HomeMy WebLinkAboutContract 46611 Developer and Project Information Cover Sheet:
Developer Company Name: Sundance Square Management, L.P.
Address, State,Zip Code: 201 Main Street, Suite 2600
Phone, E-Mail: (817)255-5700
Authorized Signatory/Title: Johnny Campbell,President
Project Name and Brief Description: Water, Sewer, Storm Drain,Paving, Sidewalk, Street Light and
Signal Improvements to serve 2nd Street Extension(Jones Street to Calhoun Street)
Project Location: 2°a Street from Jones Street to Calhoun Street
Plat Case No.: FS-13-180 Plat Name: City Center Addition
Council District: 9 City Project No: 02270
CFA: 201 4 DOE: 7218
To be co plete t by ff
",J 1.
Received boe'W
� I
O
4
n
LA
LU
L-7
W
GC
OFFICIAL RECORD
CITY SECRETARY
1 FT.WORTH,TX
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary(�
COUNTY OF TARRANT § Contract No. 1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as 2nd Street Extension
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledgeE OFFIC&L Mid=
acceptance process requires the Developer's contractor( )( 1 ' MR61FARY
2 FT.WORTH,TX
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) X Paving (B) X , Storm Drain (B-1) X , Street Lights &
Signs (C) X� Signals (C-1) X .
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section 11, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section 1I, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
1. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or dan:ages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND
7
Cost Summary Sheet
Project Name: 2' Street Extension
CFA No.: 2014-040 DOE No.: 7218
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 20,119.64
2.Sewer Construction $ 2,955.13
Water and Sewer Construction Total $ 23,074.77
B. TPW Construction
1.Street $ 192,654.47
2.Storm Drain $ 30,960.35
3.Street Lights Installed by Developer $ 99,918.33
4.Traffic Signals $ 97,146.02
TPW Construction Cost Total $ 420,679.17
Total Construction Cost(excluding the fees): $ 443,753.94
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 461.50
D. Water/Sewer Material Testing Fee(2%) $ 461.50
Sub-Total for Water Construction Fees $ 922.99
E. TPW Inspection Fee(4%) $ 8,944.59
F. TPW Material Testing(2%) $ 4,472.30
G. Street Light Inspsection Cost $ 3,996.73
H.Traffic Signal Inspection $ 3,885.84
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 21,299.46
Total Construction Fees: $ 22,222.45
Choice
Financial Guarantee Options,choose one Amount ck one)
Bond=100% $ 443,753.94
Completion Agreement=100%/Holds Plat $ 443,753.94
Cash Escrow Water/Sanitary Sewer=125% $ 28,843.46
Cash Escrow Paving/Storm Drain=125% $ 525,848.96
Letter of Credit=125%w/2yr expiration period $ 554,692.43
8
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary,with the corporate seal of the City affixed, and said Developer has execut d this
instrument in quadruplicate, at Fort Worth,Texas this �_ day of
, 20/�.
CITY OF FORT WORTH-Recommended by:
Water Department jf Transportation&Public Works Department
'J . b ) ��y
Wendy Chi-Babul ,EMBA,P.E. Douglas Q Wiersig, P.E.
Development Engineering Manager Director
Approved as to Form &Legality: Approved by Manager's Office
Douglas W. Black emando Cvsta
Assistant City Attorney Assistant City Manager
M&C No. Al �d-.p uj �A
Date: 00000000 �► ��
o° °
ATTEST: %0� ��o
0 0
too -0
° 0
°o o°°.)C A'
ary J.Kays �� 000 0000°o a
City Secreta as,,rttxin 4.oa4
ATTEST: DEVELOPER:
Sundance Squar ana ment,L.P
By: SSM Gen7, ,is gen ra artner
ignature g e
(Print)Name: P t N e: JcK
1�A�� �► itle: ate, ' /eLU
OFFICIAL RECORD
9 CITY SECRETARY
FT.WORTH,TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
® Exhibit C-1: Traffic Signal Improvements
® Traffic Signal Estimate
(Remainder of Page Intentionally Left Blank)
10
g BL
crn`E"' ADD r BLOCK 26RI CO!NNCT TO CENTER ADDITION y m CONNECT TO omc
Vol. 38B-1I8 ? 3 !
