Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 46412
Corr SccRETAW 2 COMTRAcT No. Developer and Project Information Cover Sheet: Developer Company Name: Thomas Crossing, LLC. Address, State, Zip Code: P.O. Box 939 Burleson,TX 76097 Phone, E-Mail: 817-426-3113, TCLLC@AOL.COM Authorized Signatory/Title: Peter Thomas/ Managing Member Project Name and Brief Description: Thomas Crossing Ph 6 Water, Sewerwater, Paving, Storm Drain, Street Lights & Signs to serve Thomas Crossing Ph 6 Project Location: Continuation of Thomas Crossing i Plat Case No.: FP-14-010 Plat Name: Mapsco: 120W Council District: 6 City Project No:02299 CFA: 2014-076 DOE: 7250 To be compl�l d`byl,',_staff.• Received by:—V. � �c`I Ike 1i Y��t�K% .1� Date: N IAL RECORD SECRETARYWORTH,TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. q4Q W2, WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Thomas Crossing Ph 6 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the Project. NOW,THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially cepted the Improvements. Developer acknowledges that the said OFFICIAL RECORD ceptance process requires the Developer's contractor(s) to submit an CITY SECRETARY 2 FT.WORTH,TX RECEIVED FEB 12 N15 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X, Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X, Street Lights & Signs (C) X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. 4 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and fiiture improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. 6 iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: Thomas Crossing Ph 6 CFA No.: 2014-076 DOE No.: 7250 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. A Water and Sewer Construction 1. Water Construction $95,707 2.Sewer Construction $132,111.73 Water and Sewer Construction Total $ 227,819.06 B. TPW Construction 1.Street $ 302,224.60 2.Storm Drain $ 105,015.30 3.Street Lights Installed by Developer $ 44,695.40 TPW Construction Cost Total $ 451,935.30 Total Construction Cost(excluding the fees): $ 679,754.36 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 4,556.38 D. Water/Sewer Material Testing Fee(2%) $ 4,556.38 Sub-Total for Water Construction Fees $ 9,112.76 E. TPW Inspection Fee(4%) $ 16,289.60 F. TPW Material Testing(2%) $ 8,144.80 G. Street Light Inspsection Cost $ 1,787.82 H. Street Signs Installation Cost $ 490.00 Sub-Total for TPW Construction Fees $ 26,712.22 Total Construction Fees: $ 35,824.98 Financial Guarantee Options Choose one Amount Mark choice Bond=100% $ 679,754.36 Completion Agreement= 100%/Holds Plat $ 679,754.36 x Cash Escrow Water/Sanitary Sewer= 125% $ 284,773.82 Cash Escrow Paving/Storm Drain= 125% $ 564,919.13 Letter of Credit= 125%w/2yr expiration period $ 849,692.95 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed,and said D eloper has exec ted this, instrument m ruplicate, at Fort Worth, Texas this day o 20 CITY OF FORT WORTH - Recommended by: Water Department TranM&,PLiblic Works Department Wendy Chi-Bablilal, EMBA, P.E. Douglas