HomeMy WebLinkAboutContract 25869 T TH : 'EXECUTED ,. CQPY Sam— CITY SECRETARY CITY OF FORT WORTH, TEXAS WATER DEPARTMENT CITY SECRETARY CONTRACT NO. `" SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 DECEMBER, 1999 KENNETH BARR BOB TERRELL MAYOR CITY MANAGER LEE C. BRADLEY, P.E. DIRECTOR WATER DEPARTMENT DALE A. FISSELER, P.E. DEPUTY DIRECTOR WATER DEPARTMENT CHARLY ANGADICHERIL ASSISTANT DIRECTOR/WATER PRODUCTION S. FRANK CRUMB, P.E. ENGINEERING MANAGER 0ED BLACK& VEATCH FORT WORTH, TEXAS City of Fort Worth, Texas nVolvar And Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 3/28/00 **C-17961 60NT 1 of 2 SUBJECT AWARD OF CONTRACT TO NORTH TEXAS MUNICIPAL CONSTRUCTION COMPANY, INC. FOR THE CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with North Texas Municipal Construction Company, Inc. for the Clear Fork Raw Water Pump Station Improvements, on the low bid of$1,743,000. DISCUSSION: On October 6, 1998 (M&C C-17034), the City Council authorized the execution of an engineering agreement with Black & Veatch, Inc. for design and construction management of the Clear Fork Raw Water Pump Station Improvements. The North and South Holly Water Treatment plants require an additional raw water supply for peak water demand periods. An expansion at the Clear Fork Raw Water Pump Station will allow the use of water stored at Lake Benbrook by the Tarrant County Regional Water Board. The Clear Fork Raw Water Pump Station Improvements project includes the installation of two new 30 MGD (million gallons per day) pumps with variable speed drives, the replacement of the two existing 30 MGD pumps, modifications to the raw water intake structure, installation of two new screening units, and replacement of the obsolete electric switch-gear. The four new pumps were previously pre- selected due to the long lead-time in ordering large pumps, and the purchase contract will be assigned to this construction contract. On December 30, 1999, the following bids were received: Bidder Amount Bid Time of Completion North Texas Municipal Construction Co.. Inc. $1,743,000 180 Calendar Days Oscar Renda Contracting $1,799,500 Red River Construction Co. $1,799,900 Architectural Utilities, Inc. $1,835,000 R.M. Wright Construction Co. $1,896,000 North Texas Municipal Construction Company, Inc. is in compliance with the City's M/WBE Ordinance by committing to 25% M/WBE participation. The City's goal for the project is 25%. The total authorized amount includes $52,290 for possible change orders and $7,500 for staff support. City of Fort Worth, Texas 4bolljor And Council communication DATE REFERENCE NUMBER LOG NAME PAGE 3/28/00 **C-17961 60NT 2 Of21 SUBJECT AWARD OF CONTRACT TO NORTH TEXAS MUNICIPAL CONSTRUCTION COMPANY, INC. FOR THE CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper Fund-Water. MG:k Submitted for City Manager's FUND I ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) ROVO Mike Groomer 6140 APOUNCIL Originating Department Head: CITY C Dale Fisseler 8207 (from) hM 28 2000 PW77 541300 060770160150 $1,743,000.00 �&. Additional Information Contact: 4`140 city 6eantar9 of We Dale Fisseler 8207 City of Fort Wort4Tozw ADDENDUM NO. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 CITY OF FORT WORTH, TEXAS 1999 Addendum Release: December 28, 1999 Bids to be Received: December 30, 1999 A. SCOPE. This addendum forms a part of the Contract Documents referenced above and modifies the original Contract Documents and plans. Contractor shall acknowledge receipt of this Addendum No. 3 on the space provided on page B-4 of the Proposal, and on the outside of the envelope of the bid. Failure to acknowledge receipt of this Addendum No. 3 could subject the bidder to disqualification. This Addendum No. 3 shall cover the following changes in the Contract Documents: B. SCOPE. This Addendum No. 3 consists of pages AD3-1 through AD3-2. This Addendum No. 3 covers the following additions and changes to the specifications and drawings for this project. C. SPECIFICATIONS 1. Section 11210, Paragraph 11 B-3, last sentence. a. Change the last sentence to read as follows: "The traveling screen shall be as manufactured by U.S. Filter— Intake Systems, Chalfont, Pennsylvania; E&I Corporation or engineer-approved equal." (FORT WORTH WATER DEPARTMENT ) 12/28/99 (CLEAR FORK PUMP STATION ) AD3-1 CEH (61796 ) MvW ADDENDUM NO. 3 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 ACKNOWLEDGEMENT BY BIDDER. Each bidder shall acknowledge receipt of this Addendum 3 in the space provided in the Bid Form. December 28, 1999 BLACK & VEATCH CORPORATION Iz/.28/94 Receipt Acknowledged: Company: By: Date (FORT WORTH WATER DEPARTMENT ) 12/28/99 (CLEAR FORK PUMP STATION ) AD3-2 CEH (61796 ) MVW ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77- 060770160150 CITY OF FORT WORTH, TEXAS 1999 Addendum Release: December 22, 1999 Bids to be Received: December 30, 1999 A. SCOPE. This addendum forms a part of the Contract Documents referenced above and modifies the original Contract Documents and plans. Contractor shall acknowledge receipt of this Addendum No. 2 on the space provided on page B-4 of the Proposal, and on the outside of the envelope of the bid. Failure to acknowledge receipt of this Addendum No. 2 could subject the bidder to disqualification. This Addendum No. 2 shall cover the following changes in the Contract Documents: B. SCOPE. This Addendum No. 2 consists of pages AD2-1 through AD2-4. This Addendum No. 2 covers the following additions and changes to the specifications and drawings for this project. C. PROPOSAL 1. Page B-3 a. Provide the following paragraph immediately after the line for the Total Amount. "Contractor shall be reimbursed on Pay Item 6 only for the amounts charged by procurement contractor. Contractor shall not be allowed any markup or fees on the procurement contractor's charges. All bidders shall include $500,000.00 for Pay Item 6 in their bid regardless of whether the full $500,000.00 will be charged for this work." 2. Page B-3 a. Delete the statement regarding Contract Time that reads as follows: "Ability to Deliver Raw Water from 150 Calendar Days Four New 30 MGD Mixed Flow Pumps (3/2/00—7/30/00)" (FORT WORTH WATER DEPARTMENT ) 12/22/99 (CLEAR FORK PUMP STATION ) AD2-1 CEH (61796 ) CEH b. Modify the statement regarding Contract Time as follows: "Contract Completion 215 Calendar Days (3/2/00 — 10/2/00)" 3. Page B-4 a. Add the following paragraph after the first paragraph. "Contractor shall provide in his bid at no additional cost to the Owner for one remobilization due to Owner delays in providing either the 60-inch butterfly valve or the two 30-inch check valves." D. SPECIFICATIONS 1. Section 01015, Paragraph 1.0. a. Page 1, second paragraph, second sentence. Replace the word "spay" with the word "spray". b. Page 1, fourth paragraph. Delete the fifth sentence "A sump pump shall be installed in the vault". C. Page 2, Paragraph 1. Replace words "geotextile fabric and flex base" with "concrete". 2. Section 11210, Paragraph 11 B-3.08 Motor, Page 5 a. Add the following paragraph after the first paragraph. "Each motor shall be supplied with a space heater, sized to prevent condensation on the motor core and windings. Space heater shall be isolated and located to prevent heat damage to motor components and adjacent painted surfaces. Space heater shall be suitable for 120 volt AC single phase power." 3. Section 11210, Paragraph 11 B-3.10 Safety Switch. a. Add the following sentence. "The starter provided on the traveling water screen shall be padlockable." (FORT WORTH WATER DEPARTMENT ) 12/22/99 (CLEAR FORK PUMP STATION ) AD2-2 CEH (61796 ) CEH 4. Section 13400 a. Page 1, Paragraph 1-1. Add the following sentence. "HSQ contact shall be Chris Sorensen at (650) 952-4310." E. DRAWINGS. 1. Sheet CF-3/3 of 25, Clear Fork Pump Station Site Plan. a. Delete the words "and replace" on Note 2. 2. Sheet CF-6/6 of 25. Existing Pump Station Operating & First Floor Plans. a. Add the following note to aluminum ladder for access hatches. "Provide safety extension to aluminum ladder, Halliday Products, Inc. 36"L Series L1 E safety extension or approved equal." 3. Sheet CF-8/8 of 25 Existing Pump Station Sections and Details a. Section 3 Notes, Note 3 Decrease replacement bar lengths to 3'0". 4. Sheet E-3/22 of 25. Electrical MCC One-Line Diagram. a. Add the followingnote. . "4. Multilin 469 units for pumps PS-2 and PS-4 to be furnished loose for installation by contractor into the adjustable frequency drive." (FORT WORTH WATER DEPARTMENT ) 12/22/99 (CLEAR FORK PUMP STATION ) AD2-3 CEH (61796 ) CEH ACKNOWLEDGEMENT BY BIDDER. Each bidder shall acknowledge receipt of this Addendum 2 in the space provided in the Bid Form. December 22, 1999 BLACK & VEATCH CORPORATION :..... .... .L. � CLAY ED ,,,t,E+*`_',°�,`�,..i� . 140Ai��t,Oc�``r 12� 22f q� Receipt Acknowledged: Company: By: Date (FORT WORTH WATER DEPARTMENT ) 12/22/99 (CLEAR FORK PUMP STATION ) AD2-4 CEH (61796 ) CEH ` ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77- 060770160150 CITY OF FORT WORTH, TEXAS 1999 Addendum Release: December 16, 1999 Bids to be Received: December 30, 1999 A. SCOPE. This addendum forms a part of the Contract Documents referenced above and modifies the original Contract Documents and plans. Contractor shall acknowledge receipt of this Addendum No. 1 on the space provided on page B-4 of the Proposal, and on the outside of the envelope of the bid. Failure to acknowledge receipt of this Addendum No. 1 could subject the bidder to disqualification. This Addendum No. 1 shall cover the following changes in the Contract Documents: B. SCOPE. This Addendum No. 1 consists of pages AD1-1 through AD1-21 and figures designated as A through E. This Addendum No. 1 covers the following additions and changes to the specifications and drawings for this project. C. PROPOSAL 1. Page B-3 a. Delete the phrase in the third paragraph stating "Ability to Deliver Raw Water from Two New 30 MGD Mixed Flow Pumps 120 Calendar Days (3/2/00—6/1/00)" Replace with the following phrase "Ability to Deliver Raw Water from Two New 30 MGD Mixed Flow Pumps 120 Calendar Days (3/3/00-6/30/00)" D. SPECIAL INSTRUCTIONS TO BIDDERS 1. M/WBE PROJECT GOALS +� (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-1 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 i a. Delete the existing sentence and add the following sentence. The City's MBE/WBE goal for this project is 25% of the base bid value of the contract. E. SPECIFICATIONS. 