RT.C.�z� EXWATER 388-190,p.R.T.C.T.PC. 60 �� � w EX. 6" WATER ,OR
r w
mr rrs�ens v.
a.
, Y'4 r.._ '�c qac♦a mnwwe (
a,,. .• psi -...me.. � ". , o:�.« — r:
iffift-k—a—TRIgAN
— —
EX fi WL EX. 6'WL
w
EAST 2ND STREET
-
� � PROPOSED PROPOSED 8"
r` FIRE HYDRANT [WATER LINE 6
• I
t I BLOCK 39
ULA ORIGINAL TOWN OFFORT WORTH W — ORIGINAL TO
(UNRECORDED)
N C LLA Awl
♦� e
z ' !
PE
_
O W
Zt
O
,
• � 6 y x
yg f� w •a l
EX. 8"WL
EAST 3RD STREET 3 m�
`tee ....�............................ . ..� ...............................
BLOCK 53 BLOCK 54 g
c ORIGINAL TOWN ORIGINAL TOWN ORIG
OF OF
FORT WORTH FORT WORTH FOR
a (UNRECORDED) (MBFCORDED) (UM
e
a
4
a
E. 2nd St. Extension
Exhibit A
A �vo I v i n g• E.2nd St. &Calhoun St.
civil engineerin g.plan nin
g Fort Worth, Texas SCALE: = 60' 02 DATE: 2014 SHEET:
° 00 42 43
DAP-BID PROPOSAL
Pagel of 8
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure Q�UtY Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 3305.0204 imported Embedment/Backfill,Crushed Rock 3305 10 CY 24 $71.70 $1,720.80
2 3311.0261 8"PVC Water Pipe 33 11 12 LF 220 $67.41 $14,830.20
3 3312.01 l7 Connection to Existing 4"-12"Water Main 33 l2 25 EA 3 $2,476.25 $7,428.75
4 3312.3002 6"Gate Valve 33 1220 EA 1 $1,525.00 $1,525.00
5 3312.3003 8"Gate Valve 33 1220 EA 2 $2,148.75 $4,297.50
1.6 3305.0109 Trench Safety 3305 10 LF 220 $16.35 $3,5_97.00
7 0241.1012 Remove 6"Water Line 0241 14 LF 220 $13._65 $3,003.00
8 9999.0001 Relocate Exisitng Fire Hydrant 00 00 00 EA 1 $566.25 $566.25
44ae
TOTAL UNIT I:WATER IMPROVEMENTS $36,968.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 god Stmt Extension Dennett
BLOCK 25R S;Kd t BLOCK 26R1 BG
CITY CENTER ADD, 5;,"g
VOL. 388-149, ''s^ CITY CENTER ADDITION ORIG
PG. e1—e2 s s s VOL. 388-190, PG. 60
P.R.r.C.r. S i%,S - �,'mvemcvrs av
P.R.TC.T. ��m .�p � :�i FOR
(UN
,ScSSs�S .. S"�;h'.':i'. � � ��a""` y .�/ \LIl---•---- ••--- cwa`4'C----
EAST 2ND STREET
N
EXISTING MH TO BE ;
REMOVED AND
: REPLACED WITH
W PROPOSED SHALLOW I B
ORIGINAL TO
WW (UN
MH WITH NEW 6e tyl
i STUB OUT TO PL
........
o Q C O
s.41 . HIIIHHIIIIIHIIIIIIIIHIIHNIflf111HIHggI11111111HH6HHiIHHI1IHHH21w —55 55
mwm4 J O
ABANDON EXISTING 6e SS,
FILL W/FLOWABLE FILL OR
GROUT ;
z - -- ------
^
SS-Ss-ss
' EAST 3RD STREET
_.......................................................................� ...............................
