HomeMy WebLinkAboutContract 25782 AMENDMENT NO. CITY SECRETAIJy
CONTRACT No. Z5 �L
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT $
Wf7REAS, the City of Fort Worth (City) and Dunaway Associates,
Inc. , (Engineer) made and entered into City Secretary Contract No.
24940, (the Contract) which was authorized by the City Council by
M&C 17439 on the 25th day of May 1999; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main 106R Drainage Area
Sanitary Sewer Systema Evaluation and Improvements (Group 4,
Contract 2) Part 10 and Sanitary Sewer System Rehabilitation
in the Main 71 Part 2, Drainage Area.
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maxJ mum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated March 24,
2000, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional services to be performed by
Engineer total $2, 651 .00.
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $45,351. 90.
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the dday of ,
2000, in Fort Worth, Tarrant County, Texas.
A_
(2 si✓ Contract Authorization
Gloria Pearon, City Secretary
Date
APPROVAL RECOMMENDED: APPROVED: n
-A-4 -�
A. Douglas Rademaker, P.E. vv- Mike Groomer
Director, Department of Assistant City Manager
Engineering
DUNA14AY ASSOCIATES, INC.
ENG
By: .
Name:: ame E. DeOtte P.E. R.P.L.S.
Vice President
1501 Merrimac Circle, Suite 100
Fort Worth, TX 76107
APPROVED AS TO FORM AND LEGALITY:
Gary Stei rger
Assistant City Attorney
24940
-2-
DUNAWAY ASSOCIATES, INC.
ENGINEERS • PLANNERS • SURVEYORS
DAI No. 9902100
March 24, 2000
Mr. Tony Sholola, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, Texas 76102
Reference: Amendment No. 1
Main M-1 06R Drainage Area
Sanitary Sewer System Rehabilitation and Improvements
(Group 4, Contract 2), Part 10
Sewer Project No. PS 46-070460410150
D.O.E. Project No. 2601
Dear Mr. Sholola:
Dunaway Associates Inc. is pleased to present this Amendment No. 1 for the following
additional services that are beyond our original scope of services.
• 170 LF of additional survey and design for L-602
• Preparation of 1 new Temporary Right-of-Entries
A summary of the proposed budget for this revised amendment is as follows:
Basic Fee
Design of 170 LF of sewer ($12.00/LF) $ 2,040.00
Survey(170 LF x $3.00 x 1.1) $ 561.00
Temporary Right-of-Entry ($50 /ea) $ 50.00
TOTAL PROPOSED AMENDMENT $ 2,651.00
A summary of the total project fees are as follows:
Contract Description Fee
Original Contract 3,149 LF of sewer $ 42,700.90
Amendment No. 1 Additional 170 LF of sewer and related survey& $ 2,651.00
easement preparation
TOTAL PROJECT $ 45,351.90
MY K(11��G?�Qy
1501 MERRIMAC CIRCLE • SUITE 100 • FORT WORTH,TEXAS 76107-6572 9 (817)335-1121 • M R4 4- 17)335-7437
• Amendment No. 1
March 24, 2000
Page 2
Please review the enclosed information and do not hesitate to call me if you have any
questions or require additional information regarding this revised proposal.
Sincerely,
DUNAWAY ASSOCIATES, INC.
v
Brian S. Darby, P.E.
BSD/jme
9702100_LV_TSholola_00-0324_BS D_Amend#1.doc
Enclosure
Cc: Mr.Peter Fu,P.E.—City of Fort Worth,Water Department
Mr.Rakesh Chaubey, P.E.—City of Fort Worth,Consultant Services,Wet Weather Program
G���GR
Amendment No. 1
Main M-106R Drainage Area
Sanitary Sewer System Rehabilitation and Improvements
Sewer Project No. PS 46-070460410150
D.O.E. Project No. 2601
Previous
Estimated Increased
DESCRIPTION Expense Expense Total Expense
Construction Estimate $468,859.28 $18,567.46 $487,426.74
Curve"A" 8.7% in original Contract (8.6% for this $39,518.70 $2,400.00 $41,918.70
Addendum)
Less 15% for City Administration $33,590.90 $2,040.00 $35,630.90
Survey $6,850.00 $561.00 $7,411.00
Easements $0.00 $50.00 $50.00
Deliver Documents, Bidding Assistance, Pre-Bid Conf. $400.00 $0.00 $400.00
Final Inspection $300.00 $0.00 $300.00
Final Report $300.00 $0.00 $300.00
Printings $1,260.00 $0.00 $1,260.00
TOTAL FEE $42,700.90 $2,651.00 $45,351.90
v' z; G'L IGU EPD
ROSIN
9702100_Ltr_TSholola_00-0324_BSD_Amend#1.doc KGzr0Ili�I
F0F,TW0F,TH
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE and
Mike Groomer, Assistant City Manager
FROM: Tony Sholola, DOE �• S .
DATE: April 5, 2000
RE: DESIGN FEE AMENDMENT NO. 1 TO MAIN 106R DRAINAGE
AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 4, CONTRACT 2) PART 10 AND
SANITARY SEWER SYSTEM REHABILITATION IN THE MAIN
7, PART 2 DRAINAGE AREA, DOE NO. 2601, SEWER PROJECT
NO. PS46-070460410150
The proposed amendment will allow Dunaway Associates, Inc., to provide additional de-
sign and survey services on the project as requested by City.
It has been determined that it is necessary to replace approximately 200 linear feet of se-
verely deteriorated sewer lines located within the project area. The poor condition of the
sewer lines was unknown prior to approval of the original contract.
Dunaway Associates, Inc., has submitted a fee in the amount of$2,651.00 for the addi-
tional survey and design services to be performed thereby increasing the contract fee
from $42,700.90 to $45,351.90. 1 believe this fee is fair and reasonable for the additional
services that are to be provided and recommend approval.
Please authorize the additional fee by your signatures on the attached contract amend-
ment form.
Tony Sholola
Attachment
cc: Rakesh Chaubey, Project Manager
Berdena Hamilton, Water Department Cha h p`EC_01PD
Dan Pepon, Water Department
,r.
null U CIL' Ga ^`V`
MEM02601 \ L V e
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(817) 871-7941 * FAX (817) 871-7854
�� Printed on recycled paper
Foy.Wq&TH
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE and
Mike Groomer, Assistant City Manager
FROM: Tony Sholola, DOE T. 5 .
DATE: April 5, 2000
RE: DESIGN FEE AMENDMENT NO. 1 TO MAIN 106R DRAINAGE
AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 4, CONTRACT 2) PART 10 AND
SANITARY SEWER SYSTEM REHABILITATION IN THE MAIN
7, PART 2 DRAINAGE AREA, DOE NO. 2601, SEWER PROJECT
NO. PS46-070460410150
The proposed amendment will allow Dunaway Associates, Inc., to provide additional de-
sign and survey services on the project as requested by City.
It has been determined that it is necessary to replace approximately 200 linear feet of se-
verely deteriorated sewer lines located within the project area. The poor condition of the
sewer lines was unknown prior to approval of the original contract.
Dunaway Associates, Inc., has submitted a fee in the amount of$2,651.00 for the addi-
tional survey and design services to be performed thereby increasing the contract fee
from $42,700.90 to $45,351.90. I believe this fee is fair and reasonable for the additional
services that are to be provided and recommend approval.
Please authorize the additional fee by your signatures on the attached contract amend-
ment form.
Tony Sholola
Attachment
cc: Rakesh Chaubey, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
N EM02601
ENGINEERING DEPARTMENT
ully THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(817) 871-7941 * Fax (817) 871-7854
0 Printed on recycled paper