Loading...
HomeMy WebLinkAboutContract 46512-FP1 Departwo rt of Tp&W const Services CtrY SECKMAM1 DOE# / 1WRACT . ftied ana.� 10 • Marc �l� T 1► Risk c J. 0 RT H CAwestermanrscaBro�herton ra rhe Piocee ft people haw been Conceded cmicw p the isqwA for final tI pl a wee ndeeeed eis p'ed t0""c'p'ow& TION AND PUBLIC WORKS Clearance Gondud®d By Shameka Kwi,edy PROJECT COMPLETION D.O.E.Ns: 7211 Regarding contract 1172U for CVS-FORT WORTH STORE#10489 as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the reca�nendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Priem- 582,411.00 Amount of Approved Change Orders: N91 Revised Contract Amount: 582,411.00 Total Coat Work Completed: 582,411.00 Less Deduedoas: Liquidated Damages: Days®$210.00✓Day Pavement Deficiencies: Total Deduction Amount: 50.00 i Total Coat Work Completed: $82,411.00 Less Previous Payments: Final Payment Due 582,411.00 Recommended for Acceptance Date ° Asst. Director,TPW-Infrastructure Design and Construction ¢ 9 Accepted / Datb 11 Asia. Director, WATER DEPARTMENT tJ 2 r 1S Ais+• City Manager Date f Comment- FUND ACCT:WATER M5-6071402260/SEWER P275-7071302260 OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name CVS-FORT WORTH STORE#10489 Contract Limits Project Type WATER&SEWER City Project Numbers 02260 DOE Number 7211 Estimate Number 1 Payment Number I For Period Ending 1/152015 CD City Secretary Contract Number 117211 Contract Time 1861) Contract Date Days Charged to Date 222 Project Manager Long Contract is 100.00 %Complete Contractor M-CO 6816 HARMONSON ROAD N RICHLAND IM, TX 76180 Inspectors LAYER/ MEI'O OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Wednesday,January 21,2015 Page 1 of 4 eg City Project Numbers 02260 DOE Number 7211 Contract Name CVS-FORT WORTH S"CORE#10489 Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 1/15/2015 Project Funding WATER ItemDescription of Items Unit Unit Cost Estimated Estimated Completed Completed No. Quanity Total Quauity Total 1 8"WATER PIPE 250 LF $30.00 $7,500.00 250 $7,500.00 2 24"CONCRETE AWAA C303 WATER PIPE 324 LF $133.00 $43,092.00 324 $43,092.00 3 CONNECTION TO EXISTING 24"WATER MAIN 2 EA $5,000.00 $10,000.00 2 410,000.00 4 FIRE HYDRANT 1 EA $2,360.00 $2,360.00 1 $2,360.00 5 1"WATER SERVICE.,METER RECONNECTION I EA $300.00 $300.00 1 $300.00 6 1"WATER SERVICE 1 EA $300.00 $300.00 1 $300.00 7 1 1/2"WATER SERVICE 1 EA $807.00 $807.00 1 $807.00 8 6"GATE VALVE 2 EA $835.00 $1,670.00 2 $1,670.00 9 8"GATE VALVE 1 EA $935.00 $935.00 1 $935.00 10 8"X 8"TAPPING SLEEVE&VALVE 1 EA $2,790.00 $2,790.00 1 $2,790.00 11 MANHOLE VACUUM TESTING I EA $104.00 $104.00 1 $104.00 Sub-Total of Previous Unit $69,858.00 $69,858.00 SEWER ItemEstimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 7"CONC DRIVEWAY 441 SF $6.00 $2,646.00 441 $2,646.00 2 6"CONC CURB&GUTTER 130 LF $2.00 $260.00 130 $260.00 3 REMOVE ASPHALT DRIVE 70 SY $4.00 $280.00 70 $280.00 4 REMOVE CONC.CURB&GUTTER 70 LF $4.00 $280.00 70 $280.00 5 I2"-18"TREE REMOVAL 2 EA $500.00 $1,000.00 2 $1,000.00 6 SEEDING-HYDROMULCH 116 SY $0.75 $87.00 116 $87.00 7 TRAFFIC CONTROL 1 MO $8,000.00 $8,000.00 1 $8,000.00 Sub-Total of Previous Unit $12,553.00 $12,553.00 N L RECORDCRETARYRTH, TX Wednesday,January 21,2015 Page 2 of 4 City Project Numbers 02260 DOE Number 7211 Contract Name CVS-FORT WORTH STORE#10489 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 1/152015 Project Funding Contract Information Summary Original Contract Amount 582,411.00 Change Orders Total Contract Price $82,411.00 Total Cost of Work