HomeMy WebLinkAboutContract 25775 CIN SECRET SPECIFICATIONS OITY SEC ARS CONTRAC-i No Y D.O.E. FILE AND CONTRACTOWS BONDING 6NTRACT DOCUMENTS CONSTRUCTION'S COPY FOR CLIENT DEPARTMENT NORTH BEACH STREET N.S. III PUMP STATION EXPANSION WATER DEPARTMENT PROJECT NO. PW77-060770140490 O DEPARTMENT OF ENGINEERING PROJECT NO. 2923 1'U BOB TERRELL KENNETH BARR CITY MANAGER MAYOR HUGO A. MALANGA, P.E. LEE C. BRADLEY DIRECTOR DIRECTOR TRANSPORTATION AND WATER DEPARTMENT PUBLIC WORKS MIKE GROOMER A. DOUGLAS RADEMAKER, P.E. ASST. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING NOVEMBER 1999 orm 111 4055 INTERNATIONAL PLAZA, SUITE 200 FREESE-NICHOLS FORT WORTH, TEXAS 76109- 4895 (817) 735-7300 F&N No. FTW99425 OFFICIAL HCORD C6"SEC °ff City of Fort Worth, Texas "01601f Andcommunication Coundt DATE REFERENCE NUMBER LAG NAME PAGE 4/4/00 C-17971 3000NTROL 1 of 2 SUBJECT AWARD OF UNIT 1 CONTRACT TO CONTROL SPECIALISTS, INC. AND UNIT 2 CONTRACT TO B&H UTILITIES, INC. FOR NORTH SIDE III NORTH BEACH STREET PUMP STATION EXPANSION AND 36-INCH WATER LINE INSTALLATION RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute construction contracts with Control Specialists, Inc. for $713,790 and B&H Utilities, Inc. for $368,000 for a total project amount of $1,081,790. These awards are for the construction of North Side III North Beach Street Pump Station Expansion and 36-Inch Water Line Installation. DISCUSSION: On October 19, 1999 (M&C C-17702), the City Council authorized the City Manager to execute an amended engineering services agreement with Freese & Nichols, Inc. for design of the City of Fort Worth North Side IIYI North Beach Street Pump Station expansion and 36-inch water line installation. These improvements provide a means of supplying additional water to the North Side III pressure plane to meet the increasing water service demands. The improvements are as follows; Unit I - improvements include yard piping, 1,400 linear feet of 36-inch water line and water line connections. Unit 2 - improvements include the expansion of the pump station. This project was advertised for bid November 18 and 24, 1999. On December 23, 1999, the following bids were received: F BIDDER UNIT 1 AMOUNT TIME OF COMPLETION Control Specialists, Inc. $713,790.00 40 Calendar Days B&H Utilities, Inc. $828,616.00 Architectural Utilities, Inc. $913,458.00 Oscar Renda Contracting, Inc. $953,213.00 BIDDER UNIT 2 AMOUNT TIME OF COMPLETION Architectural Utilities, Inc." $292,000.00 Oscar Renda Contracting, Inc." $246,300.00 B&H Utilities. Inc. $368.000.00 100 Calendar Days Control Specialists, Inc. $383,000.00 " Oscar Renda Contracting, Inc. and Architectural Utilities, Inc. failed to submit their M/WBE utilization forms within the prescribed time as set forth in the City's bid package. Failure to do so resulted in their bids being considered as non-responsible and therefore disqualified them from being awarded this project. City of Fort Worth, Texas "floor And council Communication DATE REFERENCE NUMBER LOG NAME PAGE 4/4/00 C-17971 3000NTROL 2 of 2 SUBJECT AWARD OF UNIT 1 CONTRACT TO CONTROL SPECIALISTS, INC. AND UNIT 2 CONTRACT TO B&H UTILITIES, INC. FOR NORTH SIDE III NORTH BEACH STREET PUMP STATION EXPANSION AND 36-INCH WATER LINE INSTALLATION Staff recommends that this project be awarded as described so that the work can be completed prior to this summer's high water demand. The project is located in COUNCIL DISTRICT 2. In addition to the contract cost, $75,725 is required for inspection and survey and $32,453 is provided for project contingencies. Control Specialists, Inc. is in compliance with the City's M/WBE Ordinance by committing to 35% M/WBE participation. The City's goal for Unit 1 is 14%. B&H Utilities, Inc. is in compliance with the City's M/WBE Ordinance by committing to 10% M/WBE participation. The City's goal for Unit 2 is 10%. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper Water Fund. MG:j Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 APQROVFO Originating Department Head: CITY COUNCIL A.Douglas Rademaker 6157 (from) APR 4 20M PW77 541200 060770140490 $1,081,790.00 ��11 Additional Information Contact: City Secretary of the A.Douglas Rademaker 6157 City of Fort Worth.Texas SPECIFICATIONS AND CONTRACT DOCUMENTS FOR NORTH BEACH STREET N.S. III PUMP STATION EXPANSION WATER DEPARTMENT PROJECT NO. PW77-060770140490 DEPARTMENT OF ENGINEERING PROJECT NO. 2923 BOB TERRELL KENNETH BARR CITY MANAGER MAYOR a HUGO A. MALANGA, P.E. LEE C. BRADLEY DIRECTOR DIRECTOR TRANSPORTATION AND WATER DEPARTMENT PUBLIC WORKS MIKE GROOMER A. DOUGLAS RADEMAKER, P.E. ASST. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING PSE�F j�Xgs�1 *5�• r� NOVEMBER 1999 PWO .Y E:CAMPS L 0- 8101 81011 �; '1��' 4055 INTERNATIONAL PLAZA, V\t E•N HOLS SUITE 200 F FORT WORTH, TEXAS 1 76109- 4895 (817) 735-7300 - =' 'a ` F&N Ng� __X99425 F .> .d t . . '9lGISTE`'" JOHN F.DEWAR . 80059 �• / !W' — r CITY OF FORT WORTH NORTH BEACH STREET NS III PUMP STATION EXPANSION WATER DEPT. PROJECT NO. PW77-060770140490 DEPT. OF ENGINEERING PROJECT NO. 2923 FREESE AND NICHOLS PROJECT NO. FTW99425 OF rZ,4Ztt ADDENDUM NO. 1 5;.. •. .s It December 10, 1999 THOMAS W.HASTER o The time for the submission of Bids has been changed to Thursday,Decemb�"�3;19 GIST......... The location for the submission of bid is unchanged. tti'���C)NAI. BID DATE: Thursday,December,23, 1999, 2:00 pm The following additions, deletions,modifications, or clarifications shall be made to the appropriate sections of the plans and specifications and shall become apart of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. r BIDDING REQUIREMENTS: Al-1 PART B -PROPOSAL Modification: Delete this section and replace it with the PROPOSAL included with this Addendum. The revised form is to be attached to the contract documents and submitted with the Bid. Al-2 PART C-GENERAL CONDITIONS Addition:Insert"SECTION Cl:SUPPLEMENTARY CONDITIONS TO PART C-GENERAL CONDITIONS"included with this Addendum. Al-3 PART D-SPECIAL CONDITIONS Modification:Modify SPECIAL CONDITIONS by deleting the"City of Fort Worth Highway Construction Prevailing Wage Rate for 1995", and adding the following "City of Fort Worth Highway Construction Prevailing Wage Rate for 1999" included with this Addendum. TECHNICAL SPECIFICATIONS: A1-4 SECTION 11210-INSTRUMENTATION A. Reference Page 1,Paragraph 1.02,A. Addition: Include Peerless Pumps as an acceptable pump manufacturer. Al-5 SECTION 16900-INSTRUMENTATION Addendum No. 1 00900-1 FTW99425 e A. Reference Page 5,Paragraph 2.05,E. Modification: Delete paragraph E in its entirety and replace with the following, "E. The chlorine residual analyzers shall be Capitol Controls." Al-6 ADD THE FOLLOWING SECTIONS: 15078 MISCELLANEOUS PIPING AND APPURTENANCES 15136 MISCELLANEOUS VALVES 16111 CONDUITS y DRAWINGS: Al-7 SHEET 6 OF 33 A. Reference: Section A. Modification: Delete the Y-9" dimension call-out from the centerline of the existing 24" gate valve to the buried joint,and replace with a single joint of pipe from the connection to existing piping to the new 24" 90 degree bend. Addition:Add the following as Note 15 of the General Notes-"Contractor shall field verify the location,line,and grade of the existing piping connections and will be responsible for removal of existing concrete blocking as required to connect to the existing piping". B. Reference: General Notes Addition:Add Note 15,"All exposed discharge piping for the pump station shall be ductile iron pipe". Al-8 SHEET 23 OF 33 A. Reference: Foundation Plan Modification:Change dimension of penetration through the floor of discharge piping from wall from T-4" to 6'-4". Al-9 REPLACE THE FOLLOWING SHEETS REPLACE SHEET WITH SHEET 2 of 33 Site Plan 2A of 33 Site Plan 3 of 33 Piping Layout-Stage I 3A of 33 Piping Layout- Stage I 4 of 33 Piping Layout-Stage II 4A of 33 Pump Station Expansion -Stage II 5 of 33 Pump Station Plan 5A of 33 Pump Station Plan 7 of 33 Profiles Water Line `A' and 7A of 33 Profiles Water Line `A' and Water Line `B' and Misc. Water Line `B' and Misc. Details Details 8 of 33 Concrete Overflow Structure 8A of 33 Concrete Overflow Structure 9 of 33 21"Waterline Modification 9A of 33 21"Waterline Modification 12 of 33 Plan &Profile -24"Water 12A of 33 Plan&Profile-24" Water Line-Sta 0+00 to Sta 10+00 Line-Sta 0+00 to Sta 10+00 13 of 33 Plan &Profile -24"Water 13A of 33 Plan&Profile-24" Water Line-Sta 10+00 to Sta Line-Sta 10+00 to Sta Addendum No. 1 00900-2 FTW99425 •- r 15+05.22 14+56 15 of 33 Miscellaneous Details 15A Of 33 Miscellaneous Details 26 of 33 Electrical Site Plan 26A of 33 Electrical Site Plan 30 of 33 Electrical Details 30A of 33 Electrical Details END OF ADDENDUM NO. 1 Addendum No. 1 00900-3 +� FTW99425 PART B - PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: Mr. Bob Terrell City Manager City of Fort Worth, Texas r FOR: NORTH BEACH STREET N.S. III PUMP STATION EXPANSION WATER DEPARTMENT PROJECT NUMBER PW77-060770140490 DEPARTMENT OF ENGINEERING PROJECT NUMBER 2923 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of all improvements and appurtenant work shown in the plans and specification, all necessary appurtenances and incidental work to provide a complete and serviceable project. Pursuant to the foregoing "Notice to Bidders", the undersigned bidder, having thoroughly examined the contract documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, and Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenant work, complete in place, the following items): lop A FTW99425 B-1 V. r NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT ONE - YARD PIPING, 36-INCH WATERLINE, WATERLINE CONNECTIONS 1. 