HomeMy WebLinkAboutContract 46611 Developer and Project Information Cover Sheet: Developer Company Name: Sundance Square Management, L.P. Address, State,Zip Code: 201 Main Street, Suite 2600 Phone, E-Mail: (817)255-5700 Authorized Signatory/Title: Johnny Campbell,President Project Name and Brief Description: Water, Sewer, Storm Drain,Paving, Sidewalk, Street Light and Signal Improvements to serve 2nd Street Extension(Jones Street to Calhoun Street) Project Location: 2°a Street from Jones Street to Calhoun Street Plat Case No.: FS-13-180 Plat Name: City Center Addition Council District: 9 City Project No: 02270 CFA: 201 4 DOE: 7218 To be co plete t by ff ",J 1. Received boe'W � I O 4 n LA LU L-7 W GC OFFICIAL RECORD CITY SECRETARY 1 FT.WORTH,TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary(� COUNTY OF TARRANT § Contract No. 1 WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as 2nd Street Extension ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledgeE OFFIC&L Mid= acceptance process requires the Developer's contractor( )( 1 ' MR61FARY 2 FT.WORTH,TX affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C) X� Signals (C-1) X . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 1I, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or dan:ages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND 7 Cost Summary Sheet Project Name: 2' Street Extension CFA No.: 2014-040 DOE No.: 7218 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 20,119.64 2.Sewer Construction $ 2,955.13 Water and Sewer Construction Total $ 23,074.77 B. TPW Construction 1.Street $ 192,654.47 2.Storm Drain $ 30,960.35 3.Street Lights Installed by Developer $ 99,918.33 4.Traffic Signals $ 97,146.02 TPW Construction Cost Total $ 420,679.17 Total Construction Cost(excluding the fees): $ 443,753.94 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 461.50 D. Water/Sewer Material Testing Fee(2%) $ 461.50 Sub-Total for Water Construction Fees $ 922.99 E. TPW Inspection Fee(4%) $ 8,944.59 F. TPW Material Testing(2%) $ 4,472.30 G. Street Light Inspsection Cost $ 3,996.73 H.Traffic Signal Inspection $ 3,885.84 H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 21,299.46 Total Construction Fees: $ 22,222.45 Choice Financial Guarantee Options,choose one Amount ck one) Bond=100% $ 443,753.94 Completion Agreement=100%/Holds Plat $ 443,753.94 Cash Escrow Water/Sanitary Sewer=125% $ 28,843.46 Cash Escrow Paving/Storm Drain=125% $ 525,848.96 Letter of Credit=125%w/2yr expiration period $ 554,692.43 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, and said Developer has execut d this instrument in quadruplicate, at Fort Worth,Texas this �_ day of , 20/�. CITY OF FORT WORTH-Recommended by: Water Department jf Transportation&Public Works Department 'J . b ) ��y Wendy Chi-Babul ,EMBA,P.E. Douglas Q Wiersig, P.E. Development Engineering Manager Director Approved as to Form &Legality: Approved by Manager's Office Douglas W. Black emando Cvsta Assistant City Attorney Assistant City Manager M&C No. Al �d-.p uj �A Date: 00000000 �► �� o° ° ATTEST: %0� ��o 0 0 too -0 ° 0 °o o°°.)C A' ary J.Kays �� 000 0000°o a City Secreta as,,rttxin 4.oa4 ATTEST: DEVELOPER: Sundance Squar ana ment,L.P By: SSM Gen7, ,is gen ra artner ignature g e (Print)Name: P t N e: JcK 1�A�� �► itle: ate, ' /eLU OFFICIAL RECORD 9 CITY SECRETARY FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate ® Exhibit C-1: Traffic Signal Improvements ® Traffic Signal Estimate (Remainder of Page Intentionally Left Blank) 10 g BL crn`E"' ADD r BLOCK 26RI CO!NNCT TO CENTER ADDITION y m CONNECT TO omc Vol. 38B-1I8 ? 3 ! RT.C.�z� EXWATER 388-190,p.R.T.C.T.PC. 60 �� � w EX. 6" WATER ,OR r w mr rrs�ens v. a. , Y'4 r.._ '�c qac♦a mnwwe ( a,,. .