HomeMy WebLinkAboutContract 25807 CITY SECRETARY CONTRACT NO. y �L fl AMENDMENT NO. 1 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. 25161 (No M&C Needed) COUNTY OF TARRANT b WHEREAS, the City of Fort Worth (City) and Turner, Collie & Braden, Inc., (Engineer) made and entered into City Secretary Contract No. 25161, (the Contract) which was authorized by the City Council by M&C C-17568 on the 3"day of August, 1999; and WHEREAS, the Contract involves engineering services for the following project: Engineering services for the extension of Meacham Boulevard from Gold Spike Drive to North Main Street; and WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 6, 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $5,000.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$421,994.00. C�,rV��E GM�M,�I Elf AMENDMENT NO. 1 (Continued) 3. All other provisions of the Contract that are not expressly amended herein shall remain in full force and effect. EXECUTED on this the � '' day of , 2000, in Fort Worth, Tarrant County, Texas. J ATT t'4T: A PROV Z Gloria Pearson Pearson `a -11 Mike Groomer City Secretary Assistant City Manager APPROV L RECOMMENDED: _ i�fit� Contract Authorization Hugo . Malanga, P.E., Dire r Date Transportation and Public Works Department Turner, Collie & Braden, Inc. ENGINEER Xbert C. Reath, P. E. Vice President APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney F' —fN ESL0'IIL�'.-2- a Inc1200 Summit Avenue Suite 600 Turner Collie OBraden � Fort Worth,Texas 76102-4409 817 332-8977 Engineers • Planners • Project Managers Fax 817 332-8979 April 6, 2000 Mr. Dan Walsh, P.E. City of Fort Worth Transportation & Public Works Department P.O. Box 870 Fort Worth, Texas 76101-0870 Re: Supplemental Authorization Request No. 1 Meacham Blvd. Extension TC&B Project No. 47-99680-810 Dear Mr. Walsh: This letter is a request for supplemental authorization to provide for the following additional engineering services requested by the City. TC&B was requested to prepare relocation plans for water and sanitary sewer lines which are in conflict with the proposed Meacham Blvd. Extension (see attached Exhibit). The following items are included. • Preparation of plan &profile sheet for the sanitary sewer relocation. • Preparation of plan sheet for the waterline relocation. • Quantity take-off and construction cost estimate. Bidding documents will not be prepared. It is assumed that City forces will do the relocation work. The estimated fee for this additional design work is $5,000. PROJECT FEE SUMMARY Contract Item Description Fee Original Contract City Secretary Contract No. 25161 $416,994 Amendment No. 1 Water& Sewer Relocation 5,000 TOTAL PROJECT $421,994 e1Di CS IJJ . 1y11P i TEXAS AUSTIN/DALLAS/FORT WORTH/HOUSTON/RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI/WINTER PARK Mr. Dan Walsh, P.E. City of Fort Worth Transportation & Public Works Dept. Page 2 If you have any questions or need additional information concerning this request,please call me at 332-8977. Sincerely, Stephen R. James, P.E. Project Manager cc: File 2.1 N:\FrWW\99680810_meacham\cor mp\ftw\Amrnd 1,4.6.00.doc G�)�/(Ju� I! Va ULA V��'�S Up �L5!