1 LS Yard Piping for Pump Station Including Piping, Fittings and Appurtenances for Pump Station Site Dollars T and Cents per LS $ $ 2. 1 EA 16" Gate Valve and Valve Vault Including Appurtenant Piping and Equipment Dollars and Cents per EA $ $ 3. 1 EA Remotely Operated Motor Operated 16" Butterfly Valve and Operator Stand Installed with NS II / ES II Transfer Meter Vault Including Appurtenant Piping and Equipment Dollars and Cents per EA $ $ 4. 2 EA Meter Vaults Including 8" Bypass Piping, 2 - 16" Isolation Gate Valves and Vaults, Fire Hydrant Assembly, Appurtenant Piping and Equipment Dollars and Cents per EA $ $ FTW 99425 B-2 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION _* PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 5. 1 LS For Chlorine Analyzer, Water Sample Station, Ph/Temperature Meter and Pressure Transmitter and Appurtenances to be Installed in the New NS III Meter Vault on Discharge Side of Pump Station -, Dollars and Cents per LS $ $ 6. 1 LS Tie-In to Existing 24" Waterline and Existing 16" Discharge Piping with New 16" x16" Tee and New 16" x 24" Reducer (Sheet 3A) Dollars and Cents per LS 7. 1 LS For.Connection to Existing 30" Suction Header at Line "A" Sta 2+48 (Sheet 3A) Dollars and Cents per LS $ $ 8. 1 LS For Connection to Existing 24" Waterline at Line "B" Sta 0+00 (Sheet 3A) Dollars and Cents per LS $ $ FTW 99425 B-3 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 9. 1 LS For Modifications to the 21" Waterline (Sheet 9A) Including All Piping, 12" Gate Valve, Fire Hydrant T Assembly, Fittings and Appurtenances Dollars and Cents per LS $ $ 10. 1,403 LF 36" Waterline Including Piping, Fittings, Closure Pieces, Joint Restraint, and Appurtenances Dollars and Cents per LF $ $ 11. 1 LS Work Performed by H.S.Q. to Complete Stage One - Piping Plan as Specified and Shown on the Drawings Dollars and Cents per LS $ $ 12. 1 LS For Electrical Work Required to Complete the Stage One - Piping Plan as Specified and Shown on the Drawings Including All Provisions for Temporary Power Dollars and Cents per LS $ $ 13. 1,738 LF Trench Safety System Dollars and Cents per LF $ $ FTW 99425 B-4 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 14. 1 LS Install and Maintain Erosion and Sediment Control During Entire Construction Period Dollars and Cents per LS $ $ 15. 1 LS Post Construction Hydro-Mulch Seeding For All Areas Disturbed During Construction Activities Dollars and Cents per LS $ $ 16. 1 LS ADD/<DEDUCT> For All Additional Work Required to Complete Stage One Piping Plan as Specified and Shown on the Drawings but Not Included in Other Items Dollars and Cents per LS $ $ FTW 99425 B-5 , r NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT TWO - N.S. III PUMP STATION EXPANSION 17. 1 LS New Pump Building Including Precast Concrete Panels, Roofing, Concrete Slab, Pump Bases, Tie-Ins to Existing 4" Sanitary Sewer and Appurtenances Dollars and Cents per LS $ $ 18. 1 LS New Pumps, Piping, Pump Control Valves, Motors and Appurtenances Dollars and Cents per LS $ $ 19. 1 LS Overflow Structure for Drain Line at Existing 5 MG Ground Storage Tank Dollars and Cents per LS $ $ - 20. 1 LS Work Performed by H.S.Q. to Complete Stage Two - Pump Station Plan as Specified and Shown on the Drawings Dollars and Cents per LS $ $ i FTW99425 B-6 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION -- PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 21. 1 LS ADD/<DEDUCT> For All Additional Work Required to Complete Stage Two Pump Station Plan as Specified and Shown on the Drawings but Not Included in Other Items Dollars and Cents per LS $ $ ALTERNATE BID ITEM 22. 1 EA 30" Butterfly Valve and Valve Vault Including Appurtenant Piping and Equipment Dollars and Cents per EA $ $ BID SUMMARY FOR NORTH BEACH N.S. III PUMP STATION EXPANSION TOTAL FOR UNIT ONE (Bid Items 1 through 16) $ TOTAL FOR UNIT TWO (Bid Items 17 through 21) $ ALTERNATE BID ITEMS (Bid Item 22) $ BASE BID TOTAL (Bid Items 1 though 21) $ ALTERNATE BID TOTAL (Bid Items 1 through 22) $ " 36" waterline pipe shall be in accordance with City of Fort Worth Water Department specification E1-4 or E1-6. Bidder/Contractor shall check the pipe material to be used for 36" diameter waterline pipe and yard piping. [ ] E1-4 Concrete Pressure Pipe and Fittings [ ] E1-6 Ductile Iron Pipe FTW99425 B-7 a � 1 i PART B - PROPOSAL (continued) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of five (5%) percent is to become the property of the City of Fort Worth, Texas, in the event the contract or bonds are not executed and delivered within the time above set forth, �- as liquidated damages for delay and additional work caused thereby. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned bidder certifies that he agrees the OWNER reserves the right to award either Unit 1 or Unit 2, or both Unit 1 and Unit 2, or neither Unit 1 or Unit 2, and that individual line items may be deleted from the Proposal from either Unit 1 or Unit 2 to arrive at the most advantageous bid total for the OWNER. Alternate bid items may be added to or deleted from the contract by the Owner. The work includes furnishing all materials, tools, equipment, transportation, services and all labor and superintendence for the construction as indicated in the Contract Documents. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin work on the Contract and to complete all work on the Contract within the time set forth in Part D - Special Conditions, "Completion Time". (Complete A or B below, as applicable:) [ ] A. The principal place of business of our company is in the State of 1� [ ] Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [ ] ' Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. [ ] B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. P FTW99425 B-8 +� r Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 Respectfully submitted, (SEAL) By: If Bidder is Corporation Title: Address: „ FTW99425 B-9 WP SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C- GENERAL CONDITIONS A. General These Supplementary Conditions amend or supplement the General Conditions of the f` Contract and other provisions of the Contract Documents as indicated below. Provisions G which are not so amended or supplemented remain in full force and affect. B. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Page C3-3 (1), should be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. C. C3-3.7 BONDS: Page C3-3 (3), the paragraph after subparagraph d. Change the paragraph to read as follows: "No sureties will be accepted by the owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and the surety shall be acceptable to the owner. In order for a surety to be acceptable to the City, (1) the name of the surety shall be included on the current U.S. Treasury List of Acceptable Sureties (Circular 870), or (2) the surety must have capital and surplus equal to ten times the amount of the bond. The surety must be licensed to business in the state of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/10) of the total capital and surplus. If reinsurance is required, the company writing the reinsurance must be authorized, accredited or trusteed to do business in Texas." D. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the,following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such Revised Pg. 1 6/04/99 materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than$400,000 at the time of execution, retainage shall be ten per cent (101/6). For contracts of$400,000 or more at the time of execution, retainage shall be five percent(5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered •- following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. E. C3-3.11 INSURANCE: Page C3-3 (5): Delete subparagraph "a. COMPENSATION INSURANCE" F. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" G. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), should be deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of or alleged to arise out of the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in partby the negligence or alleged negligence of Owner, its officers, servants, or employees Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor Revised Pg. 2 �„ 6/04/99 either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. Revised Pg. 3 6/04/99 CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 1999 CLASSIFICATION HOURLY RATE AIR TOOL OPERATOR $9.00 ASPHALT RAKER 9.55 lo` ASPHALT SHOVELER 8.80 BATCHING PLANT WEIGHER 11.51 CARPENTER 10.30 CONCRETE FINISHER-PAVING 10.50 ` CONCRETE FINISHER-STRUCTURES 9.83 CONCRETE RUBBER 8.84 ELECTRICIAN 15.37 FLAGGER 7.55 FORM BUILDER-STRUCTURES 9.83 FORM LINER-PAVING&CURB 9.00 FORM SETTER-PAVING&CURB 9.24 FORM SETTER-STRUCTURES 9.09 LABORER-COMMON 7.32 LABORER-UTILITY 8.94 MECHANIC 12.68 OILER 10.17 SERVICER 9.41 PAINTER-STRUCTURES 11.00 PIPE LAYER 8.98 BLASTER 11.50 ASPHALT DISTRIBUTOR OPERATOR 10.29 ASPHALT PAVING MACHINE 10.30 BROOM OR SWEEPER OPERATOR 8.72 BULLDOZER 10.74 CONCRETE CURING MACHINE 9.25 CONCRETE FINISHING MACHINE 11.13 CONCRETE PAVING JOINT MACHINE 10.42 CONCRETE PAVING JOINT SEALER 9.00 CONCRETE PAVING SAW 10.39 CONCRETE PAVING SPREADER 10.50 SLIPFORM MACHINE OPERATOR 9.92 s CRANE,CLAMSHELL,BACKHOE,DERRICK,DRAGLINE,SHOVEL 11.04 FOUNDATION DRILL OPERATOR CRAWLER MOUNTED 10.00 FOUNDATION DRILL OPERATOR TRUCK MOUNTED 11.83 FRONT END LOADER 9.96 .. MILLING MACHINE OPERATOR 8.62 • MIXER 10.30 MOTOR GRADER OPERATOR FINE GRADE 11.97 MOTOR GRADER OPERATOR 10.96 PAVEMENT MARKING MACHINE 7.32 ROLLER,STEEL WHEEL PLANT-MIX PAVEMENTS 9.06 ROLLER,STEEL WHEEL OTHER FLATWHEEL OR TAMPING 8.59 ROLLER,PNEUMATIC,SELF-PROPELLED SCRAPER 8.48 .. SCRAPER 9.63 TRACTOR-CRAWLER TYPE 10.58 TRACTOR PNEUMATIC 9.15 TRAVELING MIXER 8.83 r• � CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 1999 CLASSIFICATION HOURLY RATE WAGON-DRILL,BORING MACHINE 12.00 REINFORCING STEEL SETTER-PAVING 13.21 REINFORCING STEEL SETTER-STRUCTURES 13.31 STEEL WORKER-STRUCTURAL 14.80 SPREADER BOX OPERATOR 10.00 .3 WORK ZONE BARRICADE 7.32 TRUCK DRIVER-SINGLE AXLE LIGHT 8.965 TRUCK DRIVER-SINGLE AXLE HEAVY 9.02 TRUCK DRIVER-TANDEM AXLE SEMI TRAILER 8.77 TRUCK DRIVER-LOWBOY/FLOAT I0.44 TRUCK DRIVER-TRANSIT MIX 9.47 TRUCK DRIVER-WINCH 9.00 VIBRATOR OPERATOR-HAND TYPE 7.32 WELDER 11.57 4 y 15078 MISCELLANEOUS PIPING AND APPURTENANCES 1.00 GENERAL 1.01 WORK INCLUDED Furnish labor,materials,equipment and incidentals necessary to install miscellaneous piping, fittings, and appurtenances. 