HomeMy WebLinkAboutContract 36324-A6 CITY SECRETAtW
AMENDMENT No. 6 CONTRACT NO Z _ALP
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn
and Associates, Inc. , (ENGINEER) made and entered into City
Secretary Contract No. 36324, (the CONTRACT) which was
authorized by M&C C-22555 on the 4t' day of December, 2007 in
the amount of $251 ,355 . 00; and
WHEREAS, the CONTRACT was subsequently revised by:
Amendment Number 1 in the amount of $138, 730 . 00 which was
authorized by M&C C-25028 on July 19, 2011, Amendment No. 2 in
the amount of $49, 600 . 00 which was administratively authorized
on August 23, 2012 , Amendment No. 3 in the amount of
$27,000 .00 which was administratively authorized on December
6, 2012 Amendment No. 4 in the amount of $48,300 . 00 which was
administratively authorized on July 24, 2013, and Amendment
No.5 in the amount of $41,700. 00 which was administratively
authorized on January 6, 2014; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Water and Sanitary Sewer Relocations for State Highway
121T, Part 3; and
WHEREAS, it has become necessary to execute Amendment
No. 6 to the CONTRACT to include an increased scope of work and
revised fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
rn February 19, 2015, a copy of which is attached hereto and
mincorporated herein. The cost to City for the additional
Mdesign services to be performed by Engineer totals $35,000 . 00 .
a 2 .
0
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
N
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
an amount of $591, 685 . 00 . OFFICIAL RECORD
CITY SECRETARY
Page -1- FT. WORTH, TX
3.
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED : ENGINEER
City of Fort Worth Kimley-Horn and Associates, Inc.
Fernando Costa Jeff' s, P.E.
Assistant City Manager Senior Vice-President
DATE: �,L DATE: Z� /S
APPRO C
Andrew T. Cronberg,
Interim Director, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
Date: N/A
Douglas W. Black
Senior Assistant City Attorney
�� F �
®��,
ATTEST: �
0
0
a J tary
er
o0
City Secr #��°� 00000
XAS
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
Page -2-
Kimley>>>Horn
February 19, 2015
Mr. Liam Conlon
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth,TX 76102
Re: Water and Sanitary Sewer Relocations for SH-121T(Southwest Parkway), Part 3
Additional Services—Amendment No. 6
KHA No. 061018049
City Project No. 00899
Dear Liam:
This is an amendment to a contract between Kimley-Horn and Associates, Inc. and the City of Fort
Worth("the City")dated 12-19-2007 referred to herein as the"Contract".
This amendment will provide for Additional Construction Phase Services as indicated below:
ITEM 1 (CONSTRUGTION PHASE SERVICES): $3$,OOOKimley-14orn
(Water$0, Sewer$35,000)
Kimley-Hom will provide additional construction phase services as defined in the Contract Exhibit"A-
1"Part D—Construction Phase Services including:
0 Coordinating with Villages of Sunset Pointe HOA representatives during construction
Coordinate with vendors for City provided materials regarding the material's acceptability for
installation
Review substitutions and RFI's related to tunneling
Provide City assistance with change orders
We recommend that the City increase the budget by$35,000 for these additional services. From the
additional services listed above,the recommended breakdown for water and sewer services is as
follows:
Description Water Sewer Total
Item 1 —Construction Phase
$0 $35,000 $35,000
Services
Total $0 $35,000 1 $35,000
