Loading...
HomeMy WebLinkAboutContract 46253-CO1 FORT WORTH City of Fort Worth City Secretary Copy Change Order Request ProjectNanwl Water and Sanitary Sewer Replacement Contract 2014,WSM-C,Part 1 City Sec No.: 1 46253 Project No.(s):l P25MM170238483 DOE No. 73 0 City Proj.No.:r 02348 Project Description: Water Main Replacement on Donna Street,May Street,West Spurgeon Street and West Hammond Street Contractor. Tejas Commercial Construction,LLC Change Order# Date: 3119/2015 City Project Mgr. RobertSauceda CityInspector. I Luisa Allbdght Phone Number. 817-392-2387 Phone Number. 817-223-2259 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $611,335.00 $611,335.00 120 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $611,335.00 $611,335.00 120 Amount of Proposed Change Order $29,700.00 $29,700.00 045 Revised Contract Amount $641,035.00 $641,035.00 165 Original Funds Available for Change Orders $25,000.00 $25,000. Remaining Funds Available for this CO $25,000.001 $25,000.00 Additional Funding(if necessary) $4,700.00 $4,700.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.$6% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $764,168.75 Change order No. 1 will provide for the following: • The installation of permanent asphalt pavement repair on May Street due to reinforced concrete base that was encountered during construction. • Pay item quantity for a 6-inch PVC water main and salvage existing gate valve there were inadvertently omitted at the time the project was advertised for bid. • The deletion of pay item quantity for 2:27 concrete base this is no longer needed on the project. Staff concurs with the contras or's request for 45 add' ' al calendar days for the change order. 77 A by: / 60000000/?p I� O ° Es8O o� J. a , Cl �� 'Y ° °y 8 It is understood and agreed that the acceptance of this Changew�, h�o�itra nstitutes an accord and satisfaction and represe a ment min full(both time and money)for all costs arising out of,or incidental Yd,' . ange Order. , C-) m �!RjasCommerdal Construction, LLC Charles Allen m v o ~ T5 330 IS' r • � 3-314!S 3 3! !S M&C Number N/q M&C Date Approved F(? T WCC RT H City of Fort worth Change Order Additions Project Name Water and Sanitary Sewer Replacement Contract 2014,WSM-C,Part 1 City Sec No.: 1 46253 Project No.(s): P253-609170238483 I DOE No. 7310 City Proj.No.: 1 02348 Protect Water Main Replacement on Donna Street,May Street,West Spurgeon Street and West Hammond Street Description Contractor T 'as Commercial Construction,LLC Change Order:t__J Date: 3/19/2015 City Project Mgr. I Robert Sauced- City Inspector I Luisa Albright ADDITIONS 30 Asphalt Permanent Repair 0-5"wide Water 1300.00 LF $49.00 $63,700.00 31 Salvage existing gate valves Water 8.00 EA $200.00 $1,600.00 32 6'DR 14 PVC pipe Water 80.00 LF $30.00 $2,400.00 33 cut and plug existing 8"waterline Water 1.00 EA $1,000.00 $1,000.00 Water $68,700.00 Sewer Page 2 of 4 Additions Sub Total $68,700.00 FQ T WORTH City of Fort Worth Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2014,WSM-C,Part 1 City Sec No.: 46253 Project No.(s): P253-609170238483 DOE No. 7310 City Proj.No.: 02346 Project Description Water Main Replacement on Donna Street,May Street,West Spurgeon Street and West Hammond Street Contractor Tejas Commercial Construction,LLC Change Order: 1E Date 3/19/2015 City Project Mgr. Robert SZa City Inspector Luisa AJIbright DELETIONS I 21 10"-2:27 Trench Repair Concrete Base Water 1000.00 LF $39.00 $39,000.00 Water $39,000.00 Sewer Page 3 of 4 Deletions Sub Total $39,000.00 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4