1.02 QUALITY ASSURANCE [Not Used] 1.03 SUBMITTALS Submittals shall be in accordance with Section 01300, SUBMITTALS and shall include: 1. Shop drawings 1.04 STANDARDS [Not Used] 1.05 DELIVERY AND STORAGE [Not Used] 1.06 JOB CONDITIONS [Not Used] 1.07 OPTIONS [Not Used] 1.08 GUARANTEES [Not Used] 2.00 PRODUCTS - 2.01 MATERIALS [Not Used] 2.02 MIXES [Not Used] 2.03 FABRICATIONS [Not Used] 2.04 MANUFACTURED PRODUCTS [Not Used] 2.05 COPPER PIPE AND FITTINGS A. Copper pipe for water service shall be Type "K" hard-drawn copper tubing. Connections shall be made using cast brass or copper sweat fittings and Sil-Fos or approved equal hard solder. Union adaptors shall be used at ends of copper lines and at connections to equipment so that piping can be disconnected without unsoldering the joints. B. Joints in copper piping shall be soldered with ANSIIASME B32, Grade 95TA solder. Before making up joints,copper shall be cleaned to bright metal with emery cloth and treated with nonacid type flux. Miscellaneous Piping and Appurtenances 15078-1 FTW99425 " r 2.06 PIPE COUPLINGS A. Dresser style pipe couplings where shown on the Plans shall be Dresser Industries or approved equal, for same pressure rating as adjoining pipe. Couplings shall comprise a steel center band, steel gland rings, gaskets,and bolts. Provide thrust harness as detailed where shown on the Plans. 2.07 FLOOR DRAIN Floor drains shall be cast iron of the sizes indicated. Drain design shall allow height adjustment prior to concrete slab placement. Floor drains shall installed at the locations indicated on the drawings. Contractor shall install P-trap for connections to existing drain lines and sewer lines. 2.09 PIPE SUPPORTS Adjustable pipe supports under valves and piping shall be Grinnell Figure 264 or approved equal,comprising cast iron saddle, threaded nipple, and reducer assembly with extra strength steel pipe and floor flange. For special sizes and shapes of valves, saddle shall be fabricated steel to fit valve or piping being supported. 3.00 EXECUTION 3.01 PREPARATION [Not Used] y 3.02 INSTALLATION Piping shall be carefully handled and installed to prevent damage to the pipes. Potable water lines shall be disinfected in accordance with Section 01656, DISINFECTION. y 3.03 FIELD QUALITY CONTROL Lines shall be tested for leaks. Leaks and defects shall be repaired or replaced, and re-tested until no leaks or defects are discovered. 3.04 CLEAN AND ADJUST [Not Used] 3.05 SCHEDULES [Not Used] END OF SECTION Miscellaneous Piping and Appurtenances 15078-2 FTW99425 s 15136 MISCELLANEOUS VALVES 1.00 GENERAL 1.01 WORK INCLUDED Furnish labor,materials,equipment and incidental necessary to install miscellaneous valves. 1.02 QUALITY ASSURANCE [Not Used] 1.03 SUBMITTALS Submittals shall be in accordance with Section 01300, SUBMITTALS and shall include: 1. Shop drawings 2. Operation and Maintenance Manuals 1.04 STANDARDS [Not Used] 1.05 DELIVERY AND STORAGE [Not Used] 1.06 JOB CONDITIONS [Not Used] 1.07 OPTIONS [Not Used] 1.08 GUARANTEES [Not Used] 2.00 PRODUCTS 2.01 MATERIALS [Not Used] 2.02 MIXES [Not Used] 2.03 FABRICATIONS [Not Used] 2.04 MANUFACTURED PRODUCTS [Not Used] 2.05 FLAP VALVES A. Flap valves shall be circular flange framed, with machined back flange for attachment to flanged piping. Body and flap shall be cast iron,ASTM A-126-B. Resilient seat shall be '. neoprene or Buna-N bonded in a groove machined in the body. Hinge arms shall be high- tensile bronze, ASTM B-584-CA865 with two pivot points, an adjustable lower pivot with limited rotation and a threaded upper hinge post to adjust flap valve sensitivity. A lubrication fitting shall be supplied for each pivot. Hinge pins shall be silicon bronze, ASTM B-98-CA655 or Type 304 Stainless Steel. Miscellaneous Valves 15136-1 l+rW99425 v e _ B. Equip flap valve with a lever arm with an adjustable counter weight to securely seat flap in the closed posistion with the valve installed with the back flange facing in the vertical direction. Flap valve shall be designed to.open when differential head across the flap is 0.3'or less. C. Flap valve shall be Rodney Hunt Series FV-AC,Waterman Equal Model, or equal. 3.00 EXECUTION -- 3.01 PREPARATION [Not Used] 3.02 INSTALLATION Carefully handle and install valves in a manner that prevents damage to any part of the valves. Install valves in accordance with the Manufacturer's instructions. 3.03 FIELD QUALITY CONTROL [Not Used] 3.04 CLEAN AND ADJUST [Not Used] 3.05 SCHEDULES [Not Used] END OF SECTION Miscellaneous Valves 15136-2 FTW99425 - - 16111 CONDUITS 1.00 GENERAL 1.01 WORK INCLUDED Furnish labor,materials, equipment and incidentals necessary to install a complete conduit system for each type of electrical system. Electrical work shall be in accordance with Section 16010, GENERAL ELECTRICAL REQUIREMENTS. 1.02 SUBMITTALS No submittals required. 1.03 STANDARDS The applicable provisions of the following standards shall apply as if written here in their entirety: ANSI C80.1 Rigid Steel Conduit,Zinc-Coated i ANSUNEMA FB 1 Fittings and Supports for Conduits and Cable Assemblies N. NEMA RN 1 PVC Extemally-Coated Galvanized Rigid Steel Conduit and Electrical Metallic Tubing NEMA TC 3 PVC Fittings for Use with Rigid PVC Conduit and Tubing 2.00 PRODUCTS 2.01 MANUFACTURED PRODUCTS A. RIGID ALUMINUM CONDUIT: Heavy wall, aluminum alloy 6063; low temper number,tube, free from defects and manufactured in accordance with ANSI C80.5 standards and U.L. listed. Acceptable manufacturers shall be Vaw, Western, and Alumax. i B. PVC COATED RIGID STEEL: Meeting the requirements of rigid steel conduit, 40 mil PVC,exterior coating and 2 mil red urethane interior coating. Acceptable Manufacturers shall be Rob Roy Plastibond Red, Ocal and Perma-Cote. C. FLE)UBLE METAL CONDUIT: 1. FOR USE WITH GALVANIZED CONDUIT: Single strip, helically wound, interlocking, galvanized steel, in accordance with Fed. Spec. WW-C-566 and U.L. listed. Liquid tight conduit shall have an extruded, polyvinyl jacket over the Conduits 16111-1 �" FTW99425 S q - flexible metal. Acceptable product shall be Anaconda Type U.A. D.. RIGID NONMETALLIC CONDUIT: Schedule 40 and Schedule 80 high impact, .. polyvinylchloride, in accordance with Fed. Spec. W-C-1094 and U.L. listed. Acceptable manufacturers shall be Carlon, Cantex, and Certainteed. E. FITTINGS AND CONDUIT BODIES: 1. RIGID METAL CONDUIT: Threaded type material to match the conduit, in accordance with ANSI/NEMA FBI and as manufactured by Appleton Foran 35, Killark"O" Series, Crouse Hinds, OZ Gedney, or RACO. 2. FLEXIBLE AND LIQUID TIGHT FITTINGS: In accordance with ANSI/NEMA FB 1; cadmium-plated,malleable iron body and nut; cadmium steel ferrule; insulated throat; integrally-cast, external ground lugs, as manufactured by Appleton "ST" series, Hubbel, OZ Gedney Type 4QL, or RACO. 3. PVC CONDUIT: Solvent-welded,slip-on joints, in accordance with NEMA TC3, as manufactured by Carlon, CertainTeed. F. ELBOW AND BENDS: Rigid,nonmetallic conduit system shall use PVC-coated rigid steel for conduits 2" and larger for all bends greater than 45 degrees. Other conduit systems shall use the same material as the conduit with which they are installed. G. BUSHINGS: High impact,thermosetting,phenolic insulation; 150 degrees C.; as manufactured by Appleton "BBUH",Blackburn, or OZ Gedney type A. H. GROUNDING BUSHINGS: Conduit grounding bushings shall consist of a malleable iron,insulated throat conduit bushing with an attached aluminum set screw lug. Grounding bushing shall comply with Fed. Spec. W-F-408b and W-W-C-581 d, UL Standards 514B and 467, and shall be Crouse Hinds Lazy Lug or approved equal. I. LOCKNUTS: Zinc-plated or cadmium-plated,malleable iron, as manufactured by Appleton "BL", OZ Gedney, RACO, or Steel City. J. HUBS: STEEL CONDUIT: Cadmium-plated,malleable iron with tapered threads, a neoprene "O"ring and an insulated throat, as manufactured by Appleton "HUB", Myers type St., OZ Gedney,type CH-T. K. CONDUIT THROUGH-WALL AND FLOOR SEAL: Malleable iron body with oversized sleeves, sealing ring,pressure clamp and rings and sealing grommet; hex head cap screw, as manufactured by OZ Gedney,type FSK. L. SMOKE AND FIRE SEALS: Material shall be intumescent, one (1) part(requiring no mixing) and capable of expanding up to a minimum of eight(8) times. Material shall be U.L. classified with a fire rating equal to or greater than the penetrated number. Products Conduits 16111-2 - FTW99425 s to be in caulk,putty,wrap strip,sheet, or access kit form and shall be 3M "Fire Barrier". M. END BELLS: Hot-dipped,galvanized,threaded,malleable iron, as manufactured by OZ Gedney type TNS. N. EXPANSION FITTINGS: Hot-dipped,galvanized, malleable iron with bonding ' jumpers. Linear expansion fittings shall be OZ Gedney Zx for rigid, metal conduit or Appleton "XJ" series. Combination linear and deflection expansion fittings shall be OZ Gedney