HomeMy WebLinkAboutContract 46478 CITY SECPST L�U CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: HDMM Investments, LLC c/o Castle Development Group Address, State,Zip Code: 5751 Kroger Dr. Suite 251,Keller,TX 76244 Phone 817-337-3433 E-Mail mwmacleod@castledevgroup.com Authorized Signatory/Title /c Matthew Macleod ,Principle Project Name and Brief Description: Avondale Haslet MOB Addition Project Location: Northwest corner of Avondale Haslet& Haslet Court Plat Case No.:FS-14-128 Plat Name: Avondale Haslet MOB Addition MapscoAV Council District: 7 City Project No: TBD CFA:2015-005 DOE: TBD To be complete y VW. Received by: Date: 0?_.,; /Y6 %l7 m C-) rn m C3 M 0 N C1 OFFICIAL RECORD 1 CITY SECRETARY FT.WORTH, TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Avondale Haslet MOB Addition ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the Project. NOW, THEREFORE,For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water(A) Sewer (A-1 ) _, Paving (B) _. Storm Drain (B-1) X_, Street Lights & Signs (C)_ E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253,Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the Go of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND 7 Cost Summary Sheet Project Name: Avondale Haslet MOB Addition CFA No.:2015-005 DOE No.: TBD An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1, Water Construction 2.Sewer Construction Water and Sewer Construction Total $ - B. TPW Construction 1.Street 2.Storm Drain $ 35,446.00 3.Street Lights Installed by Developer TPW Construction Cost Total $ 35,446.00 Total Construction Cost(excluding the fees): $ 35,446.00 Construction Fees C. Water/Sewer Inspection Fee(2%) $ - D. Water/Sewer Material Testing Fee(2%) $ Sub-Total for Water Construction Fees $ - E. TPW Inspection Fee(4%) $ 1,417.84 F. TPW Material Testing(2%) $ 708.92 G. Street Light Inspsection Cost $ - H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 2,126.76 Total Construction Fees: $ 2,126.76 Financial Guarantee Options Choose one Amount Mark choice Bond=100% $ 35,446.00 Completion Agreement=100%f Holds Plat $ 35,446.00 Cash Escrow Water/Sanitary Sewer=125% $ Cash Escrow Paving/Storm Drain=125% $ 44,307.50 x Letter of Credit=125%w12yr expiration period $ 44,307.50 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed,and said 0-veloper has execu ed this instrument in qyadruplicate,at Fort Worth,Texas this day of VOLK�— 20 . CITY OF FORT WORTH-Recommended by: Transportation& Public Works Department DUA c' J, bi Douglas W. iersig, P.E. Director Approved as to Forrn & Legality: Approved by City Manager's Off ce Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. Al lk Date: LL ATTEST: �� �"° °°°ao/!