HomeMy WebLinkAboutContract 44299-FP1 CItY srtMAW
FoRTWORTH.' 53 -61 �Zqq
TRANSPORTATION AND PUBLIC WORKS CS '4 1 2 q -1
NOTICE OF PROJECT COMPLETION
D.O.E.Ns: 6227
R PM contract 44299 for RECONSTRUCTION OF ROBERTSON RD FROM BOAT CLUB RD as required
by the WATER DEPARTMENT as approved by City Council on 03/05/2013 through M&C C-26140 the director of
the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public
Works Department has accepted the proj
Original Contract Prices: P 5932,322.23
Amount of Approved Change Orders: MAR 12 2015 Ns l
Revised Contract Amount: $932,322.23
Total Cost Work Completed: $869,998.58
Less Deductions:
Liquidated Damages: Days®5210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $869,998.58
Less Previous Payments: $835,198.64
Final Payment Due $34,79994
3 /xV7—/S,-
Recommended for Acceptance Date
Asst. Director, TPW - I frastructure Design and Construction
Accepted Date
Director, VVATER Df TMEN
// /
3I13�iS
City Manager Date
Comments: FUND ACCT:0204475220-2072301299
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
v
D - «4 I
tMA, i 2, �015 C, �� o
City Project Numbers 01299 :^ _ - DOE Number 6227
Contract Name Reconstruction of Robertson Rd from Boat Club Rd to Estimate Number 43
Contract Limits 600 Ft West of Lake Country Dr Payment Number 43
Project Type WATER&SEWER For Period Ending 2/11/2015
Project Funding
Project Manager Weiss City Secretary Contract Number 44299
Inspectors GREGORY / MILLER,TOM Contract Date 3/5/2013
Contractor ED BELL CONSTRUCTION COMPANY Contract Time 382 CD
P.O.BOX 540787 Days Charged to Date 369 CD
DALLAS, TX 75354 Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $869,998.5 8
Less %Retained $0.00
E i,]1:•iE :% A?iJFiS-'A L--- =� _ Net Earned $869,998.58
Earned This Period $34,799.94
f
Retainage This Period $0.00
iT T� a Less Liquidated Damages
e _ 0 Days @ $0.00 /Day $0.00
_n_ �_ _,._q._u._ ._._.. _ ---.••------.' LessPavement Deficiency $0.00
..___.....___.—_... Less Penalty $0.00
Less Previous Payment $835,198.64
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $34,799.94
Tuesday,February 17,2015 Page 5 0
On
RIEVC-OR0
Y: WiJt(y r, tX
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Rewnstruc ion of Robertson Rd from Boat Club Rd to
Contract Limits 600 Ft West of Irks Country Dr
Project Type WATER&SEWER
City Project Numbers 01299
DOE Number 6227
Estimate Number 43 Payment Number 43 For Period Ending 2/11/2015
CD
City Secretary Contract Number 44299 Contract Time 38E'D
Contract Date 3/5/2013 Days Charged to Date 369
Project Manager Weiss Contract is 93.000 Complete
Contractor ED BELL CONSTRUCTION COMPANY
P.O.BOX 540787
DALLAS, TX 75354
Inspectors GREGORY / kgU ER,TOM
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Tuesday,February 17,2015 Page 1 of 5
City Project Numbers 01299 DOE Number 6227
Contract Name Reconstruction of Robertson Rd from Boat Club Rd to Estimate Number 43
Contract Limits 600 Ft West of Lake Country Dr Payment Number 43
Project Type WATER&SEWER For Period Ending 2/11/2015
Project Funding
Unit 1:Sewer Improvements P258-531200-70717-01299
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---— -- - - — ---- --- — -- -- -- ----- --
1 6"Sewer AbandonmcntPlug 4 EA $330.00 $1,320.00 4 $1,320.00
2 12"Sewer Abandonment Plug 2 EA $374.00 $748.00 2 $748.00
3 Remove 6"Sewer Line 256 LF $8.58 $2,196.48 256 $2,196.48
4 Remove 4'Sewer Manhole 2 EA $1,072.50 $2,145.00 2 52,145.00
