HomeMy WebLinkAboutContract 25860 i
AMENDMENT NO.-2 CITY SECRETARY
CONTRACT NO. (u
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Dannenbaum
Engineering Corporation. , (Engineer) made and entered into City
Secretary Contract No. 22821, (the Contract) which was authorized
by the City Council by M&C C-16053 on the 20th day of July 1997;
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of M-390 Drainage Area
Sanitary Sewer System Evaluation and Improvements (Group 6,
Contract 1) , Part 2 and Sanitary Sewer Rehabilitation in the
M-36SR (Group 5, Contract 2) , Part 4, Drainage Area.
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include specialized design work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the Contract:
1 .
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated the 17th day of February 2000, a copy of which is attached
hereto and incorporated herein. The cost to City for the
additional design services to be performed by Engineer total
$4,130 .00
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $369,737 . 60.
I
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
o� EXECUTED on this the /& day of ,
- 999, in Fort Worth, Tarrant County, Texas.
AT ST: /l)D rniL k(amu lkEO
r Contract Authorization
Gloria Pe son, City Secret ry
"�C� Date
APPROVAL RECOMMENDED: APPROVED: � }
i
A. Douglas Rademaker, P.E. Mike Groomer
Director, Department of Assistant City Manager
Engineering
DANNENBAUM ENGINEERING CORP.
ENGINEER
<, n
Name: James D. DANNENBAUM, P.E.
4200 S. HULEN ST. St. 424
Fort Worth, TX 76109
APPROVED AS TO FORM AND LEGALITY:
— SA�
Gary Steinberger
Assistant City Attorney
ENG1.FRM(NO M&C)
-2-
DANNENBAUM ENGINEERING CORPORATION /-ti
— U21:AMP DOW10 5LV4•,9J11E 403 FORT'H0M)-.1FXA.4:6116•'421 (?17)753-U8 �J
Yeun
of
February 7,2000 lh"ka °
Mr. Rakesh Chaubey,P.E.
Department of Engineering
City of Fort Worth
811 Lamar Street
Fort Worth, Texas 76102-6311,
R.E. Main 390 Drainage Area Sanitary Sewer Rehabilitation & Improvements,
(Group 6, Contract 1),Part 2, Sewer Project No.PS46-070460410280, D.O,E.No. 1646
I& Chaubey:
We are providing this letter to request additional compensation for the work beyond the engineering services
outlined in the contract for :'Main 390 Drainage Area between Dannenbaum Engineering Corporation and the
City.
The additional services are due to revisions of the approved construction documents during the construction
phase of the project. These revisions are described under Amendment No. 1-below.
Amendment No, 2: The change at the doNvitstrearr end of the project which required Dannenbaum Engineering
Corporation to design a junction box in lieu of the manhole originally designed.
Amendment No. 2 includes Ln increase in total conixact amount of $50,000.00 in order to accommodate the
following design changes:
1. Junction box construction at Station 0+00.00.
Due to the necessity to complete the design extremely quickly, this request for amended fee is following the
completion of the design. The fee is determined by the time Sp(tn cn tie design and the corresponding billing
rates. The engineering fee required to make rhese ie-visions to rhe construction documents is $4,130.00 and is
summarized as follows:
Person Time Billing Rate Cost
Brian D. O'Neill, P.E. 23 582.00/hr 52,050.00
ivlichel Maksoud. P.E. 10 $82.00/hr $820.00
EIT/Draftsman 20 S63.00/hr $1,260.00
Total Additional Fee S4,130.00
Attached's a sumrnary of the engineering fees for the project including amendments 1 and 2,
Please i.nfortn us of the City's approval of the contract ;hanges. If you have any questions or need anv
additional information in the meantime,please do nct hesitate to call.
Sincerely,
ItQF-� 0`20
Brian D. O'Neill,P,E,
Project Mana;er
c: Ww nc H.Ardis,P.E.
Louis H.Joncs,P.E.
file 3177.01
EXHIBIT B-3
(SUPPLEMENT TO ATTACHMENT B)
ADDITIONAL DESIGN FEE & PROJECT COST SUMMARY
M-390 and b1-36SR Drainage Areas Sanitary Sewer
Rehabilitation and Improvements
(Group 6, Contract 1), Part 2, D.O.E. 1646&
(Group j, Contract 4),Part 4, D.O.E. 1707
Water Project No. PS46-070460410280 & 260
Phare Scope of Services Fee M/WBF
MAIN 390 DRAINAGE AREA
I-a. Design Services Relief/Replacement Sewer $195,339.00 $47,240.00
(farts A and B)
II- Bidding & Construction Assistance(Part C) 520,586.70 $ 2,700.00
III- Railroad Permit Obtain(part D) S 2,236.50 $ 0.00
Sub-i otal M-390 Drainage Area(Original Contract.) 5218,162.00 $49,940.00
IV- Additional Design (Amendment No. 1) S 40,016.00 S 9,461.00
Additional Design(.Amendment:`o.2) S 4,130.00 S 0.00
Total M-390 Drainage Area(Amendment Contract) 5262,308.00 559,401.00
MAIlti 36SR DRAINAGE AREA
I- Design Services ReliefReplace_nent Sewer $ 62,148.35 510,041.00
(Parts A and B)
II- Bidding& Constructicn Assistance (Part C) S 10,994,15 S 2,040.00
III- Railroad Permit Obtain (Pan D) 5 21,236.50 S 0.00
Sub-Total M-36SR Drainage Area (Original Contract) S 75,379.60 512,081.00
IV -Additional Design,Construction & Special Semices S23,050.00 S 0.00
Total tiI-36SR Drainage Area (emended Contract) 598,429.60 $ 12,081.00
Original Contract Total 5293,541.60 562,021.00
Totals Amended Contract 5360,737.60 571,482.00
FoF,TWOP,TH
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE; and
Mike Groomer, Assistant City Manager
FROM: Rakesh Chaubey. DOE
DATE: May 2, 2000
RE: DESIGN FEE AMENDMENT NO. 2 TO M390 DRAINAGE AREA SANITARY
SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 6,
CONTRACT 1), PART 2 AND SANITARY SEWER SYSTEM REHABILITATION
IN THE M-36SR, (GROUP 5; CONTRACT 2); PART 4 DRAINAGE AREA, DOE
1646, SEWER PROJECT NO. PS46-070460410260
The proposed amendment will allow Dannenbaum Engineering Corp., to provide additional services to
the project as requested by the City.
It has been determined that it is necessary to design a Junction Box where a standard manhole had
originally been planned. During the course of construction it was found that the line to which this
project connected to on the downstream end had been upsized from 48" to 60". In order to provide
proper access for maintenance purposes, it was necessary to install a junction box.
Dannenbaum Engineering Corp., has submitted a fee in the amount of $4,130.00 for the additional
design work thereby increasing the contract fee from $365,607.60 to $369,737.60. 1 believe this fee is
fair and reasonable for the additional services that are to be provided. It is recommend that the request be
approved.
Please authorize additional fee by your signatures on the attached contract amendment form.
Rakesh Chaubey 1
Attachment
Cc: Berdena Hamilton, Water Department
Dan Pepon, Wat Pr Department.