HomeMy WebLinkAboutContract 35525-A3 CITY SEMAW CONTRACT NO, 3SS a A :iNENT No.3 TO CITY SECRETARY CONTRACT No. 35525 WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 35525, (the CONTRACT) which was authorized by M&C C-22177 on the 12th day of June, 2007 in the amount of $ 361, 072 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $76, 510 . 00 which was authorized by M&C # C-22809 on May 20, 2008, Amendment Number 2 in the amount of $385, 654 . 00 which was authorized by M&C # C-25347 on December 13, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project : Lebow Channel Roadway Crossing Replacement at Brennan Street, 28th Street and Dewey Avenue (Project No. 00778) ; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 14, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $150, 908. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under rn the Contract, as amended, so that the total fee paid by the City for all �irwork and services shall be an amount of $974, 144. 00. rn 3 . 0 3 n a All other provisions of the Contract, which are not expressly ~` City of Fort Worth co Professional Services Agreement Amendment Template C= PMO Official Release 8/1/2012 OFFICIAL RECORD CA Page 1 of 3 CITY SECRETARY FT.WORTH,TX amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER e gue Nall and Perkins, Inc. Fernando Costa Michael A. Jones, Assistant City Manager Principal DATE: /"J / DATE: IF APPROVAL RECOMMENDED: Douglas W. Wiersig, E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: G _Z W I- Date : — & Douglas W. Black Assistant City Attorney ATTEST: VOR fe 0000 ary J. ys ro o� City Sec etary o 000 a City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 OFFICIAL RECORD Page 2 of 3 CITY SECRETARY FT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 35525 Amendment No. 3 Department Fund-Account-Center Amount Transportation and Public P227-531200-202280077830 $150, 908 .00 Works Total: $150, 908 .00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 stn p teaque nall$'Mkia wvnv.1pinc.com engineers surveyors landscape architects November 14, 2014 Mr. Rick Shaffer, P.E. City of Fort Worth T/PW Storm Water Management Division 900 Monroe Street, Suite 404 Fort Worth, Texas 76102 Re: Fee Proposal for Contract Amendment No. 3— Lebow Channel Roadway Crossing Replacement: 28th St., Dewey St., and Brennan Ave. City of Fort Worth Project No. 00778 (TNP Project No. FTW 06305) Dear Mr. Shaffer: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services requested. The City has requested that TNP design the Brennan Ave. crossing of Lebow Channel for ultimate conditions requiring 900 linear feet of additional channel design. The following is a brief description and cost for the additional services to be provided on this project: I. Ultimate Channel Grading Design at Brennan Ave. The scope of services necessary to accomplish the ultimate channel grading design at Brennan Ave. is addressed below. Level of Effort shown on the table attached to this Amendment Proposal is based on and limited to three submittals (60%,90%,100%) with one set of City comments at 60% and 90%. A. Design The following additional effort will be required: 1. 900 LF of additional channel plan, profile, and cross section design —two alternative grading plans (maximum). 2. Design of gabion drop structure at upstream end. 3. Retaining wall design (up to 3 locations) to maintain 4:1 channel side slope. 4. Tree well design to preserve existing trees (up to 4 locations assumed). 5. Additional erosion control design due to extension of channel grading. 6. Design of widened driveway at Parks Dept. facility. B. Survey 1. An additional approximately 5.2 acres of topographic and design survey will be required to design the additional downstream grading, including the following: i. Tie new 10' hike and bike trail constructed since the previous s urvey; ii. Survey previously inaccessible private property north of Brennan Ave; iii. Eight (8) channel cross sections for design level channel modeling; iv. Topo required to design the widening of the Parks Dept. driveway; and v. Tree survey and cataloging for trees 6-inches and larger within the expanded project limits outside Lebow Channel existing top of banks and trees 27-inches and larger anywhere within the expanded project limits. C. Permitting/Coordination The additional channel design will require additional time and effort in obtaining the Mr.Rick Shaffer,PE November 14,2014 Page 2 of 4 following permits: 1. Floodplain Development Permit 2. Urban Forestry Permit and Phase 1/Phase 2 Exhibits 3. Grading Permit D. Park Conversion Application A Park Conversion Application will be required due to the additional downstream grading that will be located on existing PACS property. The following items will be required to prepare, submit, and obtain the Park Conversion Application. 