HomeMy WebLinkAboutContract 46522 r
Developer and Project Information Cover Sheet:
Developer Company Name:Roman Catholic Diocese of Fort Worth
Address, State,Zip Code: 800 West Loop 820 1 Fort Worth,TX 76108
Phone,E-Mail: (817)560-2452,gfragosso@fwdioc.org
Authorized Signatory/Title:Michael F. Olson, STD.,Bishop of The Catholic Diocese of Fort Worth
Project Name and Brief Description: Water, Sewer,Paving&Drainage Improvements to serve St.
Thomas the Apostle Catholic Church
Project Location:NWC of Bowman Roberts Rd.&Brooklynn Dr.
Plat Case No.:FS-13-120 Plat Name: St.Thomas the Apostle Addition
Council District: 2 City Project No: 02231
CFA: 2014-048 DOE: 7189
To be completed by staff.-
Received by: Date:
Z7
m
r-J
m
m
v
M
a
f-.
00
N
OFFICIAL RECORD
1 CITY SECRETARY
FT. WORTH,TX
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 4L S
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as St. Thomas the Apostle
Catholic Church ("Project") within the City of Fort Worth,Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowle gas that the said
acceptance process requires the Developer's contraci Aff 10AA1€R0D
2 CITY SECRETARY
FT.WORTH,TX
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof. Water (AZ X,
Sewer(A-1) X,? Paving(B) X . Storm Drain(B-1)_2L_, Street Lights&
Signs(C) N/A .
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II,paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II,of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent(100%)of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed specified in the
Project Name and Description by said Developer, his contractors,
subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act,
intentional or otherwise, neglect or misconduct of said DEVELOPER, his
contractors, sub-contractors, officers, agents or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in Part, by the alleged nexligence of the City of Fort Worth, its
officers, servants, or employees Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
5
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
6
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND
7
Cost Summary Sheet
Project Name: St.Thomas the Apostle Catholic Church
CFA No.: 2014-048 DOE No.: 7189
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 63,661.00
2.Sewer Construction $ 26,456.00
Water and Sewer Construction Total $ 90,117.00
B. TPW Construction
1.Street&Storm Drain $ 182,929.00
3.Street Lights Installed by Developer $ -
TPW Construction Cost Total $ 182,929.00
Total Construction Cost(excluding the fees): S 273,046.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,802.34
D. Water/Sewer Material Testing Fee(2%) $ 1,802.34
Sub-Total for Water Construction Fees $ 3,604.68
E. TPW Inspection Fee(4%) $ 7,317.16
F. TPW Material Testing(2%) $ 3,658.58
G. Street Light Inspsection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 10,975.74
Total Construction Fees: S 14,580.42
Choice
Financial Guarantee Options,choose one Amount ck one
Bond=100% $ 273,046.00
Completion Agreement=100%/Holds Plat $ 273,046.00
Cash Escrow Water/Sanitary Sewer=125% $ 112,646.25
Cash Escrow Pavin Storm Drain=125% $ 228,661.25
Letter of Credit=125%w/2yr expiration period $ 341,307.50 ✓
8
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City
Secretary,with the corporate seal of the City affixed, and said Wveloper has execut d this
instrument in qu4druplicate, at Fort Worth,Texas this z day of
20_ 1—
CITY OF FORT WORTH-Recommended by:
Water Department Tr ortation&Public Works Department
endy Chi-Ba ula , , Do . Wiersig, P. E.
Development Engineering Manager Dire o
Approved as to Form &Legality: Approved by City Manager's Ojji�e
Douglas W. Black Fernando Costa
Assistant City Attorney Assistant City Manager
M&C No. A//k
Date: 0*000G
ATTEST:
8�
� Z
0
aryJ.Kay
�oo�o�a
City Secreta 00—
ATTEST: DEVELOPER:
Catholic Diocese of Fort Worth
l
Signature Signature
Name: Print Name: Michael F.Olson,STD.