Completed $82,411.00 Date '� Contra / Less %Retained $0.00 ' 2 / IIS Net Earned $82,411.00 Date Earned This Period 582,411.00 Inspection Su r / Retainage This Period $0.00 Date d' �� Less Liquidated Damages Project M f Q Days @ /Day $0.00 Date—W—4' LessPavement Deficiency $0.00 Asst irec or/TP,3i�-Infrastructure Design and Construc on Less Penalty $0.00 (/ ate Less Previous Payment $0.00 k5t. Director/Conhwft Dep t Plus Material on Hand Less 15% $0.00 �� IS Balance Due This Payment $82,411.00 G 2" OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Wednesday,January 21,2015 Page 3 of 4 pEC EE WE APR 09 2015 0?�S —o a�lob City Project Numbers 02260 By DOE Number 7211 Contract Name CVS-FORT WORTH STORE#10489 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 1/15!2015 Project Funding Project Manager Long City Secretary Contract Number 117211 Inspectors LAYER / NIETO Contract Date Contractor M-CO Contract Time 180 CD 6816 HARMONSON ROAD Days Charged to Date 222 CD N RICHLAND HIL, TX 76180 Contract is 000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $82,411.00 Less %Retained $0.00 Net Earned $82,411.00 Earned This Period $82,411.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $82,411.00 Wednesday,January 21,2015 Page 4 of 4 OFFICIAL (RECORD CITY SECRETARY FT.WORTH, TX FORTWORTH rev 03'05`0' TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: CVS Fort Worth Store#10489 PROJECT NO.: 02260 CONTRACTOR: M-Co Cmshr wdoa,Inc. DOE NO.: 7211 PERIOD FROM:06109/14 TO: 01/15/15 FINAL INSPECTION DATE: 6-Jan-15 WORK ORDER EFFECTIVE:6/9/2014 CONTRACT TIME: 180 0 VHB* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS PERIOD 222 222 PREVIOUS 0 0 PERIOD TOTALS TO DATE 222 222 *REMARKS: C NT COR DATE SPEC76R ENGINEERING DEPARTMENTRECORD 13 The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012 3�1 TY SECRETARY (817)392-7941 -Fax:(817)392-7845 UI FT. WORTH,TX FORTWORTHREV:02120/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name M-Co Construction,Inc CVS-Fort Worth Store#10489 DOE Inspector DOE Number Emanuel Nieto 7211 DOE Inspector Project Manager Q water2l Waste Water❑ Storm Drainage❑ Pavement Aaron Lon Initial Contract Amount Project Duff—Ity $82,411.00 O Simple .Q Routine O Complex Final Contract Amount Date $82,411.00 1/2/2015 11)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 408 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 408 1I1)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(fTS/MS]*100%) 408 / 448 = 91% Performance Category Excellent <20'/=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor X Signature DOE Inspector's Supervisor - CONTRACTOR'S COMMENTS _ TRANSPORTATION AND PUBLIC WORKS OFFICIAL RECORD The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-63 1 1CITY SECRETARY (817)392-7941 •Fax:(817)392-7845 FT,WORTH,TX FORTWORTHREV 02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION _ Date- F2/2/2015 Name of Contractor ----� ---_---_---_---------_--_ Project Name--- ----.1 �!— — M-Co Construction, Inc— _ -- _RCVS-Fort Worth Store 410489 -- DOE Inspector 'Project Manager Emanuel Nieto _Aaron Lon DOE Number lFrojectDifficultv I Tjpe of Contract 7211 10 Simple (*) Routine 0 Complex El water0 Waste water Storm Drainage Pavement Initial Contract Amount Final Contract Amount i$82,411.00 $82,411.00 Il)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3 -Good 4-Excellent _ ELEMENT �— —ii--� RATING IELEMENT ---- — -- RATING (0-4) INSPECTION EVALUATION —IPLANS&SPECIFICATIONS 1 Availabilityof Inspector -- — 1 Accuracy of Plans