BLOCK 53 BLOCK 54 BL
g, ORIGINAL TOWN ORIGINAL TOWN
ORM
OF OF
FORT WORTH FORT WORTH FOR
s (UNRE'CORDE'D) (UNRE'CORDE'D)
(UN
3
E. 2nd St. Extension Exhibit Al
R @ V O I V I Y'l g Wastewater Improvements
R E. 2nd St. &Calhoun St.
Fort worth, Texas SCALE: DATE: SHEET:
civil engineering planning 1•• = 60' 10210 4/2014
00 42 43
DAP-BIDPROPOSAL
Page 2 of 8
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 3331.5201 6"PVC Sewer Pipe,0'to 6'(Misc Only) 33 31 20 LF 5 $47.50 $237.50
2 3339.1004 4'Shallow Manhole 33 39 10,33 39 EA 1 $3,977.50 $3,977.50
3 3301.0101 Manhole Vacuum Testing 33 01 30 EA 1 $168.75 $168.75
4 0241.2001 Sanitary Line Grouting 0241 14 CY 1.6 $531.25 $850.00
7 -
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $5,233.75
CrrY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 2nd Street Extension Dennett
I I I I
LEGEND I I
PROPOSED SIDEWALKS
PROPOSED PAVEMENT
BLOOr 25,R
} BLOCK 26R1 4` B
VO 4CZNM�8,D t CITY CENTER ADDITION ORIG
PG 81-82 si VOL. 366-190, PG. 60
P.J¢T.C.r. fY P.R.T.C.T. FOR
Mi
PROPOSED
EAST 2ND STREET PAVEMENT
......
w; '„� •{.,;5'a�,. �wwy \'-e"a�s�+sa-••�� '�'i�?3.e-. •z -•7..e corns
r ffa f ' .f s 'ss 677
'p
N10
s � PROPOSED
SIDEWALK
i �
BLOCK 39
ORIGINAL TOWN OFFORT WORTH B
(UNRECORDED) ORIGINAL
m
I t
R
i
ewwi�..e
vo I
,
moan a
--
A =� FAST 3RD STREET
s ...................................... .............................
f BLOCK 53 BLOCK 54 B
e ORIGINAL TOWN ORIGINAL TOWN ORIG
OF OF
e FORT WORTH FORT WORTH FOR
(UNRECORDED) (UNRECORDEV)
b
n
s
E E. 2nd St. Extension
Exhibit B
E. 2nd St. &Calhoun St.
e v o v i n g Fort Worth,Texas SCALE: DATE: SHEET:
jj
civil cnginccring.plonning 1. 60' 1 02 04/2014
d
00 42 43
DAP-BID PROPOSAL
Page 4 of 8
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification I Unit of Bid
No Description Section No. Measure Quantity Unit Price Bid Value
UNIT IV:PAVING IMPROVEMENTS
1 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 4085 $21.56 $88,072.60
2 3213.0301 4"Conc Sidewalk 32 1320 SF 9363 $4.91 $45,972.33
3 3213.0501 Barrier Free Ramp,Type R-1 32 1320 EA 11 $1,_583.75 $17,421.25
4 3216.0102 7"Conc Curb and Gutter 32 16 13 LF 801 $20.51 $16,428.51
5 3211.0502 8"Lime Treatment 32 1129 SY 4211 $10.75 $45,268.25
6 3211.0400 Hydrated Lime 32 1129 TN 63 $262.50 $16,537.50
7 0241.1100 Remove Asphalt Pvmt 0241 15 SY 2555 $8.11 $20,721_.05
8 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 1830 $4.76 $8,710.80
9 0241.0100 Remove Sidewalk 0241 13 SF 14796 $0.86 $12,724.56
_ 100241.0300 Remove ADA Ramp 0241 13 EA 2 $325.68 $651.36
11 _ 9999.0002 Relocate Exisitng Bus Stop bench and sign 00 00 00 EA 4 $750.00 $3,000.00
12 9999.0003 Relocate Exisitng Parking Meters 00 00 00 EA_ 4 $975.00 $3,900.00
13 9999.0005 5.5"_Asphalt Base Type B 00 00 00 SY 4085 $43.43 $177,411.55
TOTAL UNIT IV:PAVING IMPROVEMENTS1 $456,819.76
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPEC]FICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 2nd Street Extension Dennett
BLOCK 25R
CITY CENTERADD. S�•�S i BLOCK 26R1 BL
VOL 3BB-149, f^ CITY CENTER ADDITION ,r ORIG
PC. 81-82 s 4C \\ t VOL. 388-190, PG. 60
IR.T ,' '
C T.:�`5R. 4 $ 3 mow, .•,ra:. P.R.T.C.T. ; Lo
{'s s `• » P 18'
PROPOSED FOR
. c wN ceomm�w (UN
STORM DRAIN
i:S.fM s'e;..i.1.�A.'fs ' ia..s:. u•a� ----- _ cnc. ..
