HomeMy WebLinkAboutContract 25860 i AMENDMENT NO.-2 CITY SECRETARY CONTRACT NO. (u STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation. , (Engineer) made and entered into City Secretary Contract No. 22821, (the Contract) which was authorized by the City Council by M&C C-16053 on the 20th day of July 1997; WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of M-390 Drainage Area Sanitary Sewer System Evaluation and Improvements (Group 6, Contract 1) , Part 2 and Sanitary Sewer Rehabilitation in the M-36SR (Group 5, Contract 2) , Part 4, Drainage Area. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include specialized design work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated the 17th day of February 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4,130 .00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $369,737 . 60. I 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. o� EXECUTED on this the /& day of , - 999, in Fort Worth, Tarrant County, Texas. AT ST: /l)D rniL k(amu lkEO r Contract Authorization Gloria Pe son, City Secret ry "�C� Date APPROVAL RECOMMENDED: APPROVED: � } i A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering DANNENBAUM ENGINEERING CORP. ENGINEER <, n Name: James D. DANNENBAUM, P.E. 4200 S. HULEN ST. St. 424 Fort Worth, TX 76109 APPROVED AS TO FORM AND LEGALITY: — SA� Gary Steinberger Assistant City Attorney ENG1.FRM(NO M&C) -2- DANNENBAUM ENGINEERING CORPORATION /-ti — U21:AMP DOW10 5LV4•,9J11E 403 FORT'H0M)-.1FXA.4:6116•'421 (?17)753-U8 �J Yeun of February 7,2000 lh"ka ° Mr. Rakesh Chaubey,P.E. Department of Engineering City of Fort Worth 811 Lamar Street Fort Worth, Texas 76102-6311, R.E. Main 390 Drainage Area Sanitary Sewer Rehabilitation & Improvements, (Group 6, Contract 1),Part 2, Sewer Project No.PS46-070460410280, D.O,E.No. 1646 I& Chaubey: We are providing this letter to request additional compensation for the work beyond the engineering services outlined in the contract for :'Main 390 Drainage Area between Dannenbaum Engineering Corporation and the City. The additional services are due to revisions of the approved construction documents during the construction phase of the project. These revisions are described under Amendment No. 1-below. Amendment No, 2: The change at the doNvitstrearr end of the project which required Dannenbaum Engineering Corporation to design a junction box in lieu of the manhole originally designed. Amendment No. 2 includes Ln increase in total conixact amount of $50,000.00 in order to accommodate the following design changes: 1. Junction box construction at Station 0+00.00. Due to the necessity to complete the design extremely quickly, this request for amended fee is following the completion of the design. The fee is determined by the time Sp(tn cn tie design and the corresponding billing rates. The engineering fee required to make rhese ie-visions to rhe construction documents is $4,130.00 and is summarized as follows: Person Time Billing Rate Cost Brian D. O'Neill, P.E. 23 582.00/hr 52,050.00 ivlichel Maksoud. P.E. 10 $82.00/hr $820.00 EIT/Draftsman 20 S63.00/hr $1,260.00 Total Additional Fee S4,130.00 Attached's a sumrnary of the engineering fees for the project including amendments 1 and 2, Please i.nfortn us of the City's approval of the contract ;hanges. If you have any questions or need anv additional information in the meantime,please do nct hesitate to call. Sincerely, ItQF-� 0`20 Brian D. O'Neill,P,E, Project Mana;er c: Ww nc H.Ardis,P.E. Louis H.Joncs,P.E. file 3177.01 EXHIBIT B-3 (SUPPLEMENT TO ATTACHMENT B) ADDITIONAL DESIGN FEE & PROJECT COST SUMMARY M-390 and b1-36SR Drainage Areas Sanitary Sewer Rehabilitation and Improvements (Group 6, Contract 1), Part 2, D.O.E. 1646& (Group j, Contract 4),Part 4, D.O.E. 1707 Water Project No. PS46-070460410280 & 260 Phare Scope of Services Fee M/WBF MAIN 390 DRAINAGE AREA I-a. Design Services Relief/Replacement Sewer $195,339.00 $47,240.00 (farts A and B) II- Bidding & Construction Assistance(Part C) 520,586.70 $ 2,700.00 III- Railroad Permit Obtain(part D) S 2,236.50 $ 0.00 Sub-i otal M-390 Drainage Area(Original Contract.) 5218,162.00 $49,940.00 IV- Additional Design (Amendment No. 1) S 40,016.00 S 9,461.00 Additional Design(.Amendment:`o.2) S 4,130.00 S 0.00 Total M-390 Drainage Area(Amendment Contract) 5262,308.00 559,401.00 MAIlti 36SR DRAINAGE AREA I- Design Services ReliefReplace_nent Sewer $ 62,148.35 510,041.00 (Parts A and B) II- Bidding& Constructicn Assistance (Part C) S 10,994,15 S 2,040.00 III- Railroad Permit Obtain (Pan D) 5 21,236.50 S 0.00 Sub-Total M-36SR Drainage Area (Original Contract) S 75,379.60 512,081.00 IV -Additional Design,Construction & Special Semices S23,050.00 S 0.00 Total tiI-36SR Drainage Area (emended Contract) 598,429.60 $ 12,081.00 Original Contract Total 5293,541.60 562,021.00 Totals Amended Contract 5360,737.60 571,482.00 FoF,TWOP,TH MEMORANDUM TO: A. Douglas Rademaker, Director, DOE; and Mike Groomer, Assistant City Manager FROM: Rakesh Chaubey. DOE DATE: May 2, 2000 RE: DESIGN FEE AMENDMENT NO. 2 TO M390 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6, CONTRACT 1), PART 2 AND SANITARY SEWER SYSTEM REHABILITATION IN THE M-36SR, (GROUP 5; CONTRACT 2); PART 4 DRAINAGE AREA, DOE 1646, SEWER PROJECT NO. PS46-070460410260 The proposed amendment will allow Dannenbaum Engineering Corp., to provide additional services to the project as requested by the City. It has been determined that it is necessary to design a Junction Box where a standard manhole had originally been planned. During the course of construction it was found that the line to which this project connected to on the downstream end had been upsized from 48" to 60". In order to provide proper access for maintenance purposes, it was necessary to install a junction box. Dannenbaum Engineering Corp., has submitted a fee in the amount of $4,130.00 for the additional design work thereby increasing the contract fee from $365,607.60 to $369,737.60. 1 believe this fee is fair and reasonable for the additional services that are to be provided. It is recommend that the request be approved. Please authorize additional fee by your signatures on the attached contract amendment form. Rakesh Chaubey 1 Attachment Cc: Berdena Hamilton, Water Department Dan Pepon, Wat Pr Department. ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * FAx (817) 871-7854 �� Printed on recycled paper