City of Fort Worth CONTRACT NO.
Change Order Request
Change Order No. Date TP W Project No. Funding(FAC)
2 (TWO) 2/2/2015 P259-541200-
209070219980
Facility and Project Description City Secretary Contract No.
HOUSTON STREET PARKIKNG GARAGE LOWER LEVEL IMPROVEMENTS 45645
ORIGINAL CONTRACT AMOUNT................................................................ $444,527.00
EXTRAS TO DATE.........................................
............................ $ 12,048.00
CREDITS TO DATE.................................................................... $ 0
CONTRACT COST TO DATE.................................................................................................. $456,575.00
AMOUNT OF PROPOSED CHANGE ORDER.......................................................................:.... $ 1,870.48
REVISED CONTRACT AMOUNT............................................................................................. $458,445.48
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................................................ $ 102,873.00
REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS.................................:........................ $ 88,945.52
ADDITIONAL FUNDING (IF NECESSARY)................................................................................ 0
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
r' Changes required by site conditions as per the attached PCR's 3 and 4. $ 1,870.48
Pull permit for new gas meter and replace broken chiller control motor for chiller.
Total Add $ 1,870.48
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time
and money)for all costs arising out of or incidental to,the above Change Order
Contractor's Name
BASECOM CONSTRUCTION SERVICES
Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order
110 0 110 cd 0
Contractor- _ Date Con ction Ma er Date
Chi Architectural rvices Division Date Dir t ,T e t-T Date
rP1 Project Architect/ Date Assistant City a ager Dat
rrl �' 7D11
Assistan ityAttomey Date Council A If Required) Date
m
❑ r Proved
3 � X
by:
Distribution:
tj Distribution: Q
File e $
tj Construction Manager7J o�
Project Manager
Contractor j. , Ci Sec
ENO: M&C REQUIRED OFFICIAL RECORD
TPW Facilities Management Division CITY SECRETARY
Change Order Form(3/20/12) - FT.WORTH,TX
' SM
aCONSTRUMTKOIIF S OGE-S
5209 Vesta Farley,Fort Worth,Texas76119
(817)569-0050 Fax: (817)483-2609
November 20, 2014
City of Fort Worth
401 W. 13th Street
Fort Worth,TX 76102
Re: PCO#3 Houston Street Garage Improvements Gas Meter& Inspections
Basecom is pleased to submit the following price proposal for the above-mentioned PCO#3; Pull
permit and pay fees associated with getting a gas meter installed, disconnect and cap off existing
fixtures, pump up and test existing gas line. If existing gas line holds pressure we will request
inspection, upon approval we will reconnect fixtures and proceed with startup. If existing gas line does
not hold pressure and receive inspection approval we will find leak and prepare a cost estimate for
your approval to repair existing gas lines.
We are requesting an additional Five (5) days to be added to the Substantial Completion date to
accommodate this additional scope for getting inspection and meter.
PCO#3
RAM 769.44
Subtotal 769.44
Basecom 10% Markup 76.94
TOTAL PCO#3 $ 846.38
Sincerely,
John Womack
Project Manager
Basecom, Inc.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Date: 11119/14 Project Name: Houston Street Garage Improvements
SubConhactor RAM Contracting
Proposal Submitted to: Ekmcom,Inc. Basecom PCO#3
PCO No.: RAM PCO#1 PGO Description:
Add qas permit,fees and test
test aria request ction.n existing gas tine win not UUM an st�u2wnrinm rt'axarm--
prepare a cost estimate foryour approval to repair.
Description of Scope of Work Work to be performed during normal business hours.