5 Temporary Asphalt Paving Repair 60 LF $30.80 $1,848.00 60 $1,848.00
6 Block Sod Placement 300 SY $5.78 $1,734.00
7 Manhole Vacuum Testing 3 EA $198.00 $594.00 3 5594.00
8 Trench Safety 2058 LF $1.10 $2,263.80 2058 $2,263.80
9 Utility Markers I LS $1,001.00 $1,001.00 1 $1,001.00
10 Concrete Collar 3 EA $390.50 $1,171.50 3 $1,171.50
11 Ductile Iron Sewer Fittings 1 TO $4,818.00 $4,818.00 1 $4,818.00
12 6"Sewer Force Main 1592 LF $74.80 $119,081.60 1592 $119,081.60
13 12"Sewer Pipe 352 LF $85.80 $30,201.60 352 $30,201.60
14 3"Sewer Air Release Valve&Vault 1 EA $13,821.50 $13,821.50 1 $13,821.50
15 Epoxy Manhole Liner 9 VF $225.50 $2,029.50 9 $2,029.50
16 4'Manhole 2 EA $4,301.00 $8,602.00 2 $8,602.00
17 Removal of SS air release valve and 1 EA $1,028.50 $1,028.50 1 $1,028.50
Sub-Total of Previous Unit $194,604.48 $192,870.48
Unit II:Water Improv P253-531200-60717-01299
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 8"Water Abandonment Plug 2 EA $605.00 $1,210.00 1 $605.00
2 Remove 8"Water Valve 3 EA $203.50 $610.50 2 $407.00
3 Salvage Fire Hydrant 1 EA $302.50 $302.50 1 $302.50
4 Salvage 1"Water Meter 1 EA $88.00 $88.00 1 $88.00
5 Concrete Encase Sewer Pipe 10 CY $286.00 $2,860.00 10 $2,860.00
6 Temporary Asphalt Paving Repair 4593 LF $21.45 $98,519.85 1806 $38,738.70
7 Temporary Water Services 1 LS $1,408.00 $1,408.00 1 $1,408.00
8 Trench Safety 5067 LF $1.10 $5,573.70 5067 $5,573.70
9 Utility Markers 1 LS $2,068.00 $2,068.00 1 $2,068.00
Tuesday,February 17,2015 Page 2 of 5
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
City Project Numbers 01299 DOE Number 6227
Contract Name Reconstruction of Robertson Rd from Boat Club Rd to Estimate Number 43
Contract Limits 600 Ft West of Lake Country Dr Payment Number 43
Project Type WATER&SEWER For Period Ending 2/11/2015
Project Funding
10 Ductile Iron Water Fittings 3 TO $4,631.00 $13,893.00 3 $13,893.00
11 6"PVC Water Pipe 263 LF $75.90 $19,961.70 263 $19,961.70
12 8"PVC Water Pipe 211 LF $86.90 $18,335.90 211 $18,335.90
13 12"PVC Water Pipe 4593 LF $106.70 £490,073.10 4593 $490,073.10
14 Fire Hydrant 8 EA $3,195.50 $25,564.00 8 $25,564.00
15 Water Sampling Station 1 EA $2,084.50 $2,084.50 1 $2,084.50
16 Connection to Existing 8"Water Main 1 EA $2,689.50 $2,689.50 1 $2,689.50
17 24"x 12"Tapping Sleeve&Valve 1 EA $7,045.50 $7,045.50 1 $7,045.50
18 2"Water Air Release Valve&Vault 1 EA $7,90350 $7,903.50 1 $7,903.50
19 1"Water Service,Meter Relocation l EA $2,018.50 $2,018.50 1 $2,018.50
20 6"Gate Valve 8 EA $1,039.50 $8,316.00 8 $8,316.00
21 8"Gate Valve 4 EA $1,298.00 $5,192.00 4 $5,192.00
22 12"Gate Valve 10 EA $2,200.00 $22,000.00 10 $22,000.00
Sub-Total of Previous Unit $737,717.75 $677,128.10
-- -------------------------------------
Tuesday,February 17,2015 OFFICIAL"RE00tD
CITY SECRETARY
FT.WORTH,TX
City Project Numbers 01299 DOE Number 6227
Contract Name Reconstruction of Robertson Rd from Boat Club Rd to Estimate Number 43
Contract Limits 600 Ft West of Lake Country Dr Payment Number 43
Project Type WATER&SEWER For Period Ending 2/11!2015
Project Funding
Contract Information Summary
Original Contract Amount $932.322.2.=
Chanee Orders
Total Contract Price $932,322.23
Date '7 211 4" Total Cost of Work Completed $869,998.58
r Less %Retained $0.00
/,A(4t'Ir Net Earned $869,998.58
Date J
ection Supervisor Earned This Period $34,799.94
��� Retainage This Period 50.00
DateA44�� Less Liquidated Damages
Project Man
Days @ /Day $0.00
Dat -�2LessPsvement Deficiency $0.00
