Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 45053-CO1
CITY SECRETAW FORT WORTH. City of Fort Worth CONTRACT�• 1 Change Order Request Project Name 9700 Trinity Blvd Drainage Improvements City Sec# 1 45053 Client Project#(s) CFW Project No.00100,DOE 4704 Project Construction of a four-lane bridge structure to convey storm water flows in a 100-year storm,reducing street and property Description flooding in the vicinity of Trinity Blvd between Bell Spur Rd.and Norwood Dr. COUNCIL DISTRICT 5 Conb-actorl McMahon Contracting L.P. Change Order# Date 1 212612015 City Project Mgr.I Paul Roach City Inspector I Quincy Jones/Doug Dickinson Dept. TPW Water Sewer Contract Time Totals D Original Contract Amount $3,342,519.36 $3,342,519.36 730 Extras to Date $0.00 Credits to Date $0.00 0 Pending Change Orders(in M&C Process) $0.00 0 Contract Cost to Date $3,342,519.36 $3,342,519.36 730 Amount of Proposed Change Order $23,678.34 $0.00 $0.00 $23,678.34 139 Revised Contract Amount $3,366,197.70 $3,366,197.70 869 Original Funds Available for Change Orders $100,000.00 $100,000.00 Remaining Funds Available for this CO $100,000.00 $100,000.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.770 MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,178,149.20 1.A geotechnical investigation indicated that the site soil conditions dictate revised gabion rock baskets and different foundation material be placed at the bridge abutment walls to achieve acceptable global stability.This change order adds 35.79 cubic yards to the 1,282.21 cubic yards of gabions added by Field Order No. 1. 2. A 16"water main proposed to be relocated was found to be ductile iron instead of bar-wrapped concrete which neccesitated the addition of a special adaptor kit to make the connections to the existing water main. 3. A 30"steel casing for a proposed 21"sanitary sewer was deter ized.A 42"casing is recommended. 4.139 days will be need to be added for time lost to pe or the geotechnic Q ti c Ai recommended improvements and negotiate the field order. A by: x.°00 It is understood and agreed that the acceptance of this Change Order by c or constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. m M m McMahon Contracting L.P. aT ;5 m v _ a - c _0 J -15 a 00 N M&C Number M&C Date App y Ft•.WORTH,TX 00 cv) o U') v rnMl Ml Llc o O N � N N O a o OL U c Q rn z p c v1 y v> a> c c c� o v a) U _ � C E v :m C1 } U N fh cu p N O � o cm O O J (CO a -1 L fA ns Z U S d0.o � O O 'a m $ L € 0 v a Cd y v o LL -o Q �- 0 o as to 2 = C V C y O t ea (D v U a' L) m E c > o CL E Lu 3 C N m J r j yam. c U caw cc _ m Z O O C c O c ami 4 •E U L C O U U O N I— d (LD > rn r L? CN O .L... � ori U U c a c m o_ x co cli o o cmp z .a m M 3 zM m a m Lir a U o U a P� SCA LFT. iIY0RT1#j TX � 0 0 N O O � d4 H3 O N c O � 3 _ cu 0 N O N N C10 m CL c O =a Q v O v ao c co r U OFFICIAL RECORD CITY SECRETARY FTT, WORTH, TX co G ° LO C / � G & _ 2 § 0- cn e ¥ k LL- � 2 k — 0 b0 m � k % C o CD - (D / 2 Q a E Cc 2 0 = to / d v 2 2 £ § 02 . \ 0 \ k � E o LU@ 2 z - � �\ v 2 � o « � o % toCLcu � � 2 \ \ECD D § eQ &/ Ew � 2 a R 4) cn q k R m k k / £ a a ca § _ > 2 0 IB « f/ 9 0 » (Dk o * CD 75 k / kcc © m e # g 2 & § / f 2 0 ■ � 7 � � - . . OCV O O 4 O O � CA 69 CD cd 69, 691c O O U) N O N O w m a c O cu as 0 v v O v ao c m L OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 9/17/2013 DATE: Tuesday, September 17, 2013 REFERENCE NO.: C-26446 LOG NAME: 20SW 9700 TRINITY BLVD CONSTRUCTION SUBJECT: Authorize Execution of a Contract with McMahon Contracting L.P., in the Amount of$3,342,519.36 for the 9700 Trinity Boulevard Culvert Replacement Project and Provide for Contingencies and Construction Services for a Total Project Cost in the Amount of$3,864,019.36 (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with McMahon Contracting L.P., in the amount of$3,342,519.36 for construction of the 9700 Trinity Boulevard Culvert Replacement Project. DISCUSSION: The purpose of this Mayor and Council Communication is to authorize the execution of a contract for the construction of a project to provide a four-lane bridge structure that will convey storm water flows during a 100-year storm, thereby reducing street and property flooding in the vicinity of Trinity Boulevard between Bell Spur Road and Norwood Drive. The project was advertised for bid in the Fort Worth Star-Telegram on June 13, 2013 and June 20, 2013. On July 25, 2013, the following bids were received: BIDDERS AMOUNT CD Builders, Inc. $2,709,740.42 McMahon Contracting L.P. $3,342,519.36 Rebcon Inc. $3,723,513.20 The design engineer's opinion of probable cost for the construction was $3,600,000.00. It was determined by Staff that the apparent low bidder, CD Builders, Inc., did not meet the prequalification requirements for sanitary sewer improvements, as required for this project. CD Builders, Inc., was given an opportunity to comply with the City requirements, but did not provide a prequalified subcontractor to perform the work and failed to provide the necessary documentation to allow CD Builders, Inc., to perform the work themselves. Therefore, Staff recommends that the contract be awarded to the next lowest bidder. The recommended contract award amount includes $210,000.00 for a pre-established field order allowance which is incorporated in the contract amount. Other budget items beyond the construction contract amount include $421,500.00 for survey, materials testing, and iTF7T. 7RECORD 00.00 contingency. The total project budget is $3,864,019.36. Logname: 20SW_9700 TRINITYBLVD CONSTRUCTION Page I of 2 M/ BE Office - McMahon Contracting, LP, is in compliance with the City's BDE Ordinance by committing to 21 percent MBE participation on this project. The City's MBE goal on this project is 20 percent. This project is located in COUNCIL DISTRICT 5, Mapsco 67B and 67C. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P227 541200 205280^u10083 $3.342.519.36 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Rick Shaffer (6821) ATTACHMENTS 1. 00100 9700 Trinity Blvd FAR.pdf (CFW Internal) 2. 00100 9700 Trinity Blvd Map.pdf (Public) 3. 00100 9700Trinity Blvd MWBE.pdf (CFW Internal) 4. P227 00100 avail funds.pdf (CFW Internal) EOFFICIAL RECORD RETARYTH, TX Logname: 20SW 9700 TRINITY BLVD_CONSTRUCTION Page 2 of 2