IN rammumbifif 801 - c
Kimley>>>Horn Page 2
The following table summarizes the fee per Work Phase:
Total
Work Phase Water Fee Sewer Fee Fee
31 $0 $0 $0
32 $0 $0 $0
33 $0 $35,000 $35,000
51 $0 $0 $0
Total 1 0 $35,000 1 $35,000
The following table summarizes our recommended budget revisions by Item(please see attached
Fee Breakdown for an hourly breakdown of each item):
Description Item 1 Total
Pre-Engineering $- $0
Conceptual Engineering $- $0
Preliminary Construction _
Plans $ $0
Final Construction Plans $- $0
Pre-Construction _
Services $ $0
Construction Phase
$35,000 $35,000
Services
Total $35,000 $35,000
Kidep Horn Page 3
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Description Original Amend Amend Amend Amend Amend Amend Revised
Fee No.1 No.2 No. 3 No.4 No.5 No. 6 Contract
Pre-Engineering $35,900 $35,400 $5,200 $4,800 $- $- $- $81,300
Conceptual $62,980 $8,900 $- $- $- $- $- $71,880
Engineering
Preliminary
Construction $49,665 $32,130 $- $- $- $- $- $81,795
Plans
Final
Construction $85,010 $46,300 $44,400 $- $43,200 $ 18,600 $- $237,510
Plans
Pre-
Construction $3,600 $5,000 $- $- $5,100 $- $- $13,700
Services
Construction
Phase Services $14,200 $11,000 $- $22,200 $- $23,100 $35,000 $105,500
Total Project $251,355 $138,730 $49,600 $27,000 $48,300 $41,700 $35,000 $591,685
The following tables summarize our revisions to the M/WBE percentages:
This Amendment
Sub-Consultant Fee
N/A $0
Total $0
MIWBE Percentage 0%
Total Contract
Description Per Amend No.5 Revised
Contract Amount $556,685 $591,685
Total Contract MNVBE $93,840 $93,840
Total Contract MIWBE 16.8% 15.8%
Percentage
801 - • 0 Ft.Worth,TX 76102 ..
Ki m epMr n Page 4
The following table summarizes our revisions to the water and sanitary sewer design fees:
Amend. Amend. Amend. Amend. Amend. Amend.
Description Original Total
No. 1 No.2 No. 3 No.4 No. 5 No. 6
Water $133,377 $108,695 $36,300 $0 $0 $0 $0 $278,372
Sewer $117,978 $30,035 $13,300 $27,000 $48,300 $41,700 $35,000 $313,313
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC
Glenn A.Gary,P.E.
Sr.Vice President
GAG/jck
Attachments
\T-M FPO MatalProjec6F7N_U tili6es10610180491PPPWmendment-6WHA-SH121 R25 Anand 6-Ltr-Updaled.doc
• • 8011 Ft.Worth, 76102
EM" Kimley-Horn
M and Associates,Inc. Budget Summary
Project Workplan Budget Date: Feb 17.2015
:General Project Information Fee Information
Client: City of Fort Worth Fee Type: CP Fix Mult
Project: SH 121T Part15-Am6 Expense Mult: 1.10 r Schedule:
KHA No. 061018049
PM: Josh Kercho Allocation: 0.0%
Budget0,
No. Task Name Hours Labor Expenses Allocation Subtotal
500 CCA 212 $ 34,700 $ 300 $ 35,000
777 Contingency $ -
TOTALS: 2121 $ 34,7001 $ 3001 $ - 1 $ 35,000
Subconsultant Summary
Task No. Task Name Cost Multiplier Subtotal
1.10
1.10
1.10
1.10
1.10
TOTALS:1 $ Is
Project Budget
Labor: $ 34,700
Expenses: $ 300
TOTAL: $ 35,000
Pane 2 of 3
CMFI Kimley-Horn
M and Associates.
BudgetProject Workplan Date. February 17,2015
Client: City of Fort Worth G€nsrai Project Information Task Effort Summary Task Information
Labor: 00 b- ii
Project: SH 121T Part 15-Am6 Expenses: $ ii Name: CCA
KHA No: 061018049
TOTAL:PM: Josh Kercho iii
Task Description and t3udgeting
Task Descriptions: GLC: P7 P5 P2 N5 (Hrs) Expenses
Villages of Sunset Pointe HOA Coordinaflon 8 16 8 32
Construction Support Services
Vendor C ination 24 24, 81 56.$ 200
Tunneling Substitutions 24 24 12 60
Change Orders 24 24 16 64
. . :0 00
Task GostlEffort Subtotals (s000s) Lbe Expenses(5)
Effortl 17.4113.11 4.21 1 1 1 1 1 1 F776
00