r etorn?WW cttue Design anj Co truction Less Penalty 50.00
Date 3 i Z 1 less Previous Payment $835,198.64
DirectorTContracting Department Plus Material on Hand Less 15% $0.00
CCXV�L Balance Due This Payment $34,799.94
J
Tuesday,February 17,2015 OF
Ir- ¢o COR®
CITY SECRETARY
FT.
WORTH, TX
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: 2008 CIP Arterial St Robertson Rd(W of Lake Country Dr.to Boat Club Rd)
PROJECT NUMBER: 01299
DOE NUMBER: 6227
WATER
PIPE LAID SIZE TYPE OF PIPE LF
6" PVC 263
8" PVC 211
12" PVC 4593
FIRE HYDRANTS: 8 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Passed
NEW SERVICES: 2"x 2 EA
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
6" Force Main 1592
12" P'v'C 352
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Passed
NEW SERVICES: 0
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 7 - ORD
(817)392-7941•Fu:(817)392-7845 CITY SECRETARY
FT.WORTH,TX
AFFIDAVIT OF CONTRACTOR
Ed Bell Construction Company
I hereby certify that all bills for labor and materials due Subcontractors on the following
City of Fort Worth project Robertson Road (West of Lake Country Drive to Boat
Club Road) have been paid by the undersigned and that no outstanding bills for labor
or materials exist on the above-referenced project.
In consideration of receiving final payment, and upon receipt of final payment, the
undersigned does hereby hold harmless and indemnify the City of Fort Worth from any
liability, and will reimburse the City of Fort Worth for all its costs, expenses, court costs,
reasonable attorney's fees and damages, on any such claims or lawsuits hereinafter
made in connection with the above project for any subcontractor for supplying of labor
or materials on said project.
I sign th' /�idavit with full authority and knowledge of the facts contained herein.
^7/
By: Steve Priddy
Its: President
I
Subscribed to and sworn to before me under official of office this Z'�I_day of �E6�2,gaI
2015.
ot,aY'u84b Lloyd Phillippe Falkner
Notary Public in anc�'for * Notary Public,State of Texas
� y My Commission Expires
The State of Texas 9�OFP 06118116
(SEAL)
My Commission Expires: OFFICIAL RECORD
CITY SECRETARY
FT. WORTHp TX
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document G707
Bond No SUI 120487
PROJECT:
(name, address)2008 CIP Arterial Street- Robertson Road
Fort Worth TX
TO (Owner)
F ARCHITECT'S PROJECT NO:
CITY OF FORT WORTH CONTRACT FOR:
1000 Throckmorton Street 2008 CIP Arterial Street-Robertson Road from Boat Club Road to
600'West of Lake Country Drive City Project No.01299
Fort Worth TX 76102 CONTRACT DATE:
CONTRACTOR:ED BELL CONSTRUCTION COMPANY
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
there insert name and address of Surety Company)
ARCH INSURANCE COMPANY
300 Plaza Three
Jersey City NJ 07311-1107 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
ED BELL CONSTRUCTION COMPANY
10605 Harry Hines
Dallas TX 75354-0787 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
CITY OF FORT WORTH
1000 Throckmorton Street
Fart Worth TX 76102 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 20th day of February, 2015
ARCH INSURANCE COMPANY
Surety Co pany,
Attest:Sophinie Hunter
(Seal): Signature of A#horized Representative
Lisa M. Bonnot Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AF ND CLAIMS,
Current Edition
OrrIGIAL D ONE PAGE
CITY SECRETARY
PT. WORTH, TX
OMERAWN
THIS POWER OF ATTORNEY 1S NOT VALID-UNLESS 1T 1S PRINTED ON BLUE BACKGROUND.
