HomeMy WebLinkAboutContract 45430-FP2 �p2
Department o TP&W Const.Services QTY SECRETAG�NTRACf�®• (,L j �3�
DO -7L Q Date
Project Manager •�/J —4
Risk Management J. Page RT WORTH. r Aaw,,�z
D.O.E. Brotherton � C r A
CFA Kni httScanned 2 12 —cy
The Proceeding people have n Contacted concerning the request for final
payment&have released this project for such payment
ffATION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy )F PROJECT COMPLETION
D.O.E. N2: 7174
Regarding contract 117174 for WEST FORK RANCH PH5B-STORM DRAIN as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Prices: $38,694.80
Amount of Approved Change Orders: Ne
Revised Contract Amount:
Total Cost Work Completed: $38,694.80
Less Deductions:
Liquidated Damages: Days @$210.001 Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $38,694.80
Less Previous Payments: $0.00
Final Payment Due $38,6944..80
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Accepted (� / Date
Director, TRANSPORTATION & PUBLI WORKS
City Manager Date
Comments: C205-541200-202760221683
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WEST FORK RANCH PH5B
Contract Limits
Project Type STORM DRAIN
City Project Numbers 02216
DOE Number 7174
Estimate Number I Payment Number I For Period Ending 10/23/2014
CD
City Secretary Contract Number 117174 Contract Time 4CD
Contract Date Days Charged to Date 107
Project Manager Buckley Contract is 000000 Complete
Contractor KCK UTILITY CONSTRUCTION
103 N.ALLEN DRIVE
ALLEN, TX 75013
Inspectors LAYER / DOVERS
Wednesday,November 05,2014 Page I of 4
�I
City Project Numbers 02216 DOE Number 7174
Contract Name WEST FORK RANCH PH513 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 10/23/2014
Project Funding
STORM DRAIN
Item Description of items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
————— - —
---------------------------
1
27"RCP 149 LF $59.00 $8,791.00 149 $8,791.00
2 24"RCP 136 LF $51.00 $6,936.00 136 $6,936.00
3 21"RCP 101 LF $47.00 $4,747.00 101 $4,747.00
4 27"HEADWALL I EA $1,925.00 $1,925.00 1 $1,925.00
5 !0'STD CURB INLET 5 EA $2,860.00 $14,300.00 5 $14,300.00
6 18"THICK ROCK RIP RAP I I SY $110.00 $1,210.00 11 $1,210.00
7 REMOVE PLUG AND CONNECT TO EX I EA $670.00 $670.00 1 $670.00
8 TRENCH SAFETY 386 LF $0.30 $115.80 386 $115.80
-------------------
Sub-Total of Previous Unit $38,694.80 $38,694.80
---------------------------------------- -
Wednesday,November 05,2014 Page 2 of 4
City Project Numbers 02216 DOE Number 7174
Contract Name WEST FORK RANCH PH513 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 10/23/2014
Project Funding
Contract Information Summary
Original Contract Amount $38,694.80
Chance Orders
Total Contract Price $38,694.80
Total Cost of Work Completed $38,694.80
C r Less %Retained $0.00
Net Earned $38,694.80
Date J)4
pec on S e 'or Earned This Period $38,694.80
Retainage This Period $0.00
Date ()C)Ll Less Liquidated Damages
roject M n o
Days @ /Day $0.00
Date li ' S LessPavement Deficiency $0.00
Asst ' todl'PW-Infrastructure Design and Construction Less Penalty $0.00
7
14 (J 0 Date 7 Less Previous Payment $0.00
Director/ ontractingDepartn t It( Plus Material on Hand Less 15% $0.00
Balance Due This Payment $38,694.80
Wednesday,November 05,2014 Page 3 of 4
City Project Numbers 02216 DOE Number 7174
Contract Name WEST FORK RANCH PH5B Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAM For Period Ending 10/23/2014
Project Funding
Project Manager Buckley City Secretary Contract Number 117174
Inspectors LAYER / DOVERS Contract Date
Contractor KCK UTILITY CONSTRUCTION Contract Time 40 CD
103 N.ALLEN DRIVE Days Charged to Date 107 CD
ALLEN, TX 75013 Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
----------------------------------- ------