• psi -...me.. � ". , o:�.« — r: iffift-k—a—TRIgAN — — EX fi WL EX. 6'WL w EAST 2ND STREET - � � PROPOSED PROPOSED 8" r` FIRE HYDRANT [WATER LINE 6 • I t I BLOCK 39 ULA ORIGINAL TOWN OFFORT WORTH W — ORIGINAL TO (UNRECORDED) N C LLA Awl ♦� e z ' ! PE _ O W Zt O , • � 6 y x yg f� w •a l EX. 8"WL EAST 3RD STREET 3 m� `tee ....�............................ . ..� ............................... BLOCK 53 BLOCK 54 g c ORIGINAL TOWN ORIGINAL TOWN ORIG OF OF FORT WORTH FORT WORTH FOR a (UNRECORDED) (MBFCORDED) (UM e a 4 a E. 2nd St. Extension Exhibit A A �vo I v i n g• E.2nd St. &Calhoun St. civil engineerin g.plan nin g Fort Worth, Texas SCALE: = 60' 02 DATE: 2014 SHEET: ° 00 42 43 DAP-BID PROPOSAL Pagel of 8 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No Description Section No. Measure Q�UtY Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3305.0204 imported Embedment/Backfill,Crushed Rock 3305 10 CY 24 $71.70 $1,720.80 2 3311.0261 8"PVC Water Pipe 33 11 12 LF 220 $67.41 $14,830.20 3 3312.01 l7 Connection to Existing 4"-12"Water Main 33 l2 25 EA 3 $2,476.25 $7,428.75 4 3312.3002 6"Gate Valve 33 1220 EA 1 $1,525.00 $1,525.00 5 3312.3003 8"Gate Valve 33 1220 EA 2 $2,148.75 $4,297.50 1.6 3305.0109 Trench Safety 3305 10 LF 220 $16.35 $3,5_97.00 7 0241.1012 Remove 6"Water Line 0241 14 LF 220 $13._65 $3,003.00 8 9999.0001 Relocate Exisitng Fire Hydrant 00 00 00 EA 1 $566.25 $566.25 44ae TOTAL UNIT I:WATER IMPROVEMENTS $36,968.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 god Stmt Extension Dennett BLOCK 25R S;Kd t BLOCK 26R1 BG CITY CENTER ADD, 5;,"g VOL. 388-149, ''s^ CITY CENTER ADDITION ORIG PG. e1—e2 s s s VOL. 388-190, PG. 60 P.R.r.C.r. S i%,S - �,'mvemcvrs av P.R.TC.T. ��m .�p � :�i FOR (UN ,ScSSs�S .. S"�;h'.':i'. � � ��a""` y .�/ \LIl---•---- ••--- cwa`4'C---- EAST 2ND STREET N EXISTING MH TO BE ; REMOVED AND : REPLACED WITH W PROPOSED SHALLOW I B ORIGINAL TO WW (UN MH WITH NEW 6e tyl i STUB OUT TO PL ........ o Q C O s.41 . HIIIHHIIIIIHIIIIIIIIHIIHNIflf111HIHggI11111111HH6HHiIHHI1IHHH21w —55 55 mwm4 J O ABANDON EXISTING 6e SS, FILL W/FLOWABLE FILL OR GROUT ; z - -- ------ ^ SS-Ss-ss ' EAST 3RD STREET _.......................................................................� ............................... BLOCK 53 BLOCK 54 BL g, ORIGINAL TOWN ORIGINAL TOWN ORM OF OF FORT WORTH FORT WORTH FOR s (UNRE'CORDE'D) (UNRE'CORDE'D) (UN 3 E. 2nd St. Extension Exhibit Al R @ V O I V I Y'l g Wastewater Improvements R E. 2nd St. &Calhoun St. Fort worth, Texas SCALE: DATE: SHEET: civil engineering planning 1•• = 60' 10210 4/2014 00 42 43 DAP-BIDPROPOSAL Page 2 of 8 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.5201 6"PVC Sewer Pipe,0'to 6'(Misc Only) 33 31 20 LF 5 $47.50 $237.50 2 3339.1004 4'Shallow Manhole 33 39 10,33 39 EA 1 $3,977.50 $3,977.50 3 3301.0101 Manhole Vacuum Testing 33 01 30 EA 1 $168.75 $168.75 4 0241.2001 Sanitary Line Grouting 0241 14 CY 1.6 $531.25 $850.00 7 - TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $5,233.75 CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 2nd Street Extension Dennett I I I I LEGEND I I PROPOSED SIDEWALKS PROPOSED PAVEMENT BLOOr 25,R } BLOCK 26R1 4` B VO 4CZNM�8,D t CITY CENTER ADDITION ORIG PG 81-82 si VOL. 366-190, PG. 60 P.J¢T.C.r. fY P.R.T.C.T. FOR Mi PROPOSED EAST 2ND STREET PAVEMENT ...... w; '„� •{.,;5'a�,. �wwy \'-e"a�s�+sa-••�� '�'i�?3.e-. •z -•7..e corns r ffa f ' .f s 'ss 677 'p N10 s � PROPOSED SIDEWALK i � BLOCK 39 ORIGINAL TOWN OFFORT WORTH B (UNRECORDED) ORIGINAL m I t R i ewwi�..e vo I , moan a -- A =� FAST 3RD STREET s ...................................... ............................. f BLOCK 53 BLOCK 54 B e ORIGINAL TOWN ORIGINAL TOWN ORIG OF OF e FORT WORTH FORT WORTH FOR (UNRECORDED) (UNRECORDEV) b n s E E. 2nd St. Extension Exhibit B E. 2nd St. &Calhoun St. e v o v i n g Fort Worth,Texas SCALE: DATE: SHEET: jj civil cnginccring.plonning 1. 