City of Fort Worth
Change Order Request
ProjectNamel East Rosedale-US287 to Miller Ave. City Sec# 1 44218
Client Project#(s) C116-02116021222,C200-205230014283,P253-605170014283,P258-705170014283,P227-205280014283
Project
Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements
Contractorl Jackson Construction,Ltd Change Order# Date 11/612014
City Project Mgr.1 Dena Johnson City Inspector Randy Horton
Dept. TPW Water Sewer Totals Select Day Type
Original Contract Amount $13,866,014.15 $2,149,404.50 $573,715.00 $16,589,133.65 600
Extras to Date $132,803.18 $16,555.45 $50,586.55 $199,945.18 155
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $13,998,817.33 $2,165,959.95 $624,301.55 $16,789,078.83 755
Amount of Proposed Change Order $85,444.64 $0.00 $0.00 $85,444.64 45
Revised Contract Amount $14,084,261.97 $2,165,959.95 $624,301.55 $16,874,523.47 800
Original Funds Available for Change Orders $497,674.01 $65,000.50 $17,500.00 $580,174.51
Remaining Funds Available for this CO $364,870.83 $48,445.05 $0.00 $413,315.88
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.72%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $20,736,417.06
JUST,1l~ICATION(REASONS)rF ;*f ING C?t2E3ER
The change order will allow for the following:
Light pole removal due to closeness to other lights.Extra barricades for traffic control at roundabout on Mitchell Street.Subgrade adjustment on
Beach Street.Bearing pads for existing bridge abutment. 1,000 of 6-inch concrete curb,Relocate storm drain line A-3 due to change in inlet
location.Relay 24-inch storm drain pipe.Relay 4ft x2ft k to first junction box.Bishop Street storm drain connection.Beach
Street Storm drain 4ft x 4ft drain box relocation.Flo fill i under stairways and approach slab of the existing East
Rosedale Bridge. 0 ' Staff concurs with
the contractor's request for 45 ad '' nal calend ° fro ge order.
A $ sX OFFICIAL RECORD
CITY SECRETARY
FT. WORTNI TX
Secrets
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Com an Name . Contractor Nae ', fr 5i ate;
Jackson Construction,Ltd Steve Haberstroh All
I s ectorllns ect)(I SU rY( _� . pate Pro Mana f tri aner f '
Assts` t 1�ate'$, Co tin De artment bet pafe"
t Dine F "' tate
,,Ass[ �tlatra r C3,,. �: C
~> e 2 i 5
Council Action'if to utred" s <.
M&C Number N/A M&C Date Approved
RECEIVED FEB 10 .2015
Four Wax City of Fort worth
W Change Order Additions
Project Name I East Rosedale-US287 to Miller Ave. City Sec# 44218
Client Project# I C116-02116021222,C200-205230014283,P253-605170014283,P258-705170014283,P227-205280014283
Project Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements
Contractor Jackson Construction,Ltd Change Order# O7 Date 11/612014
City Project Mgr. Dena Johnson City Inspector FlTandy Horton
AUDITIVNS DEPT
y Unit Unitos -Total
Excavate and remove existing light pole foundations
Tfl-TFA--Barricades at Mitchell Street L
=- A Removal of sign at Ayers Avenue P
Extra Signage for detour perCity's request
11 ARe-grade Beach Street due to Staking change TPW L
-77A -inch ball valve installed on irrigation line in park L
A Elastomeric Bearing Pads
A Concrete sidewalk cur LF
Relocate storm drain line
A Relay lateral A- -inch storm drain due to staking error P L 5
11 A Relay ine D-54-inch storm drain due to staking error P L ,7
A Relay Line A- ft x 2ft box culvert due to sta ing error
Tie Bishop Street drainage to new wye P LS $7,095.66 s7,095.86
A Grate inlet change onMichell treet L
A -inch PVC drain east of Beach,move 4ft.Drain box
V-12A Flowable fill pumped in voids under bridge stairway TFffY
TPW $85,444,64
Water $0.00
Sewer $0.00
Sub otal Additions
Change Order Additions Page 3 of 5
Fo T Wp T'H City of Fort Worth
Change Order Deletions
Project Name East Rosedale-U5287 to Miller Ave. City Sec# 4421$
Client Project# C116-02116021222,C200-205230014283,P253-605170014283,P258-705170014283,P227-205280014263
Project Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements
Contractor Jackson Construction,Ltd Change Order# r • r Date 11/612014
City Project Mgr. Dena Johnson City Inspector r Randy Horton
UtLL RUNS
y Unit Unitos o a
TPW 0.00
Water $0.00
Sewer $0.00
Sub Total Deletions
Change Order Deletions Page 4 of 5
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Cowtown Redi-Mix Concrete Redi-mix $4,272.23
Total $4,272.23
Previous Change Orders
CO# DATE AMOUNT
Total $4.00
CITY OF FORT WORTH
AMENDMENT, CHANGE ORDER or EXTRA WORK
CONTRACT COMPLIANCE MEMORANDUM
THIS FORM MUST BE ATTACHED TO THE ROUTING "M& C" BEFORE LAW
DEPARTMENT AND CITY MANAGER APPROVAL.
To: Dena Johnson
(underline appropriate one) Proiect ana er Buyer Department Director
From: Patty Jean WilsonET 817-212-2678
MNVBE Office Staff Extension
Date: January 8, 2015
In the Amount of$ 85,444.64 TPW-00142, 6316
DOE/Project No(s).
ProjecVBid: Change Order No. 7 for the 2004 CIP, Reconst.
(Concrete), Water & Sewer, Beautification and Improvements on
Rosedale and 287 (Combine Project) 11
7. Compliance with the City's BDE Ordinance as it relates to amendments, change orders
or extra work,which exceeds ten percent (10%)of the original contract amount or the
revised ordinance applicable amount of$50,000.00 or more of the original contract amount
has been achieved by one of the following methods:
a) is in compliance with the City's BDE Ordinance by committing to an
additional_% MBE participation on this Amendment/Change Order No.
b) Jackson Construction. Ltd. is in compliance with the City's BDE Ordinance by
committing to an additional 5% MBE participation on this Amendment/Change Order
No. 7
C) is in compliance with the City's BDE
Ordinance by documenting good faith effort. The City's goal on this Amendment/Change Order or
extra work is %.