HomeMy WebLinkAboutContract 45374-FP2 oepartment o TP&W Const. Services
DOE CtT17 "-LCk?f T -}
# Date ` CrA!TRACT No. D t4-FPa
Project Manager
Risk Management J. ape T WORTH.D.O.E. br `
Brotherton
CFA Scanned It
Tho Proceeding people have been Contacted concerning the request for final
payment 8 have released this project for such payment
ATION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION
D.O.E.Ns: 7125
Regarding contract 17125 for SANTA FE TRAILS PHASE 6 as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of die TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Prices: $683,178.62
Amount of Approved Change Orders: Ns 1
Revised-Contract-Amount:-
Total Cost Work Completed: $683,178.62
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $683,178.62
Less Previous Payments:
Final Payment Due $683,178.62
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Accepted Date
Director, TRAN PORTATION AND PU IC WORKS DEP M
City Manager Date
Comments: FUND ACCT:C205-2027602181
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SANTA FE TRAILS PHASE 6
Contract Limits
Project Type PAVING&DRAINAGE
City Project Numbers 02181
DOE Number 7125
Estimate Number 1 Payment Number 1 For Period Ending 10/7/2014
CD
City Secretary Contract Number 117125 Contract Time 12ED
Contract Date Days Charged to Date 187
Project Manager Jeafari Contract is .000000 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors LAYER / ODEN
Wednesday,October 08,2014 Page i of 5
City Project Numbers 02181 DOE Number 7125
Contract Name SANTA FE TRAILS PHASE 6 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 10/7/2014
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
------- -------------------- - ----------------
1 36"RCP 40 LF $80.00 $3,200.00 40 $3,200.00
2 30"RCP 184 LF $70.00 $12,880.00 184 $12,880.00
3 24"RCP 542 LF $50.00 $27,100.00 542 $27,100.00
4 21"RCP 65 LF $45.00 $2,925.00 65 $2,925.00
5 36"SLOPING HEADWALL 1 EA $2,500.00 $2,500.00 1 $2,500.00
6 30"SLOPING HEADWALL I E4 $2,000.00 $2,000.00 1 $2,000.00
7 24"SLOPING HEADWALL 2 FA $1,500.00 $3,000.00 2 $3,000.00
8 SPECIAL RIPRAP 101 SY $65.00 $6,565.00 101 $6,565.00
9 4'STORM JUNCTION BOX 2 E4 $3,500.00 $7,000.00 2 $7,000.00
10 10'CURB INLET 7 EA $2,000.00 $14,000.00 7 $14,000.00
11 15'CURB INLET 2 E4 $3,000.00 $6,000.00 2 $6,000.00
12 TRENCH SAFETY 831 LF $1.00 $831.00 831 $831.00
13 ENGINEERED CHANNEL 141 LF $20.00 $2,820.00 141 $2,820.00
-------- ------- --------- - ---------------
--- _Sub-T-0taI-Of-P-Pevbus-Mit- S90,82L00 $90,82100_ - - -
PAVING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
------------------------------------------ -
1 10"CONC PVMT 614 SY $42.50 $26,095.00 614 $26,095.00
2 6"CONC PVMT 16067 SY $27.50 644I,842.50 16067 $441,842.50
3 8"LIME TREATMENT 664 SY $3.00 $1,992.00 664 $1,992.00
4 6"LIME TREATMENT 17228 SY $2.65 $45,654.20 17228 $45,654.20
5 HYDRATED LIME 273 TN $155.00 $42,315.00 273 $42,315.00
6 4"CONDT PVC SCH 40 180 LF $20.00 $3,600.00 180 $3,600.00
7 4"CONC SIDEWALK 5302 SF $2.96 $15,693.92 5302 $15,693.92
8 BARRIER FREE RAMP 14 EA $155.00 $2,170.00 14 $2,170.00
9 24"SLD PVMT MARKING PAINT 25 LF $12.00 $300.00 25 $300.00
10 RAISED MARKER 47 E4 $5.00 $235.00 47 $235.00
11 REFL RAISED MARKER 12 E4 $5.00 $60.00 12 $60.00
12 STREET HEADER 104 LF $15.00 $1,560.00 104 $1,560.00
13 TYPE III STREET BARRICADE 116 LF $40.00 $4,640.00 116 $4,640.00
Wednesday,October 08,2014 Page 2 of 5
City Project Numbers 02181 DOE Number 7125
Contract Name SANTA FE TRAILS PHASE 6 Estimate Number 1
Contract Limits Payment Number
Project Type PAVING&DRAINAGE For Period Ending 10/7/2014
Project Funding
14 REMOVE STREET BARRICADE I EA $200.00 $200.00 1 $200.00
15 MOVE SIGN 1 LS $500.00 $500.00 1 $500.00
16 BOND 1 LS $5,500.00 $5,500.00 1 $5,500.00
Sub-Total of Previous Unit $592,357.62 $592,357.62
Wednesday,October 08,2014 Page 3 of 5
City Project Numbers 02181 DOE Number 7125
Contract Name SANTA FE TRAILS PHASE 6 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 10/7/2014
Project Funding
Contract Information Summary
Original Conlract Amount $683,178.62
Change Orders
Total Contract Price $683,178.62
Date ! ' t Total Cost of Work Completed $683,178.62
JnrLess r / J %Retained $0.00
/ Net Earned $683,178.62
Date
Inspection S�pe iso Earned This Period $683,178.62
Retainage This Period $0.00
Date l Less Liquidated Damages
ProjeX�oDate
Days @ /Day $0.00
