Loading...
HomeMy WebLinkAboutContract 25837 CITY SECRETARY p2 CONTRACT ►gyp• REIMBURSEMENT AGREEMENT Rpri l This Reimbursement Agreement(the"Agreement")is made on the*A day of-N4sreh,, 2000, by and between the City of Fort Worth,a Texas municipality("CITY" ),having its mailing address at 1000 Throckmorton Street,Fort Worth,Texas 76102,and CITGO PRODUCTS PIPELINE COMPANY, a Delaware corporation, ("CITGO")with its principal office located at 6100 South Yale,Tulsa, Oklahoma 74136. WHEREAS, CITGO is the present holder of certain Rights-Of-Way(the"Rights-Of-Way"), originally granted in favor of Sinclair Refining Company,a Maine corporation, ("Sinclair")by virtue of the following instruments: 1. Right-Of-Way dated November 10, 1947, executed and delivered by Gene Conway and wife, Willie Conway,as Grantors,to Sinclair Refining Company,a Maine corporation, as Grantee, recorded in Volume 1966,Page 511,Deed Records of Tarrant County,Texas. 2. Right-Of-Way dated November 4, 1947,executed and delivered by George Degenhart and Jessie Pauline Degenhart,his wife,as Grantors,to Sinclair Refining Company,a Maine corporation,as Grantee,recorded in Volume 1966,Page 513,Deed Records of Tarrant County,Texas. 3. Assignment and Assumption Agreement between ARCO Pipe Line Company,a Delaware corporation, and CITGO Products Pipeline Company,a Delaware corporation,dated September 30, 1994,Instrument No.D194219480, Volume 11747,Page 0001,Deed Records of Tarrant County,Texas. WHEREAS, at CITY's request, CITGO has agreed to relocate approximately 500 feet of its Arlington to DFW 8", approximately 900 feet of its Arlington to Irving 8",approximately 500 feet of its Arlington to Dallas 3",and approximately 500 feet of its Arlington to Fort Worth 3" (the"Lines")to accommodate the CITY's construction at FM 157 and Trinity Blvd in the City of Fort Worth,Tarrant County,Texas (the"Project") ;and WHEREAS,CITY has agreed to reimburse CITGO for 24%of all costs incurred and associated with the Project(the"Costs"as defined herein)in accordance with the terms hereof. IN CONSIDERATION of the matters described above and of the mutual benefits and obligations set forth in the Agreement, CITY and CITGO hereby agree as follows: 1. All of CITGO's work incidental to the Project shall be performed by CITGO with its own forces and personnel and/or contractors paid under a contract let by CITGO in accordance with all applicable laws,regulations and ordinances. 2. An estimate of the Costs of permitting,acquiring easements,engineering,surveying, inspecting,and relocating the Lines associated with the Project are set forth on Exhibit"A", attached hereto and incorporated herein by reference. 3. By executing this Agreement, CITY is agreeing to pay CITGO's actual Costs to accomplish the Project,whether said Costs are more or less than the estimated costs of S 129,443.61. It is understood that the Texas Department Of Transportation will reimburse the City 50%of the CI TY's 24%of the final actual Costs. It is also understood and agreed that CITGO,at its sole discretion,will determine the actual footage of Lines that have to be relocated to accommodate the Project. The amount could be more or less than the estimated amount of Lines to be relocated 4. CITY shall be liable for all reasonable Costs incurred by CITGO and agrees to reimburse CITGO for any and all reasonable Costs incurred as follows: (a) "Costs"as used and defined in this Agreement will mean the total actual cost,direct and indirect,incurred by CITGO for labor, including normal and regularly scheduled overtime(including casual overtime)required by CITGO to complete the Project,and/or (b) Materials used in connection with the Project,the cost of small tools and/or equipment actually consumed in the relocation of the Lines and the rental or amortization of the cost of major equipment used,the costs of permits and inspections,engineering services, survey and field work,and to the extent that CITGO shall subcontract any portion of the Project,the amount of such subcontracts. (c) Costs shall not include(1) the unamortized investment in removed or abandoned pipelines or appurtenances unless related to a net reduction in the pipeline system and equipment of CITGO and CITY does not pay for the cost of replacing the line capacity provided by such abandoned or removed pipelines and(2) the cost of any work that enhances,or provides an improvement in or an increase in capacity or service for CITGO. 