Loading...
HomeMy WebLinkAboutContract 46522 r Developer and Project Information Cover Sheet: Developer Company Name:Roman Catholic Diocese of Fort Worth Address, State,Zip Code: 800 West Loop 820 1 Fort Worth,TX 76108 Phone,E-Mail: (817)560-2452,gfragosso@fwdioc.org Authorized Signatory/Title:Michael F. Olson, STD.,Bishop of The Catholic Diocese of Fort Worth Project Name and Brief Description: Water, Sewer,Paving&Drainage Improvements to serve St. Thomas the Apostle Catholic Church Project Location:NWC of Bowman Roberts Rd.&Brooklynn Dr. Plat Case No.:FS-13-120 Plat Name: St.Thomas the Apostle Addition Council District: 2 City Project No: 02231 CFA: 2014-048 DOE: 7189 To be completed by staff.- Received by: Date: Z7 m r-J m m v M a f-. 00 N OFFICIAL RECORD 1 CITY SECRETARY FT. WORTH,TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 4L S WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as St. Thomas the Apostle Catholic Church ("Project") within the City of Fort Worth,Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowle gas that the said acceptance process requires the Developer's contraci Aff 10AA1€R0D 2 CITY SECRETARY FT.WORTH,TX affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof. Water (AZ X, Sewer(A-1) X,? Paving(B) X . Storm Drain(B-1)_2L_, Street Lights& Signs(C) N/A . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II,of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent(100%)of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed specified in the Project Name and Description by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged nexligence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements 5 in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this 6 Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND 7 Cost Summary Sheet Project Name: St.Thomas the Apostle Catholic Church CFA No.: 2014-048 DOE No.: 7189 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 63,661.00 2.Sewer Construction $ 26,456.00 Water and Sewer Construction Total $ 90,117.00 B. TPW Construction 1.Street&Storm Drain $ 182,929.00 3.Street Lights Installed by Developer $ - TPW Construction Cost Total $ 182,929.00 Total Construction Cost(excluding the fees): S 273,046.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 1,802.34 D. Water/Sewer Material Testing Fee(2%) $ 1,802.34 Sub-Total for Water Construction Fees $ 3,604.68 E. TPW Inspection Fee(4%) $ 7,317.16 F. TPW Material Testing(2%) $ 3,658.58 G. Street Light Inspsection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 10,975.74 Total Construction Fees: S 14,580.42 Choice Financial Guarantee Options,choose one Amount ck one Bond=100% $ 273,046.00 Completion Agreement=100%/Holds Plat $ 273,046.00 Cash Escrow Water/Sanitary Sewer=125% $ 112,646.25 Cash Escrow Pavin Storm Drain=125% $ 228,661.25 Letter of Credit=125%w/2yr expiration period $ 341,307.50 ✓ 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed, and said Wveloper has execut d this instrument in qu4druplicate, at Fort Worth,Texas this z day of 20_ 1— CITY OF FORT WORTH-Recommended by: Water Department Tr ortation&Public Works Department endy Chi-Ba ula , , Do . Wiersig, P. E. Development Engineering Manager Dire o Approved as to Form &Legality: Approved by City Manager's Ojji�e Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. A//k Date: 0*000G ATTEST: 8� � Z 0 