type AXDX. O. THREADED NIPPLES: As manufactured by Allied, Triangle or Steel Duct. Conduit nipples shall have two(2) independent sets of threads. Running threads shall not be used. Utilize the conduit union when joining two (2) fixed conduits in a continuous run. P. ESCUTCHEONS: Chrome-plated, sectional floor and ceiling plates, as manufactured by Crane No. 10. Q. ACCESSORIES: Reducers,washers, etc.,shall be cadmium-plated,malleable iron. R. IDENTIFYING TAPE FOR BURIED CONDUITS: 6"wide,polyethylene with continuous printing along the length of the tape, as manufactured by Brady "Identoline" or Sentry Lin "Terra Tape". Use red with black letters for buried electrical power conduits. Use green with black letters for buried electric instrumentation and communication conduits. S. WEATHERHEADS: Weatherheads shall be threaded aluminum for threaded rigid conduit application and shall not be clamp type. Weatherheads shall be Crouse Hinds series F, O-Z type 17 or Appleton Series F. T. CONDUIT DRAINS: Conduit drains shall be Crouse Hinds ECD Universal, or approved equal. U. BURIED CONDUIT: PVC Schedule 40 or PVC coated rigid steel. V. ABOVE GRADE CONDUIT: Rigid Aluminum,unless noted otherwise. W. ALUMINUM CONDUIT IN CONCRETE: Aluminum conduit shall not be used in concrete. X. Conduit in concrete shall be Rigid Steel or PVC-coated Rigid Steel. Conduits 16111-3 FTW99425 3.00 EXECUTION 3.01 INSTALLATION A. Size conduits as required by the NEC for the number and sizes of wires to be drawn into the conduit. Conduits less than 3/4" shall not be used unless specified otherwise. B. Install the conduit at elevations which maintain headroom and at locations which avoid interference with other work requiring grading of pipe, the structure, finished ceiling, walls, etc. Avoid crossing other work. Do not place the conduits in close proximity to equipment, systems and service lines, such as the hot water supply and return lines or steam pipes which could be detrimental to the conduit and its contents. Maintain a minimum of 3" separation, except in crossing,which shall be a minimum of V. C. Prevent displacement by securely supporting the conduit which is to be concealed and installed in advance of other work. Carefully layout all conduit installed within the structure, such as in floors,beams and walls to avoid densities excessive for the F0 construction. D. Cut the conduit square with a saw. Ream, deburr and swab the inside of the conduit before installing the conductors. Make bends and offsets in 1" and smaller conduit with approved bending devices. Use a hydraulic, one-shot conduit bender or factory elbows for bends in conduit larger than V. Use conduit bodies to make sharp changes in direction around ground beams. Install no more than four(4) 90 degree bends between boxes. E. Where space conditions prohibit the use of standard elbows, use cast ferrous alloy fittings to match the conduit construction. "Condulet" type fittings shall not be used on conduit containing#4 or larger wire. F. Make conduit joints mechanically tight and electrically continuous. Pitch the conduit in areas where moisture may be present to avoid creating moisture traps. Where indicated or necessary to prevent accumulation of water in the conduit,provide a junction box with a drain fitting at the conduit system's low point. G. Group the conduit in parallel runs where practical and use a conduit rack constructed of steel channels with conduit straps or clamps. Prove space for an additional 25%conduit. Route conduit inside building extents parallel to building lines. H. Route and suspend conduit crossing expansion or Seismic joints to permit expansion, contraction, and deflection utilizing approved fittings to prevent damage to the structure, conduit, and supporting devices. Combination expansion/deflection fittings shall be installed on conduits which are concealed when they cross expansion joints. Route conduit through roof openings for piping and ductwork where possible; otherwise,route through the roof with pitch pocket. Do not allow conduit to penetrate duct work. Do not install conduit exposed on the roof without prior permission from the Engineer. Conduits 16111-4 FTW99425 I. Connect motors, equipment containing motors, equipment mounted on isolated foundations, light fixtures and other equipment and devices which are subject to vibration and which require adjustment with a liquid-tight, flexible metallic conduit from the device to the conduit serving it. The maximum length of the flexible conduit shall be 3011, unless specifically instructed otherwise by the Engineer in writing. J. Install escutcheons on exposed conduits passing through interior floors,walls and ceiling. Install fire seals on conduit passing through fire-rated partitions, floors and ceilings. Install through-wall seals on conduit passing through exterior walls, or use standard,galvanized steel pipe sleeves with diameters 1/2" greater than the outside diameter of the sleeved conduit. Fill the annular space with oakum and the ends of the sleeve with fire-resistant compound. K. Install a sleeve for the conduit passing through the interior floors and insulated throat grounding bushings on conduit which is stubbed through slabs and foundations into electrical enclosures. L. Provide grounding for conduit, fittings and accessories. M. Use PVC coated, rigid steel,factory elbows for bends in PVC conduit runs which are longer than 100', or in PVC runs which have more that two bends, regardless of their length. N. Use double locknut construction on conduit which terminates at electrical enclosures, pull boxes,motor terminal enclosures, etc.,with an approved bushing over the conduit. Increase the length of the conduit threads at outlets and junction boxes wherever necessary to accommodate double locknuts and bushings. Seat all bushings fully against the end of the conduit. O. Generally, conduit runs shall not be installed in concrete slabs, but shall be installed in cushion sand below slabs. Where specifically indicated to be cast into concrete, conduits shall be rigid steel and shall be located in the middle between top and bottom reinforcing. Maintain a minimum of 1-1/2" concrete cover at all locations. The maximum size of conduit permitted to be embedded in slabs is 1". Do not route conduit in a manner to cross each other. Conduit shall have a minimum spacing of 1-1/2" apart. Unless specifically indicated, conduits shall not be placed in slabs on grade. P. Use PVC coated, rigid metal conduit for all conduits penetrating slabs. Where PVC coated, rigid steel or aluminum conduit joins a dissimilar conduit, the fittings shall also be PVC coated. PVC conduit in slabs shall be protected from mechanical damage by extending PVC coated rigid metal conduit a minimum of 12" into the concrete at the transition. Q. Use suitable conduit caps to protect installed conduit against entry of dirt and moisture. Conduits 16111-5 FTW99425 R. Install empty conduits in or below-slabs so that a threaded fitting with PVC plug is placed on each conduit and is flush with the concrete or finished floor surface. 3.02 UNDERGROUND DUCT BANK INSTALLATION A. Install top of duct bank minimum of 18"below finished grade. B. Install conduit with minimum grade of 4"per 100'. C. Terminate conduit in end bell at manhole entries. D. Stagger conduit joints in concrete encasement a minimum of 6" vertically. E. Use suitable separators and chairs installed not greater than 4' on centers. Band conduit together with suitable banding devices. Securely anchor conduit to prevent movement during concrete placement. F. Provide a minimum of 3" concrete cover at bottom,top, and sides of duct bank. G. Provide two No. 4 steel reinforcing bars in top of bank under paved areas. H. Color of concrete encasement shall be red. I. Duct bank trench shall be backfilled with material free from large rocks, paving material, or large angular substance. END OF SECTION Conduits 16111-6 PM FTW99425 TABLE OF CONTENTS 1. Part A - Notice to Bidders - Comprehensive Notice to Bidders 2. Special Instructions to Bidders 3. Minority and Women Business Enterprise Specifications 4. Part B - Proposal 5. Part C - General Conditions (City of Fort Worth) 6. Part D - Special Conditions 7. Part E - Material and Construction Specifications 8. City of Fort Worth Standard Certificate of Insurance 9. Contractor Compliance With Worker's Compensation Law . 10. Part F - Bonds (City of Fort Worth): a. Performance Bond b. Payment Bond C. Maintenance Bond 11. Part G - Contract (City of Fort Worth) Appendix A - Easements (See Special Conditions) Appendix B - Storm Water Pollution Prevention Plan PART A NOTICE TO BIDDERS PART A- NOTICE TO BIDDERS Sealed proposals for the following: FOR: NORTH BEACH STREET N.S. III PUMP STATION EXPANSION WATER DEPARTMENT PROJECT NUMBER PW77-060770140490 DEPARTMENT OF ENGINEERING PROJECT NUMBER 2923 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., Thursday, DECEMBER 16, 1999 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans and Specifications for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00). This deposit is refundable if the documents are returned in good condition within ten (10) days after the bids are opened. Additional sets may be purchased on a nonrefundable basis for fifty dollars ($50.00) per set. A majority of the work consists of the following: New Pump Station, Yard Piping, Electrical and SCADA Approximately 1,500 LF 24" Waterline and Appurtenances Included in the above will be all other items of construction as outlined in the Plans and Specifications. In accordance with City of Fort Worth Ordinance No. 13471 as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the ordinance can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included within these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render a bid non-responsive. In addition, the M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM, AND GOOD FAITH EFFORT FORM, as applicable, must be submitted within five (5) City business days after the bid opening. Failure to comply shall render a bid non-responsive. For additional information concerning this project, please contact Anthony Wilkins, Project Manager, at (817) 871-8047 or J.R. Baddaker, P.E. or Mike Brownlee, E.I.T., Freese and Nichols, Inc. at (817) 735-7300. Advertising Dates: November 18. 