r— —
p.yn —www
*—w— w— W_ W
on EAST 2ND STREET
ti
stKv ;�i1 ias cr -'�'C _..v-----•---........o. ._.
w
O .man
=7^
>L: `, � ~S,s4 •~ PROPOSED 10. '
REMOVE EXISTING
00
SD MH
BLOCK 39
ORIGINAL TOWN OF FORT WORT ORIGINAL TO
(UNRECORDED) , O (UN
REMOVE EXISTING a
E-4 m r INLET
Lw
VOi E.� �.,:..,..... Lw — — — — — —
°n
o
. 8 y •.a
• f
o .wrr v,.ao
e �
4 ... a ..m....X?- a o ' r _____-
8
EAST 3RD STREET
........................................................................` ..............................
E BLOCK 53 BLOCK 54 BL
ORIGINAL TOWN ORIGINAL TOWN ORIC
OF OF
FORT WORTH FORT WORTH FOR
x (UNRECORDED) (UNRECORDED) (UN
R
E. 2nd St. Extension Exhibit B1
E. 2nd St. & Calhoun St. Storm Drain Improvements
° e v o l v n g' Fort Worth, Texas SCALE: DATE: SHEET:
civil engineering planning 1" = 60' 07/02/2014
BLOCK 33 BLOCK 22
ORIGINAL TOWN ORIGINAL TOWN
.�.,,1,,•a �, OF OF
FORT WORTH FORT WORTH
PROPOSED 18"
20 m iso`° (UNRECORDED) (UNRECORDED)
STORM DRAIN
-----at................
.....-•--_.... ......f... .... ....
.. ------
.------------- - -
M 4
o REMOVE EXISTING
SD MH
BLOCK 43 i I
ORIGINAL TOWN OF FORT WORTH
o BLOCK 37(UNRECORDED) ORIGINAL TOWN
OF
i e
o ~ FOT WORTH
T
_. H
_ —..........
„ _.. .
(UNRECORDED)
- - - - - -
O ...............
REMOVE EXISTING
24" RCP
--� X PROPOSED 4'
a STORM DRAIN
°R MAN HOLE
�.
n � _
RECONNECT TO
.............`
.........................................................
SD MH s
_....
a '
E •• BLOCK 56
BLOCK 55 --• --
ORIGINAL TOWN :� ORIGINAL TOWN
OF OF
FORT WORTH yy FORT WORTH
s (UNRECORDED) , ! (UNRECORDED)
, r
4 E. 2nd St. Extension Exhibit B1
• Storm Drain Improvements
R e v o 1 v ng- E. 2nd St. &Calhoun St.
