HomeMy WebLinkAboutContract 46490 CVN 39eHKAW
CONTRACT NO.
Developer and Project Information Cover Sheet:
Developer Company Name: D.R. HORTON-TEXAS, LTD.
Address, State,Zip Code: 6751 NORTH FRWY., FORT WORTH,TX, 76131
Phone,E-Mail: 817-230-0800
Authorized Signatory/Title: RANDY HORTON/ ASSISTANT SECRETARY
Project Name and Brief Description: SANTE FE TRAILS PHASE 4
WATER, SEWER,PAVING, STORM DRAIN, STREET LIGHTS & SIGNS TO SERVE SANTE FE
TRAILS PH. 4
Project Location: J. WALKER SURVEY,ABSTRACT #1602 ,TARRANT COUNT,TEXAS
r_ P_
Plat Case No.: 13-088 Plat Name:
Mapsco: 34V Council District: 2 City Project No: 02268
CFA: 2014-082 DOE: 7212
To be completed by staff.
Received by: Date:
NIFT
ICIAL RECORD
Y SECRETARY
.WORTH,TX
RECEIVED MAR 0 4 1015
i
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 400
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as SANTA FE TRAILS PH. 4
("Project") within the City of Fort Worth,Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X, Sewer
(A-l) X, Paving(B) X, Storm Drain (B-1) X, Street Lights & Signs (C) X
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section I1, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
3
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
4
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said
5
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
6
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND
7
Cost Summary Sheet
Project Name: SANTA FE TRAILS PH. 4
CFA No.: 2014-082 DOE No.: 7212
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 178,444.50
2.Sewer Construction $ 34,032.50
Water and Sewer Construction Total $ 212,477.00
B. TPW Construction
1.Street $ 407,130.25
2.Storm Drain $ 161,220.00
3.Street Lights Installed by Developer $ 57,465.00
TPW Construction Cost Total $ 625,815.25
Total Construction Cost(excluding the fees): $ 838,292.25
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 4,249.54
D. Water/Sewer Material Testing Fee(2%) $ 4,249.54
Sub-Total for Water Construction Fees $ 8,499.08
E. TPW Inspection Fee(4%) $ 22,734.01
F. TPW Material Testing(2%) $ 11,367.01
G. Street Light Inspsection Cost $ 2,298.60
H. Street Signs Installation Cost $ 1,470.00
Sub-Total for TPW Construction Fees $ 37,869.62
Total Construction Fees: $ 46,368.70
Financial Guarantee Options Choose one Amount Mark choice
Bond=100% $ 838,292.25 X
Completion Agreement=100%/Holds Plat $ 838,292.25
Cash Escrow Water/Sanitary Sewer-125% $ 265,596.25
Cash Escrow Paving/Storm Drain=125% $ 782,269.06
Letter of Credit=125%w/2yr expiration period $ 1,047,865.31
8
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary,with the corporate seal of the City affixed, and said eveloper has executed this
instrument in quadruplicate, at Fort Worth,Texas this day of WrOt)
, 20 16 .
CITY OF FORT WORTH-Recommended by:
Water Department T sportation& Public Works Department
Wendy Chi-B bulal, EMBA, P.E. Douglas W. Wiersig, P.E.
Developmen ngineering Manager Director
Approved as to Form &Legality: Approved by City Manager's Once
Douglas W. Black Fernando Costa
Assistant City Attorney Assistant City Manager
M&C No.
Date:
ATTEST: ��°°°°��
f S.o
�$ °0
a
0
a J.K $°
City SecreW)/ 0000,00000
T�XAg
ATTEST: DEVELOPER:
D.R.Horton-Texas, Ltd.,a Texas Limited Partnership
By: D.R. Horton,Inc.,a Deleware Corporation
Its aut ent
!!!':�
��-
Signature Signature
(Print)Name: Print Name: Randy Horton
Title: Assistant Secretary
OFFICIAL RECORD
9 CITY SECRETARY
FT. WORTH,TX
i
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
--------------- --- ---- ---------------------------------- ---- - - - ---
\ 81 ORTH TARRANT PKWY
287
\ I
rzl
I �
0 f — 35W
w
I=
m SW O
1 � �
BASSWOOD BLVD
PROJEC" Uld56z \
SAGINAW`-
\o
�7� WESTERN CENTER BLVD \ \ \
1 3 35W
z
a
81
L)L)
N
�1 U IU
287
S
\ ❑
---- - --- -------- -- ----------- -- -------- ------ ------ ------------ - - - ------ --------- --------- ----------------- -------. .--
OWNER/ DEVELOPER: Ii!II PELOTON
LANDTIONS
SANTA FE TRAILS DR HORTON-TEXAS, LTD KRO {DIY DRIVE 5751GER
noaTH PHASE 4 6751 NORTH FREEWAY SUITE 185
NOT TO SCALE FORT WORTH,TEXAS 76131 KELLER,TX 76244
DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
RETASAL 1,L.P.