1. Section 04200— BUILDING MASONRY a. Replace Section 04200— BUILDING MASONRY with the attached section AD1-04200. Seepages AD1-10 through AD1-18 of this addendum. 2. Section 04210— CAST STONE a. Page 1. Item 1, SCOPE. Replace the sentence with the following: r "This section covers the furnishing and installation of cast stone sills." 3. Section 07531 — SINGLE-PLY ROOFING, MECHANICALLY FASTENED a. Page 4. Item 2-1, MATERIALS. Revise the insulation paragraph to read as follows: "1-1/2 inch minimum thickness with factory tapered sections..." 4. Section 07600— SHEET METAL a. Page 3. Item 2-2.01, TYPES OF MATERIALS. Remove "Through- Wall Flashing". b. Page 3. Item 2-3, Item 2-2.02, THROUGH-WALL FLASHINGS. Remove this paragraph. C. Page 4. Item 2-3, ROOF DRAIN FLASHING. Remove this paragraph. d. Page 4. Item 2-4, MISCELLANEOUS METAL FLASHINGS. Remove the second paragraph. e. Page 4. Item 3-2.01, THROUGH-WALL FLASHINGS. Remove this paragraph. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-2 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 f. Page 5. Item 3-2.03, REGLETS. Remove this paragraph. g. Page 5. Item 3-2.04, COUNTER FLASHINGS. Remove this paragraph. h. Page 5. Item 3-3, ROOF DRAIN FLASHINGS. Remove this paragraph. 5. Section 08110 — STEEL DOORS a. Pae 1 Item 2-1 ACCEPTABLE PRODUCTS. Remove the first paragraph and substitute with the second paragraph. Also, remove "The Ceco Corporation and Pioneer Industries" from below the second paragraph only. b. Page 2. Item 2-2, MATERIALS. Remove the references to "Internal Reinforcing" and "Fillers for Internally Reinforced Doors". C. Page 4. Item 2-4.03, CONSTRUCTION. Remove the second paragraph. 6. Section 08700 — FINISH HARDWARE a. Page 3. Item 3-4, HARDWARE SCHEDULE. Modify the following: "D-101 Provide 8 butts in lieu of the 6 indicated. Provide 2 cylinders in lieu of the 1 indicated. D-102 Provide 4 butts in lieu of the 3 indicated" 7. Section 11210 — TRAVELING WATER SCREENS a. Page 3, Item 11 B-3.02 Materials. Delete the phrases "Screen Cloth Square mesh 12 W&M gage (0.0105 inch dia.) steel wire, galvanized" and add the following phrase "Screen Cloth Square mesh, 14 W&M gage (.080 gage) 304 stainless steel wire". b. Page 4, Item 11 B-3.03 Main Frame. Replace the words "four-post construction" and replace with the words "two-post construction" in the first sentence. c. Page 4, Item 11 B-3.03 Main Frame. Replace the words "both the ascending and descending runs" with the words "on the ascending runs" in first sentence of the second paragraph. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-3 MRR 1 (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 d. Page 4, Item 11 B-3.05. Terminal Machinery. Delete the third paragraph and replace with the following sentence: "The drive chain shall be located inside the screen housing." e. Page 6, Item 11 B-3.10. Safety Switch. Delete this paragraph and replace with the following sentence. "Provide a reversing motor starter mounted in the screen control panel, and local stop/reverse jog pushbutton station. 8. Section 13400— INSTRUMENTATION a. Page 4. Item 2-1.02, METERING ACCURACY. Replace the first sentence in paragraph a with the following: "Magnetic or transit-time ultrasonic metering: 1.0 percent of actual flow between 10 and 100 percent of scale." 9. Section 13400, Appendix 2— INPUT/OUTPUT LISTING a. Page 1. Ref. No. AI-003. Revise the description to read "Raw Water pH". Revise the process range to read "0-14 PPM". b. Page 1. Ref. No. Al-008 through AI-012. Revise the process range to read "0-20 PSI". 10. Section 15130—Add the attached Section 15130, PRESSURE GAUGES 11. Section 15500 — HEATING, VENTILATING, AND AIR CONDITIONING a. Page 5. Item 2-4.03.01, ELECTRIC UNIT HEATERS. Revise the first sentence of the second paragraph to read "...include fan and motor assembly, built-in contactor, safety disconnect switch, and a control transformer ...". l� 12. Section 16050 — ELECTRICAL ,w a. Page 15, Item 3-4.01.w, INSTALLATION OF INTERIOR AND EXPOSED EXTERIOR CONDUIT. Replace the word "steel" with "aluminum". 13. Section 16480 — 600 VOLT CLASS MOTOR CONTROL CENTERS a. Page 2. Item 1-2.04, SYSTEM CHARACTERISTICS. Replace the sentence as follows: (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-4 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 "This equipment will be connected to a 480 volt, 3 phase, 60 hertz, 4 wire system with a solidly grounded neutral." b. Page 4. Item 2-2.05, BUSING. Add the following sentence. "A fully rated neutral bus shall be furnished continuous through the control center." D. DRAWINGS. 1. Sheet CF-2/2 of 25. Pump Station Site Plan. a. Add the following note: "Contact Jim Cole at 871-7676 for P&CS Utilities in Trinity Park." 2. Sheet CF-3/3 of 25. Pump Station Site Plan. a. See attached Figure A for site modifications to the MCC Building and transformer pad. b. Meter Vault Site Plan: Add the following note: "Provide 60 feet of construction safety fence between vault and asphalt path." C. Add the following note to the Pump Station Site Plan. T. Provide detour and barricades for jogging path when constructing the new access road to the north side of the Pump Station." d. Add the following note to the Pump Station Site Plan. "9. Provide protective fencing around the drip line of Tree 1." e. Change the legend title "5" CONCRETE PAVING" to "NEW 5" CONCRETE PAVING." 3. Sheet CF-4/4 of 25. MCC Building and Existing Pump Station Elevations. a. West, North and East Elevations— Provide control joints (CJ) above doors and glass block openings at each jamb within the split face block courses above. Do not extend into top block course (bond lip beam). (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-5 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 b. East Elevation — Relocate door D-102 and glass block GB-104 to the southeast corner of the building. See Attached Figure B. C. North Elevation — Extend the north face of the MCC Building by 2'-8". See Attached figure B. d. Add the following note: "4. Approximately 50 cubic yards of select fill shall be imported to the site and compacted on the west side of the pump station building to provide for constructing the MCC building base slab at the elevation indicated on the drawings." 4. Sheet CF-9/9 of 25, Existing Pump Station Roof Plan, Sections and Details. a. Detail B — Revise the Note: "12"w x 6"h Conc. Opng." to read as follows: "Saw cut 12"w x 6"h Opng. in Existing Conc. Parapet". b. Detail B —The Note °1-1/2" Insulation" shall read as follows: "Min. 1-1/2" Insulation." C. Existing Pump Station — Roof Plan. Add Note 2: "2. Contractor to coordinate hatch installation with roofing system manufacturer. Contractor shall see roofing system manufacturer for special installation details at the space between new roof hatch and existing parapet." d. Detail E —Add the following note: "Note: Sign shall be .04 mil vinyl clad aluminum." 5. Sheet CF-10/10 of 25, MCC Building --- Plans, Sections, and Details. a. MCC Building Plans—The MCC Building Floor Plan, Glass Block Floor Plan, and Roof Plan have been modified. Remove and replace with the attached Figure B. The building has increased in size by 2'-8" to the west. Door D-102 and Glass Block GB-104 have been moved to the south face and Glass Block GB-105 has been moved to the east face. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-6 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 b. Detail B — Remove "Through Wall Flashing" below top course. C. Detail B — Remove the "Rake and Caulk"joint pointing below the top course. Provide a "Rake and Caulk"joint at the top of concrete slab elevation. d. Section 1 — Provide a fully grouted bond beam with 245 bar at the base of the masonry wall. e. Structural Notes—The "20 psi" indicated for roof live load (unreduced) shall be "20 psf'. 6. Sheet CF11/11 of 25, MCC Building and Existing Pump Station Door and Louver Schedule and Details. a. Door Head at Glass Block Sill/Detail B— Revise the shelf angle note from "74"" long to "5'-11" at glass block, 3'-4" at Door D-102, and 6'-0" at Door D-101." b. Jamb at Glass Block/Detail C— Provide caulk both sides all around at channel and masonry wall. C. Glass Block Sill/Detail F—The lug type cast stone sill indicated shall be a "Slip Sill" type which will not extend into the jamb each side. d. Lintel/Detail M — Remove the 1/2" plate extension beyond the outside face of the door. Locate 1/4" inside the outside face of the door. Field weld and caulk. The lintel plate shall become 6-3/4" wide in lieu of the 7'-4" indicated by dimension and note. 7. Sheet CF13/13 of 25, Miscellaneous Details. a. Add the following note to Detail N. 1. Use 7" middle ring. Inform pump manufacturer to weld lugs to pump discharge pipe to provide 1'11" dimension from lug face to end of plain end." 8. Sheet M-1/19 of 25, Heating, Ventilating. and Air Conditioning Plans and Schedules. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-7 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 a. MCC Building — Floor Plan. See attached Figure B for modifications to the building size and door relocation. Equipment to remain on the east wall as indicated. 9. Sheet E-2/21 of 25. Electrical Site Plan. a. Site Plan — Reference Figure A for revised mcc building location. 10. Sheet E-3/22 of 25. Electrical MCC One-Line Diagram. a. Motor Control Center (MCC) One-Line Diagram — Revise main bus description to be 4 wire.Revise circuits M-3C, M-5C, Al-4, and A2-4 to be 6-1 TR#16S, 1 1/4". 11. Sheet E-4/23 of 25. Electrical Schematics atics And RTU One-Line Diagram. Schematics for Raw Water Pumps PS-1, PS-3 and schematic for Raw Water Pumps PS-2, PS-4 —Add the Multilin motor management relay specified in the 600 volt motor control center section. 12. Sheet E-5/24 of 25. Electrical Pump Station And Building Plans. a.Existing Pump Station Power Plan Upper Level —Add bearing temperature relays at each motor. b.Existing Pump Station Electrical Wetwell Plan —Add the area designation of "Area Type 7A" to the plan. c. MCC Building Electrical Plan—Add a #4/0 ground cable from the grounding pad to transformer L2. Add a note to the USGS meter equipment to clarify the equipment as furnished and installed by others. Reference Figure B for revised mcc building dimensions. 13. Sheet E-6/25 of 25. Miscellaneous Electrical Details And Lighting Fixture Schedule. a. Add instrument installation details shown on Figures C, D, and E. r (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-8 MRR (61796 ) bk ADDENDUM NO. 1 (CONTINUED) CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-060770160150 ACKNOWLEDGEMENT BY BIDDER. Each bidder shall acknowledge receipt of this Addendum No. 1 in the space provided in the Bid Form. December 15, 1999 BLACK & VEATCH CORPORATION n CLAY.....�.!<. . .....,..•;�,�': ur:, Receipt Acknowledged: Company: By: Date: (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-9 MRR (61796 ) bk Section AD1-04200 BUILDING MASONRY PART 1 - GENERAL 1-1. SCOPE. This section covers building masonry. Pff 1-2. GENERAL. Building masonry shall be constructed of units of the types, dimensions, arrangements, and coursing indicated on the drawings and specified herein, complete with all materials, accessories, and appurtenances indicated, specified, or required. 1-3. SUBMITTALS. Before masonry construction is begun, the following drawings, data, specimens, and samples shall be submitted in accordance with the submittals section. If the source of a material is changed during the course of the work, the tests and reports required for preliminary review of that material shall be resubmitted. Specimens of the masonry units which will be used in project construction, showing range of colors, textures, finishes, and dimensions. Shop drawings or manufacturers' literature showing details of anchors, ties, and metal accessories to be used in masonry construction. Manufacturer's literature and data for any admixture added to the grout or mortar. 1-3.01. Concrete Block Samples. After the general colors and textures have been selected, sample block panels shall be submitted to the Engineer for final color selection. The panels shall be of sufficient size to show the proposed shade distribution and shall be submitted in as many different textures, arrangements, and shade combinations as required for making a proper selection. Panels shall be at least five courses high and three stretcher units wide, laid up in running bond. 1-4. SAMPLE PANELS. Before the installation of any masonry materials, one sample panel, 6-8" long by 4'-0" high, showing proposed color range, texture, bond, mortar joints, split face and smooth surface block course, and workmanship for masonry materials shall be erected at the building site. The panel shall have concrete block laid in running bond. The panel shall be of the thickness indicated on the drawings for walls of similar construction. The concrete block panel shall be representative of the typical wall construction indicated on the drawings, complete with split face and smooth face courses, joint reinforcement, and insulation. No masonry work shall progress until the (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-10 MRR (61796 ) bk Engineer has accepted the sample panel. An accepted panel shall become the standard of comparison for all masonry work it represents, and shall not be destroyed or moved until masonry work is completed. 1-5. STORAGE AND HANDLING. All masonry units shall be handled in a manner which will prevent soiling, chipping, or damage of any kind. Broken, discolored, chipped, or otherwise damaged facing units will be rejected and shall be replaced with undamaged units. Masonry units shall be stored on pallets, shall be protected against contamination and staining, and shall be kept covered and dry at all times. Lime and cement shall be stored under cover in a dry place. Sand shall be stored so that the inclusion of foreign materials is prevented. Whenever sand is piled directly on the ground, the surface beneath the sand shall be smooth, well drained, and free from dust, mud, and debris. The bottom 6 inches of each pile shall not be used in mortar. Insulation shall be stored under cover in a dry place, and shall be protected from the weather at all times. PART 2 - PRODUCTS 2-1. MATERIALS. Sizes of concrete block are nominal, the actual size being slightly smaller to allow for mortar joints. Concrete Block ASTM C90, Type 1, moisture- controlled units, 8 by 16 inches, with special shapes as required; lightweight aggregate conforming to ASTM C331. Color and texture as selected by the Engineer. Split Face Block ASTM C90, Type 1, moisture controlled units, 8 by 16 inches by 12 inches wide with special shapes and sizes required; aggregate with tolerances specified in ASTM C33; color and texture as selected by the Engineer. Concrete Brick ASTM C55, Type I, Grade N-1, moisture-controlled units. Sand ASTM C144, natural sand. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-11 MRR (61796 ) bk Pea Gravel ASTM C33 coarse aggregate, re ate, 90 percent passing 3/8 inch sieve, 90 percent retained on No. 4 sieve. Portland Cement ASTM C150, Type I. Hydrated Lime ASTM C207, Type S. Quicklime ASTM C5, pulverized. Lime Putty Quicklime, thoroughly slaked and stored for one day; kept moist until used. Integral Waterproofing Aluminum stearate, ammonium stearate, or calcium stearate, " 2 percent of weight of cement; A. C. Horn "Hydratite", Master Builders "Omicron Mortarproofing", Sika "Red Label", or Sonneborn "Hydrocide". Water Repellant Fed Spec SS-W-110C clear, colorless, Prime-A-Pell 200, Prosoco "Saltguard", or equal. Water Clean and free from deleterious substances. Joint Reinforcement Fabricated from cold drawn steel wire, ASTM A82; galvanized, ASTM A153, Class B-2. Ladder Type AA Wire Products or Dur-O-Wal; two-rod and three-rod types as indicated on the drawings. Standard Weight 9 gage side rods and cross rods. Corners Prefabricated corners. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-12 MRR (61796 ) bk +rr Dovetail Anchors Galvanized, ASTM A153, Class B-2. Anchors 12 gage, 1 inch wide, punched or notched for mortar grip; length as specified, or extending to within 1/2 inch of outside face of masonry facing units. Slots 22 gage, with fillers. Reinforcing Steel ASTM A615, Grade 60, except No. 3 bars which may be either Grade 40 or Grade 60. Loose Fill Insulation Granular perlite, ASTM C549, or IP vermiculite, ASTM C516, treated for water repellency; Grace "Zonolite" or Grefco "Permalite". Preformed Control Joint Synthetic rubber; AA Wire Products "Titewall AA1000" or Dur-O-Wal "Rapid Control Joint". a.. 2-2. COLORS. Colors for the block masonry will be selected from samples submitted as specified. Equivalent colors by other manufacturers may be furnished subject to acceptance by the Engineer. 2-2.01. Concrete Block. Concrete block will be selected by the Engineer and the Owner from catalog data submitted by the Contractor. The general color shall be gray hues. Catalog data shall be submitted showing as many different colors and textures as required for proper selection. 2-3. MORTAR. The method of measurement of all mortar ingredients shall be accurate and shall ensure definite and uniform proportions. The use of masonry cement will not be acceptable. 2-3.01. Masonry Mortar. Masonry mortar shall conform to ASTM C270, except as modified herein. Mortar shall be machine mixed for at least 5 minutes and shall be used within 90 minutes after mixing. Mortar left when work is stopped shall be discarded. Remixing of mortar more than 90 minutes old with additional water, cement, or other materials will not be acceptable. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-13 MRR (61796 ) bk Mortar shall be mixed in volumetric proportions as follows: Portland Hydrated Lime Sand Type Cement or Lime Putty max Type S 1 1/2 4 The sand content specified above is maximum quantity. Integral waterproofing shall be added to each mortar mixture. 