Loading...
HomeMy WebLinkAboutContract 41100-A1 CITY SECR,E1'A ^ � 1 CONTRACT NO. - THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT AMENDMENT TO THE AGREEMENT FOR WATER SERVICE BETWEEN THE CITY OF FORT WORTH AND THE CITY OF KELLER FOR THE CONSTRUCTION OF A NORTHSIDE II 48-INCH WATER MAIN AND ALLOCATED CAPACITY This Amendment is made and entered into by and between the City of Keller, acting herein by and through its Interim City Manager, Chief Mark Hafher, hereinafter referred to as CUSTOMER and the City of Fort Worth, acting herein by and through its Assistant City Manager, Fernando Costa, hereinafter referred to as FORT WORTH, all of Tarrant County, State of Texas, (collectively the"PARTIES")witnesseth: WHEREAS, FORT WORTH and CUSTOMER have entered in an Agreement for Water Service known as Fort Worth City Secretary Contract No. 41100("CONTRACT"); and WHEREAS,the parties recognize that there is a need for additional water capacity in the northeast sector of Fort Worth and in Keller;and WHEREAS,to address this need FORT WORTH is constructing a water 48-inch water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard, approximately 11,713 linear feet as shown in EXHIBIT Fla; and WHEREAS, CUSTOMER has requested capacity in the proposed water main which will increase its total projected water demand; and WHEREAS, Section 3.3 of the CONTRACT states that the CUSTOMER shall pay for each new or enlarged or additional connection to the FORT WORTH system, including the cost of the wholesale meter and the CUSTOMER's proportionate share of the improvements required for that service; and WHEREAS, CUSTOMER recognizes that the City of Southlake, Trophy Club Municipal Utility District No. 1 and the Town of Westlake have also requested capacity in the proposed Northside II 48-inch water main; OFFICIAL RECORD CITY SECRITARY RECEIVED MAR 112015 FT.WORTH,TX WHEREAS,the PARTIES agree that the CUSTOMER's cost and participation for the Northside II 48-inch water main shall be as stated in this AMENDMENT NOW THEREFORE,the PARTIES agree to amend the CONTRACT as follows: The CONTRACT shall be amend to include the following as EXHIBIT F.2 ALLOCATION OF COST AND CAPACITY FOR THE NORTHSIDE II 48-INCH WATER MAIN 1.) FORT WORTH shall be responsible for the preparation of plans and specifications, together with any modifications required during construction, and contract documents for the construction of the Northside II 48-inch water main, shown on Exhibit F2a. 2.) CUSTOMER requested an additional 3.5 MGD, increasing its existing capacity of 14.4 MGD to a total of 18 MGD at the North Beach Wholesale meter location shown on Exhibit A to the CONTRACT. The additional 3.5 MGD equals to 5.8 percent of the proposed Northside II 48-inch water main's 60 MGD capacity. The estimated total engineering and construction cost of the Northside II 48-inch water main is estimated $15,959,000. Customer agrees to pay FORT WORTH 5.8 percent that equals to $930,942 as its proportionate share of the cost. 3.) CUSTOMER agrees that it shall not use more than 3 MGD at CUSTOMER's Katy Road meter as shown on EXHIBIT A to the CONTRACT. 4.) The cost of easements, appraisal fees, and right-of-way acquisitions shall be shared by FORT WORTH, CUSTOMER, Southlake, Trophy Club Municipal Utility District No.l and Westlake proportionately. 5.) The estimated engineering and construction costs presented herein are for planning purposes. Actual Project cost may differ and shall be adjusted to reflect the final cost of engineering, construction, easement and right-of-way acquisition and financing. Actual Project cost shall be shared by the PARTIES in the same percentage breakdown as designated for the estimated cost. 6.) Nothing contained herein shall be construed so as to prevent FORT WORTH from including the costs it incurs hereunder as system costs as that term is defined in the CONTRACT with CUSTOMER. 7.) All payments are due and payable within 30 days from the date the Northside 1148- inch water main is completed. A payment is late if not paid within 10 days from the due date. Late payments shall accrue interest at the rate of one and one-half percent (1-1/2%)per month until paid. If the Customer exceeds the requested 18 MGD capacity at North Beach meter, then the Customer will be required to provide additional cost participation toward the proposed 48-inch water main. If the Customer exceeds the 3 MGD at the Katy Road meter, then the Customer will be required to provide additional cost participation toward Northside III water main upsizing to deliver additional flow to the meter. This AMENDMENT shall become effective upon full and complete execution of each party below: iL. tAGj- EXECUTED this J' day of_Jam, 2015. CITY OF FORT WORTH CITY OF KELLER 4../'�' FERNANDO COSTA CHIEF MARK HAFNER ASSISTANT CITY MANAGER INTERIM CITY MANAGER DATE: 3 /0 2v�5/ DATE: 3/I S APPROVED AS TO FORM AND APPROVED AS TO FORM AND LEGALITY LEGALIT CHRISTA LOPEZ-REYN DS STANTON RY SR. ASSISTANT CITY ATTORNEY CITY ATTORNEY OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX ATTEST ATTEST , 1i _ o ` OR MARY KAYSER $ .70 HEILA STEPHENS % CITY SECRETARY QWo�o '� CITY SECRETARY �XAS -za_�� i0 � - �;�tvoot Authoriaatioa I C')�, ,�GJQ I L� Date M