BASSWOOD BOULEVARD
—+e—�G------ EX 16"W—
1 2 3O S4 5 6 7 8 9 10 11 12 13 14 15 16 17 pp
S
PNP SE3 I 7
wo
— — — 79 I }NI 6
I
21 22g I 1 2 3 4 5 6 7 8 9 10 11 12 13 I I-_0 5
20 1I(Z,Lu
I jl
q 21 > a 94
24 23QII 26 25 24 23 22 [L20Ll 16 15 14 22 OI N(P E
X oI SP(RA1�r'6
LLJ � PN,PSE
23 �— I 2
-- -- -- 1 124
J
9 10 11 12 13 14 15 16 _mAj_
17 18 19 20 21 22 23 FOSSIL I 1
� I ESA WA
66
� I �
40 39 38 37 36 35 34 33 [Lll3029 28 27 26 Q I 12Q 1X I 1
-- — \ 10 I I
9 10 11 12 13 14 15 [1-
6 17 18 19 20 21 22 23 24 II I 9 I I y
SPNjPFE E.Sj 65 I 62 �I >!n
P s O Z
ss x I co
40 39 38 37 36 35 34 33 32 31 30 29 28 27 25 7 I �xjJl I I�
- " _2"i
34 1 CO
LOT 2X,BLOCK 62 —
17 18 I L)J 5 I
CL
J
O
LEGEND
PROPOSED GATE VALVE
- -- EXIST GATE VALVE
PROPOSED FIRE HYDRANT
- - EXIST FIRE HYDRANT
NOTE:ALL PROPOSED WATER LINES ARE 8"
UNLESS OTHERWISE NOTED
EXHIBIT A - WATER
=------ --- -------------_ ---------- - ---------- - ------- -- ------- ------------ ---- --- ----- ---------- -.. ----------
�j OWNER/ DEVELOPER: 11!11 PELOTON
0 NORTH 200' SANTA FE TRAILS DR HORTON-TEXAS, LTD I `RO EDRI
ANDIONS
5751SUOE
PHASE 4 6751 NORTH FREEWAY VE
FORT WORTH,TEXAS 76131 KELLER,TX 76244
GRAPHIC SCALE DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
' RETASAL 1,L.P.
BASSWOOD BOULEVARD
68 �
1 2 3 g4 5Li7
8 9 10 11 12 13 14 15 16 17 O
PNTQ 9E 3 t
18 7
UJU
19 70- 6
J �w
21 22Q 1 2 3 4 5 6 7 8 9 10 11 12 13
61 I I 20 I Z 5
I j
-- E21
21 > 4
234 24 23 22 21 20 19 18 17 16 15 14I 22 )X T P B
�0 9PS�6
23
---- L -- ------- W 2
-_ -- -- 1 124
J 1
s 10 n 12 13 14 11 11 n FOSSIL
18 1s 20 21 2z z3 I I MESA WA
ss I
I �
40 39 38 37 3635 34 3332 31 30LL2
27 26 Q I I 12
-- -- I 11 1X 1
10 I I
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 II I I 9
5A 65 I
SPNTAP� g 62
P
85 I7 I
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25
IN R ADI
—� 5---�- —J-- EX !"S.S-- e EX 12"'S --
1 U - LOT 2X,BLOCK /
17 18 5I
Uj
_j
LEGEND
�— PROPOSED SEWER LINES
--�-- EXIST SEWER LINES
EXIST SSMH RIM TO BE ADJUSTED
NOTES:
1, ALL PROPOSED SANITARY SEWER
LINES ARE 8"UNLESS OTHERWISE NOTED.
