Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 25732
CITY SECRETARY $/ # 35. LD.O.E. FILE CONTRACT DOCUMENTS CONTRACTOR'S BONDING CO. AND L CO SPECIFICATIONS NS1'RUCTION'S COPY FOR CITY SECRETARY L CLIENT DEPARTMENT CONTRACT NO. 1999 MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 5 SEWER PROJECT NO.PS46-070460410280 UNIT 1 - D.O.E. PROJECT NO. 1649 L CITY OF FORT WORTH,TEXAS i KENNETH BARR BOB TERRELL " MAYOR CITY MANAGER DALE L. FISSELER, P.E. DIRECTOR, WATER DEPARTMENT HUGO A. IVIALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, P.E, DIRECTOR , DEPARTMENT OF ENGINEERING PREPARED BY lflHDE Z4A � "4Zflitt &.,ASSOCIATES,.INC. E. . 1'F! FORT WORTH,TEXAS 1999 BROOKSIf 4MERD D .GHAFAR Y ,� 67697 _ ���': 5 192O STl R "l ^RRIG�Q� vo 0toi0, iS, FG/STtR`� �� S�ONAIL ter' g �i � AL Ea.= City of Fort Worth, Texas qV01yor 0101d Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 3/28/00 **C-17956 1 30TEX 1 of 2 SUBJECT AWARD OF CONTRACT TO TEXAS-STERLING CONSTRUCTION, INC. FOR MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 6, CONTRACT 1 PART 5, UNIT 1 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Texas- Sterling Construction, Inc. in the amount of $793,498.65 for Main 390 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 1) Part 5, Unit 1. DISCUSSION: On March 24, 1998 (M&C C-16691), the City Council authorized the City Manager to execute an engineering agreement with Wade & Associates, Inc. to prepare plans and specifications for the reduction of inflow/infiltration in Sanitary Sewer Main 390 drainage area. The project is part of the City's Integrated Wet Weather Wastewater Management Program to comply with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer overflows from the City's wastewater collection system. The proposed improvements consist primarily of the replacement of the following sanitary sewer laterals and main: • L-987 Located in the alley between Ada Avenue and Millet Avenue from Campbell Avenue to Wallace Avenue; and • L-1020 Lgcated in the alley between Ada Avenue and North Littlejohn Avenue from Little Street to Ayers Avenue; and • L-984/L-1172 Located in the alley between Millet Avenue and Ada Avenue from Little Street to Wallace Avenue; and • L-1014 Located in the alley between Avenue L and Avenue K from Wallace Avenue to Bishop Street; and • M-53 Beginning from a point located 500 feet west of the Hanger Avenue/Little Street intersection, northerly 460 feet, then easterly 600 feet, then northerly 1,250 feet; and • L-986 Located in the alley between Avenue L and Avenue M from Campbell Street to Ayers Avenue. The proposed improvements consist of the replacement of approximately 9,300 linear feet of primarily 8-inch sewer pipe. City of Fort Worth, Texas "ayor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 3/28/00 **C-17956 1 30TEX 2 of 2 SUBJECT AWARD OF CONTRACT TO TEXAS-STERLING CONSTRUCTION, INC. FOR MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 6, CONTRACT 1 PART 5, UNIT 1 The project is located in COUNCIL DISTRICT 5, Mapsco 78Q. The project was advertised for bid on December 23 and 30, 1999. On January 27, 2000, the following bids were received: BIDDER AMOUNT TIME OF COMPLETION Texas-Sterling Construction, Inc. $ 793,498.65 160 Calendar Days Conatser Construction, Inc. 852,841.50 Kebo Services, Inc. 899,337.00 Long Construction & Engineering, Inc. 899,462.25 Cleburne Utility Construction Co., Inc. 978,149.75 Jackson Construction, Inc. 1,343,403.00 In addition to the contract cost, $56,000.00 is required for inspection and survey and $24,000.00 is provided for project contingencies. Texas-Sterling Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 24% M/WBE participation. The City's goal on this project is 24%. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the State Revolving Fund - Sewer. MG:k Submitted for City Manager's FUND I ACCOUNT CENTER I AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 APPROVED Originating Department Head: CITY COUNCIL A.Douglas Rademaker 6157 (from) MAR 28 200 PE42 541200 070420417840 $793,498.65 Additional Information Contact: O�w.,l�"ta•�aJ City!secretary of the A.Douglas Rademaker 6157 City of Fort Wortk Tela.-- JAN-26-00 WED 9: 41' F. W. +. __.. :17 971 7�a4 P. 1 Jan-20-00 11 :00 Wade & Assoc iaty "rtc, 817 335 1799 P.02 ADDEF A TO THE PLANS, SPECW1CA1-„')'H-- &4Z 00MMAGT DOCUMENTS CITY OF FORT : ' MJCCT MAIN 390 DRAINAGE AREA SANITAPY SEWIi-g SYSTEM REHABILITATION VAPROVEMENTS (GROUP 8, CONTRACT r AT 5,UNITS 1,3& 5 SEWER PROJEC7 F` ,PS46-074464410280 UNIT 1 - D.O.E. PF30JECT NO. 1649 UNIT 3 - D.O.E.PROJECT NO.2548 UNIT 5 - D.O.E. ROJ1ECT NO.2797 Prospective bidders are herebynotified of Ups fo”Changes to the Prow Construction Documents: 1. The bid date for this project has bran: 1ponsd from January 20,2004 to January 27, 2000. ORIGINAL SCHEDULED BID DATE: Janusry 70M DATE ADDENDUM ISSUED: January 1 ' RECEIPT ACKNOWLEDGED; DEPARTMENT OF ENGINEERING a.. By: r ',ic'r,Trice, P.E. �2ic��• arnger, Consultant Services r/fe oj-Ec i Post-it'Fax Note 7671 ao1s� To s� _ _ . � —�zrom O./Dept �C PnOM N Phos Far k 1'aje 1 01/19/00 '5-00 09 :35 Wade & ASS0Cia.'1`QXr IMC- 817 335 1729 P.06 1, Two-Week Pre-Construction Notift-*�tin FIVat. The first notification shall be posted two (2) weeks prior to beginning any construction activity on each block in the project area. The fever shall be prepared on the Contractor's letterhead and shall include the Wtvoeino information: Name of Project, DOE No., Scope of Project (i.e. type of construction activRy), anticipated construction time within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone num(w and the City's ager-hours phone number. A sample of the 'two week pre-construction notifwAtion' flyer is attached. 2. Three-Day Pre-Construction Notification Flyts, The second notification shall be posted three (3) days prior to beginning actual construction on each block in the piggoct area. This flyer will also be printed on the Contractor's letterhead and shall basica4ty serve as a follow-up letter to the two week notification flyer and shall inform residents of the actual construction duration for the neighborr.ocd. A sample of the three day pre-construction notification flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project, to the inspector. In addition, Copies of both flyers shall be delivered to the City Inspector for his review prior being distributed. The contractor will not be allowed to begin construction or. any b4ock until both flyers are delivered to all residents of the block. Electronic versions cf, the sa:mpie flyers can be obtained from the Wet Weather office at 332-5474. All work invclved with the pre-construction notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. This addendum forms a part of the Contract Documents and modifies the original Notice to Bidders. A signed copy of this addendum shalt be attached to the proposal at the time of bid submittal. Bidders shall also acknowledge receipt of the Addendum in the space provided in the Bid Form. Failure to acknowledge receipt of the Addendum may subject bidder to disqualification. RE-SCHEDULED BID DATE: January 27, 2000 DATE ADDENDUM ISSUED: January 24, 2000 RECEIPT ACKNOWLEDGED: DEPARTMENT OF ENGINEERING By - _ D A v Gf is Rick Trice, P.E. Manager, Consultant Services Pa-e S 01/24/00 Jan-24-00 16:33 Wade & Associates , Inc. 817 335 1729 P.02 ADDENDUM NO. 2 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS CITY OF FORT WORTH PROJECT MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 5, UNITS 1, 3 & 5 SEWER PROJECT NO. PS46-070460410280 UNIT 1 - D.O.E. PROJECT NO. 1649 UNIT 3 - D.O.E. PROJECT NO. 2548 UNIT 5-D.O.E. PROJECT NO. 2797 Prospective bidders are hereby notified of the following changes to the Protect Construction Documents: 1 Sheet 5, CONSTRUCTION PLANS for the subject project are hereby revised or amended as follows: • The plan reference for 20 LF OF 10' CL 51 DIP S.S. BY OTHER THAN OPEN CUT has been changed to read 20 LF 10" CL 51 DIP S.S. BY SHORT BORE 2. Sheet 39, CONSTRUCTION PLANS for the subject project are hereby revised or amended as follows: The plan reference for gabion mattresses shall specify GEOMAC MATRESSES (6 x 8 mesh type)or approved equal. Standard configuration for the mattresses shall be 18' long, 6' wide and 12" high. Wire must be Zinc+ PVC coated. See attachment. 