�hrse�er o�attorney limits IhF, d- S.caf the;l� ,arrzrti herein,and theyy,l�al a no aut or ty-to bind the Crrrnz_nly axL��,ur rr�!h
�F�i:" 9E: "�J pp rrtk p
man►rer arc tojbe extent hf--rtjrr, f._[sdi No it vaf d-fur Mortgage Note, Loan; Lette rf C.edit, Bank oi?pgs1 Caricmr Iia •a
EI
refes€KaWor-Residential raPt"e Ca araniF�s ICynil Nig _
POWER OF ATTORNEY im
r .les P These Prestlsk
— —
That the Arch Insurance Company, a corporationI organized and existingar e Paws of the State of Mersclui1, n Is principal
administrative office in Jersey City,New Jersey(hereinafter referred to as the"Company")does hereby appoint:
+1 Aa.4,1'�Attorneys)ln-1914.
M.Bonnot,Iic rd R o FtOial_ Sophlnre Hun a ad DeLee Marshall of baPlaSTOblas
�i �I,true rd 17?k,�, seal,and deliver froha the d to of issuance of this power fc
surety,and as its act and deed: V
Any and all S, undertakings,recognizances and other surety obligations,in the penal su-n nqt exceeding
IArs($90.000,000.,!
hF1l tl r ru 1.s doe. not permit the.sametobli "b,l to be split into two cd sOWNg each suchrtvlfpinhdol
limit of authority as set forth herein.
The execution of such bonds, undertakings, recognizances and other surety obligations in pursuance of these presents shall be as
di cr e said Company as full ern o all intents and �"urp sesgl s Iff t''" `same had been I E,dministrative ot[tce IJeiseyt New Jersey.
1 IX4.I II1. �M r ri, _
'Fis Power of Attorney is wxera�ke ority of resolutions adopted by unanimous consent of the Board of Dirm Company
on September 15, 2011, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned
Secretary as being in full force and effect:
iIH a
Chairman of the; pp �d �I�rltfPt,.' 11 peln"��I� or the Exacutly e – Senior Vice Fire ttk` (t d t
U.- or their a is$6'I C71 11111 11 F Id'0.1
I ecreta shat t
—m I ,. PPol�te d $" at i I wr)Yg and filed nY
P Illrl T� el tri 1,IG11
atatM-?'N'f,a�n:;cn I' agents and a �->aict, an to authorize them SSr ate' ns set forth in 1�eir ,I. a po rs r7r
attorney,to execute on behalf of the Company, and attach the seal of the Company thereto,bonds, undertakings, recognizances and
other surety obligations obligatory in the nature thereof, and any such officers of the Company may appoint agents for acceptance of
process."
_ t. k (
jwmmi ey is sign d o �Tfacsim ie and ; "�d i auit or ft d flFtf i,following r
W e of the Boar _._ an0A
s W43ri on Septem 2Q` 1':+.,,tl la � I�I�
VOTED,That the signature of the Chairman of the Board,the President,or the Executive Vice President,or any Senior Vice President,
of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, and the signature of the
, cr _, ,thr sof the Company, an ce 'fiEafon uq the Secretary, may ae rx faftgtile on any power of a ey
�.. n 1 1I 1 a1 Ill ul l iiy tl l
e to the resolutj��11 d e bIh Bo d of Dirsors 1 and any sucWNW_
ri ~ with respecytltOB'� ii qr"'ll'ndeaRing to which l P it1q to be valid
i1fil!tt 1 ""I l +141t ,'smpaiiy
M aa
OOMLOO13 00 03 03 Page 1 of 2CITY €�R� 1°�Rdn t d in U.S.A.