W, iersig, P.E. Development Engineering Manager Director Approved as to Form & Legality: Approved by City Manager's Office q00' issR Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. AA� Date: VOR ATTEST: j O�°°"�' - o� S g� a a a J. K ys o City Secretary ATTEST: DEVELOPER: Signature Signature (Print)Name: Print Name: Peter Thomas Title: Managing Member OFFICIAL RECORD 9 CITY SECRETARY FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 UK 131M PRO 4 weepkV wdow 81 J Qakcr i Cemetery RuNkv Ekn Ct S Wteo"iip 00".3t (3 Tys Cronnq 141 Ct Red Oak Dr - }foA Worth S I S �` lY3i � `Hms S N KS Thq,serki oaks o. Q Q BeorrRd AIRPORT BWI"-RtoRd 8ulMonf eseRd IRp'SyA � � 4 • a .�. j, Cod C� 3JL. f" 99C St Q t SU JEST' ' Ra PR PEOTY 9 _ _ `'br"L°*or TARRANT CO. ` r1�M c«_,,,s_a - -- ---- ------- JOHNSON CO. ="��=��+----- ---- 'l (NOT TO SCALE) LOCATION MAP THOMAS CROSSING PHASE SIX CivilSolutions Inc Engineers Surveyors Planners P.O.Box 100247, Fort Worth,Texas,76185 (817)423-0060 (817)346-0520 Fax Texas Registered Engineering Firm F-7997 OCTOBER 2014 Texas Licensed Surveying Firm 100062.002.00 Copyright © 2014 CivilSolutions Inc 12-021 N 19 18 24 23 q2 21 20 a� C7o W Zft HOUSAN OAK50 S 21 100 • 100 200• �j 14 13 20 GRAPHIC SCALE:1 IN=100 FT. A 11 15 19 11 w 16 $ — WATER LINE a 18 O 17 z —HAY DR SPANISH FIRE HYDRANT SPANISH � � � � 17 ... 0 v 18 00 18 19 ° 15 z 20 R 14 21 13 'SOMAS CROSSING DR. `lr?c\ ®22 �. 12 23 11 24 25 10 27C 276 27A 27 26 8' W 9 SUU4yERH C a�S p{q MERTON 05k- 8 - 7 2 3 4 5 8 RMFRA S EXHIBIT A WATER THOMAS CROSSING PHASE SIX CivilSolutions Inc Engineers Surveyors Planners P.O. Box 100247, Fort Worth,Texas,76185 (817)423-0060 (817)346-0520 Fax Texas Registered Engineering Firm OCTOBER 2014 Texas Licensed Surveying Firm 100062-00062-00 Copyright © 2014 CivilSolutions Inc 12-021 3 UNIT PRICE BID ESTIMATE - WATER Project Item Information Bidder's Proposal Bidlist Item Description Specifica Unit of Bid Unit Price Bid Value No. tion Measu Quantity Section re No. UNIT I: WATER IMPROVEMENTS 1 3311.0001 Ductile Iron Water Fittings With 33 11 11 Tons 1 $8965.32 $8965.32 Restraint 2 3311.0161 6"PVC Water Pie 33 11 12 LF 12 $50.00 $600.00 3 3311,02418"PVC Water Pipe 33 11 10 LF 2005 $21.45 $43,007.25 33 11 12 4 1 33 12.000 1 Fire Hydrant 33 1240 Ea 2 $2,660,55 $5,321.10 6 3312.2003 I"Water Service 33 12 10 Ea 47 $695.83 $32,704.01 7 3312.3002 6"Gate Valve 33 1220 Ea 2 $600.00 $1,200.00 8 3312.3003 8"Gate Valve 33 1220 Ea 4 $977.41 $3,909.64 TOTAL WATER IMPROVEMENTS $95,707.32 THOMAS CROSSING-PHASE SIX CITY OF FORT WORTH CITY PROJECT NO.02299 STANDARD CONSTRUCTION BID FORM-DEVELOPER AWARDED PROJECTS 00 42 43 Bid Form-DAP.docx Form Revised April 2,2014 N 19 18 l 24 I 23 �2 �y1 21 20 R. 1 4 TFIOUSANQ OAKS D J Fps 21 100 0 00 1 • 1. 