1. Prepare Park Conversion Application Documents after approval of Preliminary(60%) design by Stormwater Group and direction by them to proceed with Application process. 2. Meet with PACSD staff on-site to discuss proposed alignment—one meeting only. 3. Prepare a preliminary aerial plan and plat that includes all requirements listed in the Park Conversion Application Instructions received from PACS staff on March 25,2014 —one submittal only. 4. Staking on park property identifying channel alignment, easement area, tree save area(s), temporary work space, access routes, and staging area(s)—one time only. 5. Meet with PACSD staff on-site to inspect and receive approval of proposed layout— one meeting only. 6. Prepare and subm it final aerial plan and plat—one subm ittal only. 7. Attend one (1) PACS Advisory Board meeting. 8. Provide support during the 30-day advertisement period for the park conversion City Council Meeting. 9. Attend one (1) City Council Meeting. Due to the multiple approvals required for the Park Conversion Application and high probability of multiple iterations being required for the items listed above, the Park Conversion Application task shall be setup as a special services item.Written authorization from the City will be required to charge to the Special Services task.An estimated budget has been established and included in this Amendment although the actual effort required is unknown. This task will, therefore, be invoiced and paid as an hourly reimbursable item at TNP's standard hourly rates. The budgeted amount will not be exceeded without City approval and authorization. E. LOMR 1. Additional mapping, modeling,and survey required for the LOMR due to the extension of the downstream channel grading at Brennan Avenue. F. Bid Phase/Construction Phase Services 1. An increase in effort will be required in both the bid and construction phases due to the expanded scope of the project. A level of effort spreadsheet is attached to this amendment giving a breakdown in additional effort. 2. Time has been added for a structural engineer to assist with any question, clarification, or revision regarding the retaining walls and gabion drop structure included in this amendment. 3. Time has been added for a landscape architect to assist with any question, clarification or revision regarding the landscape and irrigation plans that are included in this amendment. Mr.Rick Shaffer,PE November 14,2014 Page 3 of 4 II. Landscape and Irrigation Construction Plans The City requests that TNP design landscape and irrigation components for the Brennan Ave. crossing. The scope of services necessary to accomplish this change is addressed below. Fee assumes tree mitigation will be performed on-site. G. Design The following additional effort will be required: 1. Project Management — Submittal Review Meetings (up to 4 meetings), and Coordination Meetings (up to 4 meetings). 2. Landscape Design —design of tree/landscaping improvements to help mitigate loss of existing trees due to proposed channel grading. 3. Irrigation Design — design of a permanent irrigation system for proposed tree/landscaping mitigation areas. 4. Create landscape and irrigation details and technical specifications. III. Credits H. Credits A credit will be applied to Amendment 3 for work that is currently included in the Contract that has not and will not be performed per the City's direction and that the City will release TN P from any obligation from performing. 1. Survey — originally $36,000 was allocated in the survey work phase of the original 00778 contract for anticipated easement and property acquisition along Lebow Channel at a rate of$1,000 per property. Currently$18,835.00 remains in the Survey work phase originally intended for this purpose. The City has instructed TNP that this work will not be performed and to apply a credit to this Amendment in return for releasing TNP from any obligation to perform this work in the future. 