Total Cost of Work Completed $38,694.80
Less %Retained $0.00
Net Earned $38,694.80
Earned This Period $38,694.80
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Band Less 15% $0.00
Balance Due This Payment $38,694.80
Wednesday,November 05,2014 Page 4 of 4
FORTWORTH rev 03/0510-1
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:I
NAME OF PROJECT: West Fork Ranch PH 513
PROJECT NO.: C205-202760221 CONTRACTOR: KCK
DOE NO.: 7174
PERIOD FROM:04/24;14 TO: 08/08/14 FINAL INSPECTION DATE: 12-Nov
WORK ORDER EFFECTIVE:4/14/2014 CONTRACT TIME: 40 O WC* CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
PERIOD 107 107
PREVIOUS
0 0
PERIOD
TOTALS
TO DATE 107 107
*REMARKS:
Q1l l 1-2- -1`1 A0Z
CONjTZACTOR DATE INSPECTOR DA
ENGINEERING DEPARTMENT
0 The Cite of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I PROJECT INFORMATION Date: 10/24/2014
Name of Contractor Project Name
KCK West Fork Ranch PH513
DOE Inspector Project Manager
Keith Dovers Patrick Buckle
DOE Number Project Dculh, Type of Contract
7174 O Simple QQ Routine 0 Complex 0 Water❑ Waste WaterO Storm Drainage[] Pavement
Initial Contract Amount Final Contract Amount
$38,694.80 $38,694.80
11)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 13 ApplicabiLity Applicabilityof Specifications
4 Display Of Professionalism 14 Accuracy of Plan Quantities
5 Citizen Complaint Resolution 1PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
I Change Order Processing Time 3 Communication
2 Tim]iness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
lit)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor 0
Signature DOE Inspector 1 ��--
Signature DOE Inspector's Supervisor LA
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
Q9 (817)
City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
Q9
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV 02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
KCK West Fork Ranch PH5B
DOE Inspector DOE Number
Keith Dovers 7174
DOE Inspector Project Manager
❑ Water❑ waste Water❑ Storm Drainage[—] Pavement Patrick Buckle
Initial Contract Amount Project Difficulty
$38,694.80 10 simple Routine O Complex
Final Contract Amount Date
$38,694.80 10/24/2014
M PERFORMANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 N
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 1 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 N
I I Property Restoration 5 N
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 368
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 368
III)CONTRACTOR'S RATING
Maximum Scare(MS)=448 gr sum of applicable element score maximums which= 368
Rating([TS/MSJ* 100%) 368 / 368 = 100%
Performance Category Excellent
<20%=Inadequate 10%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector F .�— Signature Contractor
Signature DOE Inspector's Supervisor la-7/1
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
0The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
0
(817)392-7941 •Fax:(817)392-7845
CONSENT OF OWNER
SURETY COMPANY ARCHITECT
TO FINAL PAYMENT CONTRACTOR
SURETY
AIA DOCUMENT G707 0'1'I IER
Bond No. 2181381
PROJECT: Water,Sanitary Sewer,and Storm Drainage Improvements to serve West Fork Ranch
(name,address) Phase 513,Ft.Worth TX
TO(Owner) [ City of Fort Worth and ] ARCHITECT'S PROJECT NO:
Pulte Homes of Texas LP
1234 Lakeshore Dr.,Ste 750A CONTRACT FOR: Construction
Coppell,TX 75019
[ ] CONTRACT DATE: 3/3/2014
CONTRACTOR: KCK Utility Construction,Inc.
1024 So. Greenville,Suite 100
Allen, TX 75002
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
North American Specialty Insurance Company
650 .Elm Street
Manchester,NH 03101 , SURETY COMPANY,
on bond of(here insert name and address of Contractor)
KCK Utility Construction,Inc.