-- LemPavement Deficiency- 30-00_
Asst. i or Less Penalty $0.00
()&J, IJ Less Previous Payment $0.00
Director/Co tracting Departrnent Plus Material on Hand Less 15% $0.00
114 Balance Due This Payment $683,178.62
Wednesday,October 08,2014 Page 4 of 5
City Project Numbers 02181 DOE Number 7125
Contract Name SANTA FE TRAILS PHASE 6 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 10/7/2014
Project Funding
Project Manager Jaafari City Secretary Contract Number 117125
Inspectors LAYER / ODEN Contract Date
Contractor CONATSER CONSTRUCTION TxLP Contract Time 120 CD
5327 WICHITA ST Days Charged to Date 187 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $683,178.62
Less %Retained $0.00
Net Earned $683,178.62
Earned This Period $683,178.62
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $683,178.62
Wednesday,October 08,2014 Page 5 of 5
FORT WORTH rev 0;,054q7
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Santa Fe Traits Ph 6
PROJECT NO.: C205-2027602I81 CONTRACTOR: Conatser Construction
DOE NO.: 7125
PERIOD FROM 03"20.`14 TO: 10,"07;14 FINAL INSPECTION DATE: 9-Oct-14
WORK ORDER EFFECTIVE:3120,2014 CONTRACT TIME: 120 QQ WU CD
DAYS DAYSDAY OF REASON FOR DAYS DAY OF REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
Di"RING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT.Sl'1, RAIN,TOO WET, UTILITIES OTHERS * DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
PERIOD 0 0 U 0 Ih7 l ?
PREVIOUS 0 0 U U 0 0
PI?RI OD
TOTALS
TO DATE 0 0 0 0 l h 7 IS-17
*REMARKS:
V l� -• 11' I G t
CO RACTOR DATE II INSPEOTOR DATE
ENGINEERING DEPARTIMENT
{ The City of Farr Worth•1000 Throckmorton Street•Fort Worth,T17601?-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTH REV:02/22/07
r:
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I�PROJECT INFORMATION Date: 10J9/2014
Name ofContractor Project Nance
Conatser Construction _ 'Santa Fe Trails Phase 6
DOE htspecmr Project A4anager
Weyman Oden Khal Jaafairi
DOE Number P-Ject Difflcultv Type of Cataract
7125 Simple QQ Routine Q Complex ❑ Water❑ Waste WaterO Storm Drainage0 Pavement
Initial Contract Amount Final Contract Amount
$683,178.62 1$683,178.62
II)PERFORMANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent_
ELEMENT RATING ELEMENT RATING
— _ _ 0-4
INSPECTION_ _EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector Ljj I Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 1A 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 4 3 Aalicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting,up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
I Chane Order Processing Time 13 Communication
2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
—III)COMMENTS&-SIGNATURES — ——COMMENTS
Signature Contractor
Signature DOE Inspector
.o
Signature DOE Inspector's Supervisor Ea*�
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
r` The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH REV:02'20107
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Conatser Construction Santa fe Trails Phase 6
DOE Inspector DOE Number
Weyman Oden 7125
DOE Inspector Project Manager
❑ Water[I Waste WaterO Storm DrainagC] Pavement Khal Jaafarri
Initial Contract Amount Project D(lriculty
$683,178.62 O Simple QQ Routine O Complex
Final Contract Amount Date
$683,178.62 10/9/2014
II)PERFORMANCE EVALUATION
0-Inadequate t-Deficient 2-Standard- 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(YIN) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 1 4 20 20
72 After-Hours-Response 5 Y 1 _ -20 1-5--
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 443
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 443
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MSJ * 100%) 443 / 448 = 99%
Performance Category Excellent
<20%=/nadequate 20%to<40%=Deficient 40%10<60%=Standard 60%10<80%= Good >80%=Excellenl
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector � Signature Contractor
Signature DOE Inspector's Supervisor ]
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311
(817)392-7941 •Fax:(817)392-7845
B-H-HOUMN" NYSE
aeml
October 8,2014
City of Fort Worth
Weymon Oden
CFW Inspector
8851 Camp Bowie West
Fort Worth,TX 76116
RE: Santa Fe Trails Phase 6, DOE 7125
Mr.Oden:
This letter is to serve notice that D.R. Horton, Inc.will not charge any liquidated damages to Conatser
Construction TX, LP on the above referenced project.
Sincerely,
Mark P.Allen,P.E.