3. Sheet 11, CONSTRUCTION PLANS for the subject project are hereby revised or amended as follows: • The plan reference stating SEE SHEET 43 FOR EASEMENT AND RIGHT OF ENTRY INFORMATION has been changed to read SEE SHEET 2A FOR EASEMENT AND RIGHT OF ENTRY INFORMATION 4. Replace UNIT 1, Part B Proposal pages Part 5—UNIT 1 (4) and Part 5—UNIT 1 (5). The following quantities have been changed on the revised sheets attached: Pay Item 21 —Install Watertight Manhole Insert The quantity has changed from 29 to 30. Pay Item 22— Install Concrete Collar The quantity has changed from 27 to 28. Pay Item 23—Manhole Vacuum Testing The quantity has changed from 29 to 30. Page 1 01/24/00 Jan-24-00 16:33 Wade & Associates, Inc. 817 335 1729 P.03 5. Section Cl: Supplementary Conditions to Part C- has been replaced. The new version of Section C1 is attached. 6. PART D—SPECIAL CONDITIONS—A header has been added and reads as follows: This Part D — Special Conditions Is complimentary to Part C — General Conditions of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions of the Contract are to be read together. Any conflict between Part C — General Conditions of the Contract and this Part D. Part D shall control. 7. PART D—SPECIAL CONDITIONS—Item D-2 has been replaced and reads as follows: D-2 SUBMISSION OF CONTRACT DOCUMENTS, CONSTRUCTION START TIME AND PRE-CONSTRUCTION SUBMITTALS: The contractor(s)shall execute and return the contract documents to the Department of Engineering within ten (10) working days after notification by the City. A Pre-Construction meeting date will be established and noted in the Letter to Contractor. The effective work order date will be set at the pre-construction conference. The contractor(s) shall be required to start construction on the project no later than ten (10) calendar working days after the pre-construction meeting date, unless a different date is established in a Notice to Proceed. The City shall begin to charge time on the project to the contractor eleven days after the pre-construction meeting date, unless a different date is established in a Notice to Proceed. Per City ordinance 13471, as amended by Ordinance No. 13781, the contractor(s) shall submit the letters of intent or a copy of the agreements with certified IVIMBE subcontractor(s) at or before the pre-construction conference. To expedite M/WBE compliance contractors are strongly encouraged to submit the executed letters of intent (with M/WBE subcontractors) at the time of submittal of the UTILIZATION FORM or GOOD FAITH EFFORT FORM. The letter(s) must be signed by both parties. If the contractor(s) fails to submit the letter(s) or agreement(s), the contractor(s) will not be allowed to begin work. Time on the project will start to accumulate at the end of the ten (10) days as stipulated above. Additional submittals at time of pre-construction meeting shall include (but not limited to): Contractors Work Plan and Schedule Disposal Site for Waste Material Information Sub-Contractor Identification Trench Safety Design (if required) Confined Space Entry Program Name and number of a responsible person for off hour emergencies Project schedule which must reflect a project completion date to be determined by the completion time period stipulated in the proposal section. Page 2 01/24/00 Jan-24-00 16:34 Wade & Associates , Inc. 817 335 1729 P.04 The pre-construction conference is intended as a forum between the contractor and the appropriate City staff to go over the project in detail and to afford the contractor the opportunity to submit all the required documents listed above. If the contractor fails to submit any of the required documents, the contractor will not be allowed to begin work; however contract tame shall begin as stipulated in this paragraph. 8. PART D-SPECIAL CONDITIONS-Item D-3 GENERAL has been amended to include the following paragraph- Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. 9. PART D-SPECIAL CONDITIONS-Omit Item D-4 10. PART D- SPECIAL CONDITIONS-Item D-5 PROJECT DESIGNATION has been amended to include the correct Project Designation: Project No. PS46-070460410280 11. PART D- SPECIAL CONDITIONS -Omit Item D-9 12. PART D- SPECIAL CONDITIONS - Item D-11 has been added and reads as follows: D-11 PROJECT CLEAN UP The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of resident's property Each day as work progresses, Contractor shall store materials and clean up the work site so as to minimize interruption of the use and enjoyment of private property. Additionally, as work is completed on any particular private property, the contractor shall restore that property to the condition it was in prior to the work, as well as make the necessary repair or replacement of any damage. If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed)the appropriate bid item(s)will be reduced by 25%. 13. PART D- SPECIAL CONDITIONS - Item D-14 CALENDAR DAY has been amended to read: D-14 CALENDAR DAY: Delete paragraph C1-1.24, in Part C-General Conditions, in its entirety and substitute the following new paragraph* Page; 01/24,100 Jan-24-00 16:34 Wade & Associates, Inc. 817 335 1729 P.05 C1-1.24 Calendar Dar A Calendar day is any day of the week or month. All calendar days are counted in computing contract time and for determining liquidated damages, if any: however, the Contractor will not be allowed to work on Sundays or any holidays observed by the City of Fort Worth. 14. PART D —SPECIAL CONDITIONS—Item D-17 EASEMENTS AND PERMITS The last paragraph has been amended to read: The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permlt(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. Any and all costs associated with compliance with permits(s) including payment for flagmen shall be subsidiary to the project price. No additional payment will be allowed for this Item. 15. PART D—SPECIAL CONDITIONS —Omit Item D-26 16. PART D—SPECIAL CONDITIONS—Omit Item D-37 17. PART D—SPECIAL CONDITIONS—Item D-38 SANITARY FACILITIES FOR WORKERS has been amended to read: D-38 SANITARY FACILITIES FOR WORKERS: Specific attention is directed to Section C6-6.4 of Part C—General Conditions of the Contract. 18. PART D— SPECIAL CONDITIONS — Item D-39 has been amended to read: D-39 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Section C-6-6, "Legal Relations and Responsibilities to the Public' of Part C—General Conditions of the Contract. 19. PART D—SPECIAL CONDITIONS— Item D-40 RIGHT TO AUDIT The last paragraph (C.) shall read: C. Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor and subcontractor for the costs of copies at the rate published in the Texas Administrative Code. 20. PART D—SPECIAL CONDITIONS— Add Item D-87 as follows: D-87 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver two notices or flyers of the pending construction to the front door of each residence or business that will be impacted by construction. The two notices shall be prepared as follows: Page 4 01124/00 Jan-24-00 16:35 Wade & Associates , Inc. 817 335 1729 P.06 1 Two-Week Pre-Construction Notification Flyer. The first notification shall be posted two (2) weeks prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), anticipated construction time within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the 'two week pre-construction notification'flyer is attached. 