Fort Worth, Texas SCALE: DATE: SHEET:
civil engineering-planning 1" = 60• 1 07/02/2014 2
00 42 43
DAP-BID PROPOSAL
Page 3 of 8
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item DescSpecification Unit of Bid
No. rp11O° Section No. Measure Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS
1 0241.3014 Remove 21"Storm Line 0241 14 LF 22 $12.23 _ $269.06
2 0241.3015 Remove 24"Storm Line 0241 14 LF 350 $14.56 _ $5,096.00
3 0241.4001 Remove 10'Curb Inlet 0241 14 EA 1 $651.25 _ $651.25
4 0241.4301 Remove 2'Grate Inlet 0241 14 EA 1 $508.75 $5_08_.75
5 3305.0112 Concrete Collar 3305 17 EA 2 $411.25 $822.50
6 3305.0114 Manhole Adjustment,Major w/Cover 3305 14 EA 1 $2,312.50 _ $2,312.50
7 3341.0202 21"RCP,Class IV 3441 10 LF 86 $84.29 _ $7,248.94
8 3349.0001 4'Storm Junction Box 3349 10 EA 1 $6,506.25 _ $6,506.25
9 3349.0101 3'Round Manhole Riser 3349 10 EA 1 $1,437.50 $1,437.50
10 3349.0106 Manhole Steps 3349 10 EA 1 $200.00 $200.00
11 3349.5001 10'Curb Inlet 33 49 20 EA 3 $4,103.75 $12,311.25
12 3305.0109 Trench Safety 3305 10 LF 86 $16,35 $1,406.10
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $38,770.10
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 god Street Extemion Denoett
fil;l,S �fi
BLOCK 2W 5 BLOCK 26R1 B
crff CRIv7E7P D. s CITY CENTER ADDITION ORIG
VOL SM-149.
PG B[-B2 fS VOL. 366-190, PG. 60
P,ST.C.r. s�;E r P•R.TC.T- wwrw�i�mLp.. ; i FOR
i .name—mm,.na-
tom•-------
----. =x--•-
®`" EAST 2ND STREET
b.veww � ..... ... ...
lMW.o w1�fR(rT • Y � i ; � i� ..
C I BLOCK 39 B
ORIGINAL TOWN OF FORT WORTH ORIGINAL TO
�y (uNRecolrDEv)
�+• lr
UJ
oc
m
'!77ff
OPOSED STREET --
�4� j HT (TYPICAL)
• Y
Q) lV
� 1
w05� _ z
JQ)
0. ----------------
- -
b m4wR b
a
•s
x
-�—° EAST 3RD STREET
I. ........................................................................` .................................
BLOCK 53 BLOCK 54BL
ORIGINAL TOWN ORIGINAL TOWN ORIG
OF OF
b FORT WORTH FORT WORTH FOR
(UNRECORDED) (UNRECORDED)
b
a
0
s
s
E. 2nd St. Extension
Exhibit C
RE.2nd St. &Calhoun St.
rin
A evo v n g° Fort Worth'Texas SCALE: DATE: SHEET:
s civil cnginccg.planning 1� :. 60' 02/04/2014
tr,42 41
DAP-BID PROPOSAL.
Pie�of 4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Aid Value
No. Section No. MeasureQuantity
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3011 2"CONDT PVC SCH 40(T) 26 05 33 LF 1827 $13.75 $25,121.25
2 2605.3021 3"CONDT PVC SCH 40(T)Should be on,gplal 26 05 33 LF 290
3 2605.3022 3"CONDT PVC SCH 40(B)Should be on signal 26 05 33 LF 320
4 3441.3021 Omamental Assmbly,Simple 3441 20 EA 26 $8,125.00 $211,250.00
Ornimental foundation type 7 26 $3,125.00 $81,250.00
Furnish/Install Electrical service pedestal 1 $6,875.00 $6,875.00
Ground Boxes 8 $1,062.50 $8,500.00
Remove and salvage street light 2 $1,000.00 $2,000.00
NO 8 AWG 5481 $1.56 $8,550.36
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $343,546.61
CITY OF FORT NORTH
STA-ND.ARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 2nd Street Extension Dennett
I I I I
I I I I
i
i
I
I I
BLOCK 25R i:oF a
BLOCK 26RI BL
CITY CENTER ADD. �
VOL. sae—/48, v CITY CENTER .ADDITION , ORIC
PC e/ VOL. 388 190, PG. 60
ply . . . s:a; m.
s y P.R.T.C T Ra m FOR
ac°comm s�o (UN
_IJ
EAST 2ND STREET
O
4s-
LU
•s.
BLOCK 39 B
ORIGINAL TOWN OF FORT WORTH i ORIGI AL TOv
(UNRECORDED) 3
PROPOSED STREET
o Z LIGHT (TYPICAL) V)
O rc - W
o I I§
a
°
° EAST 3RD STREET
BLOCK 53 BLOCK 54 RI.