2-3.02. Grout Fill. Grout fill for filling bond beams and other reinforced masonry shall be concrete grout meeting the requirements of ASTM C476, mixed in the volumetric proportions of 1 part cement, 2-1/2 parts sand, and 1-1/2 parts pea gravel. Only enough water shall be added to produce a mixture which is flowable, but which will not show an excess of water when placed. Unless otherwise specified, grout fill shall have a slump ranging from 8 to 11 inches. PART 3 - EXECUTION 3-1. MORTAR JOINTS. Masonry shall be laid in straight, level, uniform courses, with mortar joints of uniform width. Head joints shall approximately equal the horizontal joints in width. In laying up concrete block masonry, abutting surfaces of head joints shall be completely and solidly cemented together with mortar. All solid masonry units and hollow units with horizontal cells shall be laid on a full bed of mortar. All unfilled hollow masonry units with vertical cells shall be laid with face shell mortar bedding, except that starter courses shall be laid on a full bed of mortar. Web joints of all cores which will be subsequently filled with grout fill shall be fully mortared. The filling of masonry joints shall mean that the entire space between abutting surfaces of units is full, and that the body of the mortar is forced against and into the porous surface of each unit. All exterior and exposed interior mortar joints, except joints which are to be raked, shall be tooled to a smooth uniform surface and shall be finished free of voids using a rounded tool. Mortar joints specified to be caulked shall be raked to a depth of 1/2 inch. Tooling of joints shall be regulated so that the mortar for each wall space has a uniform appearance. 1 3-2. BONDING AND REINFORCING. Except where otherwise indicated on the drawings, all concrete block shall be laid in running bond. All masonry shall be reinforced and anchored as indicated on the drawings and as specified herein. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-14 MRR (61796 ) bk Unless otherwise specified, all concrete block masonry shall be bonded and reinforced with continuous ladder type joint reinforcement spaced not more than 16 inches apart vertically. The joint reinforcement shall have one longitudinal rod at each face shell of the masonry units. Except where bond beams are indicated on the drawings, the top three courses of all masonry walls, including backup, shall have continuous joint reinforcement placed in each joint (8 inches on centers). Joint reinforcement shall be terminated at expansion joints and control joints. Openings in masonry walls shall have joint reinforcement placed in the two courses immediately above lintels and in the two courses immediately below all sills. Joint reinforcement shall extend 24 inches past openings on each side. The width of joint reinforcement (side rod to side rod) in each case shall be approximately 2 inches less than the nominal overall thickness of the wall in which it is placed. All joint reinforcement shall be fully embedded in mortar and shall be covered with at least 5/8 inch of mortar on the exterior face. The ends of sections of joint reinforcement shall be lapped at least 8 inches. Joint reinforcement shall be lapped full width at corners and intersections, or prefabricated corners and tees shall be used. Unless otherwise indicated on the drawings, masonry walls which abut concrete beams shall be anchored to the concrete by anchor slots cast in the concrete and dovetail anchors built into the masonry. Dovetail anchors shall also be placed in each bond beam and in the course above and below each bond beam. Concrete block bond beam units shall be provided, installed, and reinforced with reinforcing steel where required and as indicated on the drawings. Bond beam units shall be filled with grout fill as specified herein. Reinforcing steel shall be continuous around corners, and all laps shall have a minimum length of 48 bar diameters. At expansion joints, all bond beam reinforcing shall be discontinuous. At control joints, 50 percent of the bond beam reinforcing shall be discontinuous. Vertically reinforced concrete block cores shall be provided as indicated on the drawings. Reinforcing shall be accurately placed and securely tied to prevent shifting during core filling. All lap splices shall have a minimum length of 48 bar diameters. Mortar fins which project into cores more than 1/2 inch and all loose mortar and debris shall be removed before filling the cores. Cores shall be filled with grout fill as specified herein. 3-2.01. Grout Fill. Unless otherwise acceptable to the Engineer, grout fill shall be placed in lifts not to exceed 5 feet. Pours exceeding 12 inches in height shall be consolidated by mechanical vibration and reconsolidated after initial water loss and settlement. Bond beam fill shall not be mechanically vibrated. Grout fill (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-15 MRR (61796 ) bk shall be placed in reinforced block cores, bond beams, and in other locations indicated on the drawings. 3-3. LAYING MASONRY UNITS. All masonry units shall be free from dust, dirt, and surface moisture when laid. Concrete blocks shall be dry when laid. All masonry shall be laid to a line. Walls shall be plumb and straight and in level courses. At no time shall any part of masonry construction project more than 8 feet above adjacent work. When work is suspended, the tops of exterior masonry walls shall be covered and protected from the weather. Only whole, undamaged units shall be used in corners and at jambs, to maintain uniformity of appearance. Masonry units laid in running bond in exposed locations shall be so constructed that vertical joints in alternate courses lie in the same vertical lines, midway between the vertical joints in adjacent courses. Masonry units shall be saw-cut to provide openings and to accommodate embedded items. Anchors shall be securely embedded in mortar. Door, glass block, and window frames shall be maintained plumb and true. Masonry shall be built tightly against interior door frames. A caulking space shall be provided between exterior door and glass block frames and masonry in accordance with the details indicated on the drawings. The jambs of built-in hollow metal door frames shall be completely filled with grout fill or mortar. Lintels shall be provided over all openings wider than the length of a masonry unit. Lintels shall be of the types and sizes indicated on the drawings or as required, and shall be acceptable to the Engineer. Lintels longer than 3 feet shall bear on solid masonry units or on grout-filled cells of hollow units at least one masonry course in height, unless otherwise indicated on the drawings. All embedded items shall be set and securely anchored in the masonry work as indicated on the drawings or as acceptable to the Engineer. Joints between masonry and embedded items shall be pointed. All concrete block cores not grout filled shall be filled with loose insulation. The insulation shall be poured into the space as the work progresses, with care taken to fill all spaces and voids. F" Masonry units shall be selected and laid so that the exposed face of each unit is free of broken corners, chipped edges, or other defects which would be detrimental to the appearance of the wall surface. 3-4. CONTROL JOINTS. Control joints in masonry walls shall be constructed as indicated on the drawings. Preformed control joint strips shall be placed in the (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) AD1-16 MRR (61796 ) bk wall as construction proceeds, with masonry units laid tight against the strips. Control joint filler strips shall be at least 4 inches wide and shall have a thickness equal to at least 1-1/2 times the nominal width of the joint. The filler strips shall be firmly bonded to one joint face by the adhesive backing, held back 1/2 inch for caulking, and placed under compression by the abutting masonry. All joints in filler strips shall be tightly butted. 3-5. ANCHORS AND INSERTS. All necessary ties, anchors, bolts, inserts, bucks, flashings, sleeves for piping, conduits of every kind, window, glass block, and door frames, and other work shall be accurately set and securely held in the masonry work as indicated on the drawings or in a manner acceptable to the Engineer. Sleeves shall be provided where small piping passes through the masonry. 3-6. LOW TEMPERATURES. When the temperature of the surrounding air is below 40 F, or when the outdoor temperature is likely to fall below freezing at any time during the 24 hour day, the following precautions shall be taken to prevent freshly laid masonry from freezing: a. In addition to the protection specified for ordinary conditions, masonry materials shall also be kept from contact with snow, ice, or dampness of any kind. b. The temperature of the mixed mortar shall be between 70 and 120 F. Mixing water shall be warm, but not above 165 F. If necessary, sand shall be heated also. Mortar mixing equipment shall be heated before it is used. The use of salt or calcium chloride is not acceptable. c. Masonry units shall be free of ice and snow and shall be above freezing when laid. If the outdoor temperature is below 30 F, units shall be heated to at least 40 F. If the temperature is below 0 F, units shall be heated to at least 60 F. Heating shall be done so that the units are not damaged. d. Masonry units shall not be laid on surfaces that are frozen or covered with snow or ice. e. Masonry laid during freezing weather shall be kept warm for at least 3 days after laying. The air temperature at the masonry surface shall be kept between 45 and 90 F, using heating methods that will not unduly dry out or otherwise damage the masonry. Heat shall be applied to both sides of the wall, with provisions for proper circulation of air. The masonry shall be suitably housed or covered. (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-17 MRR (61796 ) bk 3-7. HIGH TEMPERATURES. When the ambient air temperature exceeds 99EF in the shade and the relative humidity is less than 50 percent, masonry shall be protected from direct exposure to wind and sun during and for 48 hours after erection. 