Title: Title:Bishop of The Catholic Diocese of Fort Worth
Pe r M. n,Att ey-in L RECORD
chaei F. n' S ' B aTYSECRETARY
Cath &J ' ort
9 FT. WORTH,TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
am m o
SANTA ERT UDIS ,y
m �lyF
En m STONt 'QTRy��Fy
SHADY
LONGHORN o
CROMWELL MARINE CREEK
U)
Co
O
K
1220
;000sSITE
U
m
TEN MILE BRIDGE
z
7GREENFIELD
2 Ln
NORTH m HILL a
n _
ORTH Z w
RIDGE Oy
SOUTH RIDGE
OVER
B SW O D LAKE
RHE RIDGE
S Q
Ro)(kt NE WAY
R�
i26 t0 IIL SEA BREEZE
HATCH 0 FAIR WIND
i DEAL SHA Y /� REE
PT SPRINGTIDE
In J N' W Y L O N
Or D
LAKESIDE LAKES/� z v w
N 6.1
AZA C
WALLIS5J>� g CA ON o
N = LONGHOR 3
v o i o BIG BEND PC CKY
OINT 020
X }o Ci Sl a CIRCLE
u
:! FOSTER
,61ywn SCALE: I TAW
RON"CATHOLIC DIOCESE OF FORT YMORTH m THIS PURPOSE OF I T RELEASED FOR THE
w*fm Loop ew omni, VICINITY MAP " • Ian of KONSTAIMNEREMEW R
for 11D"K TEXAS 76106 8
Ter(et))S60-24W.,s6 W BAKNTAS.PE. Ta ND. 67072 R IS NOT
= INTENDED TOR CONSTRUCTION,9100NG
i OR PERMR PURPOSCS
0�Baird, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH m
e e En lneerin & Surve in NWC OF BOWMAN ROBERTS RD.R BLUEOILL DR.
4W S6 lEO A 110 SIM IT 1=1 loW701-M rw(917)6,-M O—MIitcw 9 FORT WORTH,TEXAS $ H SE
WE M j, zoo s.7os.000
DRM6NC TILE. E:\201 76D0.000\20177660W\0WC\CEA\NC WP.6,6 I Lep^.tl (a)
217 Lf OF
PROP 8•WATER
BLUEGILL
DRIVE
i
I
C IED ,
FflTN�E L— ` Imo_
5�(%]L FUTLPF 1
� PL•Y
GRDUAp
4 �
3
a o
o Q
J
O
W
rUTL�
PAR15}r HAL' m
— run,Pe
rANia+ f .
_ rL�
sl—
FUTURE ra,eFUTURE
RECTORY 1IIIIII
1111
m
ONCOR ELECTRIC DELIVERY COMPANY,LLC
VOLUME 2013,PAGE 290 w
D.R.T.C.T. w
v
rile m
LEGEND i
DUSTING PROPOSED I a0
— - - PROPERTY UNE
BUILDING FOOTPRMR `I a
a
FUTURE 9UIlLDM
a N I.
CURB A GUTTER -- =•—•— — — —ASP/ALT PAVE►IBR - -•—.
SANITARY SEWER — — D 150' 300 — — AMB R ACK
WATER VALVE I I .� TRAIL
FIRE NYDRANT 1
METER 8W 16 SCALE 160W I�
WATER LM �>
p SEWERMATHOLE • DOE No: 7189 a
— STORM
srORM �E _ — — City Project No: 02231
IW
A THIS DOCUMENT IS RELEASED FOR THE
ROMAN CATHOLIC DIOCESE OF FORT 1NORTH EXHIBIT "A" Y PURPOSE Or INTERiM RENEW UNDER
800 NEEUM r L00P an 50THE AUTHORITY OF KONSTANTINE
Foy .7Dus 7eIo68" WATER LINE 8 BARINTAS. P.E. I.No 670I2 IT IS NOT
Tst(517)560-2452'ISE Z INTENDED FOR CONSTRUCTION. BIDDING
? OR PERMIT PURPOSES
Q0 Baird, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH m k
ea ❑ e� Engineering & Surveying NWC OF BOWMAN ROBERTS RD.do BLUEGILL DR. Bre PROJECT NO
assn SA 3®Sb.U0.QWP:..tt 7051��I F,0nTp �
slnE...PWS FORT WORTH,TEXAS n 2013.708.000
DRAWIM3 FILE:E\2D13000ADD\2013.708.30\DWG\CFA\waUw "I WATERLgoul
i
I
11
I
PROP B' WATER
BLUEGILL
DRIVE
FUTuaE
Gw I
f LTL+dE � !pf
SCNO�L FUt�*L' � d
RAV
GFC u'C � e,I
01
U
' I
•. -��
7-7.