5. CITY will submit to CITGO a Resolution from the City Counsel that states that the CITY will pay to CITGO 24%of the final actual COSTS. Upon the conclusion of the Project, CITGO shall provide to CITY an invoice with supporting documentation of the Costs which CITGO incurred in the Project. 6. CITY shall pay the actual Costs invoiced within thirty(30)days from the date of the invoice via wire transfer(as directed by CITGO)of immediately available federal funds. CITGO may charge CITY a finance charge in the amount of one and one-quarter percent 1.25%)per month on any unpaid balance and any accrued but unpaid finance charges. 7. CITY hereby releases and forever releases CITGO, its affiliates and their respective directors,officers,employees,and agents for any damages or losses(including lost profits and business interruption)suffered by CITY from the lack of or failure of any permits or easements,from the design,construction,and inspection associated with the Project,except for willful acts and acts of negligence of CITGO. This Agreement shall be construed and interpreted in accordance with the laws of the State of Texas. G?iil This Agreement incorporates all understandings and arrangements between the CITY and CITGO concerning the subject matter of this Agreement. TH TY O ORT ORTH -C- APPROVED APPROVED AS TO FORM By AND LEGALITY Name:Mike Groomer Title: Assistant City Manager Assistant Ci Attorney CITGO R ,DUCTS PI LINE COMPANY ATTESTED BY By' ' Name: Aaadd W r 1 Title: er OT TaAr 04f -d0 Contract Authorization Do Date NEPD EXULUE ';9 CITGO PRODUCTS PIPELINE COMPANY PROJECT ESTIMATION PROJECT TRINITY&HWY 167 ROAD BORES Preliminary line locate/probe Preliminary survey/engineering/R.O.W. $ 10,000.00 Preliminary digup for survey/asbestos test $ 800.00 Total Prellminarp>x s 10,800.00 Primary Contractor Labor Per.Hour Hours Per.O.T. O.T.Hours Superintendent $ 37.00 89 S 3,293.00 $ 55.50 Foremen $ 32.00 180 $ 5,760.00 $ 48.00 30 Operator $ 25.00 380 $ 9,500.00 $ 37.50 60 Laborer $ 18.00 750 $ 13,500.00 $ 27.00 150 Welder $ 26.00 130 S 3,3360.00 $ 39.00 10 Weld.Helper $ 19.00 130 $ 2,470.00 $ 28.50 10 total reg labor»> $ 37,903.00 total o.t.taboo» TOTAL LABOR»»»»»» $ 46,318.00 Equipment Per.Hour Hours Trackhoe $ 75.00 360 $ 27,000.00 Rbr.Tire Backhoe $ 30.00 190 $ 5,700.00 Side boom $ 65.00 20 $ 1,300.00 Dozer $ 75.00 10 $ 750.00 Loader $ 55.00 $ - Winch Truck $ 25.00 $ Dump Truck $ 42.00 $ - Haul Truck W/Float $ 52.00 20 $ 1,040.00 Motor Grader $ 85.00 $ Pickup W/Tools $ 11.00 590 $ 6,490.00 Trench boxes r d $ 275.00 10 $ 2,750.00 Air Compressor $ 40.00 50 $ 2,000.00 Crane $ 75.00 $ - Compactor $ 40.00 80 $ 3,200.00 Welding Rig Is 23.00 90 $ 2,070.00 Misc.Wtr.Pmp./Genrtr./Etc... $ 2,500.00 TOTAL EQUIPMENT»»»»»» $ 54,800.00 PER FT. FOOTAGE Road/River Bores-CONY $ 60.00 S Road/River Bores-DIRECT $ 100.00 1,700 $ 170,000.00 Rydrotest $ 6,000.00 Testing Pig Run $ 1,600.00 Pressure Test Stopples Asebestos Removal/Disipmosal S 12,000.00 Concrete and Asphaft Work TOTAL MISC CHARGES»»»»» $ 188,600.00 Primary Materials Pipe 800-3"S 800-8"heavy $ 10.00 2468 S 24,680.00 Casio Wall P' $ Pipe Bends 5 800 $ 4,000.00 Flanges/Filings $ Vent Pipe Pipe Coating/Rock Shield $ 3,600.00 Sand/Select FBI/SOD $ 3,000.00 TOTAL MATERIALS»>»»»> $ 35,180.00 Other Contract Services X-Ray SeMces $ 3,710.00 Vacum Trucks/Frac Tnks $ 4,600.00 Stopple Services $ Stopple Materials ! Nitrogen Services $ 9,000.00 Compaction Testing $ 1,200.00 TOTAL OTHER CONTRACT SERVICES»»»»> $ 18,410.00 CITGO Company Labor $ 30.00 260 $ 7,800.00 $ 7,800.00 R.O.W.Damages/Settlements