3-8. FINISH POINTING. On completion of the work, all exposed masonry shall be pointed where necessary and all voids and holes in the mortar shall be filled to match adjacent joint surfaces. Defective joints shall be cut out and repointed with mortar. Care shall be taken to produce a uniform overall appearance. Spottiness due to variations in either materials or workmanship will not be acceptable. 3-9. PROTECTION FROM DAMAGE. Masonry and all embedded or built-in items shall be carefully protected from damage. Masonry walls discolored by paint, mortar, or concrete shall be rebuilt with new materials. Where concrete is placed adjacent to previously constructed masonry, the masonry shall be adequately protected against splashing of concrete paste and from other damage. Where concrete is placed on top of previously constructed masonry, the masonry shall be protected from splashing and spilling of concrete and penetration of water with polyethylene film or Sisalkraft paper placed on top of the masonry and extended down each side of the wall as required. The protective covering shall be neatly trimmed away at face of the wall after form removal. 3-10. CLEANING. Following finish pointing, all exposed masonry surfaces shall be cleaned to remove all surface stains and smears. Mortar smears or droppings on concrete blocks shall be removed with a steel trowel after they have hardened to the extent that removal will not cause additional smearing. Any remaining mortar shall be removed to the extent possible by rubbing with a small piece of block. All surfaces shall then be thoroughly brushed. 3-11. OWNER'S FIELD CONTROL TESTING. No field control tests are required. End of Section (FORT WORTH WATER DEPARTMENT ) 12/15/99 (CLEAR FORK PUMP STATION ) ADI-18 MRR (61796 ) bk Section 15130 PRESSURE GAUGES PART 1 - GENERAL 1-1. SCOPE. This section covers analog dial-type pressure gauges and accessories to be furnished and installed at the locations indicated in the Gauge Schedule at the end of this section. Gauges to be furnished by an equipment supplier, either with an item of equipment or as a component of an equipment package, are covered in the applicable equipment section. Gauge piping and fittings are covered in the miscellaneous piping section. 1-2. GENERAL. 1-2.01. General Equipment Stipulations. The General Equipment Stipulations shall apply to all equipment furnished under this section. 1-2.02. Governing Standard. Except as modified or supplemented herein, all gauges shall conform to the requirements of ANSI/ASME 840.1. 1-2.03. Accuracy Grade. Unless otherwise specified, gauge accuracy shall be ANSI Grade 2A or better. 1-3. SUBMITTALS. Complete drawings or catalog cuts, together with detailed specifications and data covering materials used, shall be submitted in accordance with the submittals section. PART 2 - PRODUCTS 2-1. GAUGE CONSTRUCTION. Unless otherwise specified, gauges shall be indicating dial type, with C-type phosphor bronze Bourdon tube; stainless steel rotary geared movement; phenolic or polypropylene solid front turret case; adjustable pointer; stainless steel, phenolic, or polypropylene ring; and acrylic plastic or shatterproof glass window. The dial shall be 4-1/2 inches in diameter, with white background and black markings. The units of measurement shall be indicated on the dial face. Subdivisions of the scale shall conform to the requirements of the governing standard. Pointer travel shall be not less than 200 degrees [3.5 rad] nor more than 270 degrees [4.7 rad] of arc. (Fort Worth Water Department) 15130 12/15/99 (Clear Fork Pump Station) AD1-19 CEH (61796) CEH The units of measurement, range, and mounting configuration of each gauge shall be as indicated in the Gauge Schedule. 2-2. GAUGE ACCESSORIES. 2-2.01. Isolation Valves. Each gauge shall be provided with a threaded end ball-type shutoff valve as specified in the miscellaneous valves section. 2-2.02. Snubbers. Unless otherwise indicated in the Gauge Schedule, each pressure gauge shall be provided with a pressure snubber. Each snubber shall be of internal or external design, fabricated of bronze, and of a size and pres- sure range compatible with the gauge served. Pressure snubbers shall be Operating and Maintenance Specialties "Ray Snubbers", Ashcroft "Pulsation Dampers", Weksler "Piston Type Pressure Snubbers", or Trerice "Pulsation Dampeners". 2-2.03. Gauge Isolators. Pipe-mounted diaphragm seals shall be provided where indicated in the Gauge Schedule. Diaphragm seals shall be thread-attached type with removable cleanout AISI Type 316 stainless steel diaphragm, zinc or cadmium plated carbon steel upper housing, and bronze lower housing. The diaphragm seal shall be of "continuous" design to safely contain the process fluid in the event of gauge breakage or removal with the system under pressure. The lower housing shall be provided with a tapped 1/4 inch NPT flushing connection and an MxF stainless steel needle valve. Each isolator and diaphragm seal and the gauge served shall be factory assembled, filled with a suitable fluid, and calibrated as a unit. PART 3 - EXECUTION 3-1. INSTALLATION. Gauges shall be installed at the locations indicated on the drawings. Installation configurations shall conform to the requirements of the Gauge Schedule. All gauges, snubbers, and diaphragm seals shall be installed in the vertical upright position. Threaded connections shall be assembled using teflon thread tape or teflon thread sealer, as specified in the miscellaneous piping section. All connections shall be free from leaks. Lines shall be purged of trapped air at gauge locations prior to installation of the gauge or diaphragm seal. (Fort Worth Water Department) 15130 12/15/99 (Clear Fork Pump Station) ADI-20 CEH (61796) CEH 2E . E C� z z z z z E \ ¢ ¢ ¢ n R q q q q q q q q q q - k U) ) a @ 2 \ / ( 3 3 k k� � � cc § � 6 2 2 2 8 I co k a. a. a. a. a. § E ] � ML a. E < F- a a a a a � 2 _ k CS R C� J J J J I 2 § / S ; � « � EI ' • � ° 2 : - a a a a a k k �� cr © � ° � c @ 12 5. / k 2 ® 0) Q U) / ® = E (D k • 2 / ] f � k � tm � f � $ $ $ $ $ I e - § 7 a -0 CL ■ o wE o z ® CL - ' ` a z z z z z 2 Q) < 0000 = o u 2EEEEEE � � O � C } } } } a. � ƒ � 0) 0U� � � i r Aw Air- i NORTH = S198 79 r + + + + + r EAST = 5093 .53 + + + + + + NORTH = 5180.94 + + + + EAST = 5083.89 + + D + + TRANSFORMER + + Q r 9'-0" x 8 '-6" + CONCRETE PAD /` + EQUIPMENT PAD + + + + D + NORTH = 5195 .61 r + + ERST = 5081 .59 ! + 0 l U u 3 , c- t + z + a + + 1 O ui O + D + ti JN + 1 �D � Lu R + + + ad QEn + +cj Ln k + ' U + + REMOVE EXIST. 6' CHAIN�LINK ' + D FENCE AND REPLACE WITH W 8' Ili_4„ { ' CHAIN LINK FENCE (NO BARBED �i WIRE) + + NORTH _ 5189.31 �' ONO STp j EAS; = 5L53.93 OP + ' f + +00 ,/--- + + + + + + + p 1 INSTALL NEW PEDESTRIAN GATE °a ° ---- 12' SWING GATE WITH LOCK BfidC&%AMtCh-P FONT PORTA.TEXAS FIGURE A 4-20mR OUTPUT 120VRC POWER rFIT CONTRACTOR MOUNT 6 INSTRUMENT 4 '-6" ABOVE FLOOR - I RE rc 4) CABLE SUPPLIED BY INSTRUMENT MFR - 3/4" TO ORRIN 1/4" O.D. S.S. FROM TUBING SAMPLE PUMP TURBIDITY METER DETAIL C 0 NO SCALE }� o TYP. FOR RE/AIT-002 'r N ` O Q f O Z W 0 0 cr cn r FORT WORTH. TE%RS ti to FIGURE C W W J N a� a� w z o w z O �.. —0 LD ix x oEn c a �N Oz J')- O Z zoo cnCC cn Lu CC L) .,cn z 0 o cn w Z W JW C9 N CCOcc CC W f— J LL.00 H Z 0 w CC o O Z > owx Cr X: H CC Z CC J �s0 J I-U M U 2cc U I- >�+O CL X i I ol I..L 0 � Cn J O w Z 1-� o LU c3c o J W a I W Ym W w U 'n J HCCWEn w = cn mcc cn J 0 CD co xz coC-g0ww W 0 wz �f �z=� H z LJ0 ~ CCp0O U W CC HOzz wQf cn f CC— W LL W J O x O a' w Z� > I OQO w U W OW H f w J 1�� J J ►-F- w O o: CC Z .J O ZWN:~ U cr W W CCUN 0 cc w " �Z CCXx 3 ♦A J J z ccW— V J CC cc " Occ W Z X CC ♦A U U U f- J CC— Q �L• V! N .r U O Q 2 Z a �..♦ Z H J •LD .. 3 >Z p oZW o a •Y% O C) ' m Q Nfa f O O U>- Z Z W CC O O z & .LLP FORT YORTN. TEM r w p FIGURE D PROCESS � SHUT-OFF VALVE I/2" COPPER. SLOPE HORIZONTAL RUNS AT LEAST 1" PER FOOT . SUPPORT AS REQUIRED. UNION OR COMPRESSION FITTING TO ALLOW EASY FIELD REMOVAL TRANS. OF TRANSMITTER SHUT-OFF VALVE SLOWDOWN VALVE I I I I NC I i I 1 SUPPORT INSTRUMENT FROM . I I WALL OR FLOOR MOUNT PIPE I I STAND. PIPE STANDS SHALL BE O'BRIEN CORPORATION SWAGELOCK TYPE I I SADDLEPACK SERIES. OR CAPPED TEST PORTS FIELD FABRICATED I I EQUIVALENT. TYPICAL STATIC PRESSURE TRANSMITTER INSTALLATION NO SCALE TYPICAL FOR: PIT-OOSA THROUGH PIT-006 C3 0 O 0 Q s C17 D 0 Z W O Q CD ^ Bl0K.1CiV aUtC",LLP Q) FORT NORTH. T"AS _r m FIGURE E North Texas Municipal Qnst uctien COMDAnnv,_Cpn"Ctor Inc. 3181 F.M. 182 7 Street Address McKinney, TX 75069 City&State (972) 569-8537 Telephone CITY OF FORT WORTH, TEXAS WATER DEPARTMENT SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PROJECT NO. PW77-080770160150 DECEMBER, 1999 00-4j, 6 Iff- 11<1 C—aF,4F f OF 1. WCA a.'MOmltE� po::q W 64930....' C/ Q►� hi rJ........