1024 So. Greenville,Suite 100
Allen,TX 75002 >CONTRACTOR,
hereby approves of the final payment to the Contractors,and agrees that final payment to the Contractor shal I not relieve
the Surety Company of any of its obligations to(here insert narne and address of Owner)
City of Fort Worth and Pulte Homes of Texas,LP
1234 Lakeshore Dr.,Ste 750A
Coppell,TX 75019 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 6th day of October 2014
North American Specialty Insurance Company
Surety Company
Signature of Authorized Representative
Attest:
(Seal): Andrea Rose Crawford Attorney-In-Fact
Title
NOTE, This form is to be uscd us a companion document to AIA DOCUMENT 0706,CONTRACTOR'S AFFIDAVIT Ol;PAYMENr OF DEB I'S AND CLAIMS,
Current Edition
AIA DOCUMENT G707 CONSENT OF SURETY COMPANY TO FINAL,PAYMENT APRIL 1970 EDITION AIA ONE PAGE
1970 THE AMERICAN TNsTITUTE OF ARC11TrECTS,1735 New York Ave.,NW,WAS[IINGTON,D.C. 20006
NAS SURETY GROUP
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALI,MEN BY THESE PRESENTS,THAT North American Specialty Insurance Company,a corporation duly organized and existing under
laws of the State of New Hampshire,and having its principal office in the City of Manchester,New Hampshire,and Washington International
Insurance Company,a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of
Schaumburg,011nois,each does hereby make,constitute and appoint:
SAMMY JOE MULLIS,JR.,JOHN WILLIAM NEWBY,JULIE STORM,CFfERI LYNN IRBY,WILBERT RAYMOND WATSON,
CAROLYN J.GOODENOUGH,MICHAEL L.TULLIS,SANDRA LEE RONEY,DEBRA LEE MOON,ANDREA ROSE CRAWFORD,
MARY JO ZAKRZEWSKI and TROY RUSSELL KEY JOINTLY OR SEVERALLY
Its true and lawful Attomey(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies,as surety,on contracts of suretyship as are or may be required or permitted by
law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of- FIFTY MILLION($50,000,000.00)DOLLARS
This Power of Attomey is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 9h of May,2012:
"RESOLVED,that any two of the Presidents,any Managing Director,any Senior Vice President,any Vice President,any Assistant Vice President,
the Secretary or any Assistant Secretary be,and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named
in the given Power of Attorney to execute on behalf of the Company bonds,undertakings and all contacts of surety,and that each or any of them
hereby is authorized to attest to the execution of any such Power of Attomey and to attach therein the seal of the Company; and it is
FURTHER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached."
.atwnluufu
awn'
S3' rY£oaPoP
6te+t.P.A.dm.gsmt.,Vk.Fend.(ofWuhl.e-Toter..a..dt.mnoceCamp..y SIAL'
V,fj rttl� �n Q 6Sema,Vt."deaf ffl"Ardui=9p.1.1ty 1—.. C.mp..y
�g um
B d
D A Ly....VT-Pt Wit.f W.dtt. Innr..nce Ce¢y.ny
&YumPnW—t.fNorrhA—A3p.!&yInrur.eceC.e,pmy
IN WITNESS WHEREOF,North American Speciatty lnsurance Company and Washington Intematfonal Inaiurance Company have caused their
official seals to be hereunto affixed,and these presents to be signed by their authorized officers this 12th day of December 2013 ,
North American Specialty Insurance Company
Washington International Insurance Company
State of 111 i no i s
County of Cook ss'
On this 12thday of December ,2013 before me,a Notary Public personally appeared Steven P.Anderson ,Senior Vice President of
Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and David M.Layman,
Vice President of Washington Intemational Insurance Company and Vice President of North American Specialty Insurance Company,
personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney as officers ofand
acknowledged said instrument to be the voluntary act and deed of their respective companies.
"OMCLAL9�4I"
DONNA D.SKLEN,S _
Notary Nblfc,Staeof Illinois Donna D.Sklens,Notary Public
MyCemmitsloo& - 14tICJ7AIJ
1, 2c_ffyr GQidb= the duly elected Assistant Sccretary of North American Specialty Insurance Company and Washington
International Insurance Company,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company,which is still in MI force and effect.
IN WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this-6ttj_day of October 2014
reRr,y Cordbory Via Pmsidau&Advaa&eu y of
W.4i.gm Wwn+o,.a.l Inrutncs Coni;+y&Non%Am.r Sp.cialy tnwmm CwWuy
tPulteGroup
October 23,2014
Mr.Greg Littrell
KCK Utility Construction
1024 Greenville Ave
Allen,Texas 75002
Re: Contract for West Fork Ranch Phase 5B
CoFW Project No.02216
CoFW File No.W-2297
CoFW DOE No.7174
Dear Greg Littrell:
This letter will document that Pulte Homes of Texas,L.P.confirms that KCK Utility Construction, has
completed the Work associated with the above-referenced contract in an appropriate time frame,
subject to completion of any warranty or maintenance work as identified and required by the City of
Fort Worth,and that no liquidated damages will be assessed by Pulte Homes in connection with the
Work.
Pulte Homes of TX, L.P.
By:G
Curt M.Millward
Land Development Project Manager
Cc: City of Fort Worth