S 4,000.00 $ 4,000.00 Total Cost of Project less contingency&Overhead»>»» $ 366,908.00 10°/.Contingency>»»»»>»»>»»»»> $ 36,690.80 TOTAL COST OF PROJECT LESS CORPORATE 0/ $ 402,498.80 CITGO Corporate Overhead % 34%>»»»»»»»»»»> $ 138,849.68 GRAND TOTAL »»»> $ 539,348.39 CITGO CITY I ICOUNTY 37.70% 24.00%1 1 38.30% $ 203,334. $129 443.61 1 1$ 206 570.43 1 - - LUD: A Resolution Adopted Resolution No. _a� RESOLUTION AUTHORIZING PAYMENT TO CITGO PRODUCTS PIPELINE COMPANY TO RELOCATE APPROXIMATELY 1,400 FEET OF 8-INCH AND 1,000 FEET OF 3-INCH PETROLEUM/GAS PIPELINES FOR CONSTRUCTION OF TRINITY BOULEVARD FROM WEST OF ARLINGTON-BEDFORD ROAD TO FM157 WHEREAS, on October 25, 1994 (M&C G-10853), the City Council approved Texas Department of Transportation (TxDOT) Minute order No. 104369 dated September 29, 1994, for the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157; and the minute order establishing the cost sharing for utility adjustments to be 50% City and 50% TxDOT; and WHEREAS, TxDOT and CITGO Products Pipeline Company have determined that approximately 1,400 feet of 8-inch and 1,000 feet of 3-inch petroleum/gas pipelines belonging to CITGO Products Pipeline Company must be relocated for construction of Trinity Boulevard from west of Arlington-Bedford Road to FM 157 at an estimated cost of $539,348.39; and WHEREAS, CITGO Products Pipeline Company has estimated the cost of relocating the petroleum/gas pipelines and the actual cost may be more or less than estimated; and WHEREAS, CITGO Products Pipeline Company's work shall be performed by its own forces and personnel and/or contractors, paid under a contract let by CITGO Products Pipeline Company in accordance with all applicable laws, regulations and ordinances; and WHEREAS, "costs" as used and defined herein will mean the total actual cost, direct and indirect, incurred by CITGO Products Pipeline Company for labor, including normal and regularly scheduled overtime required by CITGO Products Pipeline Company to complete the pipeline relocation; and WHEREAS, materials used in connection with the project, the cost of small tools and/or equipment actually consumed in the relocation of the pipelines, and the rental or cost of major equipment used, the costs of permits and inspections, engineering services, survey and field work, and to the extent that CITGO Products Pipeline Company shall subcontract any portion of the project, the amount of such subcontracts; and „N r Ifs SJ1 ��'i�;��p�15G.o a CITY OF FORT WORTH WHEREAS, cost shall not include the unamortized investment in removed or abandoned pipelines or appurtenances unless related to a new reduction in the pipelines system and equipment of CITGO Products Pipeline Company, and City of Fort Worth does not pay for the cost of replacing the line capacity provided by such abandoned or removed pipelines and the cost of any work that enhances, or provides an improvement in or an increase in capacity or service for CITGO Products Pipeline Company; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, that the City will pay CITGO Products Pipeline Company 24% of the final actual costs, whether said costs are more or less than the estimated costs of 129,443.61 (with the Texas Department of Transportation 'reimbursing the City for 50% of the final actual costs), to relocate approximately 1,400 feet of 8-inch and 1,000 feet of 3-inch petroleum/gas pipelines for the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157. ADOPTED this day of , 2000. l Mayor APPROVED CITY COUNCIL APR 4 2000 City Secretary �I CitySecratary of the city of Fort Worth Texas APPROVED AS TO FORM AND LEGALITY: Assistant Ci y Attorney l ' CITY OF FORT WORTH May 10, 2000 TO: Maribel Luttrell, Customer Service Representative City Secretary Office FROM: Dan Walsh, Engineering Manager Transportation & Public Works Department SUBJECT: Reimbursement Agreement with CITGO Products Pipeline Company for the Relocation of Petroleum/Gas Pipelines for Construction of Trinity Bo!levard from West