CONTRACT NO. -N-)
FORT WiaRTH City of Fort Worth City Secretary Copy
Change Order Request
Project Name: Sanitary Sewer Rehabilitation Contract 64,Part 2 City Sec No.: 1 44775
Project No.(s): P254-702170149387/P258-702170149387 DOE No. 3890 City Proj.No.: 01493
Project Description: Sanitatry sewer rehabilitation on North Main Street,NW 30th Street,Grafton Street,Chester Street,Loving Avenue and
Prairie Avenue
Contractor: Ark Contracting Services,Inc. Change Order# t� Date: 4/6/2015
City Project Mgr, Rakesh Chaubey City Inspector: I Adilda Cazorla
Phone Number: 817-392-6051 Phone Number: 817-223-2282
Dept. Sewer Unit I Sewer Unit II Totals Contract Time
(Calendar Days)
Original Contract Amount $602,125.00 $310,670.00 $912,795.00 210
Extras to Date $5,500.00 $5,500.00 05
Credits to Date 182
Pending Change Orders(in M&C Process)
Contract Cost to Date $607,625.00 $310,670.00 $918,295.00 397
Amount of Proposed Change Order $2,983.00 $31,892.40 $34,875.40
Revised Contract Amount $610,608.00 $342,562.40 $953,170.40 397
Original Funds Available for Change Orders $27,384.00 $27,384.00
Remaining Funds Available for this CO $27,384.00 $27,384.00
Additional Funding(if necessary) $2,983.00 $4,508.40 $7,491.40
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 4.420/6
MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) 1 $1,140,993.75
NEW-
The change order will provide for the increased pay item quantities on the project due to actual field
conditions that were encountered during construction.The change order will allow also for the deletion of
pay item quantities that are no longer on the project.
p'4q�00RT°dYaa�
Cit °°Cc-
° °O��d
'¢ A71%L (�00�0 O 0���
0
010 od
W 00 o dd
WMaty a�tt�4�04°° 0000° �3Qa
OFFICIAL RECORD
cc CITY SECRETARY
FT.WQRTNi TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and sat ment
in full(both time and money)for all costs arising out of,or incidental to,the above Change 0 er,
Name
Ark Contracting Services, Inca Mike Plunk
f Ile—
Date
4-8-za! 7
T•e.
dote
Councit Actiong1red
M&C Number N/A M&C Date Approved NIA
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Rehabilitation Contract 64,Part 2 City Sec No.: 44775
Project No.(s): P254-702170149387/P258-702170149387 DOE No. 3890 City Proj.No.: 01493
Project Sanitatry sewer rehabilitation on North Main Street,NW 30th Street,Grafton Street,Chester Street,Loving Avenue and Prairie
Description Avenue
Contractor Ark Coniicfing Services, Inc. Change Order: ® Date: 4/6/2015
City Project Mgr. I Rakesh Chau6ey City Inspector r Adilda Cazoda
ADDITIONS
[ IJrfl Tx�
Unit I SRF Funded
13 Manhole Std 4'diam.Add depth Sewer Unit I 11.00 VF $101.00 $1,111.00
17 Pipe sewer 8"all depths DIP(other than open cut) Sewer Unit 1 69.00 LF $220.00 $15,180.00
18 Pipe sewer 8"all depths DIP SDR 26 Sewer Unit 1 165.00 LF $60.00 $9,900.00
21 Sewer service 4"install on private property Sewer Unit 1 116.00 LF $25.00 $2,900.00
23 Sewer service 4"tap Sewer Unit 1 15.00 EA $320.00 $4,800.00
27 Curb&gutter install Sewer Unit 1 63.00 LF $35.00 $2,205.00
28 Pavement additional HMAC repair beyond trench Sewer Unit 1 238.56 SY $30.00 $7,156.80
30 Paving concrete on 2/27 concrete B Sewer Unit 1 278.00 SY $65.00 $18,070.00
37 Pipe abandon and fill with flowable fill Sewer Unit 1 265.00 LF $6.00 $1,590.00
Unit II City Funded
1 Erosion control mattress 9"gabion Sewer Unit 11 15.00 CY $300.00 $4,500.00
5 Grass Bermuda sod install Sewer Unit 11 55.00 SY $5.00 $275.00
12 Manhole abandon Sewer Unit 11 1.00 EA $250.00 $250.00
