AMENDMENT TO CITY SECRETARY CONTRACT NO. 41110 FOR WATER
SERVICE BETWEEN THE CITY OF FORT WORTH AND THE CITY OF
SOUTHLAKE FOR THE CONSTRUCTION OF A NORTHSIDE II 48-INCH
WATER MAIN AND ALLOCATED CAPACITY
This First Amendment to City Secretary Contract No. 41110 ("AMENDMENT")
is made and entered into by and between the City of Southlake, acting herein by and
through its Mayor, John Terrell, hereinafter referred to as CUSTOMER and the City of
Fort Worth, acting herein by and through its Assistant City Manager, Fernando Costa,
hereinafter referred to as FORT WORTH, all of Tarrant County, State of Texas,
(collectively the "PARTIES").
WHEREAS, FORT WORTH and CUSTOMER have entered in an Agreement for Water
Service known as Fort Worth City Secretary Contract No. 41110 ("CONTRACT"); and
WHEREAS, the PARTIES recognize that there is a need for additional water capacity in
the northeast sector of Fort Worth and in Southlake; and
WHEREAS, to address this need FORT WORTH is constructing a 48-inch water main
from Heritage Trace Parkway to Alta Vista and Timberland Boulevard, approximately
11,713 linear feet as shown in EXHIBIT F.2a; and
WHEREAS, CUSTOMER has requested capacity in the proposed water main which will
increase its total projected water demand; and
WHEREAS, Section 3.3 of the CONTRACT states that CUSTOMER shall pay for each
new or enlarged or additional connection to the FORT WORTH system, including the
cost of the wholesale meter and CUSTOMER's proportionate share of the improvements
required for that service; and
WHEREAS, CUSTOMER recognizes that the City of Keller, Trophy Club Municipal
Utility District No. 1 and the Town of Westlake have also requested capacity in the
proposed Northside II 48-inch water main; and
WHEREAS, the PARTIES agree that CUSTOMER's cost and participation for the
Northside II 48-inch water main shall be as stated in this AMENDMENT.
NOW THEREFORE, THE PARTIES AGREE TO AMEND THE CONTRACT AS
FOLLOWS:
The CONTRACT shall be amended to include the following as EXHIBIT F.2:
OFFICIAL RECORD
CITY SECRETARY
RECEIVED MAR 11 Yp1c FT. WORTH,TX
EXHIBIT F.2
ALLOCATION OF COST AND CAPACITY FOR THE
NORTHSIDE II 48-INCH WATER MAIN
1.) FORT WORTH shall be responsible for the preparation of plans and specifications
(together with any modifications required during construction) and contract
documents for the construction of the Northside II 48-inch water main, shown on
Exhibit F.2a.
2.) CUSTOMER shall be entitled to an additional 13 MGD capacity in the Northside
II 48-inch water main, increasing its existing capacity of 20 MGD to a total of 33
MGD at the Caylor Tank meter location shown on Exhibit A to the CONTRACT.
The additional 13 MGD equals 21.7 percent of the proposed Northside II 48-inch
water main's 60 MGD capacity. The estimated total engineering and construction
cost of the Northside II 48-inch water main is $15,959,000. Customer agrees to
pay FORT WORTH 21.7 percent that equals $3,457,783 as its proportionate share
of the cost.
3.) Because the completion of the Northside II 48-inch water main is not expected
before the peak summer demand period of 2015, FORT WORTH shall remove the
existing orifice plate (which restricts the flow to less than 20 MGD) prior to May
1, 2015. CUSTOMER agrees to continue to limit the flow rate at the Caylor Tank
meter to 20 MGD or less until the proposed Northside II 48-inch water main is
placed in service. Once the Northside II main is placed in service, CUSTOMER
will be allowed to utilize a total of 33 MGD through the Caylor Tank meter.
4.) The cost of easements, appraisal fees, and right-of-way acquisitions shall be shared
by FORT WORTH, CUSTOMER, Keller, Trophy Club Municipal Utility District
No.I and Westlake proportionately.
5.) The estimated engineering and construction costs stated herein are for planning
purposes. Actual Project cost may differ and shall be adjusted to reflect the final
cost of engineering, construction, easements, appraisals, and right-of-way
acquisition and financing. CUSTOMER will be responsible for 21.7 percent of the
Actual Project cost.
6.) Nothing contained herein shall be construed to prevent FORT WORTH from
including the costs it incurs hereunder as system costs as that term is defined in the
CONTRACT.
7.) Upon completion of the Northside II 48-inch water main, FORT WORTH will
submit an invoice to CUSTOMER detailing CUSTOMER's percentage of the
costs. CUSTOMER shall pay FORT WORTH such costs within 30 days from the
date the invoice is received. A payment is late if not paid within 10 days from the
Amendment:F.2 Northside II 48-inch Water main OFMIAL RECORD
(01/05'15)
CITY SECRETARY
FT.WORTH,TX
due date. Late payments shall accrue interest at the rate of one and one-half
percent (1-1/2%)per month until paid.
8.) If CUSTOMER exceeds the 33 MGD capacity at the Caylor Tank wholesale
meter, then the CUSTOMER will be required to provide additional cost
participation toward the Northside 11 48-inch water main. The additional cost
participation will be required prior to CUSTOMER increasing the rate of flow at
the Caylor Tank meter.