2. ALL SAINTARY SERVICES ARE SDR-26.
EXHIBIT Al - WASTEWATER
--- ------ ------- -- ----- ---- -- --------------- -
OWNER/ DEVELOPER: 11!11 PELOTON
0 NORTH 2O0� SANTA FE TRAILS DR HORTON-TEXAS, LTD PUS KRO ELYRIVE
PHASE 4 6751 NORTH FREEWAY 5751 SUITE 185
FORT WORTH,TEXAS 76131 KELLER,TX 76244
GRAPHIC SCALE DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
RETASAL 1,L.P-
BASSWOOD BOULEVARD
O S
68 �
1 2 3 Lg4 5 6 7 6 9 10 11 12 13 14 15 16 17 It
STA 9E3 I
P - 7
1 ---- - Lu
r— \ 19 La
N 6
crZ
21 22 1 2 3 4 5 6 77 �
9 10 11 12 13 I I I a
II I 20 I z W s
a
21 a s9 4
24 23O 26 25 24 23 22 27L2. Ll 16 15 14 I 22 ❑ Plj ids
�O SPHpSE6
' ------- - - I 234 I W 2
24 �1
-- -- O
FOSSIL 1
s 10 11 12 13 14 1s 16 17 1e 19 20721 z2 z3 III ESA W
ss II; _
g I - Ir
40 39 38 37 36 35 34 33 32L31 .L 29 28 27 26 Q I 12--_ ¢_ I 11 1X 1
-----_�---_ 10 1 I
9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 24 I II 9
sl II
SP1'jTAFE I 8 62
65 I I
7 I
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 11 I
--= 6
I
_- - --- -
34 1 U LOT 2X,BLOCK 62
17 18 5
a
J
O
LEGEND
29' B-B /50' ROW (TYP)
® 39' B-B /60' ROW
SIDEWALK BY DEVELOPER
--- SIDEWALK BY HOMEBUILDER
O H.C. RAMPS BY DEVELOPER
EXHIBIT B - PAVING
-------- ----- -------- -- ------ --------- -------- -- - -- ----- --- - -- -------- --- --- - --------- --- -- -- ---- --- -
OWNER/ DEVELOPER: 1i!ll PELOTON
ONS
0 NORTH 200' SANTA FE TRAILS DR HORTON—TEXAS, LTD 57 KROLAND ELD IV
PHASE 4 6751 NORTH FREEWAY 5751 SUOEE180RIVE
FORT WORTH,TEXAS 76131 KELLER,TX 76244
GRAPHIC SCALE DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
RETASAL 1,L.P.
BASSWOOD BOULEVARDEX
RCP1��
_ —6—m1
1 2 3 54 5 6 7 8 9 10 11 12 13 14 15 i6 17 21"/
-1 ' IN ET kRCPEX
7
18
—21" RCP — -1-.0 a
II� y 6
Zt 2Z� 1 2 3 4 5 6 7 8 9 10 11 12 13 I 0.p
6, 2 10' NLET I 20 5' WID C NC'
FLUME '-
41 I I 21 a 59 4
LCI �
24 23Q 2� 24 23 22 21 20 19 18 17LINL
i6 15 74 22 x t�P E
O _ RQ 2 15' T I I o sPsP6
30" RC I J
— -- -- -- 121" RCP 2
FOSSIL 1
T�
11 12 13 14 15 i6 17 78 19 20 21 22 23 9Ine
ESA WA
66 le
W
-15' IN T > �-
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 1Q I 0
1X 1
—— 4 24„RC Q 511SQM z
-- —7 21" RCP _ I 10 --
1 01
2- 5' 1 L
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 9
SPtitPFE ESS 65 8 82
p O W
m
40 39 38 37 636 35 34 33 32 31 30 29 28 27 26 21" RCP 7 0
EX 2r RCP — 2 10' INL T G �t--4' SQM
�— CAPULIN ROAD
34 1 (n 5 — LOT 2X,BLOCK 62
J
O
LEGEND
—� PROPOSED STORM DRAIN INLET
0
--�-- EXIST STORM DRAIN INLET
—�— PROPOSED STORM DRAIN MANHOLE
- -- PROPOSED STORM DRAIN HEADWALL
EXHIBIT B1 - STORM DRAINAGE
�j OWNER / DEVELOPER: PELOT0N
0 NORTH 2O0' SANTA FE TRAILS DR HORTON-TEXAS, LTD QUI LAND ,CLY
PHASE 4 6751 NORTH FREEWAY 5751 SUITE KROG18 DRIVE
FORT WORTH,TEXAS 76131 KELLER,TX 76244
GRAPHIC SCALE DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
RETASAL 1.L-P.