16 1 Manhole Std 4'diam.Add depth Sewer Unit 11 7.00 VF $100.00 $700.00
20 Pipe sewer 8"SDR 26(all depths) Sewer Unit 11 70.00 LF $60.00 $4,200.00
22 Sewer service 4"install on private property Sewer Unit II 20.00 LF $25.00 $500.00
26 Trench safety system 5'depth Sewer Unit II 223.00 LF $2.00 $446.00
31 Pavement 2"HAMC on 2:27 Sewer Unit 11 915.00 LF $24.00 $21,960.00
32 Concrete walk install Sewer Unit II 40.00 SF $8.00 $320.00
IFFICIA1 HE 110
FT.W®RTF99 'X
Sewer Unit 1 $62,912.80
Sewer Unit 11 $33,851.00
Additions Sub Total
Page 2 of 4
fr
FORT WORTH City of Fort Worth
W 00- Change Order Deletions
Project Name FSanitary Sewer Rehabilitation Contract 64,Part 2 City Sec No.: 44775
Project No.(s): P254-702170149387/P258-702170149387 DOE No. 3890 City Proj.No.: 01493
Project Description Sanitatry sewer rehabilitation on North Main Street,NW 30th Street,Grafton Street,Chester Street,Loving Avenue
and Prairie Avenue
Contractor Ark Contracting Services,Inc. Change Order: E1:1 Date 4/6/2015
City Project Mgr. Rakesh Chaubey City Inspector: Adilda Cazorla
DELETIONS
ITEM DESCRIPTION DEPT Qlly Unit: Unit Cost Total
2 Grass Bermuda Hydromulch install Sewer 640.00 SY $3.00 $1,920.00
4 Collar Manhole 32"frame and cover Sewer 1.00 EA $400.00 $400.00
5 Inspection Post construction Sewer 384.00 LF $1.00 $384.00
6 Inspection pre-construction Sewer 60.00 LF $2.00 $120.00
7 Manhole remove Sewer 6.00 EA $300.00 $1,800.00
8 Manhole remove upper abandon lower Sewer 1.00 EA $250.00 $250.00
9 Manhole paint&coating interior Sewer 2.00 VF $150.00 $300.00
14 Pipe sag adjustment Sewer 25.00 LF $70.00 $1,750.00
15 Pipe sewer 8"DIP all depths Sewer 70.00 LF 1$84.00 $5,880.00
16 Pipe sewer 8"DIP all depths w/cement stab.back fill Sewer 20.00 LF $90.00 $1,800.00
20 Pipe sewer 8"PVC All depths w/cements stabilizer Sewer 20.00 LF $85.00 $1,700.00
22 Sewer service 6"install on private property Sewer 35.00 LF $35.00 $1,225.00
25 Trench safety system 5 feet depth Sewer 589.00 ILF $2.00 $1,178.00
26 JAIley crushed stone install Sewer 29.00 SY $12.00 $348.00
29 Paving 2"HMAC 2/27 concrete Sewer 283.00 LF $22.00 $6,226.00
31 Concrete valley gutter install Sewer 11.89 SY $60.00 $713.40
32 Concrete walk install Sewer 45.00 SF $7.00 $315.00
33 Dehole exploratory excavation Sewer 5.00 JEA $600.00 $3,000.00
34 Concrete type B install Sewer 5.00 Cy $100.00 $500.00
35 Concrete type E install Sewer 5.00 Cy $80.00 $400.00
36 Concrtee encasement install Sewer 20.00 LF $35.00 $700.00
Unit 2 city founded
37 JPipe abandon and fill with flowable fill Water 913.00 LF $6.00 $5,478.00
30 Pavement additional repair beyond trench Water 300.00 SY $40.00 $12,000.00
3 Fence stne install Water 40.00 LF $20.00 $800.00
4 Grass Bermuda Hydromulch install Water 845.00 SY $2.00 $1,690.00
9 Inspection pre-construction cleaning Water 125.00 ILF $2.00 $250.00
10 lInspection post-construction cleaning Water 250.00 LF $1.00 $250.00
11 Inspection pre-construction Water 100.00 LF $2.00 $200.00
13 Manhole remove Water 3.00 EA $300.00 $900.00
14 Manhole paint&coating interior Water 18.00 VF $150.00 $2,700.00
19 Pipe sewer 8"DIP all depths Water 20.00 ILF $85.00 $1,700.00
23 Sewer service 6"install tap Water 7.00 EA $300.00 $2,100.00
24 Sewer service 4"2way clean out Water 4.00 EA 1$500.00 $2,000.00
26 Sewer service 6"2way clean out water 1.00 EA 1$800.00 $800.00
®FICIAL Sewer Unit I
CITY SECRETARY Sewer Unit Il
F WORTH,TX
Deletions Sub Total
Page 3 of 4
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
R
ICIAL RECORDY SECRETARY WORTH, TX
Page 4 of 4