additional design services are being presented for your review: A. Additional Concrete Walk: SPECIAL SERVICES: Revise Construction Plans to Add Sidewalks & Walls $ 1,200.00 Revise X-Sections to Add Sidewalks $ 700.00 SUB-TOTAL(AMENDMENT No. 2, CONCRETE SIDEWALKS) $ 1,900.00 B. Additional Channel Work: SPECIAL SERVICES: Additional Survey(400 If) $ 1,000.00 Additional Channel Design $ 3,000.00 SUB-TOTAL(AMENDMENT No. 2, CHANNEL DESIGN) $ 4,000.00 JA02043ftontractlamendment\Amend No 2 w channel.doc Engineering Excellence 1701 River Rua 111��� ! A `, Suite 610 Consultants Fort Worth,Texas 76107 ENGINEERS, PLANNERS, SURVEYORS (817)335-9900 am.mi"-t to G�xceCCence Since 199x! Fax(817)335-9955 TOTAL (AMENDMENT No. 2) $ 5,900.00 The following is a revised Project Fee Summary to include Amendment No. 2: Original Contract $ 108,200.00 Amendment No. 1 $ 41,204.00 Amendment No. 2 $ 5,900.00 TOTAL $ 155,304.00 All current contractual requirements shall apply to Amendment No.2 services. No additional DBE participation is anticipated for this additional scope of services. If you have any questions or require additional information, please contact me. Sincerely, R anne L. Pillar, P.E., Vice President A.N.A. Consultants, L.L.C. JA0204301contract\amendmentlAmend No 2 w_channel.doc - �- Engineering Excellence