•��C+ AA1d1� Dec. 3 /'911 PREPARED BY BLACK&VEATCH, LLP 100 E. 1ST"STREET, SUITE 600 FORT WORTH, TEXAS 76102 (817) 429-7558 TABLE OF CONTENTS 1. PART A NOTICE TO BIDDERS Notice to Bidders Instructions to Bidders 2. PART B PROPOSAL Proposal 3. M/WBE BID SPECIFICATIONS 4. PART C GENERAL CONDITIONS 5. PART CS SUPPLEMENTARY CONDITIONS 6. PART D SPECIAL CONDITIONS 7. PART E TECHNICAL SPECIFICATIONS 01015 Project Requirements 01070 Abbreviations of Terms and Organizations 01300 Submittals and Construction Sequence 01400 Quality Control 01500 Temporary Facilities 01610 General Equipment Stipulations 01620 Equipment Schedule 02050 Demolition and Salvage 02200 Earthwork/Trenching/Bedding/Backfill 02512 Asphaltic Concrete Paving 02832 Chain Link Fencing 03300 Cast-in-Place Concrete 03600 Grout 04200 Building Masonry 04210 Cast Stone 04270 Glass Unit Masonry 05550 Anchor Bolts and Expansion Anchors 05990 Structural and Miscellaneous Metals 07531 Single-Ply Roofing, Mechanically Fastened 07600 Sheet Metal 07900 Caulking 08110 Steel Doors 08700 Finish Hardware 09900 Painting 10300 Louvers 11140 Vertical Flow Pumps 11210 Traveling Water Screens 13002 Full Flow Meter 13400 Instrumentation 14630 Traveling Bridge Crane 15060 Miscellaneous Piping 15061 Ductile Iron Pipe 15062 Steel Pipe 15100 Miscellaneous Valves 15101 Butterfly Valves 15105 Tilting Disc Check Valves 15108 Air Valves 15112 Sluice Gates 15400 Plumbing 15500 Heating, Ventilation &Air Conditioning 16050 Electrical 16150 Adjustable Frequency Drives (Installation Only) 16480 600 Volt Class Motor Control Centers 8. PART F BONDS AND INSURANCE Performance Bond Payment Bond Maintenance Bond Certificate of Insurance Contractor Compliance with Workers Compensation Law 9. PART G CONTRACT Contract Contract Attachment A - Agreement Assignment of Contract 10. PART H PLANS (bound separately) PART A NOTICE TO BIDDERS PART A - NOTICE TO BIDDERS Sealed Proposals for the following: CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PW77-060770160150 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office, City of Fort Worth, in the lower level of the Municipal Building, 1000 Throckmorton, Fort Worth, Texas 76102 until 1:30 P.M., Thursday, December 30, 1999,and then publicly opened and read aloud at 2:00 P.M. in the Council Chambers. The major portions of this project includes: • Installation of four 30 MGD Vertical Mixed Flow Pumps • Construction of a Motor Control Center Building • Electrical and Control System Improvements • Pump Station Site Improvements • Flow Meter Station Specifications and contract documents for this project may be obtained at the office of Black & Veatch, 100 E. 15'h Street, Suite 600, Fort Worth, Texas 76102, Telephone (817) 429-7558. A set of the documents will be provided to prospective bidders for a non-refundable fee of seventy-five dollars ($75.00). These documents contain additional information for bidders. Documents are also on file and may be reviewed at Dallas/Fort Worth Dodge Plan Rooms, AGC, DFW Minority Business Council and Texas Contractors. The City of Fort Worth (City) has contracted for the procurement of the 30 MGD pumps and selected equipment. The Procurement Contract will be assigned by the City to the Construction Contractor to whom a contract is awarded for final payment and installation of the equipment. Prequalification of bidders according to the Fort Worth Water Department Contract Specifications is required. The City reserves the right to accept or reject any or all bids or parts of bids, to waive any formalities and technicalities and to accept the Bid(s) most advantageous to the City. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. Robert Terrell City Manager Gloria Pearson City Secretary Publication: December 2, 1999 December 9, 1999 A-1 SPECIAL INSTRUCTIONS TO BIDDERS 1. PREQUALIFICATION REQUIREMENTS. All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, current financial statement, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. a The financial statement required shall have been prepared by an independent certified public accountant or independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in the work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water - Department project. d) Bid received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject a bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalifed bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a wavier of any necessary prequalification. r 11. BID SECURITY. A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in the amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety company shall be included on the current U.S. Treasury list A-1 of acceptable sureties, or (2) the surety company must have capital and surplus equal to ten times the limit on the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the U.S. Treasury list or one-tenth (1/10) the total capital and surplus. 12. BONDS. A performance bond, a payment bond, and maintenance bond each for one hundred (100%) percent of the contract price will be required. Reference C3-3.7. 13.. WAGE RATES. Not less that the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 14. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 15. BIDDER LICENSE: Prior to the award of contract to an out-of-state bidder, the bidder shall be licensed to do business in the State of Texas. For licensing procedures, contact the Texas Secretary of State Offices (Telephone Number 1-512-463-5555 or 1-900-263-0060) 16. NONRESIDENT BIDDERS: Pursuant to Article 6018, Texas Revised Civil Statues, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower that the lowest bid submitted by a Texas resident bidder by the same amount that a Texas resident would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident `s principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has a place of business in the State of Texas. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do SEP so will automatically disqualify that bidder. 10. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be paid within forty-five (45) days after the completion and acceptance by the City. 11. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. A-2 i" Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of the contract. 10. DISABILITY: In accordance withP rovisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on, the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of the Contractor or any of its subcontractors. Contract warrants it will fully comply with ADA's provision and any other applicable Federal, State, and local laws concerning disability and will defend, indemnify and hold harmless against any claims or allegations asserted by third parties or subcontractors against the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning disability discrimination in the performance of this contract. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth Ordinance Nos. 11923 & 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of these Ordinances can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation") as applicable. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or Women Business Enterprise (WBE) on a contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state A-3 or local laws or ordinances relating to false statements. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3)years. 12. ADDENDA: Bidders wanting further information, interpretation or clarification of the contract documents must make their request in writing to the Fort Worth Water Department Engineering Services, at least 96 hours prior to bid opening. Answers to i all such requests will be bound and made a part of the Contract Documents. No other explanation or interpretation will be considered official or binding. Should a bidder find discrepancies in, or omissions from, the Contract Documents, or should the bidder be in doubt as to their meaning, the bidder should at once notify the Fort Worth Water Department Engineering Services, in order that a written addendum may be sent to all bidders. Any addenda issued will be mailed or be delivered to each prospective bidder. The bid proposal as submitted by the bidder must be so constructed as to include any addenda issued by the Fort Worth Water Department, prior to 24 hours of the opening of bids with appropriate recognition of addenda so noted in the bid proposal. A-4 PART B PROPOSAL PROPOSAL TO: Mr. Bob Terrell City Manager, City of Fort Worth Purchasing Division, Municipal Office Building 1000 Throckmorton Street P.O. Box 17027 Fort Worth, Texas 76102 PROPOSAL FOR: installation of four procured 30 MGD vertical mixed flow pumps and two procured adjustable frequency drives; construction of a Motor Control Center Building; new electrical switchgear, metering station, monitoring and supervisory control systems; modifications and improvements to the existing pumping station; installation of traveling screens; general pump station and site improvements; all necessary appurtenances and incidental work to provide a complete and serviceable project, designated as: CLEAR FORK RAW WATER PUMP STATION IMPROVEMENTS PW77460770160150 Pursuant to the foregoing "Notice to Bidders", the undersigned bidder has thoroughly examined the documents, including the Contract Documents, Notice to Bidders, Instructions to Bidders and Technical Specifications. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish an approved Maintenance Bond, Performance Bond and Payment Bond, and such other bonds required by the City of Fort Worth {Owner) for the performing and completing of said work within the time stated and for the following sums, to wit: It is understood that the Owner reserves the right to reject any and all bids received and waive informalities in any Bid. Prices shalt be shown in words and figures. In the event of discrepancy, the words shall govern. B- 1 PAY APPROX. DESCRIPTION OF ITEMS WITH 610 UNIT TOTAL ITfa QUA PRIC S WRITTEN IN 1ACORDS RI E AMOUNT 1. 1 LS Clear Fork Pump Station Improvements as stlgwn and specified._ Xv eMI LLJO4 ONtr 9&Aj1R64 fF0JLry -rWO jg&) 6v E 6jg&Rollars & .a AID Cents per Lump Sum. 51�� � 14.7 spa�- 2. 1 LS Clear Fork Raw Water Metering Station as shown and specified. cmars& /!)0 Cents per Lump Sum, S 71 t9 $ 50,nob. 3. 1 LS Existing Venturi Meter Vault Oemotition, Vault Improvements and 604nch Valve asshown and specified rp�JrTV'0 N 7A"6mmMh Dollars & A//p` _____CoM per Lump Sum. $ / 000°$ $ /��o00. 4. T EA Combination air& vacuum release valves Located on Raw Water Pipeline Kj J ir 70HftjAgJb Dollars & M `N oo, ----- Cents per Each . $ a 5. 50 LF Trench Safety System For Tenches (Depth;)-S-foot) _f A - ,_,_Dollars & i✓d Cents per Uneer Foot.