BASSWOOD BOULEVARD
1 2 3O g4 5 6 7 8 9 10 11 12 13 14 15 16 417SEP - 7
w
�� 6
J �w
21 22 1 2 3 4 5 7)7 9 10 11 12 13 j Ow 5
I 20 Z
I j
I I 21 >0. 59 4
24 2301 I 26 25 24 23 22 21 20 19 18 17 16 15 14 22 clx S1P, E
I�O P�pSE6
-- - 23 I 2
24 [aui
J FOSSIL 1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 I ESA WA
66 I
g O40 39 38 37 36 35 34 33L32L3130 29 28 27 26 Q I 12 I
-- -- QANii - lo
Q
17771
11 1X 1
I I
9 10 11 12 1314 15 16 T� -
19 20 21 22 23 24 I I 9
EST I
SANTAFE g 62
4
65 7 I I
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25
- 6
---� -- -�
34 1 to - LOT 2X,BLOCK 6�
v 6 U 5 I I
uj
C,
�-1O
LEGEND
PROPOSED STREET LIGHTS
EXIST STREET LIGHTS
EXHIBIT C - STREET LIGHTS
---- -------- ---- --- - ---- - ---- - - --- -- ........ ----- --- ------- - ----- ----- - ---------- . -------------- -
�j OWNER/ DEVELOPER: Ui I1 PELOTON
0 MORTH 2O0� SANTA FE TRAILS DR HORTON-TEXAS, LTD ��UI KROLANDSOLUTIONSE RIVE
PHASE 4 6751 NORTH FREEWAY 5751 SUOEE 8DRIVE
FORT WORTH,TEXAS 76131 KELLER,TX 76244
GRAPHIC SCALE DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
BETASAL 1,L.P.
BASSWOOD BOULEVARD
68 `r
68
1 2 3 g4 5 6 7 8 9 10Ll
Ll' '�
14 15 16 17
PN? SE3 I 18 7
'
Lu L)
19 >N s
J Ww
21 22� 1 2 3 4 5 6 7 8 9 10 11 12 13 I a0
F- 61 F11
I Z F 5
I cr
7Q. S94724 23Q 26 25 24 23 22 21 20 19 18 17 16 15 14 0x SANTA E
I �� PHps66
' —— — 23 I 2
LL1
24
-- -- f1l
J I O
EOA IL 1
—
9 10 11 12 13 14 15 16—T1718 19 20 21 22 23
86 ~
AM
40 39 38 37 36 35 34 3332 31 30 29 1 28 27 26 Q I 12AN
1
Q1 1X i
-- — — — 10
I I
9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 24 1 1 9
EST 6S I
s�TAPE g 62
P
65 7 I
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25
— 6
i LOT 2X,BLOCK 62
17 i6 U J 5
4.
O}-
J
O
LEGEND
PROPOSED STREET NAME SIGNS
0 EXIST STREET NAME SIGNS
EXHIBIT Cl - STREET NAME SIGNS
----------- ---------------- ------ ---- -------------- -- -- --------- ----- -- --- -------- --- ------------------ ---- ----------
�jj OWNER / DEVELOPER: PELOTON
Wl
0 NORTH 200 5751 SANTA FE TRAILS DR HORTON-TEXAS, LTDOTIONS
KRO ELY DRIVE
PHASE 4 6751 NORTH FREEWAY SUITE 185
FORT WORTH,TEXAS 76131 KELLER,TX 76244
GRAPHIC SCALE DATE:DECEMBER 2014 PHONE:817-230-0800 PHONE:817-562-3350
PELOTON LAND SOLUTIONS,LLC
5751 KROGER DR,SUITE 185,KELLER,TX 76244(817)562-3350
SFT Phase 4
Unit Pricing is Actual Bid Prices
12/16/2014
WATER IMPROVEMENTS
ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL
3311.0241 8"Water Pipe LF 3,218 30.00 96,540.00
3312.3003 8"Gate Valve _ EA 6 1,050.00 6,300.00
3312.0001 Fire Hydrant EA 4 3.200.00 12,800.00_
3311.0001 Ductile Iron Water Fittings w/Restraint TON 2 4,000.00 8,000.00
3312.2003 1"Water Service I EA 100 1 450.00 45,000.00
3312.2103 1 1/2"Water Service EA 2 2,000.00 4,000.00
3312.0117 Connection to Existing 4'-12'Water Main EA 5 1,000.00 5.000.00