1999 November 24, 1999 FTW99425 A-1 COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: NORTH BEACH STREET N.S. III PUMP STATION EXPANSION WATER DEPARTMENT PROJECT NUMBER PW77-060770140490 DEPARTMENT OF ENGINEERING PROJECT NUMBER 2923 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., DECEMBER 16, 1999 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. . Plans and Specifications for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00). This deposit is refundable if the documents are returned in good condition within ten (10) days after the bids are opened. Additional sets may be purchased on a nonrefundable basis for fifty dollars ($50.00) per set. A majority of the work consists of the following: New Pump Station, Yard Piping, Electrical and SCADA Approximately 1,500 LF 24" Waterline and Appurtenances Included in the above will be all other items of construction as outlined in the Plans and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Award of Contract: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting Department of Engineering at (817) 871-7910. FTW99425 A-2 In accordance with City of Fort Worth Ordinance No. 13471 as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the ordinance can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included within these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render a bid non-responsive. In addition, the M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM, AND GOOD FAITH EFFORT FORM, as applicable, must be submitted within five (5) City business days after the bid opening. Failure to comply shall render a bid non-responsive. For additional information concerning this project, please contact Anthony Wilkins, Project Manager, at (817) 871-8047 or J.R. Baddaker, P.E. or Mike Brownlee E.I.T., Freese and Nichols, Inc. at (817) 735-7300. BOB TERRELL GLORIA PEARSON CITY MANAGER CITY SECRETARY Department of Engineering A. Douglas R maker, P.E. Director Advertising B Dates: : Y Rick Trice, P.E. November 18. 1999 Manager, Consultant Services November 24, 1999 FTW99425 A-3 SPECIAL INSTRUCTIONS TO BIDDERS 1. PREQUALIFICATION REQUIREMENTS: A current financial statement, an acceptable experience record and an acceptable equipment schedule must be filed with the director of the Water Department at least one week prior to the hour for opening bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Proposals submitted by the prospective bidder who has not fulfilled the above requirements shall remain unopened. Prospective bidders whose qualifications are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received will be notified before the date of bid opening, and any proposals submitted by them shall be returned unopened. Liquid assets in the amount of ten (10%) percent of the estimated project cost will be required. For an experience record to be considered acceptable for a given project, it must reflect the experience of the firm seeking the qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to the date on which bids are to be received. The Director of the Water Department shall be the sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth (1/10) the total capital FTW99425 SI-1 and surplus. 3. BONDS: A performance bond, a payment bond, and a maintenance bond, each for one hundred (100%) percent of the contract price, will be required. Refer to Part C - General Conditions, Item C3-3.7, as well as Part D - Special Conditions. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the -- Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDER: Pursuant to Article 6018, Tex. Rev. Civ. Stat., the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower that the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. "Texas resident bidder" means a bidder whose principal place of business - is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks in the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is less than $25,000.00, the contract amount shall 4 be paid in one lump sum upon completion and acceptance by the City of Fort Worth Water Department. 9. AGE: In accordance with the policy ("Policy') of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while FTW99425 SI-2 engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirements. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its • subcontractors' alleged failure to comply with the above-referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state, and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included with these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render a bid non-responsive. In addition, the bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM AND/OR THE GOOD FAITH EFFORT FORM (Documentation), as appropriate. The documentation must be received no later than 5:00 p.m., five (5) City FTW99425 SI-3 business days after bid opening. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom the delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render a bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records, or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under the appropriate federal, state or local laws or ordinances relating to the false statements. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a "- period of time of not less than three (3) years. The City will consider the Contractor's performance regarding its M/WBE program in the evaluation of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate "good faith effort", shall result in a bid being rendered non= - responsive to specifications. Contractor shall provide copies of subcontracts or co-signed letters of intent with approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City's M/WBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting its goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a joint venture equal to the percentage of the M/WBE participation in the joint venture for a clearly defined portion of the work to be performed. All M/WBE contractors used in meeting the goals must be :. certified prior to the award of the Contract. The M/WBE contractor(s) must be certified by either the North Central Texas Regional Certification Agency (NCTRCA) or Texas Department of Transportation (TXDOT), Highway Division and must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE utilization or good faith forms as applicable. Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. FTW99425 SI-4 Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE shall be given an opportunity to perform the work. Whenever a change order exceeds ten (10%) percent of the original contract, the M/WBE coordinator shall determine the goals applicable to the work to be performed under the change order. During the term of the contract the contractor shall: Make no unjustified changes or deletions in its M/WBE participation commitments submitted with or subsequent to the bid, and, If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the contractor had represented he would perform with his forces, the contractor shall notify the City before subcontracts or purchase orders are let, and shall be required to comply with modifications to goals as determined by the City, and, Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the contractor desires to change or delete any of the M/WBE subcontractors or suppliers. Justification for change may be granted for the following: Failure of Subcontractor to provide evidence of coverage by Worker's Compensation Insurance. Failure of Subcontractor to provide required general liability of other insurance. Failure of Subcontractor to execute a standard subcontract form in the amount of the proposed used by the Contractor in preparing his M/WBE Participation plan. Default b the M/WBE subcontractor or supplier in the performance Y PP of the subcontractor. Within ten (10) days after final payment from the City, the Contractor shall provide the M/WBE Office with documentation to reflect participation of each subcontractor and supplier used on the project, inclusive of M/WBEs. FTW99425 SI-5 2x-14-2000 4:22PM FROM CONTROL SPECIALIST 817 638 2629 P.2 ATTACHMENT 'iA City of Fort Worth gage 102 of2 Minority and Women Business Enterprise Specifications �_ �� ��_ 1 MBENVBE UTILIZATION �r �rTPou 5rEC.I At_.I ST t FJ G 12.12�I9 PRIME COMPANY NAM£ eIu DATE�---•— las�-►Jmc BC-a�C�t STw �tau rAF1 SrA. f gaL*t 2'T L3 PROJECT NAME 4tW l wpm"ArN )NST4%A Arr WJ– tJtTS PROJECT MULL ER Carrs My U rROJacc GQ4L: IAVWBE ptJUMN:Ac&wcu&vf&; Failure to complete this form, in its ="etty with supporting documentation, and received by the.Managing Department on or before 5:00 p.m. fire (5) City business days after bid owing,exclusive of bid opening data,will result in the bid being considered non-responsive to bid specifications. The undersigned bidder agrees to enter into a formal agreement with the MBE and/or INBE firms for work listed in tAis schedule, conditioned upon execution of a contract with the City of Fort Worth..:The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will.r in The bid being considered non-responsive to speciticatma. Com pony Name,Contact Name, Ca tltled Specify$lLC0T**Mn9 Speck�'Items to be Dollar Amount Address,and Telephone Na Scope of tAlork Supplied('). £ ,( ecwRF fN 'ice 2Z 1,278 Mr*Ws minit to tooted Into tl(i** 4aft bivatnmse Intl*atidcatplape at the ume of W. In SPar ►aM.trMsfi whicirMWBE'sn bu Li uiglf�.d endla items to be sp�pllad: A o1l ww.lo tie !r 1n.adM ► h+ti:c[+�1Rtaiwis+d tpe MINI 1'I Mwft aaclr Thr iw#sk . TMf.Mises itis lsvei4f aubeosRaallpp bNow ilia pdrat! ... l.af a dihet.psllnrnt f t>trprin+roonl or W�i•ahaoiNradortr+oA.lau+ra;t�`fir:=p+T t b5r i#uhoo for 1� al: IirtY"ti.,. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING,EXCLUSIVE OF THE BID OPENING DATE Rev.erilli b 2-14-2000 4.23PM FROM CONTROL SPECIALIST 817 638 2629 P.3 ATTACHMENT 1A Page 2 of 2 Cly of Fort Worth Minority and Women Business Enterprise Specifications MBEIWBE UTILIZATION Canpeey Neme,Comeau k a". c0tlllsa SpecifjtAll CW*44ing city At wags babe Douu Amount Address,and Teloplwpe No. Scope of Wak 9A The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MSE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal,State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may resuH In a determination of an irresponsible offeror and bared from participating in City work for a period of time not less than one(1)year. ALL BEs and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD . :ri'w►es W, 100tS ARorized Signature Printed Signature 0.)6ea" "A►'JAGEaz Title Contact Name and Title(if different) &*nWoL- 5feCtAWT gli- i.s8- ZGZ,7 C;W p—Name Telephone Number(s) Fo .max j.4i gI?- 4s- 25 Z�o7i AZ uatim �� T O ChylSa t 0p Code ate THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5..00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING,EXCLUSIVE OF THE BID OPENING DATE Rev.6f2J'i8 ' City of Fort Worth Minority and Women Business Enterprises Specifications 4 Affidavit Statement " Project Name K6�H fyff,,N Scmaf--r 85111*?LWtP0 Project No. fV4T7- 060770140410 �Jl 7DT.. » L:tRi* Q4Si38M€:, # iCt) �TE as�Y•�?TC� v�JC :.. WiY-.,.. C,�nv:�tvna� Ga ~'Ai, W. moi. ( 'Hy q- 1�TtC— '�t� yka.�c^wx�!s �t}��i':�x. X ;wF D:a it°T Nf �.,f7i�x;Bt[ �u=.aP NIN 01M, Y.RES€ ' �„ iAI TF�1Sw::>: i f 3i"1NG '.v•�f..f��a.:w.,�<?}«:Cs*:sausn(ou�ras -N.-s a�aUE- K„fic'N."IT� r,a, ................TD:ER.�. . ONESPC a .. .: ... ........ ...:....................... .....................:..........•.............,....................:.. a............ -.'r;;:,ca..:o,::tAcm wYc:«<,,.c. The undersigned bidder hereby certifies that they will comply with the City's 'M/WBE Ordinance and the specifications of this bid in the following manner. [check the most appropriate nranber(s]] t. Y THE M/WBE PARTICIPATION WILL MEET OR EXCEED THE STATED GOAL, WILL COMPLETE THE MMBE UTILIZATION FORM. " 5 2 THE MJWBE PARTICIPATION WILL BE LESS THAN THE STATED GOAL,WILL COMPLETE"GOOD FAITH EFFORT FORM". 3. NO M/WBE PARTICIPATION,WILL COMPLETE"GOOD FAITH EFFORT". 4. NO SUBCONTRACT OR SUPPLIER OPPORTUNITIES AVAILABLE, WILL COMPLETE WAIVER FORM. Vo- utho ed 1gnatu Printed Signature tTJE=M-T Tale Contact Name and Title(if different) C.o"moo, SFGCIAL-I STS I N C 517- (3S - Z6 z9 Company Name Contact Telephone Number(s) `tom" 0. T�,e 14l S l� ir,38 Z - �. Address Fax Number 1`0AP40KZ(oZ City/StateMp Code Date Rev 316!96 PART B - PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: Mr. Bob Terrell City Manager City of Fort Worth, Texas FOR: NORTH BEACH STREET N.S. III PUMP STATION EXPANSION WATER DEPARTMENT PROJECT NUMBER PW77-060770140490 DEPARTMENT OF ENGINEERING PROJECT NUMBER 2923 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of all improvements and appurtenant work shown in the plans and specification, all necessary appurtenances and incidental work to provide a complete and serviceable project. Pursuant to the foregoing "Notice to Bidders", the undersigned bidder, having thoroughly examined the contract documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, and Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenant work, complete in place, the following items): FTW99425 B-1 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT ONE - YARD PIPING, 36-INCH WATERLINE, WATERLINE CONNECTIONS 1. 1 LS Yard Piping for Pump Station Including Piping, Fittings and Appurtenances for Pump Station Site ONE NuNnkcp TiiRef-7rA tsmJ Dollars �p and Cents per LS $ /04,000 $ /03,OOa-2. 1 EA 16" Gate Valve and Valve Vault Including Appurtenant Piping and Equipment ` S1,tfcm Thousand Dollars and nlb Cents U-0 09 per EA $ /41000 $ 14"ASU 1 1 EA Remotely Operated Motor Operated 16" Butterfly Valve and Operator Stand Installed with NS II / ES II Transfer Meter Vault Including ! Appurtenant Piping and Equipment !en Thvu6&nd Dollars and A10 Cents ud 00 per EA $ /0,000 $ 10, 000 4. 2 EA Meter Vaults Including 8" Bypass Piping, 2 - 16" Isolation Gate Valves and Vaults, Fire Hydrant Assembly, Appurtenant Piping and Equipment fwu Thousa4Dollars and � rid d Cents `v o0 per EA $ 82, o00 $ 16110,00 FTW 99425 B-2 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 5. 1 LS For Chlorine Analyzer, Water Sample Station, Ph/Temperature Meter and Pressure Transmitter and Appurtenances to be Installed in the New NS III Meter Vault on Discharge Side of Pump Station Fi-teen Yh o usa nd Dollars and A10 Cents 0 0 - per LS $ l 5,Uoo $ l 6. 1 LS Tie-In to Existing 24" Waterline and Existing 16" Discharge Piping with New 16" x 16" Tee and New 16" x 24" Reducer (Sheet 3A) C14k, T oases d Dollars and ov vv do Cents per LS 7. 1 LS For Connection to Existing 30" Suction Header at Line "A" Sta 2+48 (Sheet 3A) SIx4-gcn 7-housclAd Dollars and . n/a Cents p o per LS $ /4J0000-0$ 16,000 8. 1 LS For Connection to Existing 24" Waterline at Line "B" Sta 0+00 (Sheet 3A) Seven TAou.suhcl Dollars and /Vo Cents o 0 00 per LS $ 7, 000 $ 000 FTW 99425 B-3 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 9. 1 LS For Modifications to the 21" Waterline (Sheet 9A) Including All Piping, 12" Gate Valve, Fire Hydrant Assembly, Fittings and Appurtenances Tweniy Thoa.6dmd Dollars - and No Cents 09 00 per LS $ 20, 000 $ 201 UoU r 10. 1,403 LF 36" Waterline Including Piping, Fittings, Closure Pieces, Joint Restraint, and Appurtenance 014Lc L dundad Six �je On and 0 Cents 100 per LF $ l ro l — 1. LS Work Performed by H.S.Q. to Complete Stage One - Piping Plan as Specified and Shown on the Drawings Niter-! ~THvvSA�n Dollars and oto Cents per LS $ 301600 00 $ 30,1000 12. 1 LS For Electrical Work Required to Complete the Stage One - Piping Plan as Specified and Shown on the Drawings Including All Provisions for Temporary Power TN�RT�t E►�t-rr�I��bDollars and "o Cents 00 per LS $ 38,oco— $ 38,�QO c 13. 1,738 LF Trench Safety System Or.►E Dollars and �r F-I r--r%4 Cents 7 I� per LF $ � � $ 2, FTW 99425 B-4 NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 14. 1 LS Install and Maintain Erosion and Sediment Control During Entire Construction Period C` mr -t4oUSANo, owe NvNyeEoDollars and 1.to Cents per LS $ 1,10000 $ 11100°0 15. 1 LS Post Construction Hydro-Mulch Seeding For All Areas Disturbed During Construction Activities (544- iV4xjsAt w ,-rw0 Nvr►arzGvDollars and No Cents _ 0 per LS $ l,Zoo00 $ it Z,00 p 16. 1 LS AQ,Q1<DEDUCT> For All Additional Work Required to Complete Stage One Piping Plan as Specified and Shown on the Drawings but Not Included in Other Items Sixieen 'Thousand Dollars anc+ A/O Cents v_o QP per LS $ 14,000 S l6, DOO r F rFTW99425 B-5 r NORTH BEACH STREET N.S. III PUMP STATION EXPANSION PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 21. 1 LS ADD/<DEDUCT> For All Additional Work Required to Complete Stage Two Pump Station Plan as Specified and Shown on the Drawings but Not Included in Other Items Sire,„ Z'hvusand Dollars and Md Cents ®® 8m per LS $ 14,1000 $ l6,Dao ALTERNATE BID ITEM 22. 1 EA 30" Butterfly Valve and Valve Vault Including Appurtenant Piping and Equipment Forty Thousand Dollars and A10 Cents oa o0 per EA $ ¢U,000 $ 4 0,000' BID SUMMARY FOR NORTH BEACH N.S. III PUMP STATION EXPANSION 4W TOTAL FOR UNIT ONE (Bid Items 1 through 16) $ (o -73, 7 to 00 TOTAL FOR UNIT TWO (Bid Items 17 through 21) $ 383, 000— ALTERNATE 383, 000`ALTERNATE BID ITEMS (Bid Item 22) $ '10,006 BASE BID TOTAL (Bid Items 1 though 21) $ (j USG, y4 ao ALTERNATE BID TOTAL (Bid Items 1 through 22) $ 1, 076, y0 36" waterline pipe shall be in accordance with City of Fort Worth Water Department specification E 1-4 or E 1-6. An Bidder/Contractor shall check the pipe material to be used for 36" diameter waterline pipe and yard piping. [✓] E1-4 Concrete Pressure Pipe and Fittings E1-6 Ductile Iron Pipe FTW 99425 B-7 PART B - PROPOSAL (continued) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of five (5%) percent is to become the property of the City of Fort Worth, Texas, in the event the contract or bonds are not executed and delivered within the time above set forth, as liquidated damages for delay and additional work caused thereby. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned bidder certifies that he agrees the OWNER reserves the right to award either Unit 1 or Unit 2, or both Unit 1 and Unit 2, or neither Unit 1 or Unit 2, and that individual line items may be deleted from the Proposal from either Unit 1 or Unit 2 to arrive at the most advantageous bid total for the OWNER. Alternate bid items may be added to or deleted from the contract-by the Owner. The work includes furnishing all materials, tools, equipment, transportation, services and all labor and superintendence for the construction as indicated in the Contract Documents. The undersigned assures that its employees and applicants for employment and those of anv labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin work on the Contract and to complete all work on the Contract within the time set forth in Part D - Special Conditions, "Completion Time". (Complete A or B below, as applicable:) [ ] A. The principal place of business of our company is in the State of [ ] Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. [VI B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. FTW99425 B-8 Receipt is acknowled ed of the following addenda: Addendum No. 1 v �o Addendum No. 2 Addendum No. 3 Respectfully submitted, Co►-4T L, SPECIAL -LST INC . (SEAL) By: If Bidder is Corporation Title: aESL0Ew-r Address: -7.o . 1 oA 141, I�A►�oL�E, T?C. 7GZ�Z FTW99425 B-9 PART C GENERAL CONDITIONS ?ART C - GENERAL 'CONDITIONS TABLE OF CONTENTS' NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2• Contract Documents C1-1 (1) C1-1.3 Notice to Bidders C1-1 ( 2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1. 6 General Conditions Cl-1 (2) C1-1.7 Special Conditions Cl-1. (2) C1-1. 8 Specifications C1-1 (2) C1-1. 9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3 ) C1-1.11 Plans Cl-1 (3 ) C1-1.12 City C1-1 (3 ) C1-1.13 City Council C1-1 (3) C1-1.14 Mayor C1-1 (3) C1-1.15 City Manager C1-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works Cl-1 (4) C1-1.18 Director, City Water Depart-ment C1-1 (4) C1-1.19 Engineer -1 (4) C1-1.20 Contractor C1-1 ( 4 ) C1-1. 21 Sureties C1-1 (4 ) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4 ) C1-1.24 Calendar Day C1-1 ( 4) C1-1. 25 Legal Holiday C1-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6 ) C1-1.28 Paved Streets and Alleys C1-1 ( 6 ) C1-1.29 ' Unpaved Streets and Alleys - C1-1 ( 6 ) C1-1.30 City Streets C1-1 ( 6) C1-1.31 Roadway C1-1 ( 6) C1-1.32 Gravel Street C1-1 ( 6) - C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL. ' C2-2.1 Proposal Form C2-2 (1) C2-2.2 . Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2' (2) C2-2. 4 Submitting of Proposal C2-2 (3 ) C2-2.5 Rejection of Proposals C2-2 (3 ) C2-2. 6 Bid Security C2-2. (3 ) t C2-2. 8r Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of ?roposals C2-2 ( 4 ) -r C2-2 .10 Public Opening of Proposal C2-2 ( 4) C2-2 .11 Irregular Proposals C2-2 ( 4 ) C2-2 .12 Disqualification of Bidders C2-2 (5 ) C3-3' AWARD AND EXECUTION OF DOCUM2\TS C3-3 .1 Consideration of Proposals C3-3 (1) C3-3 . 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3 . 3 Equal Employment Provisions C3-3 (1) C3-3 . 4 Withdrawal of Proposals C3-3 (2) C3-3 .5 Award of Contract C3-3 ( 2) C3-3 . 6 Return of Proposal Securities C3-3 (21 C3-3 .7 Bonds C3-3 (2) C3-3 . 8 Execution of Contract C3-3 (4 ) C3-3 . 9 Failure to execute Contract C3-3 ( 4) C3-3 .10 Beginning Work C3-3 (4 ) C3-3 .11 Insurance C3-3 (4) C3-3 .12 Contractor's Obligations C3-3 (7) C3-3 .13 Weekly Payroll C3-3 (7) C3-3 .14 Contractor's Contract Administration C3-3 (7) C3-3 .15 Venue C3-3 ( 8 ) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4. 2 Special Provisions C4-4 (1) C4-4. 3 Increased or Decreased Quantities C4-4 (1) C4-4 .4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4. 6 Schedule of Operations C4-4 (3 ) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4 ) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) CS-5. 2 Conformity with Plans Ct,-5 (1) C5-5. 3 Coordination of Contract Documents C5-5 (2) C5-5. 4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work CS-5 (3 ) CS-5 . 6 Field Office -05-5 (3 ) CS-5.7 Construction Stakes C5-5 (3 ) CS-5 . 8 Authority and Duties of Irsp_ctors , C5-5 (4 ) C5-5. 9 Inspection CS-5 (5 ) CS-5.10 Removal of Defective and Unauthorized Work C5-3 (5 ) CS-5.11 Substitute Materials or Equipment C5-5 (5 ) CS-5 .12 Samples and Tests of Materials CS-5 ( 6 ) CS-5 .13 Storage of Materials C5-5 ( 6) CS-5 . 14 Existing Structures and Utilities C5-5 (7) C5-5 . 15 Interruption of :Service & CS-3 (7) C5-5 . 16 Mutual Responsibility 'of Contractors CS-5 (8 ) C5-5 . 17 Cleanup CS-S ( 8 ) C5-5 .18 Final Inspection CS-5 (9 ) (2) C6-6 L:G=.L RELATIONS PND ?UBLIC R=SPONSIBILITY. C6=6.1 Laws to be Observed C6-6 (1) C6-6 .2 Permits and Licenses C6-6 (1) C6-6 .3 Patented Devices , Materials and Processes C01-6 (1) C6-6 . 4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience Co'-6 (2) Co"-6. 0' Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6.7 Railway 'Crossings C6-6 (4) C6-6. 8 Barricades, Warnings and Watchmen C6-6 (4) C6-6. 9 Use of Zxplcsives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 ( 6) C6-6.11 lnd=Pend=nt Contractor Co'-6 (8) CS-6.12 Contractor ' s Responsibility for Damage Claims ' C6-6 (8 ) Co"-6 .13 Contr_ctdr• ' s Claim for Damages C6-6• (10) C'o-6.14 Adjesht of Relocatioa of Public IItilities, etc. C5-6 (10) Co'-6.15 Te-Moorary Sewer Drain Connections COO-6 (10) Co'-6 .16 Arrancement and Charges of Water Furnished by City C5-6 (11) C6-6.17 Use of a Section of Portion of the Work Co'-6 (11) C6-6.18 Contractor' s Responsibility for Work C6-6 (11) C6-6 .19 No Waiver of Legal Rights C6-6 (12) Co'-6. 20 Personal Liability of Public Officials Co"-6 (12) C6-6. 21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Eauipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3) C7-7. 7 Time of Commencement and Comm=_tion C7-7 (4 ) C7-7. 8 Extension of time of Completion C7-7 (4) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Sa__ty Methods and Practices C7-7 (13) C8-8 M.=.ASUR:CM=NT AND PANT CS-8 .1 Measurement of Quantities CS-8 (1) C8-8 . 2 Unit Prices C8-8 (1) (3 ) CS-8 . 4 Scop_ of Payment c�-8 ►�, C8-8.5Partial estimates and Retainage C3-8 (2) C8-8 . 6 Withholding Payment C3-8 (3) CS-8 .7 Final Accept-ance _ C8-8 (3 ) C8-8 . 8 Final Payment' C3-8 (3) CB-8 .9 Adcuacy of Design C3-8 ( 4) CB-8 .10 General Guaranty CS-B (4) CS-8 .11 Subsidiary Work C3-8 (5) C8-8.12 Miscellaneous Placement of Material C3-8 (5 ) CS-8.13 Record Documents C3-8 (5) 4 I 3 (4) f , PART C - GENERAL CONDITIONS . Cl-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or. pronouns in place of them are used , the intent and meaning shall , be understood and interpreted as follows: C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These *are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS :* The General Cont-, act- Documents Documents govein all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Devel(3per) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White • PART G - CONTRACT (Sample) White = b. SPECIAL CONTRACT DOCUMENTS : The Soecial Contract Documents are prepared for each specific project as a suoolement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as • above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERKITS/EASEMENTS PART F - BONDS PART G CONTRACT PART H -' PLANS (Usually bound separately) Cl-1 (1) C1-1 . 3 NOTICE TO BIDDER'S : All of the legal publications either actually published. in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutas the notice to bidders. C1-1 . 4 P.tO?OSAL: The completed written and signed offer or tender of' a bidder to perform the work which. the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. i C1-l . S BIDDBE : Any-. person, persons , firm , partnership, company, association, corporation; acting 'directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 6 G.NE3AL CONDITIONS : ' The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure , the local statistes , and -requirements of the City of Fort Worth ' s charter and g+, promulgated ordinances. _. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take Precedence and shall govern. C1-1 . 7 S?ZCIAL CONDITIONS : Spacial conditions are the specific requirements which are necessary for the particular - project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 S?TCIFICATIONS : The Specifications is that section or part of the Contract Documents which sets f orth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specif ications, regulations, requirements .. statutes ,, etc . , such referred• to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds, are the written guarantee or security furnished by the Contractor for the prompt and i Cl-1 (2) faithful performance of the contract and include the X ollowing: . a. Performance Bond (see paragraph C3-3 .7 ) b. ?aym=nt Bond (see paragraph C3-3 .7) C. maintenance Bond (see paragraph C3-3 .7 ) d. ?roposal or Bid Security (se_ Special Instructions to Bidders, Part A and C2-2. 6) C1-1 . 10 CONTRACT: The- Contract is the formal signed 'agr=em=nt between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project i to be completed under the Contract Documents. � 1 • C1-1 . 11 PLANS : The clans are the drawings or reproductions therefrom m_de by the Owner ' s representative showing in detail the location, dimension and position of the various elements of the project , including such' profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue - to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually bound separately from other parts of the -€ Contract Documents , but they are a part oaf the Contract Documents just as though they were bound therein. C1-1 . 12 CITY: The City of Fort Worth , Texas , a municipal corporation, authorized° and chartered under the Texas State i Statutes , acting by and through its governing body or its City Manger, each of which is required by charter to perform --'• specific duties . Responsibility for final enforcement of Contracts involving the City of Fort North is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL : The duly elected and qualified q. ' governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth , Texas , or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. . C1-1 (3) C1-1 . 