included:
Labor
Labor Burden
Quantity Unit Cost/Unit Amount Rate Burden Cost Total Comments
1 Supervision with truck 3.00 Hour $ 59.00 $ 177.00 32.00% $ 56.64 S 233.64
2 Plumber 6.00 Hour $ 28.00 $ 168.00 32.00% $ 53.76 $ 221.76
3 Helper 6.00 Hour $ 16.50 $ 99.00 32.00% $ 31.68 $ 130.68
4 0.00 Hour $ - $ - 0.00% $ - $ -
5 0.00 Hour $ - $ - 0.00% $ - S -
6 0.00 Hour $ - $ - 0.00% $ - S
Subtotal Labor S 886.08
Materials Sales Sales
Quantity Unit Cost Unit Amount Tax% Tax Cost Total Comments
1 Miscellaneous fittings for testing 1.00 Unit $ 50.00 $ 50.00 0.00% $ - $ 50.00
2 PerrNt application fee 1.00 Unit $ 33.00 $ 33.00 0.00% S - $ 33.00
3 0.00 Unit $ - $ - 0.00°/6 $ - $ -
4 0.00 Unit $ - $ 0.00% $ - S -
5 0.00 Unit $ - $ - 0.00% $ - $ -
6 OAO Unit $ - $ 0.00% $ - i
Subtotal Materials�i.00
Equipment Sales Sales
Quantity Unit Cost/Unit Amount Tax% Tax Cost Total Comments
1 Description 0.00 Unit $ - $ - 0.00% $ - $
2 0.00 Unit $ - $ - 0.00% S - $ -
3 0.00 Unit $ $ - 0.00% S - $ -
4 0.00 Unit $ - $ 0.00% S - $ -
5 0.00 Unit $ - $ - 0.00% $ - $ -
6 0.00 Unit $ - $ - 0.00% $ -
Subtotal Equipment -
Subtotal Labor,Materials,and Equipmerr $ 669.08
15.00% OH&Profit $ 100.36
Subtotal $ 769.44
Total
rOFFICIAL RECORD
ECRETARY
ORTH, TX
Y
a` AS `--COM
CCASTRUCTION SERVIGES
5209 Vesta Farley, Fort Worth,Texas76119
(817) 589-0050 Fax: (817)483-2609
December 12, 2014
City of Fort Worth
401 W. 13th Street
Fort Worth,TX 76102
Re: PCO#4 Houston Street Garage Improvements—Replace Power Supply Chiller Controls
Basecom is pleased to submit the following price proposal for the above-mentioned PCO#4; replace
existing power supply board at chiller controls in order to facilitate startup of existing chiller systems.
PCO#4
RAM 931.00
Subtotal 931.00
Basecom 10% Markup 93.10
TOTAL PCO#3 $ 1,024.10
Sincerely,
John Womack
Project Manager
Basecom, Inc.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
Date: 12/10/14 Project Name: Houston Street Garage improvements
Subcontractor RAM Contracting
Proposal Submitted to: Basecom,Inc.
PCO No.: PCO#4 PCO Description:
Replace Power Supply at Chiller Controls
Initiate start up of existing chiller pump and chill water.We could not get the existing ABB Drive
Description of Scope of Work to respond.After some investigation of the existing pump drive we found the bypass power
Included:supply control board was out.Cost for new bypass control board Installation Is as follows.
$Ilbti drtN ft4st'Wi
Labor
Labor Burden
Quantity Unit Cost/Unit Amount Rate Burden Cost Total Comments
1 HVAC Technician 5.00 Hour $ 48.87 $ 244.37 3200% $ 78.20 $ 32257
2 0.00 Hour $ - $ - 3200% $ - $ -
3 0.00 Hour $ - $ - 32.00% $ - $ -
4 0.00 Hour $ - $ - 0.00% $ - $
5 0.00 Hour $ - $ - 0.00% $ - $ -
6 0.00 Hour $ - $ - 0.00% $ - $
Subtotal Labor
Materials Sales Sales
Quantity Unit Cost/Unit Amount Tax% Tax Cost Total Comments
1 Power supply 1.00 Unit $ 487.00 $ 487.00 0.00% $ - $ 487.00
2 0.00 Unit $ - $ - 0.00% $ - $ -
3 0.00 Unit $ - $ - 0.00% $ - $ -
4 0.00 Unit $ - $ - 0.00% $ - $ -
5 0.00 unit $ - $ - 0.00% $ - $ -
6 0.00 Unit $ - $ - 0.00% $ -
Subtotal Materials $�8.t
Equipment Sales Sales
Quantity Unit Cost/Unit Amount Tax% Tax Cost Total Comments
1 Description 0.00 Unit $ - $ - 0.00% $ - $
2 0.00 Unit $ - $ - 0.00% $ - $ -
3 0.00 Unit $ - $ - 0.00% $ - $ -
4 0.00 Unit $ - $ - 0.00% $ - $ -
5 0.00 Unit $ - $ - 0.00% $ - $ -
6 0.00 Unit $ $ - 0.00% $ - $
Subtotal Equipment I -
Subtotal Labor,Materials,and Equipment $ 809.57
15.00% OH&Profit $ 121.44
Subtotal $ 931.0
Total