$ S O B•2 T PAY APPROX. DESCRIPTION OF ITEMS WITH 810 UNIT TOTAL ITEM QUANTI PRICES WRITTEN IN WQRDS PRICE 6MgUNJ 6. 1 LS Payments to Procurement Contractor for providing four 30 MGn mixed flow vertical pumps, two adjustable frequency drives and pump station model testing. Five-Hundred Thousan,d Dollars & Zsro Cents per Lump Sum. 3 500.000.00 S 500.000.00 TOTAL AMOUNT S_� '�, 3 n o D. In evaluating Bids, Engineer and Owner will consider the qualifications of the Bidders, whether Bids comply with the prescribed requirements, and such alternatives, and other data as requested. Additional information regarding bid evaluation is contained in the Instructions to Bidders. Within ten (10) days after notification by the Owner, the undersigned will execute the formal r4 v!i act and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this Contract The attached bid security in the amount of five percent (5%) is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. M. -ytees that the work will be completed within the following numbers of days after the ;�::� commencement of Contract Time as defined in the General Conditions. The anticipated dates are also included for reference. 044,4�,,,,,.y Ability to Deliver Raw Water from 3/3/00- L0e �(, -u t Two New 30 MGD Mixed Flow Pumps 120 Calendar Days r� qua@ b Contract Completion -ae Calendar Days (3/2/00 AAA et-k9 w► z 1-51dder egrees to accept assignment of procurement contract,for Ctez-F pe war Pump g ' ,mcn; pump 5 ation Mote• t snnu whiw l ►s 3 1the %iLa�./�Q i� �'$:ra spe�^�tions by refereri:.... L.rNllt 0�s�:� --my I� i4i contract documents with Phoenix Pump Incorporated at the offices of Black & Veatch Fort B- 3 City of Fort Worth Minority and Women Business Enterprises Specifications SPECIAL INSTRUCTIONS TO BIDDERS APPLICATION OF POLICY _ YN L � 'ri '^'s�rr;a ,S` 1 k' r 0 <<�bntract'i �$25,OOg r`rrior`ejfitW11M V' E goala lrr~�applica6l I (ji �t ja dalla r r u S is2 ,00i-W84luEpkgmoa.lsj rSe.�,kt+Eo°"-a,pplic,a�,.bp 166"'12A er,,1 .,g.i_u��MH, ,. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of qualified M/WBEs which provide goods and services directly or indirectly to the City: M/WBE PROJECT GOALS The City's MBE/WBE goal for this project is % of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On the City contract of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated Minimum M/WBE goals, or 2. Good Faith Effort documentation, or, 3. Waiver documentation. SUBMISSION OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. MIWBE Utilization Form received by 5:00 PM,five (5) City business days after the bid opening date, exclusive of the bid opening date. 2. M/WBE Goals Waiver Form received by 5:00 PM, five (5) City business days after the bid opening date, exclusive of the bid opening date. 3. M/WBE Good Faith Effort Form received by 5:00 PM, five (5) City business days after the bid opening date, exclusive of the bid opening date. 0�� .O.db P_ 'Vltl' H 7F1�CITY'S hAIWBE ORDINANCE WILL RESULT 1N THE BID kiNG ; CC1j1151DERED NON-RESPONSIVE TO SPEC]FICATIONS r °; `t;', Any question, please contact the M/WBE Office at (817-871-6104) Rev. 6/2/98 g" ATTACHMENT 1A PAGE 1 of 2 City of Fort Worth Minority and Women Business Enterprise Specifications MBEIWBE UTILIZATION FORM ,jrth Tel-;as Municipal .onstruction Company, Inc. December 30, 1999 ""kIME COMPANY NAME BID DATE .ear Fork Raw Water Pump Station PW77-060770160150 rROJECT NAME Improvements PROJECT NUMBER ITY'S MMBE PROJECT GOAL MNVBE PERCENTAGE ACHIEVED Failure to complete this form,In its entirety with supporting documentation, and received by the Managing Department rn or before 5:00 p.m.five(5)City business days after the bid opening,exclusive of the bid opening date,will result in he bid being considered non-responsive to bid specifications. 1'he undersigned bidder agrees to enter Into a formai agreement with the MBE and/or WBE firms for work listed in this chedule, conditioned upon execution•of a contract with the City of Fort Worth. The Intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered -eon-responsive to specifications. ecify All Conrai mingems oilai i4cnont ' c7Was ed _ r a t q. T. Hawkins & Assoc Equipment Traveling 1st $130,000..00 Wavne Hawkins X Supplier Water Screens inter.. ace r. ano, TX 75075 (972) 867-5410 --Castro Roofing of TX X Roofing All labor & lst $ 19,455 .00 Rodolfo Rodriguez Subcontractor Material to 4854 Olson Dr. Install Roof ;_Daiias, (214) 391-8108 IValflor and Assoc. X Pipe & Valve Pipe & Valves 1st $170 , 340 .00 ' David Valdez Supplier 1948 County Rd. 103 To=n—q, 77420 - (409) 657-2101 M/W8Ekri4stbe'Cocated:iti.8:dine-cam marketpiace.6r curs ' ( ) only eptly doing business in.the;markatpiacaratth+s:titrie.oRid:. .. r)Spee fy_#X.w es.h vv*dch MMBEs are to be utBxed ardror 5enr to be supplied A of ttims.to bs.` .is` h aderb received ctedittoward the MNVBE'Goel �''�`=-"`^ ��: . `�'""`�'..`. M Iderddyeach.TwIiv4L, �> �,- `Tier.Means the level of subcontracting.below Me.piins contrac3or/core nk l e..a , dtred payment from the prime•contractor to subcantrador'Is cotaiikrod t'�`tkr;. a —r �' prmmNd by a subcontractor to Rs suppNer is 666idwed a Ver fi`' THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 pm,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF BID OPENING DATEOPENING Yw Rev.6/2/98 ATTACHMENT 1A PAGE 2of2 City of Fort Worth Minority and Women Business Enterprise Specifications Ccmpan am k2M61je ifie& :'Specify All Contracting� --Specify All-ltemsao 6e "` ;Dollar d cess"Id' ,e�� o So-e_of Work a ., ys�� , t� Twisted J X. Electrical Supplier of 2nd $ 46,795..00 Katherine Palmer Switchgear Electrical P. O. Box 2012 Switchgear r ing on, TZ (817) 478-1186 N.TX Cherokee Co. X HVAC Equipmt. Unit Heaters, 1st $ 19,500.00 ruce Z7annon Supplier Fans, Louvers. 3510 Lakeview Dr. & Heat&Pump Grapevine, TX 76051 Misc. Steel Handrails, 1st $ 50, 000. 00 (817) 481-1425 Material Gratin The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, Including MBE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s)on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for Initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. A MB n WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD • Michael G. Daigre Authorized tignfiture Printed Signature President Tme Contact Name and Title(if different) North Texas Municipal Construction Company, enc. (972) 569-8537 Company Name Toktprhone Number(a) 3181 F.M. 1827 (972) 569--8592 or (214) 544-1191 Address Fax Number McKinney, TX 75069 01/06/2000 OWStatelp Cads Odie THIS FORM MUST BE RECEIVED BY THE A(ANAGING DEPAMIENT BV 5-N p s..FIVE(5)CTrV BUSINESS DAPS AFTER BID OPENING, LXCLUSIVE OF BID OPENING DATEOPENING ' Rev.6r2M ATTACHMENT 1 B City of Fort Worth Page 1 of 1 Minority and Women Business Enterprise Specifications Prime Contractor Waiver Prime Company Name Project Name Bid Opening Date Project Number If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. I=aij i1�P(ete t)i) foPrr► itt its entirety and be received by the Mahac "i IJ60&irhi t on"or S:D �: 1. X51'Citi� siness''iJays after bid oaenin6,'exclusio of.the;,bjd ope�iing date ; su * „�eµbr�, e�ng,considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) on this contract,the payment therefore and any proposed changes to the original MBE(s) and/or WBE (s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Printed Signature Title Contact Name (if different) Company Name Contact Telephone Number(s) Address Fax Number Rev 6/2/98 ATTACHMENT 1C Page 1 of 3 City of Fort Worth Minority and Women Business Enterprise Specifications GOOD FAITH EFFORT Prime Company Name Bid Date Project Name Project Number Yi*-1'ArV,5fArOd,fd1'&W'e"'MM8t,Part16iOit1'6h a4idr Y6U h4ve subcontractin 4 - thisM: Y, 9 you musj complete If the bidder's method of compliance with the MIWBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, I thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. p eta,this,Iorl "i' its brfirety. with its supp6'-ri'ng documentation., " --a"nd JW received by the IMa ng e en I nor t.00 p.m: (5) City business daysafterb,d-opphir exclusive of theA 0, -will i*§uItJh the bid being considered non-responsiV6 to bid spec ifications..,�,,'4,�, 1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF FIRMS) which will be used in the completion of this project, regardless of whether it is to be provided by a MIWBE or non-MIWBE. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev 6/2/98 ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The list is considered in compliance, if it is not more than 3 months old from the date of the bid opening. Yes Date of Listing ! / No 3.) Did you solicit bids from M1WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to the bid opening by mail, exclusive of the day the bids are opened? Yes If yes, attach MIWBE mail listing to include name of firm and address and a No dated copy of the letter mailed. 4.) Did you solicit bids from M1WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to the bid opening by telephone, exclusive of the day the bids are opened? Yes If yes, attach list to include name of M/WBE firm, Person contacted No phone number and date and time of contact. Note: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach a fax confirmation, which is to provide MIWBE name, date, fax number and documentation faxed. 