17 DIR CT03 OF PUBLIC. WORKS: The duly appointed official of the City of Fort north , referred to in the Charter as the City Engi::eer, or his* duly authorized representative. C1-1 . 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized represeentative , assistant, or agents. C1-1 . 19 ENGINEER: The Director of Public Works, the Director of the Fort north City dater Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents, acting within the scope o.6 the particular duties entrusted to them. , C1-1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting _ directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or only labor, for work at the site of the project. - C1-1. 21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor . The -_:::::,. sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 TBE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to prod"uce a completed and Serviceable project. C1-1. 23 WORKING DAY: A . working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor .permit the perfortiance of the principal unit of work for a period of not less than seven (7 ) hours between 7: 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7.6. Cl-1 . 24 CALENDAR DAYS : : A calendar day is any day of the week or month , -no days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort- Worth for observance by City employees as follows: Cl-1 (4) 1. New Year's Day January 1 2. M. L. Ring,' Jr . Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Indenend_nce Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council } ray determine When one of the -above named holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday shall b: observed on the orec=_ding Friday or if it falls on Sunday, it- shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calandar holiday as the holiday. C1-1. 26 ABBREVIATIONS : Wherever the abbreviations defined herein appear in Contract Documents , the intent and meaning shall be as follows : nASHTO - American Association of MGD Million Gallons Per "Day Highway Transportation Officials ' ASCE - American Society of Civil CF S - Cubic' Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works 3 - Percentum- �• AssociationR - Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D . - Outside Diameter FitAsoh. _ AsphaltE1 ev.- Elevation Ave Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade P, CI - Cast Iron In. - Inch CL, - Center Line ?t. - Foot OI - Galvanized Iron St. - Street ` Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.P. - Linear Foot D.I. -.Ductile Iron Cl-1 (5) C1-1 27 C3ANGE ORDER A " Chang_ Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in tae scope of the project on which bids were submitted. Increase in unit auanti=ies stated in the proposal are not the subject matter of a Change, Order unless the increase or de=raase is more than 25% of the amount of the particular item or items in the originil proposal. All " Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. C1-1 . 28 PAVED STREETS AND ALLEYS : A paved street or alley shall be defined as a street or alley having on: of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without sezarate bass material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without seoarate base material. 3 . Brick, with or without separate base material. 4. Concrete, with or without separate bas= material. S . Any combination of the above. C1-1 . 29 UNPAVED STREETS OR P.LLEYS: An unpaved street-, alley, roadway or other surface is any area except those defined above for "Paved Streets and Xlleys. 0 C1-1 . 30 CITY STREETS : A city street is defined as ;.:gat area between the right--of-way lines as the st_eet .is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between .� parallel lines two ( 2 ' ) feet back of the curb lines or four ( 4 ' ) f eat back of the average edge or pavement where no curb exists. C1-1 . 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of g=avel or similar material other than the natural material found on the street surface before any improvement was made. Cl-1 (5) SECTION C - GMNEIIRI� CONDITIONS C2-2 INTERPRETATI0N PWD PREPARATION 0= PROPOSAL SECTION C2-2 INTv-RPRETATION AND PREPARATION OF PROPOSA-1. C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a'- formal contract. The Owner will` furnish forms for the Bidder ' s "Experience Record, " "equipment Schedule , " and "Financial Statement," all of which must be properly executed and filed with the Director of the City water Department one week prior to the hour for omeninq o= bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so Dr as to reflect the current financial status . This statement must be current and not more than one (1) year old. =' In the case that a bidding date falls within the time a 'new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10% ) percent of the estimated project cost will be required. For an . experience record to be considered to be accent_ble for a given project, it must reflect the experience o= the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five (5 ) years prior to the date on which are to be received . The Director of the Water department shall be -sole judge as to the acceptability of experience for qualification to bid on any Fort north Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required t'o complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may Be listed in the proposal C2-2(1) Mp forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to tele Contractor for only the actual quantities of work, performed or materials furnished in strict accordance with the Contract Documents and Plans . The quant=ities of work to �e performed and materials to b: furnished may be increased or decreased as hereinafter provided, without • in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2 . 3 EXAMINATION Or CONTRACT DOCUMENTS AND SITE Or PROJECT: Bidders are advised that the Contract Documents on file -with the Owner -shall, constitute 'all 'of the information which' - -the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents jus,;;'_' as though such addenda were actually written into the original Contract Documents. ' Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to vis�t the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary- to gain a complete knowledge of. the conditions which will be encountered during the construction of the project . They must judge for themselves a the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained- in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation, research , tests, explorations, and other data which are necessary for `full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING Or PROPOSAL: The Bidder shall submit his _Proposal on t:^.e form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials required. All such .prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her :.ame must be signed by him (h=r) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of. each member must be given , and the proposal must be signed by a member of the firm, association , or partnership,. or by a parson duly authorized. If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. �� C2-2 . 5 REJECTION OF PROPOSALS : Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids , incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of or000sal shall be returned to the Bidder unopened. C2-2 . 6 BID SECURITY: No DroDosal will be considered unless it is accompanie3 by a "Proposal Security" of the character and in the amount indicated in the "Notice to- Bidders " and the "Proposal. " The Bid Security is required by the owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be ret=fined until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2(3 ) C2-?.7 DELIVR?v 0= 2ROPOSAL: No Proposal will be considered unless it is delivered, accompanied by its pro-a=r Bid security, t0 the City Manager or his reor=sentative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sols responsibility to'd_liver the proposal at tae proper time to the proper place. The mere fact that a pr000sal was dispatched will *not be considered. The Bidder must have the proposal actually delivered. ZEach oro_oosal shall be in a sealed envelops plainly marked with the word "PROPOSXL, " and the name or description of th_ project as designated in the "Notice to Bidders. The envelope shall be addressed to the City Manager, City 3a11, Fort Worth, Texas . C2-2. 8 WITEDRAWTNG PROPOSALS: Proposals actually filed w=,th the City Manacer cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a pr000sal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After x.11 proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner , be recur_ned - unoDened. C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: any bidder may ; modify his proposal by telegraphic communication at any time prior to the time set- for opening proposals , provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the pr000sal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will b: given to the proposal. C2-2. 10 PUBLIC OPENING Or PROPOSAL: Proposals which have been properly tiled and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders. " All proposals which have been•opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2. 11 IRREGULAR PROPOSALS: Proposals shall be considered as Bing "Irregular" if they show any omissions , alterations of form, additions, or.. conditions not called for , unauthorized alternate bids, or irregularities of any kind. However , the C2-2(4)