— 'o WORTH, TX
awy
ARCH Insurance Company ARCH Surety
TEXAS CONSUMER NOTICE
IMPORTANT NOTICE
To obtain information or make a complaint:
You may contact your agent at the telephone number provided on the Declarations page
of your policy.
You may contact William J. Misero, Surety, Arch Insurance Company, at the toll-free
telephone number or address provided below:
Arch Insurance Company
Attention: William J. Misero
3 Parkway Suite 1500
Philadelphia PA 19102
1-866-472-8845
You may contact the Texas Department of Insurance to obtain information on
companies' coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P.O, Box 149091
Austin, TX. 78714-9091
FAX# (512) 475-1771
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim you should contact the
agent or the company first. If the dispute is not resolved, you may contact the Texas
Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not become a part or condition of the attached
document.
(Ed. 4/12) EFT.
U.S.A.
L RECORD
CRETARY
RTH, TX
FORTWORTHREV:0=07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 2/17/2015
Name of Contractor Project Name
Ed Bell Robertson Rd
DOE Inspector Project Manager
Thomas Miller Mike Bennett,followed by Michael Weiss
DOE Number Project Dirk-4 Type of Contract
6227 O Simple o Routine O Complex 10 Water ❑ waste water❑ Storm Drainage❑ Pavement
Initial Contract Amount Final Contract Amount
$932,322.23 1$932,322.23
H)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 3 1 Accuracy of Plans to Existing Conditions 2
2 Knowledge of Inspector 3 2 Clarity&Sufficiency of Details 3
3 Accuracy of Measured Quantities 3 Applicability of Specifications 3
4 Display Of Professionalism j 4 Accuracy of Plan Quantities 3
5 Citizen Complaint Resolution 3 PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 3 1 Knowledge And/Or Problem Resolution Z
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 2 3 Communication 3
2 Timliness of Contractor Payments 4 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe 3
III)COMMENTS&SIGNATURES
COMMENTS
17
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor litr &7 �j
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS OFFICIAL RECORD
! The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 760 2 SECRETARII
(817)392-7941 -Fax:(817)392-7845 FT.
W01
TX
FORTWORTH REV:00/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Ed Bell Robertson Road
DOE Inspector DOE Number
Thomas Miller 6227
E&Wector Project Manager
17 Water O Waste Water❑ Storm Drainage❑ Pavement Mike Bennett,followed by Michael Weiss
Initial Contract Amount Project Diff—lty
$932,322.23 O Simple O Routine O Complex
Final Contrael Amount Date
$932,322.23 2/25/2015
I1)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 336
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 336
111)CONTRACTOR'S RATING
Maximum Score(MS)=448 Q sum of applicable element score maximums which= 448
Rating(ITS/MS]•100%) 336 / 448 - 75%
Performance Category Good
<20'/=Inadequate 20'/to<40%=Deficient 40'1*to<60%=Standard 60%to<800%=Good >-80'/=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor Gc%L
CONTRACTOR'S COMMENTS
_ TRANSPORTATION AND PUBLIC WORKS —–
�' The City of Fort Worth•1000 Throckmorton Street•Fort Worth, JI ft1J%L RECORD
(817)392-7941 •Fax:(817)392-7845 CITY SECRETARY
F '. WORTH, TX
FORTWORTH rev 03/05107
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.A3
NAME OF PROJECT: Robertson Road
PROJECT NO.: 01299 CONTRACTOR: Ed Bell
DOE NO.: 6227
PERIOD FROM 04/29/13 TO: 01/26/15 FINAL INSPECTION DATE: 9-Oat-14
WORK ORDER EFFECTIVE:4/29f2013 CONTRACT TIME: 382 O WDO CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD
TOTALS 369
TO DATE
*REMARKS:
IVS-14
N TOR DATE SPEC R DATE
ENGINEERING DEPARnIENT
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 30 2-631]
(817)392-7941•Fu:(817)392-7845 aF-F," 'L RECORD
CITY SECRETARY
WORTN, TX