RECORDRETARYTH TX TQ |� � • � -#/ { |; J TU177T e ! JN I « � z = z ¢ i,§ Q CL � � - _ _ � w LLJ _ _ = 2 _ IL Z / M q 2 § I � \ � r ) 2 . � \ j ■ § / a e n g ! � Odpp o F FI. m P r — x;05 b�g5 Ile Li , - = I — — cc w co I � Z � \ J 1 - w = oa rIT11 Ill 11111A Ill 11 cc �I O Will I z �I 5 F I dungy is-,lot so+w �ixiroonr-fuvFml�rwz\,�ww�w\a>'S833NIONa sri\v+la Qi V '�NI'SN33NI'JN3 Atl'J Y NMOi18 FORT WORTHUNAUTHORIZED 2011 CITY OF FORT WORTH UNAUTHORIZED REPRODUCTION ISA VIOLATION OF APPLICABLE LA THIS DATAExhibit A THE ACCURIACYOIS NOT TO BE BE USED FOTAKEN/U ED AS DATA F4 I WA7L•p ENGINEERING PURPOSES OR BYAREGISTERED PROFESSIONALLA D A Gl\ SURVEYOR.THE CITY OF FORT WORTH ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF SAID DATA. FA r b � m a I: c a r � s � 1' v 3 3 o. c i O 0 O A Q H Q C> 3 O O.(J Q O R W p $U I m r c m_ -m oU ^� C L O 0 mz QQ 9..! Vr N OL C E M mw a� m� rn o ,, yN. I f a p Im o i' CO a c O O LC3 M q � a' � x U 'J c ole..b Cu..—Webr Meter U O S4ejacmt City C �o NCTCOO Street - d —R.dr-d - rjF OTAD Lot. q p, Grey A.N.2012 a Valu 255 L �Low.O m tL� 0 100 200 NAD 1983 StatePlane Texas North Central FIPS 42112 Feet ®Feet EXHIBIT"F2a"— 48-inch water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard s Part 2 y — +r `� } Dart _ T ;[)LDFS 16R]A1 t, Hapd Tunnel on the Median Y z Ope�r tit s Y. g r rr ' .F - •�wii� f FORT WORTH �` WATER City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/2/2014 DATE: Tuesday, December 02, 2014 REFERENCE NO.: C-27101 LOG NAME: 60AMEND WHOLESALE CONTRACTS NSII 481N MAIN SUBJECT: Authorize Amendments to the Agreements for Water Service with the City of Southlake, City Secretary No. 41110, City of Keller, City Secretary No. 41100, Trophy Club Municipal District No. 1, City Secretary No. 41111 and the Town of Westlake, City Secretary No. 41112 for Cost Participation in the Aggregate Amount of$7,293,263.00 Toward the Capacity Needed from the Northside II 48-Inch Water Main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute amendments to the Agreements for water service with the City of Southlake, City Secretary No. 41110, City of Keller, City Secretary No. 41100, Trophy Club Municipal District No. 1, City Secretary No. 41111 and the Town of Westlake, City Secretary No. 41112 for capacity cost participation toward the Northside II 48-inch water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard. DISCUSSION: The City's existing Agreements for water service with the City of Southlake, City Secretary No. 41110, City of Keller, City Secretary No. 41100, Trophy Club Municipal District No. 1, City Secretary No. 41111 and the Town of Westlake, City Secretary No. 41112 require the wholesale customer to cost participate toward the additional capacity needed from proposed Fort Worth water transmission mains. These wholesale customers have requested capacity from Phase I, Part I and II of the Northside 48-inch water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard. Fort Worth is designing and constructing the Northside II 48-inch water main, Phase I, Part I and ll, approximately 11,713 linear feet. The 48-inch water main has a proposed 60 Million Gallon per Day capacity and estimated construction cost of$15,959,000.00. Below is the requested capacity from each wholesale water customer and the associated construction cost participation. Logname: 60AMEND WHOLESALE CONTRACTS NSI1481N MAIN Page 1 of 3 F timated pacity Cost Wholesale Requested Capacity Participation Customer Capacity Cost for the NSII Cities (MGD) 'Participation 48-inch Water (Percent) Main Construction lCost Southlake 13 21.7 percent $3,463,103.00 Keller 3.5 5.8 percent $925,622.00 I Trophy Club MUD 2.4 4.0 percent $638,360.00 No.1 Westlake 8.5 14.2 percent 1$2,266,178.00 Under the terms of the existing Agreements, the entities will pay toward the engineering, easement and construction cost of the proposed Northside II 48-inch water main. The figures above are only the construction cost estimate. The final cost participation amount from each wholesale water customer will be based on the final engineering, easement and construction cost. Each wholesale water customer will reimburse the cost participation to the City of Fort Worth at the completion of Part II of Phase I of the project. Staff has reviewed the requested capacity and has no objection to approval of these requests. In addition to the cost participation, Trophy Club MUD No. 1 has requested to amend its service area map, which is attached. Staff has reviewed the request and verified with adjacent cities, and has no objection to including this request in its amendment. The project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that the Water Department is responsible for the collection and deposit of funds due to the City. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bT. Fernando Costa (6122) Originating Department Head: Andy Cronberg (5020) Additional Information Contact: Wendy Chi-Babulal (8242) ATTACHMENTS Logname: 60AMEND WHOLESALE CONTRACTS NSII 481N MAIN Page 2 of 3 1. MUD1-PID mappdf (Public) 2. NS II 48-Inch Water Main PART 1 ALIGNMENT.pdf (Public) 3. NS II 48-Inch Water Main PART 2 ALIGNMENT.pdf (Public) Logname: 60AMEND WHOLESALE CONTRACTS NSII 48IN MAIN Page 3 of 3