to ExistingConditions —� 2 Knowledge of Inspector — i2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities y _Applicability of Specifications y 4 Dis lay Of Professionalism 14 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews, Labs „— 1 Knowledge And/Or Problem Resolution ADMINISTRATION -- 2 Availability of Project Manager I Change Order Processing Time _ 3 Communication_ 2 Timliness of Contractor Payments — �4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe — 7 - — I III)COMMENTS&SIGNATURES COMMENTS Signature Contractor — Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION.\J D PUBLIC WORKS OFFICIAL RECORD t : The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 CITY SECRETARY (817)392-7941 •Fax: (817)392- 7 845 FT- WORTH, TX FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: CVS-Fort Worth Store 410489 PROJECT NUMBER: 02260 DOE NUMBER: 7211 WATER PIPE LAID SIZE TYPE OF PIPE LF Water 8" PVC 250 Water 24" DIP 324 FIRE HYDRANTS: 1 VALVES(16"OR LARGER) NA PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: Yes NEW SERVICES: 1" Copper 1 EA 1-112" Copper I FA SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: RD CITY R� TRANSPORTATION AND PUBLIC WORKS FT.WORTH,TX 13 The City of Fort Worth-1000 Throd morton Street-Fort Worth,TX 76012-6311 (817)392-7941-F=(817)392-7845 CONSENT OF SURETY OWNER 13 ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Conforms with the American Institute of Architects G707 form OTHER ❑ Bond No: PB11509800487 TO OWNER: ARCHITECTS PROJECT NO.: 02260 (Nome and address) City Of Fort Worth 1000 Throckmorton Street CONTRACT FOR: Water&Paving Improvements Fort Worth,TX 76102 PROJECT: CONTRACT DATED: 5/23/2014 (Name and address) Water and Paving Improvements at CVS Store No. 10489, Boat Club Road and Lake Country Drive, Fort Worth, Texas In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Surety, Philadelphia Indemnity Insurance Company One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 SURETY on bond of (insert name and address of Contractor, M-CO CONSTRUCTION, INC. 316 County Road 3672 Springtown,TX 76082 ,CONTRACTOR hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) City Of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 OWNER as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: January27,2015 (Insert in writing the month followed by the numeric dote and year.. Philadelphia Inde ity Insu=Company (Surety) (Signature of authorize sentative, Attest: �—e-� Tobin Tucker,Attorne -in-f (Seal): Printed name and title) OFFICIAL RECORD C11 11 30.VtETARY FT.WORTH,TX 2540 PH11,.ADELPHIA INDE"NIT) INSURANCE.CON'IPANN Bond Na PB11509800487 One Bala Plaza,Suite 100 Bala Cxrtwvd.PA 19004 Power of Aftorncy KNOW ALL PFRSONS BY THESE PRESENTS: that PHILADELPIff.\INDENJNITIINSURANCE COMPANY(the Company),a corporation organized and existing under die laws of the Conhrnonweailh of Pennsylvania,does hereby constitute and appoint. Jared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young and Fred A.Thetford,III of Contract Bond Agency,LLC. i Its true and lawful Attorney(s)in fact with fu11 authority to execute on its behalf bonds_undertakings-recognizances and other contracts of inderri and witings UbhJator} in the n.uure thereof,Issued in the course of its business and to hind the Company thereby,in an amount not to exceed 525,000,000 I his Powcr of Attome� is granted and is signed and scaled by faCsmilC under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHL-m,INDEMNhI Y IN'SI;RANCF COMPANY at a mcetine