3305.0109 Trench Safety LF 3,218 0.25 804.50
TOTAL WATER $178,444.50
SANITARY SEWER IMPROVEMENTS
ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL
3331.4115 8"Sewer Pipe LF 195 36.00 7,020.00
3339.10_01 4'Manhole EA 2 3,000,00 6,000.00
3339.1003 4'Extra Depth Manhole VF 9 175.00 1,575.00
3305.0107 Manhole Adjustment.Minor EA 7 1,000.00 7,000.00
3301.0101 Manhole Vacuum Testing EA 9 50.00 450.00
3331.3101 4"Sewer Service EA 16 550.00 8.800.00
9999.0009 Cut and Plug Ex 4"Sewer Service FA 4 300.00 1,200.00
9999.0010 Connect to Existing SS Manhole EA 1 1,500.00 1,500.00
3301.0002 Post-CCN Inspection LF 195 1.50 292.50
3305.0109 Trench Safety LF 195 1.00 195.00
TOTAL SANITARY SEWER $34,032.50
STORM DRAIN IMPROVEMENTS
ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL
3341.0409 48"RCP,Class III LF 187 105.00 19,635.00
3341.0402 42"RCP,Class III LF 319 95.00 30,305.00
3341.0309 36"RCP,Class III LF 143 80.00 11,440.00
3341.0305 33'RCP,Class III LF 153 75.00 11,475.00
3341.0302 30"RCP,Class III LF 193 70.00 13,510.00
3341.0208 27"RCP,Class III LF 249 60.00 14,940.00
3341.0205 24"RCP,Class III LF 39 50.00 1,950.00
3341.0201 21"RCP,Class III LF 217 45.00 9,765.00
3349.5002 15'Curb Inlet - EA 8 3,000.00 24,000.00
3349.5001 10'Curb Inlet EA 4 2,000.00 8,000.00
3349.0001 4'Stoftn Junction Box EA 1 3,500.00 3,500.00
3349.0002 5'Storm Junction Box EA 1 5,000.00 5,000.00
3305.0106 Manhole Adjustment,Major EA 1 1 2,500.00 2,500.00
9999.0008 Concrete Flume,5ft Wide LF 110 20.00 2,200.00
0241.4401 Remove HeadwalVSET EA 2 1,500.00 3,000.00
TOTAL STORM DRAIN $161,220.00
PAVING IMPROVEMENTS
ITEM# DESCRIPTION UNIT CITY UNIT PRICE TOTAL
3213.0101 6"Conc Pvmt SY 11,084 28.50 315,694.00
3211.0501 16"Lime Treatment SY 11,751 2.75 32,315.25-
3211.0400 Hydrated Lime TN 176 160.00 28,160.00
3213.0501 Barrier Free Ramp,Type R-1 EA 9 1,000.00 9,000.00
3213.0301 4"Conc Sidewalk SF 1,087 3.00 3,261.00
3217.0503 24"SLD Pvmt Marking Paint(W) LF 19 20.00 380.00
0241.1000 Remove Conc Pvmt SY 326 12.00 3,912.00
9999.0005 Remove Street Barricade EA 4 500.00 2,000.00
0241.0402 Remove Asphalt Drive SF 6,617 1.00 6,517.00
0241.0800 Remove Rip Rap SF 1,551 1.001 1,551.00
0241.1300 Remove Conc Curb&Gutter I LF 138 30.001 4,140.00
TOTAL PAVING $407,130.25
STREET LIGHTING IMPROVEMENTS
ITEM# DESCRIPTION UNIT CITY UNIT PRICE TOTAL
3441.3002 Rdwy Ilium Assmbly TY 8,11,0-25,and D-30 EA 12 2,600.00 31,200.00
3441.3301 Rdwy Illum Foundation TY 1,2,and 4 EA 12 800.00 9,600.00
9999.0003 2"CONDT PVC SCH 80(T) LF 1,010 12.00 12,120.00
3441.1408 NO 6 Insulated Elec Condr LF 3,030 1.50 4,545.00
TOTAL STREET LIGHTS $57,465.00
STREET SIGNS
ITEM# IDESCRIPTION UNIT CITY UNIT PRICE TOTAL
9999.0007 IStreet Signs(Name Blades) EA 6 245.00 1,470.00
TOTAL STREET SIGNS $1,470.00