lVIUpE
. P<PoW,NII ( m
= FVFWIE
CPEh
P<VNJCN i
iVI�E
FUTURE
REDrDRY
1 ONCOR ELECTRIC DELIVERY COMPANY,LLC
VOLUME 2013,PAGE 290
DR.T.C.T.
n p 275 EF OF Prmr
LEGEND a' PUBLJC 55
EXISTING PROPOSED
_ — — PROPERTY LM — — — —
SIALOaHO FOOTPRINT (�
FTflim SOaimm �I
�a� N
ASPHALT PAVEMENT —•—•— — —
WATER LINE — — — — • BERJACK
WATER VALVE = 0 150 3W ' N TRAIL '
FIREHrroRAHrr ♦ N
METER SOX v
SANrrARY SEWER SCALE 1'm15d NINE
STORM DPAN DOE No: 7189 �m
aTORMMANHOLE ■ City Project No: 02231 1 I W
THIS OCCUMCNIIS RELEASED FOR THE
ROMAN CATHOLIC DIOCESE OF FORT WORTH EXHIBIT "A-111 Y + PURPOSE CF INTERIM REVIEW UNDER
00 NESE
8LOOP 820 SOUM THE AurHORITv of KONSIANTINE
FM WOMK' Te,oe 81' SANITARY SEWER LINE n 0 KINTAS. P.E. T. No 67022 IT IS Nor
Tot(817)500-2452.Ise
i INTENDED FOR CONSTRUCTION. BIDDING
7 OR PER41T PURPOSES.
0 Bolyd, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH =
e� 0 ea Engineering & Surveying NWC OF BOWMAN ROBERTS RD.&BLUEGILL DR. 0 8H8 PROJECT NO
45M ew 3W SIL tea ow—a Iml T dFd�I tenWT-aer -""PC— FORT WORTH,TEXAS o 2013.708.000
ORAWNC FLE,E\2013 000.000\2013 708.000\DWG\CFA\—itl V—1d.9 I S— Lnyuut
BORROW DITCH
TO BR REGARDED
4'PUPUC
SIDEWALK
ASPHALT
—A I
TRANSITION
4'PUPIIC
CONCRETE DRIVE I SIDEWALK
APPROACH
BLUEGILL
DRIVE --1.
NORTH
ENTRANCE
run.RE
rurur�
npr p
GRWID QO
a
_ m
.j
1
t iJ --
L SOUTH
E CE
ASPHALT
- f PRO TRANSITION
f _ FurupsI / 27'R CONCRETE DRIVE
— PevuOM -
_ I rUTIaaF r APPROACH
FUTURE 1 L _
PECTORY
P.DETENTION BASIPROPJ N
ONCOR ELECTRIC DELIVERY COMPANY,LLC 2 RCP ASPHALT
VOLUME 2013,PAGE 290 AVEMENT
DR.T.C.T. REPAIR
LEGEND i
EXan No PROPO a
PROPERTY LITE — — -- a
BUILDMFOOITPRINr - a AMBERJACK
FUTURE BULDINc O I a
CURB a GLITTER -- N — Tgpu1Y
ASPHALT PAVEMENT •.—•—• Z.,WATER LINEWATER VALVE Z 0 1517 SarFIRE NYOPANT • A
METM SCALE 7•=750' I I REPAIR
SANITARYSEWER s7
SEWER MAM40LE • n
STORM DRAIN DOE No: 7189 Im
STORM MANHOLE ■ City Project No: 02231 i Iw
EXHIBIT "B" THIS DOCUMENT IS RELEASED FOR THE
ROMAM CATHOLIC DIOCESE OF FORT WORTH Y PURPpSE DF INTERIM RENEW UNDER
e00 WILT Loop RE ^" PAVING AND DRAINAGE THE AUTHORITY OF KONSTANTNC
FW W TEXA3Z7 •+Se IMPROVEMENTS 7 106 m Q FAKI"TAS. PE. T. No 67022 IT IS NOI
Z INTENDED FOR CONSTRUCTION, BIDDING
7 OR PERMIT PURPOSES
0
®�Baird, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH m k'
esu 0 Eng neer ng & Surveying NWC OF BOWMAN ROBERTS R.D.R BLUEGTLL DR. S plip PROJECT NO.