This AMENDMENT shall become effective upon full and complete execution of each
party below:
II )A1EXECUTED this) day of J-1, , 2015.
CITY OF FORT WORTH CITY OF SOUTHLAKE
'�J _ .,�'
- as (� 9 -
FERNANDO COSTA JOHN TERRELL
ASSISTANT CITY MANAGER MAYOR
DATE: 345120/6- DATE: Oat -O�3'O�OIs
APPROVED AS TO FORM AND APPROVED AS TO FORM AND
LEGALITY LEGALITY
7
CHRIS LOPEZ- OL S BY: IM or
SR. ASSISTANT CITY ATTORNEY ATTORNEY
ATTEST ATTEST %%,%"0uTHL1'
.�
Fo _ �• •cg's
Q v: ;u'=
MARY KA g ayne
CITY SEC ARY a�$ SECRETAR0000*
�,-`�-110� �'��1�0► AFxAs
Amendment:F.2 Northside II 48-inch Water main Page 3
(01105115) OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
EXHBIT "F.2a"
48-inch water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard
1� i d
rt 2 - 4 f
r _
R rd 81KIC i OIL -
f
t
HaM Tonr+c!on
t 1(N11 ;til !� INl�diSn
- r �
t FORTWORTH
` WAM
Amendment:F.2 Northside 1148-inch Water main Page 4
(01105115)
M&C Review Page 1 of 2
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA RT Wo H
COUNCIL ACTION: Approved on 12/2/2014
REFERENCE 60AMEND WHOLESALE
DATE: 12/2/2014 NO.: C-27101 LOG NAME: CONTRACTS NSII 481N
MAIN
CODE: C TYPE: NON- PUBLIC NO
CONSENT HEARING:
SUBJECT: Authorize Amendments to the Agreements for Water Service with the City of Southlake,
City Secretary No. 41110, City of Keller, City Secretary No. 41100, Trophy Club Municipal
District No. 1, City Secretary No. 41111 and the Town of Westlake, City Secretary No.
41112 for Cost Participation in the Aggregate Amount of$7,293,263.00 Toward the
Capacity Needed from the Northside II 48-Inch Water Main from Heritage Trace Parkway
to Alta Vista and Timberland Boulevard (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute amendments to the
Agreements for water service with the City of Southlake, City Secretary No. 41110, City of Keller, City
Secretary No. 41100, Trophy Club Municipal District No. 1, City Secretary No. 41111 and the Town of
Westlake, City Secretary No. 41112 for capacity cost participation toward the Northside II 48-inch
water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard.
DISCUSSION:
The City's existing Agreements for water service with the City of Southlake, City Secretary No. 41110,
City of Keller, City Secretary No. 41100, Trophy Club Municipal District No. 1, City Secretary No.
41111 and the Town of Westlake, City Secretary No. 41112 require the wholesale customer to cost
participate toward the additional capacity needed from proposed Fort Worth water transmission
mains. These wholesale customers have requested capacity from Phase I, Part I and II of the
Northside 48-inch water main from Heritage Trace Parkway to Alta Vista and Timberland Boulevard.
Fort Worth is designing and constructing the Northside II 48-inch water main, Phase I, Part I and 11,
approximately 11,713 linear feet. The 48-inch water main has a proposed 60 Million Gallon per Day
capacity and estimated construction cost of$15,959,000.00.
Below is the requested capacity from each wholesale water customer and the associated
construction cost participation.
M&C Review Page 2 of 2
Estimated
Capacity Cost
Wholesale Requested Capacity Participation
Customer Capacity Cost for the NSII
Cities (MGD) Participation 48-inch Water
(Percent) Main
Construction
Cost
Southlake 13 21.7 percent $3,463,103.00
Keller 3.5 5.8 percent $925,622.00
Trophy
Club MUD 2.4 4.0 percent $638,360.00
No.1
Westlake 8.5 14.2 percent $2,266,178.00
Under the terms of the existing Agreements, the entities will pay toward the engineering, easement
and construction cost of the proposed Northside II 48-inch water main.
The figures above are only the construction cost estimate. The final cost participation amount from
each wholesale water customer will be based on the final engineering, easement and construction
cost. Each wholesale water customer will reimburse the cost participation to the City of Fort Worth at
the completion of Part 11 of Phase I of the project. Staff has reviewed the requested capacity and has
no objection to approval of these requests.
In addition to the cost participation, Trophy Club MUD No. 1 has requested to amend its service area
map, which is attached. Staff has reviewed the request and verified with adjacent cities, and has no
objection to including this request in its amendment.
The project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that the Water Department is responsible for
the collection and deposit of funds due to the City.
TO Fund/Account/Centers FROM Fund/Account/Centers
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: Andy Cronberg (5020)
Additional Information Contact: Wendy Chi-Babulal (8242)
ATTACHMENTS
MUD1-PID map.pdf
NS II 48-Inch Water Main PART 1 ALIGNMENT.pdf
NS 11 48-Inch Water Main PART 2 ALIGNMENT.pd