4 b 1i MiW�I -66 less; the bidder must coi tact.thd entire list "o eii orilpi'iahice. i if r I SSC iis4 o �'M VVk is inore1hah 10, the bidde-e- �iu`sth onfac" a I as h- k_ y fiii +i lis but izies tf an ten fo be.in compliance with questions 3 and 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the MIWBEs? Yes No 6.) If the M/WBE bids were received and rejected, you must: (1) List the M?WBE firms and reason(s) for rejection (i.e. quotation not commercially reasonable, qualifications, etc.) and (2) Attach affidavit and/or documentation to support the reason(s) listed below (i.e. letters, memos, bids, telephone calls, meetings, etc.) lease use additional sheets If ecessary,and attach Company Name Telephone Contact Person Scope of Work Reason for } Rejection w Rev 6/2/98 ATTACHMENT IC Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment therefore and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than ttrree (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Printed Signature Title Contact Name and Title (if different) Company Name Contact Telephone Number(s) Address Fax Number City/State/Zip Date Rev 6/2/98 i PART C GENERAL CONDITIONS PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2 Contract Documents C1-1 (1) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions C1-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3 ) C1-1.12 City C1-1 (3 ) C1-1.13 City Council C1-1 (3) C1-1.14 Mayor C1-1 (3 ) C1-1.15 City Manager C1-1 (3 ) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (4 ) C1-1.18 Director, City Water Department C1-1 (4 ) C1-1.19 Engineer C1-1 (4) C1-1.20 Contractor C1-1 (4) C1-1 .21 Sureties Cl-1 (4) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Day C1-1 (4) C1-1.25 Legal Holiday C1-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6 ) C1-1.28 Paved Streets and Alleys C1-1 (6 ) C1-1.29 Unpaved Streets and Alleys C1-1 (6) C1-1.30 City Streets C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street C1-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3 ) C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3) (1) C2-2.7 Delivery of Proposal C2-2 (4 ) C2-2. 8 Withdrawing Proposals C2-2 ( 4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2. 10 Public Opening of Proposal C2-2 (4 ) C2-2.11 Irregular Proposals C2-2 (4 ) C2-2.12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3. 1 Consideration of Proposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3. 3 Equal Employment Provisions C3-3 (1 ) C3-3. 4 Withdrawal of Proposals C3-3 (2) C3-3. 5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3 .7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (4 ) C3-3.9 Failure to Execute Contract C3-3 (4 ) C3-3.10 Beginning Work C3-3 (4) C3-3.11 Insurance C3-3 (4 ) C3-3.12 Contractor 's Obligations C3-3 (7 ) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor 's Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4.2 Special Provisions C4-4 (1) C4-4.3 Increased or Decreased Quantities C4-4 (1) C4-4.4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4. 7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5. 3 Coordination of Contract Documents _ C5-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Field Office C5-5 (3) CS-5.7 Construction Stakes CS-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6 ) C5-5.13 Storage of Materials C5-5 (6 ) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup C5-5 (8) C5-5.18 Final Inspection C5-5 (9 ) - (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6. 2 Permits and Licenses C6-6 (1) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6. 4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6. 6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6.7 Railway Crossings C6-6 (4 ) C6-6. 8 Barricades, Warnings and Watchmen C6-6 (4 ) C6-6. 9 Use of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6 ) C6-6.11 Independent Contractor C6-6 (8 ) C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (8 ) C6-6.13 Contractor' s Claim for• Damages C6-6 (10 ) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10 ) C6-6.15 Temporary Sewer Drain Connections C6-6 (10 ) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11 ) C6-6.18 Contractor' s Responsibility for Work C6-6 (11 ) C6-6.19 No Waiver of Legal Rights C6-6 (12 ) C6-6. 20 Personal Liability of Public Officials C6-6 (12 ) C6-6.21 State Sales Tax C6-6 (12 ) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1 ) C7-7. 2 Assignment of Contract C7-7 (1) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7. 6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7. 8 Extension of time of Completion C7-7 (4 ) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6 ) C7-7.12 Temporary Suspension C7-7 (6 ) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7 ) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10 ) C7-7.17 Safety Methods and Practices C7-7 (13 ) s C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1 ) C8-8. 2 Unit Prices C8-8 (1) (3) C8-8.3 Lump Sum C8-8 (1) C8-8.4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3) CS-8.7 Final Acceptance C8-8 (3) C8-8.8 Final Payment C8-8 (3) C8-8.9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4) C8-8.11 Subsidiary Work C8-8 (5) CS-8.12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5) f: (4) PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and �. performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White i E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) Cl-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1. 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. Cl-1 . 5 BIDDER: Any person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1. 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements , statutes , etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1. 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and C1-1 (2) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7 ) b. Payment Bond (see paragraph C3-3.7) C. Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1 . 11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner ' s representative showing in detail the location , dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY : The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager . The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR : The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth , Texas , or his duly authorized representative. C1-1 (3) CI-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1. 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C1-1. 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting within the scope of the particular duties entrusted to them. CI-1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1. 21 SURETIES : The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar - day, not including Saturdays, Sundays , and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7 ) hours between 7: 00 a .m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7.6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of .the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: Cl-1 (4) 1. New Year' s Day January 1 2. M. L. Ring, Jr . Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8 . Christmas Day December 25 9 . Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday .� shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1 . 26 ABBREVIATIONS : Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: - AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials 4 ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D. - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron Cl-1 (5) C1-1 . 27 CHANGE ORDER : A " Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. Cl-1. 28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. ' C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1. 30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 21 ) feet back of the curb lines or four E (4 ' ) feet back of the average edge of pavement where no curb exists. C1-1. 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. - C1-1 (6 ) SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL s SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2 . 1 PROPOSAL FORM: The Owner will furnish bidders with proposal . form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security , and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule, " and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This ., statement must be current and not more than one ( 1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10% ) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2 (1) .. forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided , without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: -r Bidders are advised that the Contract Documents on file with the Owner shall constitute all *of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to vis4t the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda ., thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation, research , tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the firm, association , or partnership , or by a person duly authorized . If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given , and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2. 5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2 . 6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal. " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2(3 ) C2-2. 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal. shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the name or description of the project as designated in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2. 8 WITHDRAWING PROPOSALS : Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48 ) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2. 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as eing "Irregular" if they show any omissions, alterations of form, additions , or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However , the C2-2(4)