of Arlington-Bedford Road to FM 157 Attached are three (3) executed agreements with CITGO Products Pipeline Company for the relocation of petroleum/gas pipelines for construction of Trinity Boulevard from west of Arlington-Bedford Road to FM 157. Please assign a City Secretary Contract number for the agreements. Please call me at X8702 when the agreements are ready for pickup. Thank you. City of Fort Worth, Texas en- 4velvor And cou""R Communication DATE REFERENCE NUMBER LOG NAME PAGE 4/4/00 **C-17967 1 20CITG0 1 of 2 SUBJECT APPROPRIATION ORDINANCE, RESOLUTION AND COST SHARING AGREEMENT WITH CITGO PRODUCTS PIPELINE COMPANY FOR THE RELOCATION OF PETROLEUM/GAS PIPELINES FOR CONSTRUCTION OF TRINITY BOULEVARD FROM WEST OF ARLINGTON-BEDFORD ROAD TO FM157 RECOMMENDATION: It is recommended that the City Council: 1. Approve the attached cost sharing agreement with CITGO Products Pipeline Company to relocate approximately 1,400 feet of 8-inch and 1,000 feet of 3-inch petroleum/gas pipelines for the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157 at more or less than the estimated costs of $129,443.61, with the Texas Department of Transportation (TxDOT) reimbursing the City for 50% of the final actual costs; and 2. Approve the attached resolution authorizing payment to CITGO for 24% of the final actual costs; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations by t $64,721.81 in the Street Improvements Fund for TxDOT's portion of the construction costs. i DISCUSSION: N; On October 25, 1994 (MSEC G-10853), the City Council approved TxDOT Minute Order No. 104369 dated September 29, 1994, for the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157. The minute order establishes the cost sharing for utility adjustments to be 50% City and 50% TxDOT. Due to the construction of Trinity Boulevard from west of Arlington-Bedford Road to FM157 and the widening of FM157 from Green Oaks Boulevard to SH10, CITGO needs to relocate approximately 1,400 feet of 8-inch and 1,000 feet of 3-inch petroleum/gas pipelines that cross the intersection of Trinity Boulevard and FM157 at a diagonal (see attached map). A proposed new storm drain at the intersection would directly conflict with the CITGO pipelines. The existing pipelines are approximately 3 to 4 feet deep. In order to avoid any conflicts, the pipelines will be lowered to a depth exceeding 16 feet. The cost for relocating the CITGO pipelines is $539,348.39. The breakdown of cost participation is as follows: CITGO (37.7%) $203,334.35 Tarrant County (38.3%) $206,570.43 City of Fort Worth/TxDOT 24.0% $129,443.61 (50/50 CityfTxDOT) TOTAL 100% $539,348.39 City of Fort Worth, Texas qV61yor and Council Communication DATE REFERENCE NUMBERLOG NAME PAGE 4/4/00 **C-17967 20CITG0 2 of 2 SUBJECT APPROPRIATION ORDINANCE, RESOLUTION AND COST SHARING AGREEMENT WITH CITGO PRODUCTS PIPELINE COMPANY FOR THE RELOCATION OF PETROLEUM/GAS PIPELINES FOR CONSTRUCTION OF TRINITY BOULEVARD FROM WEST OF ARLINGTON-BEDFORD ROAD TO FM157 The City of Fort Worth would be reimbursed approximately $64,721.81 by TxDOT, or 50% of the actual costs. TxDOT anticipates a letting of construction for Trinity Boulevard from west of Arlington-Bedford Road to FM157 in July, 2000. The relocation of the CITGO petroleum/gas pipelines needs to be completed before construction begins on Trinity Boulevard. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Street Improvements Fund. The Transportation and Public Works Department will be responsible for collection of reimbursement from TxDOT. MG:j i P Submitted for City Manager's FUND FACCOUNT1 CENTER I AMOUNT CITY SECRETARY Office by: (to) (3)C115 488100 020115021211 $64,721.81 AppROM Mike Groomer 6140 (3)C115 541200 020115021211 $64,721.81 CITY COUNCIL Originating Department Head: Hugo Malanga 7801 (from) APR 4 2000 (1)C115 541200 020115021211 $129,443.61 1 Additional Information Contact: l City Secretes 01the Hugo Malanga 7801 City of Fort Wortb.Tezas Adonted Ordinance No.A.L5P rWt pL;u iiesulution No. uaq