2` 14 13 20 GRAPHIC SCALE:1 IN=100 FT. 6A ii 15 19 16 g" SS 16 — GRAVITY SEINER LINE 17 — SPA1118h1 DAY OR ® —17 SS MANHOLE 18 16 19 15 20 _ — 14 21 0 2 0 13~ w 22 X 12 23 11 24 e 1 1 25 10 27C 1278 127A I 27 26 y I 9 OAKS M>_RION DR- 8 I 7 y 2 3 4 g 8 r gAltf RA UP EXHIBIT A-1 SANITARY SEWER THOMAS CROSSING PHASE SIX CivilSolutions Inc Engineers Surveyors Planners P.O. Box 100247, Fort Worth,Texas,76185 (817)42.3-0060 (817)346-0520 Fax OCTOBER 2 U 14 Texas LicRegisteredem Engineering veyingir Firm F-7997 2.00 Texas Licar,yeo Surveying Firm 16(1062.00 Copyright © 2014 CivilSolutions Inc 12-021 2 UNIT PRICE BI.D ESTIMATE - SANITARY SEWER Project Item Information Bidder's Proposal Bidlist [tem Description Specifica Unit of Bid Unit Price Bid Value No. tion Measu Quantity Section re No. UNIT II: SANITAY SEWER IMPROVEMENTS 9 3301.0002 Post-CCTV Inspection 33 01 31 LF 1910 $1.25 $2387.50 10 330 1.0 101 Manhole Vacuum Testing 33 01 30 Ea 13 $125 $1,625.00 11 3305.0109 Trench Safety 3305 10 LF 1910 $.26 $496.62 12 3331.3101 4"Sewer Service 33 31 50 Ea 46 $625.86 $28,789.56 13 3331.41 15 8"Sewer Pipe 33 11 10 LF 1830 $28.44 $52,045.20 33 31 12 3331 20 14 3331.4116 8" Sewer Pipe,CSS Backfill 33 11 10 LF 80 $40 $3,200.00 3331 12 33 31 20 15 3339.1001 4' Manhole 33 39 10 Ea 13 $3,274.45 $42,567.85 33 3920 16 3339.1003 4' Extra Depth Manhole 33 39 10 VF 10 $100.00 $1,000.00 33 39 20 TOTAL SANITARY SEWER IMPROVEMENTS $132,111.73 N 19 18 21 20 24 23 2 IHOUswC)OAK`'Oa• S N21 1- - 1- 200 14 Tsiansiiiia A 13 20 GRAPHIC SCALE:1 IN=100 FT. 11 15 19 16 0 18 I 17 SPANISH BAY DR I 17 O ' U 18 i16 F 19 a ° 1150 z o 20 a W 2 14 21 13 THOMAS CROSSING DR. \ ©22 12 23 11 25 � , 10 27C 278 27A 27 26 MERLON DR. �0+f.7�i 7 2 3 4 5 6 ' F. RIVIERA M- . EXHIBIT B-1 STORM DRAIN THOMAS CROSSING PHASE SIX C ivi ISol utions Inc Engineers Surveyors Planners P.O. Box 100247, Fort Worth,Texas,76185 (817)423-0060 (817)346-0520 Fax OCTOBER 2014 Texas RegiLicensed Surveying Firm irm10 F-7997 2-00 Texas Licensed Surveying Firm 100062-00 Copyright © 2014 CivilSolutions Inc 12-021 i UNIT PRICE ESTIMATE - DRAINAGE IMPROVEMENTS Project Item Information Bidder's Proposal UNIT III: DRAINAGE IMPROVEMENTS 17 3341.0201 21"RCP,Class 111 33 41 10 LF 36 $61.25 $2,219.40 18 3341.0205 24"RCP,Class 111 3341 10 LF 208 $45.90 $9,547.20 19 3341.0302 30"RCP,Class 111 3341 10 LF 208 $56.90 $11,838.20 20 3341.1201 50 Box Culvert 334110 LF 177 $164.82 $29,173.14 21 3341.1302 60 Box Culvert 33 41 10 LF 149 $196.14 $29,224.86 22 3349.5001 10' Curb Inlet 33 49 20 Ea 7 $3287.50 $23,012.50 TOTAL DRAINAGE IMPROVEMENTS $105,015.30 i I N 19 1B 112 21 20 24 23 y S 21 1- : 1- 2V 14 13 20 GRAPHIC SCALE:1 IN m 100 FT. 6A 11 15 19 ® - 6" CONCRETE ! 16 PAVEMENT/28' - ROADWAY o 18 a 17 SPANISH BAY OR 17 - 4' REINFORCED O 18 CONRETE WALK � 18 0 rs- 19 15 20 14 21 13 THOMAS CROSSING Dot. �o~4c\ ®22 \ 12 23 11 24 25 10 27C 2713 27A 27 26 SOUTHERN(ygPIS psq 8 7 4 5 6 2 3 r. 1;R9ium DR EXHIBIT B PAVING THOMAS CROSSING PHASE SIX CivilSolutions Inc Engineers Surveyors Planners P.O. Box 100247, Fort Worth,Texas,76185 (817)423-0060 (817)346-0520 Fax Texas Registered Engineering Flan F-7997 OCTOBER 2014 Texas Licensed Surveying Firm 100082-0062-00 Copyright © 2014 CivilSolutions Inc 12-021 ESTIMATE PAVING V Project Item Information Bidder's Proposal Bidlist