ORIGINAL TOWN ORIGINAL T00-V ORIGI
OF OF
FORT WORTH FORT WORTH FOR
(UNRECORDED) (UNRECORDED) (UN
3
E. 2nd St. Extension Exhibit C
• E. 2nd St. & Calhoun St. Street Light #1
evo I v i n g Fort Worth, Texas SCALE DATE SHEET q
civil engineering.pla,ning V- = 60' 02104 2014
I I
I I
BLOCK 33 BLOCK 22
IONORIGINAL TOFYN ORIGINAL TOWN
60 _ `:� OF OF
FORT WORTHFORT WORTH
°0F«
(UNRECORDED) (UNRECORDED)
EAST 2ND S TREE T
a' 7
d'
BLOCK 43
WORTH ORIGINAL TOWN OF FORT WORTH
(UNRECORDED) BLOCK 37
ORIGINAL TOWN
PROPOSED STREET FORT WORTH
Q) (UNRECORDED)
LIGHT (TYPICAL)
Z
O Q
I
a.
.. ...�. _
EAST 3RD S TREE T
O
BLOCK - - BLOCK
OR/G'1N--1L T'TOWN ,�� ORORIGINALTO'TOWN
OF OF
FORT NORTH �, FORT WORTH
(UNRECORDED)
(UNRECORDED)
E. 2nd St. Extension Exhibit C
• E. 2nd St. & Jones St. Street Lighting #2
evolving
Fort worth, Texas SCALE: DATE: SHEET.
ci,il enginee rin g•plon ning 1" = 60' 02/04/2014 2
00 42 43
DAL'•-13ID PROPOSAL.
6ofS
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
1 2605.0131 Salvage Electrical Equipment 2605 10 LS 2 $1,875.00 $3,750.00
2 2605.2101 Conduit Box 26 05 33 EA 1 $1,062.50 $1,062.50
1 3441.1001 3-Sect Signal Head Assmbly 3441 10 EA 9 $1,062.50 $9,562.50
2 3441.1011 Ped Signal Head Assmbly 3441 10 EA 10 $687.50 $6,875.00
3 3441.1220 Furnish/Install Model 711 Preemption Detector 3441 10 EA 4 $3,750.00 $15,000.00
4 3441.1221 Furnish/lnstall Model 712 Preemption Detector 3441 10 EA 1 $3,750.00 $3,750.00
5 3441.1224 Furnish/Install Preemption Cable 3441 10 LF 310 $2.81 $871.10
6 3441.1314 10/C 14 AWG Multi-Conductor Cable 3441 10 LF 125 $5.00 $625.00
7 3441.1315 20/C 14 AWG Multi-Conductor Cable 3441 10 LF 360 $7.50 $2,700.00
8 3441.1318 8/C 16 AWG Multi-Conductor Cable 34 41 30 LF 210 $3.13 $657.30
9 3441.1409 NO 8 Insulated Elec Condr 3441 10 LF 1820 $1.56 $2,839.20
10 3441.1414 NO 8 Bare Elec Condr 3441 10 LF 785 $1.56 $1,224.60
11 3441.1503 Ground Box Type D,w/Apron 3441 10 EA 5 $1,062.50 _$5,312.50
12 3441.1603 Fumish/Install 10'-14'Ped Pole Assmbly 3441 10 EA 1 $1,875.00 $1,875.00
13 3441.1611 Furnish/histall Type 41 Signal Pole 3441 10 EA 4 $11,250.00 $45,000.00
14 3441.1623 Furnish/Install Mast Arm 16'-36' 3441 10 EA 4 $6,250.00 $25,000.00
15 3441.1701 TY 1 Signal Foundation 3441 10 EA 1 $3,750.00 $3,750.00
16 3441.1703 TY 3 Signal Foundation 3441 10 EA 4 $6,062.50 $24,250.00
17 3441.1711 Signal Controller Foundation 3441 10 EA 2 $2,365.00 $4,730.00
18 3441.1910 Paint Sig Pole and MA 16'-36' 3441 10 EA 4 $7,500.00 $30,000.00
19 3441.2001 Salvage Traffic Signal 3441 13 EA 1 $6,875.00 $6,875.00
20 3441.3411 Reconnect Conductor 34 41 20 EA 2 $1.87.50 $__375.00
21 3441.3501 Salvage Street Light Pole 3441 20 EA 1 _
22 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 3441 30 EA 5 $687.50 $3,437.50