2. LOMR—originally $20,600 was allocated to the LOMR's at the Dewey and Brennan crossings, $10,300 for each crossing. The LOMR for Dewey will be included in the proposed overall channel LOMR that will be included in City Project No. 00084. As part of this amendment$10,300, funds originally intended for the Dewey crossing,will be credited back as part of this Amendment. Fee Proposal for Contract Amendment No. 3: $ 150,908.00 TNP proposes an additional fixed fee of$150,908.00 to accomplish the scope of services described above. This fee shall be full compensation for work required of TNP and three sub-consultants. Summary of Fees: I. Ultimate Channel Grading Desi gn at Brennan Ave. A. Design $ 46,980 B. Survey $ 19,330 C. Permitting/Coordination $ 10,380 D. Park Conversion Application $ 62,170 E. LOMR $ 4,470 F. Bid Phase/Construction Phase Services $ 5,780 G. Landscape and Irrigation Construction Plans $ 26,670 H. Credits (-)$ 29,135 Sub Markup $ 4,263 Total $ 150,908 Mr.Rick Shaffer,PE November 14,2014 Page 4 of 4 Gorrondona &Associates $42,630 Summary of Contract Fee: Original Contract Amount: $ 361,072 Amendment No. 1 $ 76,510 Amendment No. 2 $ 385,654 Amendment No. 3 $ 150,908 Revised Contract Amount $ 974,144 Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Andrew Luce, P.E. cc: Mike Jones, P.E. Attachments: 1. Level of Effort Spreadsheet 2. Gorrondona and Associates Proposal for Surveying Services o:lpmj/cts%tM46305-04%docs%cmtract%wne 1dmW M3.doc ■i� i�l l�' ��� i����li�� � � i�ll�h 1� I M ILII �I II b I �II, I ���i �i��i����i���a�w ��� n�� I � � ' I ' � � � i I� � � � � �� � � � ii i i � � � � � � n io�n� i �I I IA I II � Gorrondona & Associates, Inc. �A August 8, 2014 Teague Nall and Perkins, Inc. 1100 Macon Street Fort Worth, Texas 76102 Attn: Mr. Andrew Luce, P.E. Re: CITY OF FORT WORTH — Lebow Channel at Brennan Avenue (Additional survey south of Brennan Avenue) Dear Mr. Luce: Gorrondona & Associates, Inc. (G&AI) is pleased to submit this proposal for professional land surveying services for the above referenced project. The following itemized surveying services are to be provided by Gorrondona & Assoc. Inc.. I. DESIGN SURVEY 1.) Extend existing horizontal and vertical control for the project. Temporary benchmarks shall be set for construction. 2.) Tie all improvements X, Y & Z (water valves, water vaults, storm drains, manholes, driveways, curbs, sidewalks, all trees 6" and larger outside top of bank of channel, trees 27° and larger between the top bank of channel, signs, buildings, power poles, etc.) within the define project limits, as shown on an map provided by engineer. Provide flowline elevations of all sanitary sewer, storm drainage inlets and manholes within the project limits. Cross-sections and spot elevations shall be taken to ensure the defined project area will produce 1-foot contours. Eight (8) channel cross- sections shall be taken as defined in engineers map. 3.) Prepare a final design/topographic drawing in an AutoCAD 2013 file format showing all features located in the field, property lines & right-of- way lines, ownership information, one-foot interval contours and a land XML file. Deliverables shall also include a copy of the field notes, an ASCII coordinate file of all points located in the field and a hard copy of the coordinates. 7524 Jack Newell Blvd.So.•Fort Worth,Texas 76418-817.496.1424•Fax 817.496.1768•www.ga4nc.net II. PARK CONVERSION PLAT EXHIBIT 1.) Prepare a metes and bounds description with exhibit on letter size for up to one (1) proposed Park Conversion document showing existing easements, construction staging areas, and tree save areas, to the City of Fort Worth's standards. The Park Conversion document will be on a per document basis for a fee of$7,500.00. III. CHANNEL STAKING 1.) Provide construction staking for the proposed channel, tree save areas and construction staging areas. The construction staking will be for a lump sum fee of$8,700.00. Gorrondona & Associates, Inc. can provide the above professional land surveying services for an hourly not exceed fee of $19,750.00 for item I, a lump sum fee of $7,500.00 for item II, and a lump sum fee of $8,700.00 for item III. The total amount of this fee proposal is $35,950.00. if you have any questions or require additional information please contact me at (817) 496-1424. Sincerely, G;RRO.';)O.A & ASSOCIATES, INC. W. Truett Wilson, RPLS Survey Director 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 3/3/2015 DATE: Tuesday, March 03, 2015 REFERENCE NO.: "C-27207 LOG NAME: 20SW LEBOW CHANNEL AMENDMENT#3 SUBJECT: Authorize Execution of Amendment No. 3 to City Secretary Contract No. 35525, an Engineering Agreement with Teague Nall and Perkins, Inc., in the Amount of$150,908.00 for Additional Engineering Services for the Lebow Channel Roadway Crossing Replacement at Brennan Avenue, NE 28th Street and Dewey Street Project, Thereby Revising the Total Contract Amount to $974,144.00 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 3 to City Secretary Contract No. 35525, an Engineering Agreement with Teague Nall and Perkins, Inc., in the Amount of $150,908.00 for additional engineering services for the Lebow Channel Roadway Crossing Replacement at Brennan Avenue, NE 28th Street and Dewey Street project, thereby revising the total contract amount to $974,144.00. DISCUSSION: The Amendment recommended by this Mayor and Council Communication (M&C) is for engineering services for additional design of approximately 900 linear feet of channel improvements downstream of the current project limits for the Brennan Avenue bridge and for a Parks and Community Services park conversion related to these improvements. The original plan was to defer channel improvements downstream of the bridge to a future phase of the overall Lebow Channel improvement program. During design, however, it was determined that the channel improvements would be best accomplished as a part of the bridge project so it is necessary to amend the current Design Agreement to include the additional construction scope. The Lebow Channel program is a large, multi-phase program that will address flood risk to over 280 homes/structures and 17 roads. Due to the size and cost of the overall program (approximately $30 million), the program was developed to be designed and constructed in phases over multiple decades. Teague Nall and Perkins, Inc. (TNP), was selected to design the project based on a Request for Qualifications (RFQ) process. The City Council originally authorized the City Manager to execute an Agreement with TNP (M&C C-22177) for the design of three major roadway crossings (bridges) as one combined design and construction package. Due to the requirements associate with two federal grants and associated state funding (totaling $1,983,543.71) received for this project, the Design Agreement was amended to separate the bridges into three separate construction packages. TNP proposes to perform the engineering services described for a lump sum fee of$150,908.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. CONTRACT DESCRIPTION AMOUNT M&C NO. APPROVED Initial Contract Design of 3 bridges $361,072.00 C-22177 6/12/2007 as one contract Amendment No. Prepare techni $76,510.00 C-22809 5/20/2008 1 analysis and administrative tasks o apply for federal grants Amendment No. Separation of $385,654.00 C-25347 12/13/2011 2 project into 3 design/ construction packages; additional design alternatives; additional FEMA permitting effort; updated design requirements Amendment No. Additional design $150,908.00 pending 3 for extended project limits; PACS Park Conversion Total Contract 1$974,144.00 M/WBE Office - Teague Nall and Perkins, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 28 percent M/WBE participation for this Amendment No. 3. The City's goal on this amendment is 10 percent. Funding for this amendment is being provided from Stormwater Capital Projects Bond Fund. This project is located in COUNCIL DISTRICT 2, Mapsco 62H. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. Project Fund Appropration to date is $2,016,303.12 and Remaining Available Balance to date is $179,787.13. Upon execution of Amendment No. 3, remaining funds in the Lebow Channel Roadway Crossing Project will be $28,879.13. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P227 531200 202280077830 $150.908.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Michael Owen (8079) ATTACHMENTS 1. 00778 Map.pdf (Public) 2. 00778 MWBE.pdf (CFW Internal) 3. P227 - 00778 Lebow Channel Available Funds..docx (CFW Internal)