Loading...
HomeMy WebLinkAboutContract 44218-CO7 CITY SEMANt, FORT WORTHCONTRACT NO. f O� City of Fort Worth Change Order Request ProjectNamel East Rosedale-US287 to Miller Ave. City Sec# 1 44218 Client Project#(s) C116-02116021222,C200-205230014283,P253-605170014283,P258-705170014283,P227-205280014283 Project Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements Contractorl Jackson Construction,Ltd Change Order# Date 11/612014 City Project Mgr.1 Dena Johnson City Inspector Randy Horton Dept. TPW Water Sewer Totals Select Day Type Original Contract Amount $13,866,014.15 $2,149,404.50 $573,715.00 $16,589,133.65 600 Extras to Date $132,803.18 $16,555.45 $50,586.55 $199,945.18 155 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $13,998,817.33 $2,165,959.95 $624,301.55 $16,789,078.83 755 Amount of Proposed Change Order $85,444.64 $0.00 $0.00 $85,444.64 45 Revised Contract Amount $14,084,261.97 $2,165,959.95 $624,301.55 $16,874,523.47 800 Original Funds Available for Change Orders $497,674.01 $65,000.50 $17,500.00 $580,174.51 Remaining Funds Available for this CO $364,870.83 $48,445.05 $0.00 $413,315.88 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.72% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $20,736,417.06 JUST,1l~ICATION(REASONS)rF ;*f ING C?t2E3ER The change order will allow for the following: Light pole removal due to closeness to other lights.Extra barricades for traffic control at roundabout on Mitchell Street.Subgrade adjustment on Beach Street.Bearing pads for existing bridge abutment. 1,000 of 6-inch concrete curb,Relocate storm drain line A-3 due to change in inlet location.Relay 24-inch storm drain pipe.Relay 4ft x2ft k to first junction box.Bishop Street storm drain connection.Beach Street Storm drain 4ft x 4ft drain box relocation.Flo fill i under stairways and approach slab of the existing East Rosedale Bridge. 0 ' Staff concurs with the contractor's request for 45 ad '' nal calend ° fro ge order. A $ sX OFFICIAL RECORD CITY SECRETARY FT. WORTNI TX Secrets It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Com an Name . Contractor Nae ', fr 5i ate; Jackson Construction,Ltd Steve Haberstroh All I s ectorllns ect)(I SU rY( _� . pate Pro Mana f tri aner f ' Assts` t 1�ate'$, Co tin De artment bet pafe" t Dine F "' tate ,,Ass[ �tlatra r C3,,. �: C ~> e 2 i 5 Council Action'if to utred" s <. M&C Number N/A M&C Date Approved RECEIVED FEB 10 .2015 Four Wax City of Fort worth W Change Order Additions Project Name I East Rosedale-US287 to Miller Ave. City Sec# 44218 Client Project# I C116-02116021222,C200-205230014283,P253-605170014283,P258-705170014283,P227-205280014283 Project Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements Contractor Jackson Construction,Ltd Change Order# O7 Date 11/612014 City Project Mgr. Dena Johnson City Inspector FlTandy Horton AUDITIVNS DEPT y Unit Unitos -Total Excavate and remove existing light pole foundations Tfl-TFA--Barricades at Mitchell Street L =- A Removal of sign at Ayers Avenue P Extra Signage for detour perCity's request 11 ARe-grade Beach Street due to Staking change TPW L -77A -inch ball valve installed on irrigation line in park L A Elastomeric Bearing Pads A Concrete sidewalk cur LF Relocate storm drain line A Relay lateral A- -inch storm drain due to staking error P L 5 11 A Relay ine D-54-inch storm drain due to staking error P L ,7 A Relay Line A- ft x 2ft box culvert due to sta ing error Tie Bishop Street drainage to new wye P LS $7,095.66 s7,095.86 A Grate inlet change onMichell treet L A -inch PVC drain east of Beach,move 4ft.Drain box V-12A Flowable fill pumped in voids under bridge stairway TFffY TPW $85,444,64 Water $0.00 Sewer $0.00 Sub otal Additions Change Order Additions Page 3 of 5 Fo T Wp T'H City of Fort Worth Change Order Deletions Project Name East Rosedale-U5287 to Miller Ave. City Sec# 4421$ Client Project# C116-02116021222,C200-205230014283,P253-605170014283,P258-705170014283,P227-205280014263 Project Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements Contractor Jackson Construction,Ltd Change Order# r • r Date 11/612014 City Project Mgr. Dena Johnson City Inspector r Randy Horton UtLL RUNS y Unit Unitos o a TPW 0.00 Water $0.00 Sewer $0.00 Sub Total Deletions Change Order Deletions Page 4 of 5 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Cowtown Redi-Mix Concrete Redi-mix $4,272.23 Total $4,272.23 Previous Change Orders CO# DATE AMOUNT Total $4.00 CITY OF FORT WORTH AMENDMENT, CHANGE ORDER or EXTRA WORK CONTRACT COMPLIANCE MEMORANDUM THIS FORM MUST BE ATTACHED TO THE ROUTING "M& C" BEFORE LAW DEPARTMENT AND CITY MANAGER APPROVAL. To: Dena Johnson (underline appropriate one) Proiect ana er Buyer Department Director From: Patty Jean WilsonET 817-212-2678 MNVBE Office Staff Extension Date: January 8, 2015 In the Amount of$ 85,444.64 TPW-00142, 6316 DOE/Project No(s). ProjecVBid: Change Order No. 7 for the 2004 CIP, Reconst. (Concrete), Water & Sewer, Beautification and Improvements on Rosedale and 287 (Combine Project) 11 7. Compliance with the City's BDE Ordinance as it relates to amendments, change orders or extra work,which exceeds ten percent (10%)of the original contract amount or the revised ordinance applicable amount of$50,000.00 or more of the original contract amount has been achieved by one of the following methods: a) is in compliance with the City's BDE Ordinance by committing to an additional_% MBE participation on this Amendment/Change Order No. b) Jackson Construction. Ltd. is in compliance with the City's BDE Ordinance by committing to an additional 5% MBE participation on this Amendment/Change Order No. 7 C) is in compliance with the City's BDE Ordinance by documenting good faith effort. The City's goal on this Amendment/Change Order or extra work is %. d) is in compliance with the City's BDE Ordinance by approval of a waiver request of the MBE requirement. The City's goal on this Amendment/Change Order or extra work is %. 6/1/12