2. Three-Day Pre-Construction Notification Flyer. The second notification shall be posted three (3) days prior to beginning actual construction on each block in the project area. This flyer will also be printed on the Contractor's letterhead and shall basically serve as a follow-up letter to the two week notification flyer and shalt inform residents of the actual construction duration for the neighborhood. A sample of the three day pre-construction notification flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, Copies of both flyers shall be delivered to the City Inspector for his review prior being distributed. The contractor will not be allowed to begin construction on any block until both flyers are delivered to all residents of the block. Electronic versions of the sample flyers can be obtained from the Wet Weather office at 332-5474. All work involved with the pre-construction notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. This addendum forms a part of the Contract Documents and modifies the original Notice to Bidders. A signed copy of this addendum shall be attached to the proposal at the time of bid submittal. Bidders shall also acknowledge receipt of the Addendum in the space provided in the Bid Form. Failure to acknowledge receipt of the Addendum may subject bidder to disqualification. RE-SCHEDULED BID DATE: January 27, 2000 DATE ADDENDUM ISSUED: January 24, 2000 RECEIPT ACKNOWLEDGED: DEPARTMENT OF ENGINEERING r - Ad Rick Trice, P.E_ Manager, Consultant Services Page 5 01/24/00 Jan-24-00 16:35 Wade & Associates, Inc. 817 335 1729 P.07 COMPATIBLE rENO MATTRESSES (6 x 8 mesh type) SH WIRE DIAMETER;Galvanized or Galfan nominal diam.2.2 mm(0.087'). Galvanized and PVC minal imemal diam.22 mm(0.087'),nominal external diam.3.2 mm(0.126"). etter Length Width Thickness Number Area Capacity Color Code (ft.) (ft.) (h) of cells (sy) (cy) Code O 9' 6' 6' 3 6 1.00 White-Yellow R 12' ' 6' 6" 4 8 1.33 White-Green Y,X"LrptaCtlMalLLn9 OaOla hMaled 4 T 9' 3 6 1.50 Red-Yellow ,r,,,A rAr.-+ PAno mavvessss. Thep un" U 12' 6' 9' 4 8 2.00 Red-Green "'"11"'' '•.a'larger sun to Int vrAn a smaller yr--A ;�•edivaledintOmtemYteYsat7 X 9' 6' 12" 3 6 2.00 Brown-Yellow 1a"� rywl:rl"I.ineetaotvepoctets.and tynrAa rile'•r IeCnnl � Z 12' 6' 12" 4 8 2.67 Brown-Green M/sMNr%� Cues. Available in Zinc coated.Galfan coated,Ztnc+PVC coated wire. Note: All sizes and dimensions are nominal. See Table of tolerances for details. GEOMAC® MATTRESSES (6 x 8 mesh type) MESH WIRE DIAMETER.Galvanized or Galfan nominal diam.2.2 mm(0.087'). Galvanized and PVC nominal internal diam.2.2 mm(0.087')•nominal extemal diam.32 mm(0.126'). Length Width Height Diaphragms (in.) 12' 6' 6" 9"- 12" 3Y%I�•, a= 15' 6' 6'-9"-12' 4 •-� 18' 6' 6'-9-- 12- 5 vailable in Zinc coated,Galfan coated.Zinc+PVC coated wire. ote: All sizes and dimensions are nominal. See Table of tolerances for details. MACMAT®R Style Mesh Wire diameter Thickness Length Height Type (in.) (in.) (ft.) (ft.) 86 i 6 x 8 0.087" 0.40' 62' 6.5' t='• R8 8 x 10 0.106' 0.80" 82' 6.5' MACMAT'R6 and R8 are available in both Zinc coated and Zinc+PVC coated wire. Ifni-08*1h Geomx•mahresses Now All sizes and dimensions are nominal. See Table of tolerances for details. "•,, o."'M'•tl`t'ilea,wife mesh.inlemttepaned «a.,1 t11.•n••ati M, BrOMAC® Type of Fabric Roll height Roll length siomac°-SIC (straw+coconut) 6.5'-8' 82'-164' Biomac®-C(coconut) 6.51-81 82'-164' Note: All sizes and dimensions are nominal. See Table of tolerances for details. - .� Bank and elope ereatoa prohaUon using Macmwk a peontat mWorMd wth Slope protrctlon spunst erosion UW`Q�j'r'"�t:l,n Or.•rnMa double Misled steel aura mesh. 3 i V4 ""L�--VV iV •JV I�MVQ aJa ��.�V� ,u�c� 7 i••r� VAI VVI/ �I �./ • •-ry PAY APPROX. DFSCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID (Furnish and install complete in plate,including all appurtenant work,the following items.) 15 29.5 V.F. Extra Depth,4-Foot Diameter Manhole Dollars Cents $ $ IG 1 EA. Construct 4-Foot Diameter Shallow Cone Manhole Dollars Cents $ $ 17 7 EA. Construct 4-Foot Diameter Drop Manhole,G' Depth Dollars Cents S $ 18 33 V.F. Extra Depth,4-Foot Diameter Drop Manhole Dollars Cents S $ 19 1 EA. Construct 4-Foot Diameter Double Drop Manhole, b'Depth Dollars Cents $ $ 20 5 V.F. Extra Depth,4-Foot Diameter Double Drop Manhole Dollars Cents $ $ 21 30 EA. Install Watertight Manhole Insert Dollars Cents $ S Revised per Addendum No.2 issued January 24,2000 PART 5-UNIT 1 (4) Vd11—G'?—VV 1V•.aV "oI = to r-%�aa.r .0 YOJ, --, --- a. -- • •...r PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place,including all appurtenant work,the following items.) 22 28 EA. Install Concrete Collar Dollars Cents $ $ 23 30 EA. Manhole Vacuum Testing Dollars Cents $ $ 24 28 EA. Remove Existing Manhole Dollars Cents $ S 25 2 EA. Abandon Existing Manhole Dollars Cents $ $ 26 3 EA. Cut&Plug Existing Sanitary Sewer Dollars Cents 5 $ 27 8209 L.F. Trench Safety System,for trenches greater than 5' Dollars Cents $ $ 28 50 L.F. Pavement Replacement,Per Figure 1 Dollars Cents S $ Revised per Addendum No.2 Issued January 24,2000 PART 5-UNIT 1 (5) Jan-24-00 16:36 Wade & Associates, Inc. 817 335 1729 P. 10 SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C -GENERAL CONDITIONS A. General These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. B. C3-3.7 BONDS: Page C3-3 (3), the paragraph after subparagraph d. Change the paragraph to read as follows: "No sureties will be accepted by the owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and the surety shall be acceptable to the owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties JCircular 8701, or (2) the surety must have capital and surplus equal to ten times the amount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be authorized, accredited or trusteed to do business in Texas." C. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2),should be deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent (10%). For contracts of$400,000 or more at the time of execution,retainage shall be five percent(5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Revised Pg. l 01/14/00 Jan-24-00 16:37 Wade & Associates, Inc. 817 335 1729 P. 11 Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. D. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and replaced with D-12 of Part D - Special Conditions. E. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" F. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6(8), is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such iniurv, damare or death is caused, in whole or in part, by the nerlikence or allered ne-elikence of Owner, its officers. servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such iniury or damaPe is caused in whole or in Part by the nePlizenee or alleged nePlipence of Owner, its ofcers, servants or employees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b)provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. Revised Pg. 2 01/14/00 CONTRACT DOCUMENTS AND SPECIFICATIONS FOR 1999 MAIN 390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1),PART 5 SEWER PROJECT NO.PS46-070460410280 UNIT 1 -D.O.E.PROJECT NO. 1649 UNIT 3-D.O.E. PROJECT NO. 2548 UNIT 5-D.O.E. PROJECT NO. 2797 CITY OF FORT WORTH,TEXAS KENNETH BARR BOB TERRELL MAYOR CITY MANAGER DALE L. FISSELER, P.E. DIRECTOR,WATER DEPARTMENT HUGO A. MALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, RE, DIRECTOR ,DEPARTMENT OF ENGINEERING PREPARED BY [flfloE &_ �ZK/rA AS_SOCIATES-INC. FORT WORTH,TEXAS 1999 II TABLE OF CONTENTS PART A Notice to Bidders Detailed Notice to Bidders Special Instructions to Bidders PART B City of Fort Worth Minority/Women Business Enterprise Specifications Proposal PART C General Conditions Supplementary Conditions PART D Special Conditions Additional Special Conditions State Revolving Fund (SRF)Requirements PART E Specifications r Easements Permits PART F Certificate of Insurance Contractor Compliance with Worker's Compensation Law Bonds a. Payment Bond b. Performance