HomeMy WebLinkAboutContract 25996 AMENDMENT NO. 2
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. -0 9
(No M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and Turner Collie &
Braden, (Engineer) made and entered into City Secretary Contract
No. 24737, (the Contract) which was authorized by the City Council
by M&C C-17310 on the 11th day of March 1999 and whereas the
contract was revised by one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main C1C4B Drainage
Area Sanitary Sewer System Rehabilitation and Improvements
Group 6, Contract 2) , Part 7.
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated June 6,
2000, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $2 ,570 .00.
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $241, 914. 00.
IN S*11'Wi71WVu Y
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the of ,
2000, in Fort Worth, Tarrant County, Texas.
AT T: r
/ Contract Authorization
G oria Pearson, City Secretary
Date
APPROVAL RECONIl4ENDED: APPROVED:
A7 zzyx LP-V--, E I"
A. Douglas Rademaker, P.E. Mike Groomer
Director, Department of Assistant City Manager
Engineering
TURNER COLLIE & BRADEN, INC.
ENGINEER
''�
By: �kA-
A-V-Name: Stephen R. James, P.E.
Principal
1200 Summit Avenue, Suite 600
Fort Worth, TX 76102-4409
APPROVED AS TO FORM AND LEGALITY:
Gary einberger
Assistant City Attorney
24737
-2-
V-1CC OD
1200 Summit Avenue
Suite
Turner Collip Braden Inc. Fart Wortrth,Texas 76102-4409
817 33 2-89 77
Engineers • Planners • Project Managers Fax 817 332-8979
June 6, 2000
Mr. John Boyer
City of Fort Worth
Department of Engineering
P.O. Box 870
Fort Worth, Texas 76101-0870
Re: Supplemental Authorization Request No. 2 (Revised)
Main C 1 C4B Drainage Area
Rehabilitation and Sewer Improvements
(Group 6, Contract 2) Part 7
Unit 1-4, DOE No.'s 2113, 2710, 2711, 2712
Sewer Project No. PS46-070460410230
TC&B Project No. 47-99680-990
Dear Mr. Boyer:
This letter is a request for supplemental authorization to provide for additional design engineering
services requested by the City.
BACKGROUND
While in the process of constructing the Unit 3 replacement sanitary sewer in 5`h Street at Rosedale,
it was discovered that an existing Southwestern Bell conduit in Rosedale Street is at an elevation
that conflicts with the proposed replacement sewer. According to city staff, sufficient clearance
will be provided once the existing sewer main in Rosedale (M-30) is lowered as part of the
Rosedale widening project currently under design by Garcia & Assoc., Inc. Therefore, city staff
requested TC&B to redesign the replacement sewer so that the majority of the replacement sewer
can be constructed as part of the Unit 3 project and the remaining tie-ins and connections are made
as part of the Rosedale project. TC&B will provide the following additional services.
• Add a new MH at approximate Sta. 1+00 of the proposed replacement sewer in 5`h Street
and provide a stub-out for future connection to the lowered M-30.
• Leave stub-outs for service line connections to the proposed replacement sewer.
• Prepare sheets for inclusion in Garcia's plans to make downstream connection to the
lowered M-30, connection of service laterals to the relocated sewer in 5" Street, and
abandonment of existing sewer laterals L-440 and L-463.
'Gh'1DD
�r N W,Uff
Ft
R,
M ;;►� �jP !�.
TEXAS AUSTIN/DALLAS/FORT WORTH/HOUSTON RIO GRANDE VALLEY COLORADO DENVER FLORIDA MIAMI/WINTER PARK
Mr. John Boyer
City of Fort Worth
Department of Engineering
Page 2
PROJECT FEE SUMMARY
Contract Item Description Fee
Original Contract City Secretary Contract No. 24737 $ 234,570
Amendment No. 1 Additional Surveying $ 4,774
Subtotal $ 239,344
Amendment No. 2 Additional Design Services $ 2,570
TOTAL PROJECT $ 241,914
If you have any questions or need additional information concerning this request, please call me at
332-8977.
Sincerely,
a"
Stephen R. James, P.E.
Project Manager
cc: Peter Fu, P.E. - FWWD
File 2.1
N:TTW\99680990_c Ic4b_pMC—esp\ftw�LettersWmend_,5-30-00 dm
l' Ue U11�'�I000/ �n
M-C1C4B Drainage Area
(Group 6,Contract 2)
Part 7,Unit 3
DOE No.2711
6/6/00
PHASE I DESIGN SERVICES-PIPELINE REHABILITATION/REPLACEMENT
BASIC SERVICES
Proj. Proj.
TASK LISTING71 Pdnci al Manager Eng
n ineer Technician Clerical TOTAL
PART A-PRELIMINARY
1.Amendment Preparation 1 2 1 $287
2. Data Collection/Utility Locations 2 $150
Subtotal $437
PART B-CONST. PLANS&SPECS.
1. Design of New Connection to M-30 4 1 $360
2. Plans&Spec. Preparation/Modification
a. Existing P&P Sheets . 39 2 4 1 $390
b.Abandonment Sheet .41,add to Garcia 1 2 $195
c. New P&P Sheet add to Garciaplans) 5 8 $855
Subtotal $1,800
TOTAL HOURS-BASIC SERVICES 01 11 161 15 11 33
TOTAL LABOR-BASIC SERVICES $0 $1021 $1,200 $900 $3511 $2,237
NON-LABOR ESTIMATE
Plotting 3 sht x 2 set x$7/ea $42
Computer Use $288
TOTAL NON-LABOR BASIC SERVICES $330
TOTAL BASIC SERVICES $2,570
FRIAL PEW
1 V lu UV�'���fLtlOp �
FoF,TWOF,TH
MEMORANDUM
TO: A. Douglas Rademaker, Director DOE and
Mike Groomer, Assistant City Manager
FROM: Tony Sholola, DOE
DATE: June 14, 2000
RE: DESIGN FEE AMENDMENT NO. 2 TO MAIN CIC413 DRAINAGE
AREA SANITARY SEWER SYSTEM REHABILITATION AND
IMPROVEMENTS (GROUP 6, CONTRACT 2), PART 7, DOE NO.
2113, SEWER PROJECT NO. PS46-070460410230
The proposed amendment will allow Turner Collie & Braden, Inc. (TCB) to provide ad-
ditional design services on the project as requested by the City.
During sewer replacement Unit 3 on 51h Street at Rosedale Avenue, it was determined
that an existing SWBT conduit in Rosedale Avenue is in conflict with the sewer line.
This conflict will be eliminated once the existing sewer main in Rosedale (M-30) is low-
ered as part of the Rosedale widening project which is currently under design by another
consultant. Staff therefore requested TCB to redesign the Unit 3 sewer so that the major-
ity of the line can be constructed and the remaining tie-ins and connections are made as
part of the Rosedale project.
Turner Collie & Braden, Inc., has submitted a fee request of$2,570.00 for the additional
design services to be provided thereby increasing the contract fee from $239,344.00 to
$241,914.00. 1 believe this fee is fair and reasonable.
Please authorize the additional design fee by your signature on the attached contract
amendment form.
cc: John Boyer, Project Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
offfl'lcik RECORD
r�U d� �I�
MEMO 2113 M1
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(817) 871-7941 * FAx (817) 871-7854
ej Printed on recycled paper