� a 0 ary .Ka e °o� o���C City Secretary "0000000° TEXAS ATTEST: DEVELOPER: HDMM Investments,LLC. c/o Castle Development Group d.4� Al Signature / Signature: (Print)Name: S �� e/ Print Name: Mathew Macleod Title: Principle OMC"RECORD 9 an 41 F, WOM TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ❑ Exhibit A: Water Improvements ❑ Water Estimate ❑ Exhibit A-1: Sewer Improvements ❑ Sewer Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 81 287 me a o oZ rn a 1 Q o NenTletitio / CID a� r v Ai z PARKS a 2 � � Q Q ti KELLO J v OTeBk C) �9 0 3 GREENWAY CROSSING < A O 0 ��O Z Of C z 9� kAN U n � F p\RW AY BEND yds Q �� x Z = AVONDALE-HASLET CD Site AVONDALE 8287 TINSLEY AVON BLUE MOUND 287 BLUE MOUND 0 o lJ/ n = l U N NOT TO SCALE � � CA.5TL,E THIS DOCUMENT IS RELEASED FOR THE .r--ti DLl LLOPRf_E, :7 GF:Oli,P PURPOSE OF INTERIM REVIEW UNDER 5751 Kroger Drive, Suite 251, Keller,TX 76244 VICINITY MAP N THE T No. 0 CHARLES GENE o CAPPS T4x No. 104919; RIS NOT Tel: 817)337-3433 Fax:(817)337-3466 INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. Baird, Hampton & Brown, Inc. URGENT CARE FACILITY & D e Engineering & Surveying MEDICAL OFFICE BUILDING BHB PROJECT NO: 4550 5H 3360,S,ile 180.Grapevine,TX 76051 Tel:817.5.78.1277 F- 817.251.8810 LOTS 1&2, BLOCK 1, AVONDALE HASLET ,,,, —.BHBINC.— TBPE F­ #44 TBPI-S F /10011302 MOB ADDITION, FORT WORTH, TX 2 0 14.7 0 7.0 0 0 DRAWING FILE,B\2014.000:000\2014.707.000\1)or\24—Inde P„mic 61—0rmn\CFA\V1C M7P.dr.9 2 ° 3 ` $'ta i F� . x pt {ji ;R a 4 Q E F ■ [ !i vo -1 Z 2 a gR a sPJ I : .4 r. " Zo R W .1 O o o a s a e Ldp E` tft 3 !pl 7g_t s iFpB 0 W o W ?{ et a° K y l� I jS +`L 'tLE 9L ` i E+� ; L:a � � I �y pjj e a s '2 • tfwS- 4' � FSSF t•- 1 � � iii Ike! !1�'C L � a!� t ;: � �L� = � l{.s�� x � � " i +�. ;��3 � ja f tj� i iL{; Ft° F iii � c9� p t:� n Pf'�� 3! � -• `ftdp� I f lig -�y• s flip ifit 4 ` � i ,I T� f� f j � ; $aE � � S '' 1�1$ +�,i ° 1! ' a 2, !q1t k Ci S L P1 F fe 4 61 1J ¢ i Z y t # =t'4�"�ap15� F I S Fe y Ftlp $q Et t'� t t t�Y r# Its-` ? SR,� � __ m i' gyp! t t l "+a f�Q ! 1 sa Y�► g 2{€F= os`.b.�e l:T r• 3 ;f ! k )2 i y 7 °^ y7 a �� •i �P c b� [ j F k e�5 ,.�.'tu-.aw�.l•mr,o.,y and i7t _/'� ;{)8I �;� I(►Alieg jfQ#st Sd[ sva wTw'w� ��1 \ EIA i ? i t 4 T� j ,it .tee p it g # ; 9 (Setaj'4-3lueuel 'syawateld'99K9M 'VlayQrJ) d.:. ` apt0 `{�jp!.[iF#,pt.t1P E`.E T ; + ! !t ;• ---qPMTG--018.09Yt4 -- �/ a ;r in 3S� 6 i"i# t5 F'7 T TF l# .n iiiii i.anoo t}a1seF1 "�;50esE :i�ii�lilitd#ads f ij ft s tit tt 7ij _ 4F4 Y� y! 3}tppt N ns � \ g�! ! t tFi t� t�tftt �i^ �p g !• �t��jt �a.i flf�il lit' igt ; `�s $ S St l���E3 f _f ! 4 i a et- d4, t f MIN #6 sr bc.5• u a i+gtT+ all ! � � � $ � f � \ eIi =rEIE! r r. Y• t . �••-�- ii ps jo s6\ #p fp#!! fat a !p t Gds aflt4p°� api°t it }iitf p;E'yE�t1.# ���#lt1��t } _S %t�\ �•I \ s t. ' . it, �!HIs9f {iaFigeeii f�f �s _aa I tear t i G'a�' 3 • •j'R, � ' llTf ^t'rt .- _t• �Ys � .• tia i• c9Y� I 5 I I �) / ,gyp +� 3 ! �•�lit� t �t'ItLy �e ( I.. I I y I I $coo SI I� \Wo &a 91 2Efttt;l taal?i[E I �_-,.� ia� \ \� � aye; �i L,•�. e���!' � � p i :� _x,�t,lrt_- I � ! � I j� �'`•� � � ai��i6f� �f6��e��;F a l a rl I I t ;: = 16 p tsxn.-t uav 13 LA 11=211 z ml kI S — PJ � 3 tuvT i.9M1:.rt � p sl I 4 C 1 2 .a/' (wld aYLAIU �/ Q �I slit e. j}i) i3 e p ° 5uu a xt a 71 ✓. ----- I a /� }--T-- Noo°75't7"W -----)17.69'^ � � a �- � � � s�• I �r� � y a�4 �! E.6 .,�,....i wax wv 1 '�,o �31�a A���_ _ � i�> Sz�• �T ' _ u.vt��u..I�N _t c Ji a 5 '�c� •� vn9e'�1 PI 1 `I Z' - ' 17ug� u 2 I SW 29 i" YOU – ?a o w� wM e I ----•---M..9L�LG— ---.