Bond C. Maintenance Bond PART G Contract PART H Plans (Details) Figures T J1F PART A - NOTICE TO BIDDERS DETAILED NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS N0 T ii% Tv "DIDD1"icS Sealed Proposals for the following: Main 390 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 1), Part 5 Sewer Project No.PS46-070460410280 UNIT 1 -D.O.E.Project No. 1649 UNIT 3 -D.O.E. Project No.2548 UNIT 5—D.O.E. Project No.2797 Including: UNIT 1: The construction of 6,782 L.F. 8-Inch PVC Sanitary Sewer, 80 L.F. 8-Inch CL 51 DI Sanitary Sewer, 889 L.F. 10-Inch PVC Sanitary Sewer, 25 L.F. 10-Inch CL 51 DI Sanitary Sewer, 475 L.F. 12-Inch PVC Sanitary Sewer, 433 L.F. 8-Inch Sanitary Sewer By Other Than Open Cut, 530 L.F. 8-Inch Sanitary Sewer By Short Bore, 50 L.F. 10-Inch DI Sanitary Sewer By Short Bore, 50 L.F. 12-Inch DI Sanitary Sewer By Short Bore, 29 Manholes,272 Service Reconnects. UNIT 3: The construction of 1,881 L.F. 8-Inch PVC Sanitary Sewer, 30 L.F. 8-Inch CL 51 DI Sanitary Sewer, 185 L.F. 8-Inch Sanitary Sewer By Other Than Open Cut,20 L.F. 8-Inch Sanitary Sewer By Short Bore, 1,404 L.F. 6-Inch to 8-Inch I.D. HDPE Sanitary Sewer Pipe for Pipe Enlargement, 16 Manholes,69 Service Reconnects. UNIT 5: The construction of 145 C.Y. Unclassified Channel Excavation, 13.8 C.Y. Concrete Retaining Wall, 199 C.Y. Gabion Mattresses, 101 C.Y. Gabion Baskets,4 Manholes. Addressed to Mr.Bob Terrell,City Manager of the City of Fort Worth, Texas,will be received at the Purchasing Office until 1:30 p.m.,January 20,2000,and then publicly opened and read aloud at 2:00 p.m. Drawings, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering,Municipal Office Building, 1000 Throckmorton Street,Fort Worth, Texas. A fifty dollar($50.00)refundable deposit is required for the first set of documents and additional sets may be purchased for a non-refundable basis for fifty dollars($50.00). These documents contain additional information for prospective bidders. i A pre-bid conference will not be held. For additional information,contact Chris E.Brooks,P.E., at the offices of Wade&Associates,Inc., (817)335-2879 or Mike Domenech,P.E.,DOE Project Manager at the City of Fort Worth,(817)332- 5474 ext. 39. Advertising Dates: December 23, 1999 f December 30, 1999 Fort Worth,Texas DETAILED iiOTii E T O BIDDERS Sealed Proposals for the following: Main 390 Drainage Area, Sanitary Sewer System Rehabilitation and Improvements (Group 6,Contract 1),Part 5 Sewer Project No.PS46-070460410280 UNIT 1 -D.O.E.Project No. 1649 UNIT 3 - D.O.E.Project No. 2548 UNIT 5—D.O.E.Project No.2797 Including: UNIT 1: The construction of 6,782 L.F. 8-Inch PVC Sanitary Sewer, 80 L.F. 8-Inch CL 51 DI Sanitary Sewer, 889 L.F. 10-Inch PVC Sanitary Sewer, 25 L.F. 10-Inch CL 51 DI Sanitary Sewer, 475 L.F. 12-Inch PVC Sanitary Sewer, 433 L.F. 8-Inch Sanitary Sewer By Other Than Open Cut, 530 L.F. 8-Inch Sanitary Sewer By Short Bore, 50 L.F. 10-Inch DI Sanitary Sewer By Short Bore, 50 L.F. 12-Inch DI Sanitary Sewer By Short Bore,29 Manholes,272 Service Reconnects. UNIT 3: The construction of 1,881 L.F. 8-Inch PVC Sanitary Sewer, 30 L.F. 8-Inch CL 51 DI Sanitary Sewer, 185 L.F. 8-Inch Sanitary Sewer By Other Than Open Cut, 20 L.F. 8-Inch Sanitary Sewer By Short Bore, 1,404 L.F. 6-Inch to 8-Inch I.D. HDPE Sanitary Sewer Pipe for Pipe Enlargement, 16 Manholes,69 Service Reconnects. UNIT 5: The construction of 145 C.Y.Unclassified Channel Excavation, 13.8 C.Y. Concrete Retaining Wall, 199 C.Y. Gabion Mattresses, 101 C.Y. Gabion Baskets, 4 Manholes. Included in the above will be all other items of construction as outlined in the Drawings and Specifications. Addressed to Mr. Bob Terrell,City Manager of the City of Fort Worth,Texas,will be received at the Purchasing Office until 1:30 p.m.,January 20,2000,and then publicly opened and read aloud at 2:00 p.m. Drawings, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering,Municipal Office Building, 1000 Throckmorton Street,Fort Worth, Texas. A fifty dollar($50.00)refundable deposit is required for the first set of documents and additional sets may be purchased on a non-refundable basis for fifty dollars($50.00). These documents contain additional information for prospective bidders. All bidders will be required to comply with provision 5159 of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278,as amended by City Ordinance No. 7400(Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. A pre-bid conference will not be held. AWARD OF CONTRACT: The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of sixty(60)days from the date bids are opened. The award of the contract, if made,will be within sixty(60)days after the opening of bids,but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. SUBMISSION OF BIDS: This document is designed as three(3)separate contract documents and shall not be construed as being a single contract. The proposal sections are provided as three(3) individual proposals with three(3) individual M/WBE specifications and are arranged in units to allow prospective bidders to submit bids on one unit,any or all units. Award of contract(s), if made, shall be to the responsive low bidder for each individual unit. If a contractor is the responsive low bidder on two or more units,then a set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each unit. Construction time on all will run concurrently. For situations involving approved contracts with multiple units,the total allowable construction time period for all the units shall be the same as the unit with the longest construction time period within such contracts. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at(817)871-8100. Bidders shall not separate,detach or remove any portion,segment or sheets from the contract document at any time. Bidders shall submit the complete specifications book or risk rejection of bid. In accordance with City of Fort Worth Ordinance,No. 13471,as amended by Ordinance No. 13781,the City of Fort Worth has goals for the participation of Disadvantaged Enterprise in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the M/WBE UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM("Documentation")as appropriate. The Documentation must be received by the contracting department no later than 5:00 PM,five(5)business days after bid opening date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom the delivery was made. Such receipt shall be evidence that the Documentation was received by the City. The Contracting Department for this project is the Engineering Department. Any contract or contracts awarded under this Notice to Bidders are expected to be funded in part by a loan from the Texas Water Development Board. This contract is contingent upon release of funds from the Texas Water Development Board. Neither the State of Texas nor any of its departments,agencies, or employees is or will be a party to this Detailed Notice to Bidders or any resulting contract. For additional information contact Chris E.Brooks, Wade&Associates,Inc.,at(817)335-2879,or Mr. Mike Domenech,P.E.,DOE Project Manager,at(817)332-5474 ext.39. Bob Terrell Gloria Pearson City Manager City Secretary Advertisement Dates: Department of Engineering December 23, 1999 A.Douglas Rademaker,P.E., Director December 30, 1999 ' By: /0 0 , !;I'. Rick Trice,P.E.,Manager Consultant Services Division Fort Worth,Texas SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) 1. PRE-QUALIFICATION REQUIREMENT: All contractors submitting bids are required to be pre- qualified by the Fort Worth Water prior to submitting bids. This pre-qualification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. (a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. (b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which the bids are to be received. (c) The Director of the Water Department shall be the sole judge as to the acceptability for qualification to bid on any Fort Worth Water Department project. (d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. (e) The City, in it's sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. (f) Any proposals submitted by a non-pre-qualified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. (g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary pre-qualification. 