Loading...
HomeMy WebLinkAboutContract 45939-A2 CITY SECRETAW (; Q AMENDMENT No. 2 CONTRACT NO. L -693—A TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Wade Trim, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45939, (the CONTRACT) which was authorized by M&C 26960 on the 9th day of September, 2014 in the amount of $227,220 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount $39,069.00 which was administratively authorized on the 14th day of January, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2014, WSM-D WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 3, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $37,259.00 . 2 . M M M Article II of the CONTRACT is amended to provide for an M increase in the fee to be paid to Engineer for all work and CD services performed under the Contract, as amended, so that the 7 total fee paid by the City for all work and services shall be an C-- amount of $303,568 . 00 . co N O 3. All other provisions of the Contract, which are not e2Mressly amended herein, shall remain in full force and effect.FFICIAL RECORD Page -1- CITY SECRETARY FT.WORTH,TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENG ER Wa a Tri , Inc o� 1 aCpernando Costa David Spec P. Assistant City Manager Vice Preside t DATE: DATE: 1.2 b 1 I S APPROVAL RECONMNDED: Andrew T. Cronberg, Interim Director, W er Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A 4!2� Date: N/A Douglas W. Black Assistant City Attorney �F0 ATTEST: ry J. City Sec& a N IAL RECORD SECRETARYWORTH,TX Page -2- WADETRim February 3, 2015 City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Attention: Mr. John Kasavich, PE Project Manager Re: Water and Sanitary Sewer Replacement Contract 2014 WSM-D-Amendment 2 City Secretary No. 45939; City Project No. 02385 Dear Mr. Kasavich: The City of Fort Worth has requested Wade Trim, Inc. to perform additional water and sanitary sewer line design services. Wade Trim will perform the work outlined as follows: South Hughes Avenue—8-inch water and 8-inch Sanitary Sewer from Avenue J to Avenue N (See table below for limits.) The services associated with this item include survey and the preparation of plans for water and sanitary sewer improvements. The design will include plan and profile sheets as applicable, traffic control, erosion control, and associated sheets necessary to complete the construction. These services will be provided as the General Scope of Services of the original contract. Design Design Description Water Linear Sanitary Linear Cost Cost Feet Sewer feet Water Sewer South Hughes Ave. 8-inch 1,200 $16,766 From Avenue J to Avenue N 8-inch 1,462 $20,493 TOTAL 1 $16,766 $20,493 (See Exhibit B-1, B-1 A, B-1 B, B-2 and B-3 for a further break down of cost of expenses.) Work Phase Water Fee Sewer Fee Total Fee 31 $3,737.00 $4,567.00 $8,304.00 32 $3,737.00 $4,568.00 $8,305.00 33 $4,982.00 $6,090.00 $11,072.00 51 $4,310.00 $5,268.00 $9,578.00 TOTAL $16,766,00 $20,493.00 $37,259.00 Wade Trim, Inc. 682.237.7718 Direct 105-C North Oak Street 877.533.9873 Toll Free Roanoke,TX 76262 682.237.7719 Fax www.wadetrim.com • I N G R E L A T 1 0 N S H I P S 0 N A F 0 U N • A T 1 0 N 0 City of Fort Worth Water Department February 3, 2015 Page 2 Survey Revised Contract/Amendment Water Fee Sewer Fee Fee Total Fee Contract Amount Original Contract $98,841.00 $55,598.00 $72,781.00 $227,220.00 N/A Amendment No. 1 $19,494.00 $ 5,001.00 $14,574.00 $39,069.00 $266,289.00 Amendment No. 2 $12,456.00 $15,244.00 $9,579.00 $37,259.00 $303,568.00 TOTAL $130,791.00 $75,843.00 $96,934.00 $303,568.00 $303,568.00 This amendment will revise our current contract by $37,259 and will bring our new contract amount total to $303,568. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, Wade Trim, Inc. � . f D David T. Speicher, PE Project Manager DTS:ka AAA 8140-15 Fort Worth Amend 2 Proposal Ltr 2-3-15.docx Wade Trim, Inc. 682.237.7718 Direct 105-C North Oak Street 877.533.9873 Toll Free Roanoke,TX 76262 682.237.7719 Fax ri c • I N G R E L A T 1 0 N S H I P S 0 N A F 0 U N • A T 1 0 N 0 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract 2014 WSWD-Amendment 2 City Project No.02385 Labe Ea Task No. Tank-u IpWn pdndpY Pmjct Yanap.r Project waw CADD Amnhdslntlw Total Labor eubeonwt a Total Expense Task Sub TOW E ser CO. Naval R.Pro-U.n Cost 1220 2160 n$120 $100 380 $60 MNRIE Namaw9E 1.0 Pro' Mena 2 4 1 0 10 16 33. SO 50 SO SO 30 S0,2. 1.1 I4am M.Teem 1.12 QWQC 4 10 10 10 M,3. 34,300 1.2 Nc W aM R 12.1 Pu- Cooed u- 4 4 i1.0. . $,,- 122 t m0 112 Deo Subrtital R,v MwW e e $2,130 $0 321. 1.2.3 n Ba»im BawaM. • 2 e $1 m $1.3N 12.4Pn n Mo R. w0h a 4 e 52.100 $0 32180 125 Pn nMo MOUSSE Ra M 8 4 31.6101 SO $1.300 2.0 aI 1 n 0-P- 0 0 4 0 2 0 1840 $O 30 $0 . SO $N0 21 DMa COMcilon 4 M. SO 2.2 I D n Pacb Sol so 21.1 Cesar 8hwt . $0 $0 211 EahaOa aM Sumr . SO $0 223 PNe $0 $0 $0 22A COnWudbn Estlnnb 2 $160 SO $1. 0 PrN Dasl Pmxnt 6 8 17 49 M 12 $13110 30 . . 0100 $100 S13 10 9.1 PniNm M nPacks 2 4 10 12 12 $100 $100 Sim 3.1.1 Cow 2 5300 . 5900 3.1.2 Qur u m 1 4 8 16 52710 SO 52710 3.1.5 -.MM NR.SMab 1 2 10 $11. . 312W 3.14 S Mlutlons 2 5.40 $0 SMO 3.15 C.mkumbn E 0- 1 14 31 320 . SUM 3.2 R.vbw 1 10 $ t . 1 3.3 U Cb.. ] 7 7 $21. . 52.100 A nal Deo n 3 16 3 0 10 0 54070 . SO $0 $100 S1. S11TO 4.1 FY1al OM C.rubutlbn Pbm eM 1 1 2 5500 $100 St. $.0 42 Ful 100%Rem aM S 1 10 1 ] ,4. 50 $2.4-00 4.3 Pro bcbbn L aM 100% 50 . SO 4.3 nabuNOn Estlrmbs aM iN% 1 5 1 1 51.170 SO $1,170 so eM P... 0 0 D 0 2 0 $160 SO 50 SO 50 . 5130 5.1 SMS 0 5.1.1 U b Docurmibb Bumaw 2 $1. . 51 5.12 SA Canham D--eM i IWI . . . 5.13 luesA .M. . 5.1.4 A MEMO Mn . . F. 5.15 T.W W BMs aM R.c2mmM Awed . $O $0 51 MvW D SO . SO 6.0 0M U..Plus.S-4- 2 2 6 1 2 0 $1.- S 0 20 SO . DO S68N 3.1 aWulbn3 d 2 S42. 6.1.1 A1bM Pmm�ah 1bn Cadanm 2 4 $7. i0 S7e0 6.12 A w Pu.c Mee . . 50 11 Rwud bawl a/AS BUM 1 1 2 S3. . 3- 7.01 330 7.0 IEwemerd a.m.. 0 0 0 0 0 0 30 . $O $O f0 . So 7.1 R -En OacMnMa . 50 $0 7.2 R F91-wa lE- aM . SO 79 n R Mol SubMMI . So SO 8.00 0 0 0 0 0 $O $B TOB SO 30 . $8,70 M- 8.1 8.1 esu 0 . 53.706 SD 82Right of Sub l $0 $0 Q3 amhuctlon 9uM 9.0 Ptr " 0 0 0 D 0 0 SO SO $0 $0 SO SO SO 9.1 P . so 30 $081 EmkomuNal Sarvbsa . 9.3 Fie b3•rvM»a . so . 9.4 x00T SO, V, so 8.5 RaMoad . . W 9.6 . . . 9. . . SO moa12 $13.108 sss,�Ool Nbbr Llru Fiat 1.2. LS% Pm Sum Satyr Wu 1401 76% Tebl Haus 220 2 em 100% T..1 Leber 522.x. Total Ux m $13.1. (N Ta Fa 33729 MEUSSESubmnzulbnl -.- (9) Sues 43,579 Non-MBESBESubconwbnl . SM TaW Fes- Fw 000 10% Sub M.rku S1.2B1 -WaW Fw(00%m4� euwr M(38%.C) MBESSE MUP-tbn 34.6% 512.450.N 51512/A0 TOW P,,*t Lost 311259.00 De WWa7. 8wvx Cones I 311 p l3].. M .N 36,]04.. PraOrrbu d nSI.SBI.N 30.309.. FInM 0a n 100% 97 M,ee2.N OWN 311.072.. S 51 54310.N 3526S.N 53.579.. Subbbl SM.M.N 1 520,493.. TOW 59].259.N