Item Description Specifica Unit of Bid Unit Price Bid Value No. tion Measu Quantity Section re No. UNIT IV: PAVING IMPROVEMENTS 23 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 1321 $ $ 24 3125.0101 S W PPP> I acre 31 2500 LS 1 $1000.00 $1000.00 25 3211.0121 4"Flexible Base Type A,GR-2 32 11 23 SY 175 $28.50 $4987.50 26 3211.0400 Hydrated Lime 32 11 29 TN 128 $155.00 $19840.00 27 3211.05016"Lime Treatment 32 11 29 SY 6735 $3.00 $21480.00 28 3212.0302 2"Asphalt Pvmt, Type D 32 12 16 SY 246 $26.00 $6396.00 29 3212.0505 8"Asphalt Base,Type B 32 12 16 SY 246 $52.00 $12792.00 30 3213.0101 6"Conc Pvmt 32 13 13 SY 6300 $32.00 $211113.00 31 3213.0501 Barrier Free Ramp,Type R-1 32 1320 Ea 4 $1230.00 $4920.00 32 3217.0001 4"SLD Pvmt Marking HAS 32 1723 LF 230 $ 5.77 $1327.10 (W 33 3471.0001 Traffic Control 3471 13 Mo 4 $500.00 $2000.00 34 3217.0202 8"SLD Pvmt Makin HAS(Y) 32 1723 LF 80 $11.55 $924.00 35 3305.0107 Manhole Adjustment Minor 33 05 14 Ea 13 $150.00 $1950.00 36 3305.0111 Valve Box Adjustment 33 05 14 Ea 4 $100.00 $400.00 37 3305.0206 Imported Embed ment/Backfi1], 3305 10 CY 240 $15.00 $3600.00 Acceptable Backfill 38 9999.0001 End of Road Barricade LF 56 $50.00 $2800.00 39 3211.01216"Flexbase 32 11 23 SY 174 $17.50 $3045.00 40 3123.0102 Unclassified Excavation by 3 l 23 16 CY 100 $36.50 $3650.00 Survey TOTAL PAVING IMPROVEMENTS $302,224.60 ,a N 19 20 24 23 2 21 00.KSy THIS D � S ♦ 21 100 0 100 20 14 �l 13 r— 20 GRAPHIC SCALE:1 IN=100 FT. A 11 15 19 16 #+ — STREET LIGHT 16 17 ♦ — STREET NAME SIGN SAAWSH BAY DR 17 18 *+ ' 16 19 -- -- z 15 20 d 14 21 13 THOM"CROSSIMG OR, V?i\ ©22 --_'- 12 23 11 24 1 25� y10 27C 278 27A 27 ( 26 \ y 9 s�TfftRH OJAXg OR MFR14N DR- 8 1 6 2 3 4 , 5 EXHIBIT C OWNER/DEVELOPER: THOMAS CROSSING, LLC STREET LIGHTS/SIGNS P.O. BOX BURLESON, TT X. 76097 (817) 426-3113 tcllc®ool.com THOMAS CROSSING PHASE SIX CiviiSolutions Inc Engineers Surveyors Planners P.O. Box 100247, Fort Worth,Texas,76185 (817)423.0060 (817)346-0520 Fax OCTOBER 2014 Texas Rcerlsed rveying Firnoring Firm 067897 Texas l.icensed Surveying Firm 100062-rJ0 Copyright 2014 CivilSolutions Inc 12-021 ESTIMATE STREET LIGHTS Project Item Information Bidder's Proposal UNIT V: STREET LIGHTING IMPROVEMENTS 41 2605.3001 l '/4" Schedule 80 Conduit LF 1358 $7.05 $9,573.90 in open cut 42 3441.3401 6-6-6 Triplex Alum Elec. 3441 20 LF 4074 $1.25 $5,092.50 Conductor 43 3441.1401 No 4 Triplex OH Insulated 3441 10 LF 140 $3.25 $455.00 Elec Condr 44 3441.1501 Ground box Type B 34 41 10 Ea 2 $325.00 $750.00 43 3441.3002 Rdwy Illum Assmbly TY 3441 20 Ea 10 $2,098.40 $20,984.00 8, 11,D-25, and D-30 (AT130-3013- TYP2-70W-W WLED) 44 3441.3323 Furnish/Install 8' Wood 34 41 20 Ea 2 $340.00 $340.00 Light Pole Arm 45 3441.3301 Roadway Illum. Foundation 3441 20 Ea 10 $750.00 $7,500.00 TY 1,2,and 4 TOTAL STREET LIGHTING IMPROVEMENTS $44,695.40 TOTAL AMOUNT $44,695.40 THOMAS CROSSING-PHASE SIX CITY OF FORT WORTH CITY PROJ ECT NO.02299 STANDARD CONSTRUCTION BID FORM-DEVELOPER AWARDED PROJECTS 00 42 43 Bid Form-DAP.docx Form Revised April 2,2014