2. BID SECURITY: A cashier's check or an acceptable bidder's bond payable to the City of Fort Worth in an amount of not less than five percent (5%) of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the state of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth(1/10)the total capital and surplus. 3. BONDS: A performance bond and a payment bond each for one hundred percent (100%) of the contract ' price will be required,Reference C 3-3.7. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth,Texas,and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDER: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in the State of Texas, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in the State of Texas. This provision does not apply if this contract involves Federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the contract amount is$25,000 or less,the contract amount shall be paid within forty-five (45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. l� Contractor warrants it will fully comply with the policy and will defend, indemnify, and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state, and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement, 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with City of Fort Worth Ordinance, No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM, ("Documentation") as appropriate. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or a Women Business Enterprise(WBE)on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. ATTACHMENT 1A • Page 1 of 2 Ciof Fort Worth Minority and Women Business Enterprise Specificati0h6F s MBE/WBE UTILIZATION ENCINEERINC/CFW /E rad-.7TEa2!�i✓C= L'e�1srL'utT,OwJ.2i e_ - u11i1 28 PR `13 P ME COMP9�Y NAME BID DATE 1' ?Sitz oyGoyio.2Bo Doe A& /0419 ROJECT NAME PROJECT NUMBER CITY-s M/WBE PROJECT GOAL: a,r/(All/ M/WBE PERCENTAGE ACHIEVED: .allure to complete this.form, in Its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City-business days after bid opening, exclusive of bid opening date, will result in the bid '+eing considered non-responsive:to bid specifications. The:undersigned:.bidder agrees,tn,enter.:into a,formal.agreement-with-the.MBE;and/or_..WBEf rms-for work listed in this hadui,<.conditloned_-upon: execution;:of;ah contract;,with::.the+,.City, of;FFo.rtxWorth,;,,The=.intent[onal and/or.knnwing lisrepresentatlbn of facts:.iwgrailnds r' -foconsidamtion ot,disqualification-and will result ln:the;bid.being,considered non-responslvw-to specificatios;' r 4n:'7 " Company Name, Contact'Name, Certified- Speclfy�Contractine;�!. " Specify'AR Items to be. Dollar Amount .Address;and Telaphone:No.. �. S.cope&VYork.{•) Suppll4d(')-; �.=v t� 0 a`m 0 A,,,a flsP�,�Jr d CoNc12�TE -o 3 ZE�/'.s'�'.t pip 'HYD- - ob ✓ l I a 700. Exce53 ifs T S�oS ZIP(-,571/6 -7 ✓ I1 'yl 1/9 7. °s -7Y0-?5/00 ✓ / !0 coo. '' WWBEs must be located in the 9(nine)county marketplace or currently doing business In the marketplace at the time of bid. Specify all areas in which MWBE's are to be utilized and/or Items to be supplied: complete listing of Items to be supplied Is required In order to receive credit toward the M/WSE goal. )identify each Tier level. Tier:Means the level of subcontracting below the prime contractor/consultant,i.e.,a direct payment from the prime contractor to a subcontractor Is considered 14 tier,a payment by a subcontractor to Its supplier is considered Y-r tier. X11&FORM MU5T BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CiTY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev. 61219e Pages 1 and 2 of Attachment 1A must be received by the Managing Department ATTACHMENT 1A Page 2 of 2 Ci of Fort Worth Minority and Women Business Enterprise Specifications MBE/WBE UTILIZATION Company Name, Contact Name, Certffled Specify A•Contracting Specify All Items to be Dollar Amount Address,and Telephone No. u F Scope of Work,(") Supplied(`) r Z: N I?lAcc HyVao-aulci4 µft>g4-",jjcN 6-0-En .. / ' ,� s ✓ 7 Gam 5 s6 /lR — 1r✓srw-Gf SErcr�cES ��AE RuA !'�AuNolEs 2z 3 //? -)1,80/ 0 �r♦o rE s 9Gy7 The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, Including MBE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit andlor examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the.City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and foi•initiating action under Federal, State or ocal laws erning false statements. Any failure to comply with this ordinance and creates a material breach con c a esult in a determination of an irresponsible offeror and barred from participating in City work . for a rid ti a ess than one (1)year. L Es and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD 1411,17 13 C' - Authorized Signature Printed Signatufe ✓,'cam ��c,ES�'Dw�� ti,/� Tltie Conta t Name and Title (if different) 3031 Company Name Telephone Number(s) 8/ 7- 73 -s33 / Add ess Fax Number City/State/Zip Code Date ' THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5) CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev. 612/98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department Part B PROPOSAL THIS PROPOSAL MUST NOT BE REMOVED FROM THIS BOOK OF CONTRACT DOCUMENTS. TO: Mr. Bob Terrell City Manager Fort Worth, Texas 1999 Main 390 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 6, Contract 1), Part 5 Sewer Project No. PS46-070460410280 UNIT 1 -D.O.E. Project No. 1649 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder has thoroughly examined the Contract Documents, including Plans, special Contract Documents, the General Contract Documents, and General Specifications for Water Department Projects, and the site of the project, understands the amount of work to be done, and hereby proposes to do all the work, furnish all labor, equipment and materials necessary to complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Engineering Department Director of the City of Fort Worth,Texas. The contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish an approved Performance Bond,Payment Bond,Maintenance Bond, and such other bonds, if any, approved by the City of Fort Worth for the performing and completing of said work within the time stated and for the following sums, to wit: PART 5 —UNIT 1 (1) UNIT 1 -BID-Sanitary Sewer Pipeline Rehabilitation • PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID (Furnish and install complete in place,including all appurtenant work, the following items.) 1 6,782 L.F. * 8-Inch PVC Sanitary Sewer Pipe,All Depths I,JFwJT�( J�x Dollars on AAO Cents $ L. $ 5 �. 2 80 L.F. 8-IInch CL 51 DI Sanitary Sewer Pipe,All Depths .7i is — Dollars AA-)D Cents $ �n_.5. _— I7JZ� 3 889 L.F. *10-Inch PVC Sanitary Sewer Pipe,All Depths Dollars N Cents $ $ 4 25 L.F. 10-Inch CL 51 DI Sanitary Sewer Pipe,All Depths t'o/t-T Dollars 00 � N Cents $ 5 475 L.F. *12-Inch PVC Sanitary Sewer Pipe,All Depths +L,N T y Dollars QQ JVD Cents $ T✓o. $ 38000, ,, 6 433 L.F. 8-Inch DI Sanitary Sewer By Other Than Open Cut AJI'eJ i J Dollars M l•�U Cents $ $ 3 970. 7 530 L.F. 8-Inch Sanitary Sewer Pipe by Short Bore QJJE#aA boo Dollars M /`10 Cents $ Jt0. $ * Contractor must complete City Approved Product Form on PART 5 -UNIT 1 (8) PART 5-UNIT 1 (2) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID - (Furnish and install complete in place,including all appurtenant work, the following items.) 