HomeMy WebLinkAboutContract 25833 CITY SECRETARY CoW'RAC' NO . s AMENDMENT NO. 2 STATE OF TEXAS 3 CITY SECRETARY CONTRACT COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Deltatek Engineering, (Engineer) made and entered into City Secretary Contract No. 23737, (the Contract) which was authorized by the City Council by M&C C-16619 on the 17 day of February, 1998; and WHEREAS, the Contract involves engineering services for the following project: Design Design and construction management of repair and repainting of 2MG Eastwood Elevated storage Tank, project No.P77-060770180150 . WHEREAS, it has become necessary to execute Amendment No.2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 2, 1998, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $28, 800. 00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $159, 790. 00 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect .J EXECUTED on this the / OL day of , 2000, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED- Dale A. Fisseler, P.E. M ke Gr omer Director, Water Department Assistant City Manager Deltatek Engineering. ENGINEER AT T: S�0•DD Gloria Pearson, City Secretary By: Name: Bahram Niknam, P. E. 6424 Lone Grove Court _ l� �)�4/, Frisco, TX. 75034 7 TT Cont=act Authorization DO bate APPROVED AS TO FORM AND LEGALITY: Gary St erger Assistant City Attorney 60MCIAL F."ECOM 2 CC WC-MMEY Civil T A T F Structural O /r Electrical Environmental Water/Wastewater Plant Water Storage Facilities Construction Management Coating Evaluations Deltatek Engineering December 22, 1999 Mr. Seiavash Mir Project Manager Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Reference: Repainting and Renovation of Eastwood 1.5 MG Elevated Tank Quality Control Observation Project No. PW77-0607700180150 City Secretary No. 23737 Dear Mr. Mir: Deltatek Engineering authorized a sum of$24,000.00 to perform quality assurance during the renovation of the referenced storage facility. The renovation was scheduled to begin on August 10, 1998 and complete on December 10, 1998. Due to various difficulties with A & J Industrial Coatings and lack of performance, this project substantially completed on April 24, 1999. As a result, Deltatek Engineering extended the inspection services to ensure that contractor complies with requirements of the renovation documents and substantially complete this project. Therefore, total amount of extended services resulted in a sum of$26,800.00. In addition, quality assurance set v1CCs W ill be requlied for un inisticli portion of this Coni act ilial i5 calircriiiy -ciub performed by electrical contractor employed by the City. Summary of Account Description Amount Total original contract $118,760.00 Additional design services requested $12,230.00 Extended quality assurance service $26,800.00 Additional quality assurance for electrical $2,000.00 Total contract $159,790.00 Less previous payments $130,990.00 Total increase $28.800.00 11615 Forest Central Drive,Suite 206B,Dallas,Texas 75243,Phone(214)348-2239,FAX(214)348-2357 email:deltatek@airmail.net Page 2 Nff"E participation will be at 14% and will be performed by Thomas Design Technologies, Inc. for a sum of$4,032.00. Attached is an invoice for the additional services. Should you have any questions, please call me. Sincerely, DELTATEK ENGINEERING Bahram Niknam, P.E. Attachment: Invoice City of Fort Worth, Texas "avow and Council communication DATE REFERENCE NUMBER LOG NAME PAGE 3/7/00 **C:l 7904 1 60DELTA 1 of 1 SUBJECT AMENDMENT NO. Y TO THE CONTRACT WITH DELTATEK ENGINEERING FOR THE DESIGN AND CONSTRUCTION MANAGEMENT OF EASTWOOD ELEVATED STORAGE TANK RECOMMENDATION: It is recommended that the Cit&ouncil authorize the City Manager to execute Amendment No. � to City Secretary Contract (No. 2373) with Deltatek Engineering for the design and construction management of the Eastwood Elevated Storage Tank, increasing the total contract cost by $28,800 to $159,790. DISCUSSION: On February 7, 1998 (M&C C-16619), the City Council authorized the execution of an Engineering Agreement with Deltatek Engineering for the preparation of specifications, construction management, and construction inspection of the Eastwood Elevated Storage Tank. The contract scope included the painting and repair of the existing tank. Amendment No. 1 will allow Deltatek Engineering to provide additional construction management and inspection work necessary for the completion of the project. The contractor has been charged liquidated damages for not completing the project on schedule. Deltatek Engineering is in compliance with the City's M/WBE Ordinance by committing to an additional 14% M/WBE participation on this amendment. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 APPROW.0 Originating Department Head: CITY COUNCIL do a wu Dale Fisseler 8207 (from) MAR 7 2000 PW77 531200 060770180150 $28,800.00 Additional Information Contact: ( f Dale Fisseler 8207 ply Secr°aary of&a of Fort Worth,Texpe