Land Development Manager
D.R. Horton,Inc.—DFW West Division
6?51 North Freeway Fon Worth,TX 76131
(817)230-0800
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, Vice-President of Conatser Management Group,
Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who
being by me duly sworn,upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full;and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
SANTA FE TRAILS,PHASE 6
WATER, SANITARY SEWER,PAVING,DRAINAGE
DOE#:N/A
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
Brock Huggins
Subscribed and sworn to before me this I Oh day of October, 2014.
IF Bertha Gianulis Notary Public in Tarrant County, Texas
Notary. Public for
State of Texas
My commission expUes:0.8H812015
OWNER
CONSENT OF SURETY ARCHITECT El
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
BOND NO.: 0174430 OTHER ❑
TO OBLIGEE:
(Nanreand Address) CONTRACT FOR: Water,Sanitary Sewer,Storm
D.R.HORTON-TEXAS,LTD. Drain and Paving
6751 North Frwy,Bldg A Improvements
Fort Worth,TX 76131
PROJECT: CONTRACT DATED:January 2014
(Name and Address)
Santa Fe Trails Phase 6
Fort Worth,TX
PRINCIPAL: CONATSER CONSTRUCTION TX,L.P.
At the request of the Obligee and the Principal indicated above,(insert name and address of Surety)
Berkley Insurance Company, 412 Mt. Kemble, Suite 3ION,Morristown,NJ 07960
SURETY,
on bond of
(7nsertname and address ofContractor) CONATSER CONSTRUCTION TX, L.P.
5327 Wichita Street
Fort Worth,TX 76119
,CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final_ _
payment under the Contract have been satisfied by Principal as of the date of final payment,and that no claims
by Obligee or any third party are known or believed by Obligee or its representatives to exist as of the date of
final payment,representations as to the truth and accuracy of the foregoing conditions being deemed to have
been made by Obligee in connection with this request for Consent of Surety,hereby approves of the final
payment to the Principal,and agrees that final payment in accordance with the terms hereof shall not relieve the
Surety of its obligations to
(Insert name and address of Obligee)
D.R.HORTON•TEXAS, LTD.
6751 North Frwy,Bldg A
Fort Worth,TX 76131 OBLIGEE,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: October S,2014.
(Insert in writing the month followed by the numeric date and year.)
Berkely Insurance Compan
S ,
(Signature of authorized representative)
V.DeLene Marshall,Attorney-In-Fact
(Printed name and title)
(Seal):
No.BI-7280c
` POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
7:1KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
_ organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo A Reyna, Don E. Cornell, Lisa M. Bonnot,
Vena DeLene Marshall or Sophinie Hunter of Aon Risk Services Southwest,Inc. of Dallas, TX its true and lawful Attorney-in-
Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and
undertakings, with the exception of Financial Guaranty Insurance,providing that no single obligation shall exceed Fifty Million
r and 00/100 U.S.Dollars(U.S.S50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by
the regularly elected officers of the Company at its principal office in their own proper persons.
y J This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
v
i RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
C
c Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attomey-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Companyr.and to affix-the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
3 attorney-in-fact and revoke any power of attorney previously granted;and further
G ° RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated;and further
0 o RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
ti further
- RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have
c
o � ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF, the Comppy has can d these resents to be signed and attested by its appropriate officers and its
G 2 corporate seaJ hereunto affixed this day of Ccs ,2014.
o Attest: /r / Berkley Insurance Company
(Seal) BY BY
o Ira S.Lederman J y .Hafter
o N
Senior Vice President&Secretary or ce President
WARNING:THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER.
2.=
STATE OF CONNECTICUT)
ss:
y E COUNTY OF FAIRFIELD
o Sworn to before me, a Notary Public in the State of Connecticut, this day of /L ( , 2014,by Ira S. Lederman and
=_ Jeffrey M.Hafter who'are sworn to me to be the Senior Vice President and Secretary,and t Senior Vi President,respectively,of
Berkley Insurance Company.
MARIA C.R111Vp9AKEN
NOTARY PUBLIC ////��✓L�� 1,
< MY COMMISSION EXPIRES go6ry Public,State of Connecticut
u u APRIL 30,2018
CERTIFICATE
z I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a
lu true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded
v and that the authority of the Attomey-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorney is attached,is in full force and effect as of this date.
Given under my hand and seal of the Company,this ( i day of �7 .
(Seal)
Andr .Tu a
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Berkley Surety Group, LLC and its affiliates by
telephone for information or to make a complaint:
BERKLEY SURETY GROUP, LLC
Please send all notices of claim on this bond to:
Berkley Surety Group, LLC
(866) 768-3534
412 Mount Kemble Avenue, Suite 31 ON
Morristown, NJ 07960
Attn: Surety Claims Department
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://www.tdi.state.tx.us
E-mail: Cons umerProtectionAtdi.state.tx:us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim
you should contact your agent or Berkley Surety Group, LLC first. If
the dispute is not resolved, you may contact the Texas Department of
Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or
condition of the attached document and is given to comply with Texas
legal and regulatory requirements.