8 50 L.F. 10-Inch DI Sanitary Sewer By Short Bore OA9 J&,.J N&61S Dollars NU Cents 9 50 L.F. 12-, /Inc'h DI Sanitary Sewer By Short Bore enor msb '6&; Dollars AJ12 Cents $ ev�— $ OD. 10 2000 L.F. *4-Inch PVC Sanitary Sewer Service Pipe ! F.tITY Je �c Dollars Cents $.26. $ SHOD 11 50 L.F. *4/Inch DI Sanitary Sewer Service Pipe lff�i Q7y '&'47d7– Dollars r" ev jAJ0 Cents $s $ Dl 12 272 EA. 4-Inch Sanitary Sewer Service Connections y2 //O/Jpe&z Dollars oho' as O,/O Cents $ 40 $1T 13 333 L.F. Re-route 4" PVC Private Sanitary Sewer Service, 1 / Dollars 4j Cents $ .23• $ dS 9 14 21 EA. Construct Standard 4-Foot Diameter Manhole,6' Depth '�i�fdZEE / ,✓� Dollars k)Q Cents $ _ $ * Contractor must complete City Approved Product Form on PART 5 -UNIT 1 (8) e� r t PART 5-UNIT 1.(3) M Jan-25-0t)7707r. 37 Wade & ASSOC Inc . 817 335 1729 P.08 PAY APPROX. DESCRIPTION OF ITEMS XVITH BID PRICES UNI r PRICE TOTAL ITEM QUANTITY WRI'1 TEN Its WORDS AMOUNT BID (Furnish and install complete in plvre:. incluJing all appurtenant work. the following items.) .�. 15 29.5 `'.F. Extra Depth, 4-Fool Diameter.Manhole L�tIE AQA! dZQ Zrjj Dollars � Qe Cents S $ S IG 1 EA. Construct 4-Foot Piumeter Shallow Conc Manhoic pBw)h Dollars tyC) Cents $ S DOD 17 7 EA. Construct 4-Foot Diameter Drop Manhole. G' Depth "' _irOt!!Z /SRn,1� Dollars M AJU Cents S Is 33 V.F. Extra Depth.4-Foot Diameter Drop Manhole AxlblZeD Dollars Cents 19 l EA. Construct 4-Foot Di,imrtor Double Drop Manhole, G' Depth Dollars rely Cents S 20 5 V.F. Extra Depth.4-Foot Dintncter Double Drop Manhole Dollars L Ny Cents S SO• 00 S o. 21 30 EA. Install Watertight M-,mhole Insert /f©ILT+I Dollars Cents S J. r p •� Revised per Addendum No. 2 issued January 24,2000 PART 5 - UNIT 1 (4) Jan-25-00 '37 Wade & ASSOC! 817 335 1729 .E.09 PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN N DRDS AMOUNT BID (Furnish and install complete in place, includingall appurtenant anrk,the t'n 7ing items.) 22 28 EA. Innsttal"l Concrete Collar "e.E+� Dollars AV Cents 5 ?615? 49- $199 23 30 EA, Manhole Vacuum Tesiirra ONE f/41uArcC-w1 Dollars N �tJO CentsS fes. 4.3_ Off_ 24 28 EA. Remove Exisdn_, \-Linhole at (74t5 dwj Dollars ■* t9 Cents S 25 2 EA. Abandon Existing Manhole Dollars d.?D Cents S .500. ~_ S 26 3 E.A. Cut& Plug Exxisting Sanitary 5ewer roU2 l'f ,A-4)It Dollars N LI Cents S S 27 8209 L.F. Trench Safety System, for(•ruches greater than 5, 1V f7 Dollars 90 Cents S S 28 50 L.F. Pavement Re.placemeni. Per Figure 1 M1'k TV Dollars 6-)�____ Cent, Revised per Addendum No. 2 issued January 24,2000 PART 5 • UNIT 1 (5) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID (Furnish and install complete in place,including all appurtenant work, the following items.) 29 1640 L.F. Pavement Replacement,Per Figure 4 dV Dollars �D Cents 30 300 L.F. Concrete Curb and Gutter Replacement Dollars /U® Cents $ $�N 31 50 L.F. CCoon-crrete Sidewalk—&Driveway Repair ,�T►. I f`a Dollars Cents 32 96 L.F. Sodding ,r 'x Dollars JJv Cents $ 33 6480 L.F. Hydro-Mulch Seeding y /UO Dollars ..WJE✓� i Vy Cents 34 1 TON Ductile Iron Fittings loo A )1Z8A Dollars _ n10 Cents $ p $ ®� o• 35 3724 L.F. Pre-Construction Cleaning and Television Inspection Foot Dollars A2 0 Cents $ _ $ - 9G. so PART 5-UNIT 1 (6) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID (Furnish and install complete in place,including all appurtenant work, the following items.) 36 9239 L.F. Post-Construction Television Inspection Dollars ,2S �s _ rrt/ JL�'NE Cents $ � $ 37 40 L.F. Concrete Encasement Y i F'T Dollars 00 Cents $ 50 _ $ � 38 2 EA. Exploratory Excavation(D-hole)as Directed by the Engineer �ySA.yl1 Dollars A—)O Cents $ �• 39 20 V.F. Protective Coating for 4-Foot Diameter Drop Manhole // , CrUNNix_JT✓ Dollars o+ es A.)6 Cents $� $ �S �. SANITARY SEWER REHAB. - UNIT I TOTAL AMOUNT BID: $ 7M y98 [Transfer UNIT I TOTAL AMOUNT BID to page PART 5-Summary of Bids] PART 5 -UNIT 1 (7) CITY APPROVED PRODUCT FOR * CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED: STANDARD SPEC NO. SIZE E1-31 4" thru 30" ' J E1-25 4" thru 15" J"l El-27 4" thru 15" E1-28 18" thru 27" E100-2 18"thru 48" Consult the"City of Fort Worth Standard Product List"to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. Failure to provide the information required above may result in rejection of bid as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. PART 5 -UNIT 1 (8) Within ten (10) days after notification by City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this Contract. The attached bid security in the ,. amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents, and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms R of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. The Bidder agrees to begin construction within ten (10)calendar days after issue of the work order, and to complete the contract within one hundred sixty (160) calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of , our principal place of .. business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged of the following addenda: Addendum No. 1L Addendum No. 2 Addendum No. 3 PART 5 —UNIT 1 (9) *� Respectfully submitted, —7-9&A -S ✓ T T c. w By Title 2l00[ !2i AE .(,c.�%7JRz.v :57F. .203 Address (SEAL) If Bidder is Corporation Date: 1,7 ov A6 f. PART 5—UNIT 1 (10) PART C - GENERAL CONDITIONS PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1. 2 Contract Documents C1-1 (1) C1-1. 3 Notice to Bidders C1-1 (2 ) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder Cl-1 (2) C1-1.6 General'Conditions C1-1 (2) C1-1.7 Special Conditions Cl-1 (2 ) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3) Ci-1.11 Plans C1-1 (3 ) C1-1. 12 City C1-1 (3) C1-1.13 City Council C1-1 (3 ) C1-1.14 Mayor C1-1 ( 3) C1-1.15 City Manager Cl-1 (3 ) C1-1.16 City Attorney C1-1 (3 ) C1-1.17 Director of Public Works C1-1 (4 ) C1-1.18 Director, City Water Department C1-1 (4) C1-1.19 Engineer Cl-1 (4) C1-1.20 Contractor C1-1 (4) C1-1. 21 Sureties C1-1 (4 ) C1-1. 22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 ( 4) C1-1.24 Calendar Day C1-1 (4) C1-1.25 Legal Holiday C1-1 ( 4) C1-1.26 Abbreviations C1-1 (5) C1-1. 27 Change Order Cl-1 (6 ) C1-1.28 Paved Streets and Alleys C1-1 (6 ) C1-1.29 Unpaved Streets and Alleys C1-1 (6) C1-1. 30 City Streets C1-1 (6) C1-1. 31 Roadway C1-1 (6) C1-1.32 Gravel Street C1-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2. 4 Submitting of Proposal C2-2 (3 ) C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3 ) II (1) f� C2-2.7 Delivery of Proposal C2-2 (4 ) C2-2.8 Withdrawing Proposals C2-2 (4 ) C2-2.9 Telegraphic Modification of Proposals C2-2 (4) C2-2.10 Public Opening of Proposal C2-2 (4 ) C2-2.11 Irregular Proposals C2-2 (4 ) C2-2.12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3. 1 Consideration of Proposals C3-3 (1 ) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1 ) C3-3.3 Equal Employment Provisions C3-3 (1) C3-3. 4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (4 ) C3-3 .9 Failure to Execute Contract C3-3 (4 ) C3-3.10 Beginning Work C3-3 (4 ) C3-3.11 Insurance C3-3 (4 ) C3-3.12 Contractor ' s Obligations C3-3 (7 ) C3-3.13 Weekly Payroll C3-3 (7 ) C3-3.14 Contractor ' s Contract Administration C3-3 (7 ) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4. 2 Special Provisions C4-4 (1) C4-4. 3 Increased or Decreased Quantities C4-4 (1) C4-4. 4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4. 6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4 ) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5. 3 Coordination of Contract Documents C5-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3 ) C5-5. 6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4 ) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5 ) C5-5.11 Substitute Materials or Equipment C5-5 (5 ) C5-5.12 Samples and Tests of Materials C5-5 (6 ) C5-5.13 Storage of Materials C5-5 (6 ) C5-5.14 Existing Structures and Utilities C5-5 (7 ) C5-5.15 interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8 ) C5-5.17 Cleanup C5-5 (8 ) C5-5.18 Final Inspection C5-5 ( 9) (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6. 