aryJ.Kay �oo�o�a City Secreta 00— ATTEST: DEVELOPER: Catholic Diocese of Fort Worth l Signature Signature Name: Print Name: Michael F.Olson,STD. Title: Title:Bishop of The Catholic Diocese of Fort Worth Pe r M. n,Att ey-in L RECORD chaei F. n' S ' B aTYSECRETARY Cath &J ' ort 9 FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 am m o SANTA ERT UDIS ,y m �lyF En m STONt 'QTRy��Fy SHADY LONGHORN o CROMWELL MARINE CREEK U) Co O K 1220 ;000sSITE U m TEN MILE BRIDGE z 7GREENFIELD 2 Ln NORTH m HILL a n _ ORTH Z w RIDGE Oy SOUTH RIDGE OVER B SW O D LAKE RHE RIDGE S Q Ro)(kt NE WAY R� i26 t0 IIL SEA BREEZE HATCH 0 FAIR WIND i DEAL SHA Y /� REE PT SPRINGTIDE In J N' W Y L O N Or D LAKESIDE LAKES/� z v w N 6.1 AZA C WALLIS5J>� g CA ON o N = LONGHOR 3 v o i o BIG BEND PC CKY OINT 020 X }o Ci Sl a CIRCLE u :! FOSTER ,61ywn SCALE: I TAW RON"CATHOLIC DIOCESE OF FORT YMORTH m THIS PURPOSE OF I T RELEASED FOR THE w*fm Loop ew omni, VICINITY MAP " • Ian of KONSTAIMNEREMEW R for 11D"K TEXAS 76106 8 Ter(et))S60-24W.,s6 W BAKNTAS.PE. Ta ND. 67072 R IS NOT = INTENDED TOR CONSTRUCTION,9100NG i OR PERMR PURPOSCS 0�Baird, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH m e e En lneerin & Surve in NWC OF BOWMAN ROBERTS RD.R BLUEOILL DR. 4W S6 lEO A 110 SIM IT 1=1 loW701-M rw(917)6,-M O—MIitcw 9 FORT WORTH,TEXAS $ H SE WE M j, zoo s.7os.000 DRM6NC TILE. E:\201 76D0.000\20177660W\0WC\CEA\NC WP.6,6 I Lep^.tl (a) 217 Lf OF PROP 8•WATER BLUEGILL DRIVE i I C IED , FflTN�E L— ` Imo_ 5�(%]L FUTLPF 1 � PL•Y GRDUAp 4 � 3 a o o Q J O W rUTL� PAR15}r HAL' m — run,Pe rANia+ f . _ rL� sl— FUTURE ra,eFUTURE RECTORY 1IIIIII 1111 m ONCOR ELECTRIC DELIVERY COMPANY,LLC VOLUME 2013,PAGE 290 w D.R.T.C.T. w v rile m LEGEND i DUSTING PROPOSED I a0 — - - PROPERTY UNE BUILDING FOOTPRMR `I a a FUTURE 9UIlLDM a N I. CURB A GUTTER -- =•—•— — — —ASP/ALT PAVE►IBR - -•—. SANITARY SEWER — — D 150' 300 — — AMB R ACK WATER VALVE I I .� TRAIL FIRE NYDRANT 1 METER 8W 16 SCALE 160W I� WATER LM �> p SEWERMATHOLE • DOE No: 7189 a — STORM srORM �E _ — — City Project No: 02231 IW A THIS DOCUMENT IS RELEASED FOR THE ROMAN CATHOLIC DIOCESE OF FORT 1NORTH EXHIBIT "A" Y PURPOSE Or INTERiM RENEW UNDER 800 NEEUM r L00P an 50THE AUTHORITY OF KONSTANTINE Foy .7Dus 7eIo68" WATER LINE 8 BARINTAS. P.E. I.No 670I2 IT IS NOT Tst(517)560-2452'ISE Z INTENDED FOR CONSTRUCTION. BIDDING ? OR PERMIT PURPOSES Q0 Baird, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH m k ea ❑ e� Engineering & Surveying NWC OF BOWMAN ROBERTS RD.do BLUEGILL DR. Bre PROJECT NO assn SA 3®Sb.U0.QWP:..tt 7051��I F,0nTp � slnE...PWS FORT WORTH,TEXAS n 2013.708.000 DRAWIM3 FILE:E\2D13000ADD\2013.708.30\DWG\CFA\waUw "I WATERLgoul i I 11 I PROP B' WATER BLUEGILL DRIVE FUTuaE Gw I f LTL+dE � !pf SCNO�L FUt�*L' � d RAV GFC u'C � e,I 01 U ' I •. -�� 7-7. lVIUpE . P<PoW,NII ( m = FVFWIE CPEh P<VNJCN i iVI�E FUTURE REDrDRY 1 ONCOR ELECTRIC DELIVERY COMPANY,LLC VOLUME 2013,PAGE 290 DR.T.C.T. n p 275 EF OF Prmr LEGEND a' PUBLJC 55 EXISTING PROPOSED _ — — PROPERTY LM — — — — SIALOaHO FOOTPRINT (� FTflim SOaimm �I �a� N ASPHALT PAVEMENT —•—•— — — WATER LINE — — — — • BERJACK WATER VALVE = 0 150 3W ' N TRAIL ' FIREHrroRAHrr ♦ N METER SOX v SANrrARY SEWER SCALE 1'm15d NINE STORM DPAN DOE No: 7189 �m aTORMMANHOLE ■ City Project No: 02231 1 I W THIS OCCUMCNIIS RELEASED FOR THE ROMAN CATHOLIC DIOCESE OF FORT WORTH EXHIBIT "A-111 Y + PURPOSE CF INTERIM REVIEW UNDER 00 NESE 8LOOP 820 SOUM THE AurHORITv of KONSIANTINE FM WOMK' Te,oe 81' SANITARY SEWER LINE n 0 KINTAS. P.E. T. No 67022 IT IS Nor Tot(817)500-2452.Ise i INTENDED FOR CONSTRUCTION. BIDDING 7 OR PER41T PURPOSES. 