NW LK Mo Sa.Tea&.%.-Tx rsosl% T�W T
r..fw) -wo... wc— FORT WORTH,TEXAS
2013.708.000
OWNS 11.E E:\2073.000000\2073.70E-000\OWO\CFA\Pa;^%d.9 1 P-9 Layoul
05AL
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value
Item No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
1 13305.0103 Exploratory Excavation of Existing UlIffies 33 05 30 EA 1 $614.00 $614.00
2 13311.0261 8"PVC Water Pipe 3311 12 LF 1315 $24.61 $32,362.15
3 3312.3003 8"Gate Valve 33 12 20 EA 3 $1,449.00 $4,347.00
4 3311.0161 6"PVC Water Pipe 3311 12 LF 8 $42.87 $342.96
5 3312.3002 6"Gate Valve 33 12 20 EA 1 $1 097.00 $1,097.00
6 3311.0001 Ductile Iron Water Fittings wl Restraint 3311 11 TON 0.5 $5,288.00. $2,644.00
7 3312 0001 Fire Hydrant 33 12 40 EA 1 $3,637.00 $3,637.00
8 3312.2203 2"Water Service 33 12 10 EA 2 $2,313'57 $4,627.14
9 3312.2201 2"Water Service,Meter Reconnection 33 12 10 EA 2 $183.00 $366.00
10 331210 LF $35.21
11 3312.2103 1 1/2"Water Service 33 12 10 EA 2 $1,897.93 $3,795.86
12 331210 LF $31.89
13 3312.2101 1 1/2"Water Service,Meter Reconnection 33 12 10 EA 2 $165.00 $330.00
14 10241.1118 4"-12"Pressure Plug 0241 14 EA 1 $461.00 $461.00
15 13305.0110 Utility Markers 33 05 26 LS 1 $409.00 $409.00
16 13312.0117 Connection to Existing 4"-12 Water Main 33 12 25 EA 2 $1,577.00 $3,154.00
17 13471.0001 Traffic Control 3471 13 MO 2 $2,047.00 $4,094.00
........... _._..__ . ................. ......... _....... . ... ..........
............. _...__.._ ....... .......... ............. _..._....._.
....... ......... .......... .....- .................
.............. _. ............ .......... _...
_ _. _.. _............... . ..._........ ............... . .............
....... ......... ......... ......... ............ .. _...._.... _.._.._.._..
_........_ .......................... ... ............ __s............. ........... ........... ...............
............... .....-- ......_.. .............