dul),tailed the I"day of July,2011 RESOLVED: That the Bourd of Dircclors hereby authorizes the President or any Vice President of the Company to (I) Appoint Attorney(s) in Fact and authorize the Attonncv(s) in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligator in the nature thereof and to attach the seal of the Company thereto; and (2) to remote, at any tithe, any such Attomey-in-Fact and revoke the authority given. And,be it FURTHER RESOLVED: Ilhat the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate re!atin!R thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and biding upon the Connpany in the ivatrc with the respect to any bond or undertaking to,vhich it is attached IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSEDTHIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE.SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE,THIS 7"'DAY OF FEBRUARY 2013. Se ( I a) Robert D-O Leary Jr.President K CEO Philadelphia Indemnity Insurance Company On this 7"'day ofl-ebruary 2013,betbre me came the indn idual who executed the preceding instrument,to me personafly knotynt,and being b) me du)y sworn said that he is the therein dcscnbed and a.ahornzed officer of the PIDLADF,LPHIA IN'DENINITY INSLR.-INCE CONIPAN'Y:that the seal affixed to said instrument is the Corporate seal of said Connpany,that the said Corporate Seal and hi;signature etre duly affixed COMM0fjWPJtLTH OFFEN"Vt_VANM NOTARIAL SEAL DANIELLE PORATH,Notary Public Lower Mot on Twpp Montgorne7 Courry M Oomrtlss w Expires March 2Z 2018 Notary Public_ �— residing at Bala Cynwyd-PA _--_ (Notary Seal) My commission expires: March 22.2016 I,Craig P.Keller,Executive Vice President,Chief Financial Officer and Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution of the Board of Dtrectors and this Power of Attorney issued pursuant thereto are true and correct and are still in full force and effect.I do further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof]have subscribed my name and affixed the izestmile seal ofeacb Company this 27th day of January .20 15 Craig P.Keller.Executive Vice President,Chief Financial O PHILADELPHIA INDIiMNIIY INSURANCE COMPA Y OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me,the undersigned authority,a notary public in the state and county aforesaid, on this day personally appeared Alford Main, Secretary Of M-Co Construction,Inc.,known to me to be a credible person,who being by me duly sworn,upon his oath deposed and said; That all persons,firms,associations,corporations,or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; CVS Store No. 10489,Boat Club Rd. &Lake Country Dr.,FW,TX B Alford Main, ecretary Subscribed and sworn before me on this date 27th of Januar;y,2015. NotaryJKU blic 4C #PIFRIES Tarrant,TexasW � �,pplw"CR TX ' D ORANGE DEVELOPMENT INC Jeff Brewer-VP of Development 1200 Corporate Drive,Ste G50 Birmingham,AL 35242 Office:205.909.3798 CeN: 205261.9200 Email:ibrewerdoramedevinc.com VIA EMAIL AND USPS February 2, 2015 Emanuel Nieto Senior Construction Inspector—Transportation and Public Works 8851 Camp Bowie West. Fort Worth, TX 76116 Re: CVS 10489 Ft. Worth, TX Dear Mr. Nieto: Please accept this letter as record that Orange Development Inc., as developer for the CVS 10489 Ft. Worth, TX will not charge Walkcon Ltd. (contractor) liquidated damages for any delays in the project. If you should have any further questions, please don't hesitate to contact me at the number above. Regards, OFFICIAL RECORD Jeff Brewer CITY SECRETARY Enclosure FT.WORTH, TX