/Uo INTEROFFICE CORRESPONDENCE City of Fort Worth Transportation/Public {Yorks Department March 10, 2000 TO: Frank Crumb, Assistant Director Water Department FROM: Dan Walsh, Engineering Manager Transportation/Public Works Department SUBJECT: Meacham Boulevard Extension from Gold Spike Drive to North Main Street - Water and Sewer Relocation Enclosed is a copy of the probable construction cost estimate and map prepared by our consultant Turner Collie & Braden, Inc. (TCB) for the relocation of a 12- inch water line and 8-inch sanitary sewer line that is necessary due to the Meacham Boulevard Extension from Gold Spike Drive to North Main Street. The construction cost estimate to relocate the 12-inch water line is $64,055 and the cost estimate to relocate the 8-inch sanitary sewer line is $41,049. The total construction cost estimate is $105,104. The engineering consultant fee to produce the water and sewer relocation plans is $5,000. 1 am requesting the Water Department pay for the $5,000 engineering consultant fee and $105,104 construction cost for the water and sewer line relocation. Upon your approval, I will prepare an amendment to our engineering services contract with TCB for $5,000. APPROVAL GRANTED 57 ar,4 Frank Crumb, Assistant Director Water Department 0P,DD 0 Turner Collie OBraden Inc. TRANSMITTAL 1200 Summit Avenue Suite 600 Fort Worth,Texas 76102-4409 (817)332-8977 Fax(817)332-8979 To: Mr. Dan Walsh,P.E. Date: February 23, 2000 City of Fort Worth Transportation&Public Works Dept. P.O.Box 870 Fort Worth,Texas 76101-0870 Re: Meacham Blvd.Extension Job No.: 47-99680-810 Transmitted By: Courier We are sending you the following: Copies Description 1 Water& Sanitary Sewer Relocation Exhibit 1 Preliminary Opinion of Probable Construction Cost Remarks: FOR YOUR REVIEW Dan—Our estimated fee to produce the design drawings is$5,000. Please give me a call if you have any questions. By: Step en James, P.E. ie•,n �� I 11 01 Copies To: "�'��19't�Al File 2.1 "�' u ct�� `�� ► ° G°?u' I'' �ry3 'r�Li.: UOp YU/ 0 TURNER COLLIE&BRADEN INC TC&B JOB NO,47.996E0.810 1200 SU VE.SUITE 600 ` i FORT W. fX 76102 VILITY RELOCATION FOR MEACHAM BLVD.EXTENTION QUANTITY SUMMARY f OPINION OF PROBABLE CONSTRUCTION COST ITEM DESCRIPTION UNIT QUANTITY TOTAL UNIT CONSTRUCTION WATERLINE MODIFICATIONS PRICE COST 1,,,DEMOLISH EXISTWG CONCRETE PAVEMENT-` • . SY = "12 12: $25' 5300 a11' 2 SAW-CUT EXISTING CONCRETE PAVEMENT LF 70 70 $5 S360 z.3*4 REMOVE EXISTING WMATERLINE .x.. ., LF, ;n::7575 r;;S2y,- j1 875. .:.. 4 1 REMOVE EXISTING 8'x12'REDUCER&G.V.&B. LS 1 1 5500 $500 s 5. REMOVE EXISTINGe1T G.17 bB: t $500 .,s .a �„7' 'LS 1. 6 PLUG AND ABANDON EXISTING 12'WATERLINE LS 1 1 $1,000 51.000 ,77-7 REMOVEEXISTINGIY -LS T1.:1,: 5500 8 PLUG AND ABANDON EXISTING 12'WATERLINE LS l 1 $1,000 51.000 9;r NENf12`+PYGWATERLINE7G s c u.: LF 56t f 581580 as. S",880 10 NEW 12'GATE VALVE&BOX EA 1 1 $1,400 51,400 jE NEW REINFORCED CONCRETE PAVEMENT-"-`-?u 4'--�-.-: SY 1'x:12 max'. 12 $85 '$12 r: 12 ICAST IRON WATERLINE FITTINGS TON 1 1 $1.500 $1,500 -43';.FERTRFZERi: a. a r :.s- . '...._. TON ;1..;, -a c;;. n 77. t i. "S375j375 12 HYDROMULCH SEEDING LS 1 1 $500 5500 SUBTOTAL•OPINION OF PROBABLE CONSTRUCTION COST $55,700 15%CONTINGENCIES 581355.00 TOTAL CONSTRUCTION COST $64,055 SANITARY SEWER MODIFICATIONS ?'C PLUG-`AND ABANDON MST[NGS'-.SAN:SWR-r'"z ,1clo'-- _=:v.LS s 71-,777777777 - ;d1' *Sl ji 2 REMOVE EXISTING SANITARY SEWER MANHOLE EA 1 1 $7,000 $1.000 <3 ?NEW STANDARD SAN[TARY SEWER MANHOLE A a ': " EA n�S 3 A "� 3 j1 900- 55 WO,IAIAM 4 NEW 8'PVC SANITARY SEWER LF 483 483 S40 $19.320 e:5? CONCRETEC.OLtAR -,' ` s �`s ,• EA 6 .Y: _ ;;<:fi_". S3T5 $2 50`. 6 WATGER TIGHT INSERT EA 6 6 $300 51,800 ;i7.°Y VACUUM TESTMANHOLE :ac? AV*0 7 EA -: 3 ,.. -->'3 . 5125't -$375:_ 8 MANHOLE INSIDE COATING FOR CORR.PROTECTION VF 18 18 $225 $4,050 SUBTOTAL•OPINION OF PROBABLE CONSTRUCTION COST $35,695 15%CONTINGENCIES $5,354.25 TOTAL CONSTRUCTION COST 541,049 TOTAL CONSTRUCTION COST ORKNAl EEO nr� Fj�p a UrU l_u e Pape 1 2f12A0