IE
TOTAL UNIT I:WATER IMPROVEMENTS $62,281.11
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Foran Version April 2,2014 00 42 43_Bid Propoml_DAP_rev_02-09-15
SECTION 00 42 43
Developer AWarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidders Applkation
Project hem Information Bidders Proposal
8idlisl ilem No. kescription ISpecifications No. Und of Measure kid Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 EmIcratory Excavation of Existft Utilities 33 05 30 EA 1 S 534.60 S 634.80
2 Trench Safety 330510 LF 290 $ 5.47 S 1.587.00
3 8`Sewer Pipe 1 10.33 31 12.33 LF 275 $ 19.17 $ 5,271.62
4 4'Manhole 33 3910,33 39 20 EA 2 S3.192.81 S 6385.63
5 4'Extra Depth Manhole 33 3910.33 39 20 VF 4 S 126A3 S 505.72
6 Concrete Collar 330517 EA 2 $ 350.46 S 700.93
7 Post CCTV Inspection 33 01 31 LF 275 2.40-$ 661.25
8 Manhole Vaumn Tesbno 330526 FA 2 S 132.25 S 254.50
9 Utility Markers 3201 17 LS 1 S 423.20 S 42320
10 W Wide Asphaft Pvmnt Repair.Industrial 320129 LF 21 $ 143.16 S 3.006.77
11 Cone.Pvml Repair,AderiaYIndusinai 02 41 15 SY 8 S 83.94 S 511.54
12 Remove Asphalt Pavement 34 71 13 SY 18 S 11 J6 211 AD
13 Traffic Control 35 71 13 MO 1 $2116.00 2116.00
TOTAL UNIT h:SANITARY SEWER IMPROVEMENTS S .75
SECTION W 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidden Application
Project Item Informalm Bidders Proposal
Bidlist Item No. Descri tion iSpecikabons No. Unit of Measure I Bid Quantity Unit Price Bid Value
UNIT Ill.,PAVING AND DRAINAGE IMPROVEMENTS
1 Site Clearing 31 1000 LS 1 $ 28 075.00 5 28.078.00
2 Unclassified Excavation By Plan 312316 CY 2300 S 1026 5 23.828.00
3 Hydrated Lime 36 LBS 32 11 29 TON 11.5 $ 162.00 S 1863'00
A 8"Lime Treatment 32 11 29 SY 640 S 20.13 S 12,86320
5 HMAC Transition 331216 TN 7.5 $ S
6 6"Conc.Pvml 321313 SY 585 $ 42.59 S 24.915,15
7 4"Cone,Sidewalk 321320 SF 4320 S 3.71 S 18.027.20
8 Barrier Free Ramp.Tym R-1 32 13 20 EA 1 S 1.114,00 S 1.114.00
9 Barrier Free Ramp.IM P-1 321320 EA 4 S 1.114.00 S 4.458.00
10 SWPPP>1 Acre 312500 LS 1 S 8.743.OD S 8.743.00
11 27"RCP,CLIII 33 41 10 LF 80 S 79.38 S 4,762.80
12 27"Concrete Headw r Detail) EA 1 S 3.438.00 S 3.436.00
13 Remove Sidewalk 02 41 13 SF 660 S 0.88 S 580.80
14 Remove ADA Ram D2 41 13 EA 1 S 193.20 S 19320
15 Block Sod Placem Al Blu&411 Dr 32 92 13 SY 120 S 5.75 S 690.00
16 HydromulctgMasin Bottom 32 92 13 SY 1150 123 S 1.414.50
17 Traffic Control 34 71 13 MO 2 S 2.270.00 S 4.540AXI
18 24'RCP,CL ill 33 41 10 LF 79 S 67.65 S 5.344.35
19 24'Cornrefe Headwell er Detail EA 2 1,822.00 $ 3,644.00
20 V X5'Conoreie Outlet Struchire EA 1 S 4186.00 S 4.188.00
21 5'Wide Con.Pilo) er Detail SF 2305 6.54 S 15.074.70
22 Seeding.Soil Retention Blanket Basin Sides 329213 SY 5735 S 1.96 $ 11.240.60
23 Seed' Borrow,Dfloh North of P 329213 SY 1350 5 1.30 E 1,755.00
24 Remove Fermi 02 41 13 LF 1400 5 D.41 IS 574.00
TOTAL UNIT 1:WATER IMPROVEMENTS S 179,345.50
UNIT I:WATER IMPROVEMENTS $ 62,281.11
UNIT il:SANITARY SEWER IMPROVEMENTS $ 22,280.75
UNIT 111:PAVING AND DRAINAGE IMPROVEMENTS S 179,345.50
Toter Vucion Bid 11 263,907.36
i