-----_ 1 c , a;9 a_ -----------$ � al} �1� Vii, Q�e -----fig vl� t lo'� t aQ 71 i i i ° g� I I f � Q g:;¢ � ao•d•d }ALL clgg } �7 r 7} r �q 1 { ! 67 I I 8 ;r' Q s f ii €7 f ; d ? 8 S 7 •8a `Aig fa t(i 5 } 713 7 •1 € i} J I I sy 21 € 7111111# }isr! f f} {•¢ r1 i , 1 �1 � �s I � f�f�ttd. rill i iSiI F{ �� f rl }e I a=c� I I e•! 4i i �i`;'{' a3Aa �L it i S �} •I �N F I I`- 7 f gQ ��� 111sa� dr- if�6 \ $ }�} a>� I I �� :3r i $• p � ° ° �p '1a ( ►}{ ss 3 1 I $ FSA I I q3 I !t Fj i •y ss" �a I� ; �g � i i t o {k 3ariQ $ EDg r �5 I Rif; TrPiI ——————— r MRRP a..a.1f.00$ Haslet Oou" -_ (60'Rfghty(-Way) – – p (Ca6Yre1 A,Sid, 3x68,Plat R—d,. f/ir{ T-1 La+^�Y:T—) lid I 3 M 1 fig '< 'c 9 I I ! ax f All t �s � } } �� ,� n. .• n �'E` 2;tM21 a 7 I{i { FO PL{• �ni[i tL� !f� Yii `7 + `ie 7F'�p Il a.l-I3gFa�$$F 4o Qire pp r{ e { Q=' %{i?�Se G,q8 {,i_TSEc;i i F FH y p Q i r$ f°5 �7 all li "{ "I del yy Fi 7 ani m. 7F F r! c { pi tit Ela" n a P r :: i FQ. i(i afro E 'f 'S e7P; i ga 7 6H�:7E •4�t 1 �l16� a �) Fi 4P 7■ Il `�- [P`aC is r47 7 1 : u. boa? y�� WWF u�_ _Y X40 -.R,. G••c ff L-' -— -—- --—— ----—— —— i I t r` ^' �.,�« O I i. if: min Q� ISR,` �s" y�� 1n NI; w � I I— 8ga X t'St z Ioh„ 3A n \ '� '\\' it d I � -LI { i R Al na } • � � �✓/-\. ,�ii 3¢; 59. _ 3 - _ o i. �% -�� I mss O� ✓ �''' y .}. xaILL 1 1.111 dP0 JS ro' oM-O'TJ•,?x]^d'_OL'e�K\�CQJCCY.�L•,7 TU S+.�m IX-1, IV Fri '60C �L � y, c� �a �: iz 51 cc U) vvq- i ;f ALi3S SS i7 %ZQ 0 nag- cy') 4— LL hL- C\j — ------------ Z, LLJ R M in Cc, 00 ,� I ;v < - i ", V Cp C! zwL LO Lj W> !r ZO 7:LU (L z c 3. 3NI� NIVLUO V*Tllis ]]Vh1 ONIMVJ_IL+ d02fd ae :2 Z I �cr 'Lo /v 000 W s I ' w An \00w I � '•. + r o \U El- ell Ind' O C� .r� co �O �� M M / \ � LO U W ALN oil ' ��• f i r �•: c' r" 0� I i m s� J o i zcu / ~ le ado 00 Ln U)0 \�� 1 L��13 11 SF ' d. co IPCO CID n ! n � •r n ep.. •N....... 1p rim W 11 1 LLJ o ti 's - -� �— ��'' °• \ T I co 4 ni FC:L- '-N \" S l j Vy1 S %6Z'£/. I` •1 \ r�lIPA Avondale Haslet MOB Addition BHB Engineering Surveying 2/2/2015 4550 S.H.360,Suite 180 Grapevine,TX 76051 Tel(817)251.8550, Fax(817)251-8810 OPINION OF PROBABLE CONSTRUCTION COST for DRAINAGE IMPROVEMENTS to Serve URGENT CARE FACILITY & MEDICAL OFFICE BUILDING Lots 1 &2, Block 1 Avondale Haslet MOB Addition Fort Worth, Texas February, 2015 Public Drainage Bid Item Item Description Unit Unit Cost Quantity Total 3123.0101 Unclassified Excavation by Plan CY $ 8.35 400 $ 3,340 3137.0104 Medium Stone Riprap, dry SY $ 51.57 39 $ 2,011 3292.0500 Seeding, Soil Retention Blanket SY $ 3.49 760 $ 2,652 3341.0205 24" RCP, Class III LF $ 45.05 390 $ 17,570 3349.0001 4' Storm Junction Box EA $ 3,848.49 1 $ 3,848 3349.0002 5' Storm Junction Box EA $ 3,991.38 1 $ 3,991 3349.1003 24" Flared Headwall, 1 pipe EA $ 1,533.26 1 $ 1,533 9999.0001 Connection to Ex. 4'x4' Drop Inlet EA $ 500.00 1 $ 500 Public Drainage Total $ 35,446 Page 1 of 1