23 3441.4005 Install Alum Sign Mast Arm Mount 34 41 30 EA 4 $687.50 $2,750.00
24 3441.4109 Remove Sign Panel 34 41 30 EA 3 $93.75 $281.25
25 _ 3471.0001 Traffic Control 3471 13 MO 3 $2,500.00 $7,500.00
26 9999.0004 12 pair 19 AWG Interconnect cable(Communicati00 00 00 LF 1070 $13.13 W $14,049.10
2605.3021 3"CONDT PVC SCH 40(T)Should be on signal 26 05 33 LF 290 $25.00 $7,250.00
2605.3022 3"CONDT PVC SCH 40(B)Should be on signal 26 05 33 LF 320 $62.50 _ $20,000.00
Furnish/Install Electrical service pedestal Traffic Signal EA 1 $6,875.00 $6,875.00
_ _ _
Furnish/Install Traffic Controller&Cabint EA 1 $20,62500 -
_- _-- . _ $201,625.00
Install HWY TRF sig(Isolated) EA 1 $14,385.00 $14,385.00
TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS1 $288,425.05
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 2nd Street Extension Dermot
DO 42 43
DAP-BID PROPOSAL
Page 7 of 8
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's i=sys3u
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT VII:MISCELLANEOUS IMPROVEMENTS
1 0241.0600 Remove Wall<4' 0241 13 LF 255 $13.78 $3,513.90
2 3110.0101 Site Clearing 31 1000 LS 1 $26 936.25 $26,936.25
3 3110.0103 12"-18"Tree Removal 31 1000 EA 8 $1,005.00 $8,040.00
4 3123.0101 Unclassified Excavation by Plan 3123 16 CY 800 $29.60 $23,680.00
5 3125.0101 SWPPP 2:1 acre 31 25 00 LS 1 $9,227.50 _ $9,227.50
6 3217.0501 24"SLD Pvmt Marking HAE(W) 32 1723 LF 103 $15.26 $1,571.78
7 3217.1002 Lane Legend Arrow 32 1723 EA 3 $338.75 $1,016.25
8 3217.4402 Remove Lane Legend Arrow 32 17 23 EA 1 $197.50 $197.50
9 3291.0100 Topsoil 3291 19 CY 12 $40.00 $480.00
10 3292.0100 Block Sod Placement 32 92 13 SY 222 $5.95 $1,320.90
11 3293.0103 Plant 3"Tree 32 93 43 EA 51 $815.00 $41,565.00
12 3305.0110 Utility Markers 330526 LS 1 $1,161.25 $1,161.25
13 9999.0005 Relocate Exisitng Signs 00 00 00 EA 1 $800.00 $800.00
14 9999.0006 Remove Exisitng Signs 00 00 00 EA 7 $800.00 $5,600.00
UNIT VII:MISCELLANEOUS IMPROVEMENTS $125,110.33
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 2nd Sheet Extension Deme"
00 42 43
DAP-BID PROPOSAL
Page 8 of 8
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of Bid
No. Descnphon Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS $3_6,96_8.5_0
UNIT II:SANITARY SEWER IMPROVEMENTS $5,233.75
UNIT III:DRAINAGE IMPROVEMENTS $38,770.10
UNIT IV:PAVING IMPROVEMENTS $456,819.76
UNIT V:STREET LIGHTING IMPROVEMENTS $343,546.61
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS_ $288,425.05
UNIT VII:MISCELLANEOUS IMPROVEMENTS $125,110.33
Total Construction Bid $1,294,874.10
Contractor agrees to complete WORK for FINAL ACCEPTANCE within #days calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Foam Version April 2,2014 2nd Street Extension Dennen