2 Permits and Licenses C6-6 (1) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6. 4 Sanitary Provisions C6-6 (2) C6-6. 5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6. 7 Railway Crossings C6-6 (4 ) C6-6. 8 Barricades, Warnings and Watchmen C6-6 (4) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6 ) C6-6.11 Independent Contractor C6-6 (8 ) C6-6.12 Contractor 's Responsibility for Damage Claims C6-6 (8 ) C6-6.13 Contractor 's Claim for Damages C6-6 (10 ) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10 ) C6-6.15 Temporary Sewer Drain Connections C6-6 (10 ) C6-6 .16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor 's Responsibility for Work C6-6 (11) C6-6 .19 No Waiver of Legal Rights C6-6 (12) C6-6 . 20 Personal Liability of Public Officials C6-6 (12) C6-6. 21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7. 2 Assignment of Contract C7-7 (1) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4 ) C7-7. 8 Extension of time of Completion. C7-7 (4 ) C7-7. 9 Delays C7-7 (4) C7-7. 10 Time of Completion C7-7 (5 ) C7-7.11 Suspension by Court Order C7-7 (6 ) C7-7.12 Temporary Suspension C7-7 (6 ) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9 ) C7-7.16 Termination for Convenience of the Onwer C7-7 (10 ) C7-7.17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1) C8-8 . 2 Unit Prices C8-8 (1) (3 ) C8-8. 3 Lump Sum C8-8 (1) C8-8. 4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3 ) - C8-8.7 Final Acceptance C8-8 (3 ) C8-8.8 Final Payment C8-8 (3) C8-8. 9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4 ) C8-8 .11 Subsidiary Work C8-8 (5) C8-8.12 Miscellaneous Placement of Material C8-8 (5 ) C8-8.13 Record Documents C8-8 (5 ) (4) FP .V PART C - GENERAL CONDITIONS so C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications - either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER: Any. person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth ' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1 -1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1. 9 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project . Whenever reference is made to standard specifications, regulations, requirements , statutes , etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2 ) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3. 7) C. Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1 . 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. w C1-1. 11 PLANS : The plans are the drawings or reproductions therefrom made by the Owner ' s representative showing in detail the location, dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY : The City of Fort Worth, Texas , a municipal corporation, authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR: The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. s. C1-1. 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas , or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. Cl-1 (3 ) C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1 . 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant', or agents. C1-1 . 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting within the scope of the particular duties entrusted to them. C1 -1 . 20 CONTRACTOR : The person , persons , partnership , company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or only labor, for work at the site of the project. C1-1 . 21 SURETIES : The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7. 6. C1-1 . 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows : Cl-1 (4) 1. New Year ' s Day January 1 2. M. L. King, Jr. Birthday. Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8 . Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall .be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. M C1-1. 26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents , the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials - ASCE American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum Association R - Radius - ASA American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D . - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. Linear or Lineal CY - Cubic Yard lb. Pound Yd. Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D. I. - Ductile Iron C1-1 (5) k C1 -1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. C1-1 . 28 PAVED STREETS AND ALLEYS : A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without .separate base material. 3 . Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1 . 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1 . 30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 21 ) feet back of the curb lines or Four ( 4 ' ) feet back of the average edge of pavement where no curb exists. C1-1 . 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. Cl-1 (6) SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2 . 1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security , and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule, " and "Financial Statement, " all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status . This statement must be current and not more than one ( 1 ) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten ( 10% ) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project , it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2(1) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided , without in any way invalidating the unit prices bid or any other requirements of the 'Contract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time requi.ed for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation, research, tests , explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals , the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the firm, association , or partnership , or by a person duly authorized. If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2. 5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2. 6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders " and the "Proposal . " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2 (3 ) C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered , accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the name or description of the project as designated in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2 . 8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2 . 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals , provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight ( 48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2 . 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and For which no "Non-consideration Request" - has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders. " All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2 . 11 IRREGULAR PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions , alterations of form, additions , or conditions not called for , unauthorized alternate bids, or irregularities of any kind. However, the C2-2(4) Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. . C2- 2 . 12 DISQUALIFICATION OF BIDDERS . Bidders may be disqualified and their proposals not considered for any of , but not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement , experience record, equipment schedule , and such inquiries as the Owner may see fit to make. g. Uncompleted work which , in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner , one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer , is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(5) M. PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal , and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. �* C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE ) on the contract and the payment therefor. Contractor further agrees , upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements ; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6 ) months. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS : The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1) The Contractor shall post the required notice to that effect on the project site, and, at his request , will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal actiron on the proposals for a reasonable time, not to exceed forty-five ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. . . The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids , the Owner may, at its discretion, return the proposal security which accompanied the proposals which , in its judgment , would not be considered for the award . All other proposal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3 . 7 BONDS : With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or the use of inferior materials . This performance C3-3 (2) bond shall guarantee the payment for all labor , materials, equipment, supplies , and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract , as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160 , Revised Civil Statutes of Texas , 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session , 1959 , effective April 27 , 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications . Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner . All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner . In order to be acceptable, the name of the surety shall be included on the current U . S . Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3 ) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3 . $ EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary, approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten ( 10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal , and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor , and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee ' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order" , it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner . The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4 ) certificate of insurance for approval . The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include. the coverage of all sub-contractors. a. COMPENSATION INSURANCE : The Contractor shall maintain , during the life of this contract , Workers ' Compensation Insurance 'on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, the Contractor shall provide adequate employer ' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor ' s Comprehensive General Liability Insurance ( Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 0.00 covering each occurrence on account of bodily injury, including death, and in an amount not I ess than $ 500 , 000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set forth for public liability and property damage,. the following insurance: 1. Contingent Liability ( covers General Contractor ' s Liability for acts of sub-contractors) . 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation ( if excavations are to be performed adjacent to same) . w 4. Damage to underground utilities for $500,000. a. C3- 5 3 ( ) 5. Builder' s risk (where above-ground structures are involved) . .� 6. Contractual Liability ( covers all indemnification requirements of Contract) . d1p AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and . maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500 , 000 on account of one accident , and automobile property damage insurance in an amount - not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The nsurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF _ CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner . ( Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub- contractor , should the Prime Contractor ' s insurance not cover the sub-contractor' s work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contractor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 (6) City of Fort Worth, Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth , or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area. The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. FC3-3 . 12 CONTRACTOR ' S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials , labor and services when due. C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the F. Owner' s representative within seven ( 7 ) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3. 14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons , partnership , company , firm , association , corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort North-Dallas metropolitan area . The Contractor shall charge, delegate, or assign this office ( or he may delegate his Project Superintendent ) with full authority to transact all business actions required in the 1P performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other C3-3 (7) u matter associated such as maintaining adequate and appropriate insurance or security coverage for the project. Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be made in writing to the Engineer in advance of any work on the project , all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration , whether it be oriented z in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative Fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion , stop all work until a new local authority satisfactory to the Engineer is assigned . No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE : Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. C3-3 (8 ) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a complete , useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4 . 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed ' or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 (1) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner , provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however , that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of ( 1 ) labor, ( 2 ) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates ; ( 3 ) materials entering permanently into the project, and ( 4 ) actual cost of insurance , bonds , and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead , other profit, general and all other expense not included in ( 1 ) , ( 2 ) , ( 3 ) , and ( 4 ) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 (2 ) suggested by the Owner and shall give the Owner access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work , prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whether or not iniitiated by a 'change order ' shall be a full , complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4-4 . 6 SCHEDULE OF OPERATIONS: Before commencing any work 3 under this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof , a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. Thera C4-4 (3 ) shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10 ) days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities ( including procurement of materials, plans, and equipment) and the contemplated dates for completing the same . The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer . The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer . Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor ' s understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and construction values not to exceed $ 50 , 000 . Fabrication , delivery and submittal •activities are exceptions to this guideline. C4-4 (4 ) C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. a Thirty days shall be used for submittal .review unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14 ) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials. 1. Preparation and transmittal of submittals. ■► 2. Submittal .review periods. 3 . Shop fabrication and delivery. 4 . Erection or installation. 5. Transmittal of manufacturer ' s operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner ' s operator instruction ( if applicable) . 8 . Final inspection. F .� C4-4 (5 ) 4