0 Bolyd, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH = e� 0 ea Engineering & Surveying NWC OF BOWMAN ROBERTS RD.&BLUEGILL DR. 0 8H8 PROJECT NO 45M ew 3W SIL tea ow—a Iml T dFd�I tenWT-aer -""PC— FORT WORTH,TEXAS o 2013.708.000 ORAWNC FLE,E\2013 000.000\2013 708.000\DWG\CFA\—itl V—1d.9 I S— Lnyuut BORROW DITCH TO BR REGARDED 4'PUPUC SIDEWALK ASPHALT —A I TRANSITION 4'PUPIIC CONCRETE DRIVE I SIDEWALK APPROACH BLUEGILL DRIVE --1. NORTH ENTRANCE run.RE rurur� npr p GRWID QO a _ m .j 1 t iJ -- L SOUTH E CE ASPHALT - f PRO TRANSITION f _ FurupsI / 27'R CONCRETE DRIVE — PevuOM - _ I rUTIaaF r APPROACH FUTURE 1 L _ PECTORY P.DETENTION BASIPROPJ N ONCOR ELECTRIC DELIVERY COMPANY,LLC 2 RCP ASPHALT VOLUME 2013,PAGE 290 AVEMENT DR.T.C.T. REPAIR LEGEND i EXan No PROPO a PROPERTY LITE — — -- a BUILDMFOOITPRINr - a AMBERJACK FUTURE BULDINc O I a CURB a GLITTER -- N — Tgpu1Y ASPHALT PAVEMENT •.—•—• Z.,WATER LINEWATER VALVE Z 0 1517 SarFIRE NYOPANT • A METM SCALE 7•=750' I I REPAIR SANITARYSEWER s7 SEWER MAM40LE • n STORM DRAIN DOE No: 7189 Im STORM MANHOLE ■ City Project No: 02231 i Iw EXHIBIT "B" THIS DOCUMENT IS RELEASED FOR THE ROMAM CATHOLIC DIOCESE OF FORT WORTH Y PURPpSE DF INTERIM RENEW UNDER e00 WILT Loop RE ^" PAVING AND DRAINAGE THE AUTHORITY OF KONSTANTNC FW W TEXA3Z7 •+Se IMPROVEMENTS 7 106 m Q FAKI"TAS. PE. T. No 67022 IT IS NOI Z INTENDED FOR CONSTRUCTION, BIDDING 7 OR PERMIT PURPOSES 0 ®�Baird, Hampton & Brown, Inc. ST THOMAS THE APOSTLE CATHOLIC CHURCH m k' esu 0 Eng neer ng & Surveying NWC OF BOWMAN ROBERTS R.D.R BLUEGTLL DR. S plip PROJECT NO. NW LK Mo Sa.Tea&.%.-Tx rsosl% T�W T r..fw) -wo... wc— FORT WORTH,TEXAS 2013.708.000 OWNS 11.E E:\2073.000000\2073.70E-000\OWO\CFA\Pa;^%d.9 1 P-9 Layoul 05AL SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT I:WATER IMPROVEMENTS 1 13305.0103 Exploratory Excavation of Existing UlIffies 33 05 30 EA 1 $614.00 $614.00 2 13311.0261 8"PVC Water Pipe 3311 12 LF 1315 $24.61 $32,362.15 3 3312.3003 8"Gate Valve 33 12 20 EA 3 $1,449.00 $4,347.00 4 3311.0161 6"PVC Water Pipe 3311 12 LF 8 $42.87 $342.96 5 3312.3002 6"Gate Valve 33 12 20 EA 1 $1 097.00 $1,097.00 6 3311.0001 Ductile Iron Water Fittings wl Restraint 3311 11 TON 0.5 $5,288.00. $2,644.00 7 3312 0001 Fire Hydrant 33 12 40 EA 1 $3,637.00 $3,637.00 8 3312.2203 2"Water Service 33 12 10 EA 2 $2,313'57 $4,627.14 9 3312.2201 2"Water Service,Meter Reconnection 33 12 10 EA 2 $183.00 $366.00 10 331210 LF $35.21 11 3312.2103 1 1/2"Water Service 33 12 10 EA 2 $1,897.93 $3,795.86 12 331210 LF $31.89 13 3312.2101 1 1/2"Water Service,Meter Reconnection 33 12 10 EA 2 $165.00 $330.00 14 10241.1118 4"-12"Pressure Plug 0241 14 EA 1 $461.00 $461.00 15 13305.0110 Utility Markers 33 05 26 LS 1 $409.00 $409.00 16 13312.0117 Connection to Existing 4"-12 Water Main 33 12 25 EA 2 $1,577.00 $3,154.00 17 13471.0001 Traffic Control 3471 13 MO 2 $2,047.00 $4,094.00 ........... _._..__ . ................. ......... _....... . ... .......... ............. _...__.._ ....... .......... ............. _..._....._. ....... ......... .......... .....- ................. .............. _. ............ .......... _... _ _. _.. _............... . ..._........ ............... . ............. ....... ......... ......... ......... ............ .. _...._.... _.._.._.._.. _........_ .......................... ... ............ __s............. ........... ........... ............... ............... .....-- ......_.. ............. IE TOTAL UNIT I:WATER IMPROVEMENTS $62,281.11 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foran Version April 2,2014 00 42 43_Bid Propoml_DAP_rev_02-09-15 SECTION 00 42 43 Developer AWarded Projects-PROPOSAL FORM UNIT PRICE BID Bidders Applkation Project hem Information Bidders Proposal 8idlisl ilem No. kescription ISpecifications No. Und of Measure kid Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 EmIcratory Excavation of Existft Utilities 33 05 30 EA 1 S 534.60 S 634.80 2 Trench Safety 330510 LF 290 $ 5.47 S 1.587.00 3 8`Sewer Pipe 1 10.33 31 12.33 LF 275 $ 19.17 $ 5,271.62 4 4'Manhole 33 3910,33 39 20 EA 2 S3.192.81 S 6385.63 5 4'Extra Depth Manhole 33 3910.33 39 20 VF 4 S 126A3 S 505.72 6 Concrete Collar 330517 EA 2 $ 350.46 S 700.93 7 Post CCTV Inspection 33 01 31 LF 275 2.40-$ 661.25 8 Manhole Vaumn Tesbno 330526 FA 2 S 132.25 S 254.50 9 Utility Markers 3201 17 LS 1 S 423.20 S 42320 10 W Wide Asphaft Pvmnt Repair.Industrial 320129 LF 21 $ 143.16 S 3.006.77 11 Cone.Pvml Repair,AderiaYIndusinai 02 41 15 SY 8 S 83.94 S 511.54 12 Remove Asphalt Pavement 34 71 13 SY 18 S 11 J6 211 AD 13 Traffic Control 35 71 13 MO 1 $2116.00 2116.00 TOTAL UNIT h:SANITARY SEWER IMPROVEMENTS S .75 SECTION W 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidden Application Project Item Informalm Bidders Proposal Bidlist Item No. Descri tion iSpecikabons No. Unit of Measure I Bid Quantity Unit Price Bid Value UNIT Ill.,PAVING AND DRAINAGE IMPROVEMENTS 1 Site Clearing 31 1000 LS 1 $ 28 075.00 5 28.078.00 2 Unclassified Excavation By Plan 312316 CY 2300 S 1026 5 23.828.00 3 Hydrated Lime 36 LBS 32 11 29 TON 11.5 $ 162.00 S 1863'00 A 8"Lime Treatment 32 11 29 SY 640 S 20.13 S 12,86320 5 HMAC Transition 331216 TN 7.5 $ S 6 6"Conc.Pvml 321313 SY 585 $ 42.59 S 24.915,15 7 4"Cone,Sidewalk 321320 SF 4320 S 3.71 S 18.027.20 8 Barrier Free Ramp.Tym R-1 32 13 20 EA 1 S 1.114,00 S 1.114.00 9 Barrier Free Ramp.IM P-1 321320 EA 4 S 1.114.00 S 4.458.00 10 SWPPP>1 Acre 312500 LS 1 S 8.743.OD S 8.743.00 11 27"RCP,CLIII 33 41 10 LF 80 S 79.38 S 4,762.80 12 27"Concrete Headw r Detail) EA 1 S 3.438.00 S 3.436.00 13 Remove Sidewalk 02 41 13 SF 660 S 0.88 S 580.80 14 Remove ADA Ram D2 41 13 EA 1 S 193.20 S 19320 15 Block Sod Placem Al Blu&411 Dr 32 92 13 SY 120 S 5.75 S 690.00 16 HydromulctgMasin Bottom 32 92 13 SY 1150 123 S 1.414.50 17 Traffic Control 34 71 13 MO 2 S 2.270.00 S 4.540AXI 18 24'RCP,CL ill 33 41 10 LF 79 S 67.65 S 5.344.35 19 24'Cornrefe Headwell er Detail EA 2 1,822.00 $ 3,644.00 20 V X5'Conoreie Outlet Struchire EA 1 S 4186.00 S 4.188.00 21 5'Wide Con.Pilo) er Detail SF 2305 6.54 S 15.074.70 22 Seeding.Soil Retention Blanket Basin Sides 329213 SY 5735 S 1.96 $ 11.240.60 23 Seed' Borrow,Dfloh North of P 329213 SY 1350 5 1.30 E 1,755.00 24 Remove Fermi 02 41 13 LF 1400 5 D.41 IS 574.00 TOTAL UNIT 1:WATER IMPROVEMENTS S 179,345.50 UNIT I:WATER IMPROVEMENTS $ 62,281.11 UNIT il:SANITARY SEWER IMPROVEMENTS $ 22,280.75 UNIT 111:PAVING AND DRAINAGE IMPROVEMENTS S 179,345.50 Toter Vucion Bid 11 263,907.36 i