60' 1 02 04/2014 d 00 42 43 DAP-BID PROPOSAL Page 4 of 8 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification I Unit of Bid No Description Section No. Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 4085 $21.56 $88,072.60 2 3213.0301 4"Conc Sidewalk 32 1320 SF 9363 $4.91 $45,972.33 3 3213.0501 Barrier Free Ramp,Type R-1 32 1320 EA 11 $1,_583.75 $17,421.25 4 3216.0102 7"Conc Curb and Gutter 32 16 13 LF 801 $20.51 $16,428.51 5 3211.0502 8"Lime Treatment 32 1129 SY 4211 $10.75 $45,268.25 6 3211.0400 Hydrated Lime 32 1129 TN 63 $262.50 $16,537.50 7 0241.1100 Remove Asphalt Pvmt 0241 15 SY 2555 $8.11 $20,721_.05 8 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 1830 $4.76 $8,710.80 9 0241.0100 Remove Sidewalk 0241 13 SF 14796 $0.86 $12,724.56 _ 100241.0300 Remove ADA Ramp 0241 13 EA 2 $325.68 $651.36 11 _ 9999.0002 Relocate Exisitng Bus Stop bench and sign 00 00 00 EA 4 $750.00 $3,000.00 12 9999.0003 Relocate Exisitng Parking Meters 00 00 00 EA_ 4 $975.00 $3,900.00 13 9999.0005 5.5"_Asphalt Base Type B 00 00 00 SY 4085 $43.43 $177,411.55 TOTAL UNIT IV:PAVING IMPROVEMENTS1 $456,819.76 CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC]FICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 2nd Street Extension Dennett BLOCK 25R CITY CENTERADD. S�•�S i BLOCK 26R1 BL VOL 3BB-149, f^ CITY CENTER ADDITION ,r ORIG PC. 81-82 s 4C \\ t VOL. 388-190, PG. 60 IR.T ,' ' C T.:�`5R. 4 $ 3 mow, .•,ra:. P.R.T.C.T. ; Lo {'s s `• » P 18' PROPOSED FOR . c wN ceomm�w (UN STORM DRAIN i:S.fM s'e;..i.1.�A.'fs ' ia..s:. u•a� ----- _ cnc. .. r— — p.yn —www *—w— w— W_ W on EAST 2ND STREET ti stKv ;�i1 ias cr -'�'C _..v-----•---........o. ._. w O .man =7^ >L: `, � ~S,s4 •~ PROPOSED 10. ' REMOVE EXISTING 00 SD MH BLOCK 39 ORIGINAL TOWN OF FORT WORT ORIGINAL TO (UNRECORDED) , O (UN REMOVE EXISTING a E-4 m r INLET Lw VOi E.� �.,:..,..... Lw — — — — — — °n o . 8 y •.a • f o .wrr v,.ao e � 4 ... a ..m....X?- a o ' r _____- 8 EAST 3RD STREET ........................................................................` .............................. E BLOCK 53 BLOCK 54 BL ORIGINAL TOWN ORIGINAL TOWN ORIC OF OF FORT WORTH FORT WORTH FOR x (UNRECORDED) (UNRECORDED) (UN R E. 2nd St. Extension Exhibit B1 E. 2nd St. & Calhoun St. Storm Drain Improvements ° e v o l v n g' Fort Worth, Texas SCALE: DATE: SHEET: civil engineering planning 1" = 60' 07/02/2014 BLOCK 33 BLOCK 22 ORIGINAL TOWN ORIGINAL TOWN .�.,,1,,•a �, OF OF FORT WORTH FORT WORTH PROPOSED 18" 20 m iso`° (UNRECORDED) (UNRECORDED) STORM DRAIN -----at................ .....-•--_.... ......f... .... .... .. ------ .------------- - - M 4 o REMOVE EXISTING SD MH BLOCK 43 i I ORIGINAL TOWN OF FORT WORTH o BLOCK 37(UNRECORDED) ORIGINAL TOWN OF i e o ~ FOT WORTH T _. H _ —.......... „ _.. . (UNRECORDED) - - - - - - O ............... REMOVE EXISTING 24" RCP --� X PROPOSED 4' a STORM DRAIN °R MAN HOLE �. n � _ RECONNECT TO .............` ......................................................... SD MH s _.... a ' E •• BLOCK 56 BLOCK 55 --• -- ORIGINAL TOWN :� ORIGINAL TOWN OF OF FORT WORTH yy FORT WORTH s (UNRECORDED) , ! (UNRECORDED) , r 4 E. 2nd St. Extension Exhibit B1 • Storm Drain Improvements R e v o 1 v ng- E. 2nd St. &Calhoun St. Fort Worth, Texas SCALE: DATE: SHEET: civil engineering-planning 1" = 60• 1 07/02/2014 2 00 42 43 DAP-BID PROPOSAL Page 3 of 8 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item DescSpecification Unit of Bid No. rp11O° Section No. Measure Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 0241.3014 Remove 21"Storm Line 0241 14 LF 22 $12.23 _ $269.06 2 0241.3015 Remove 24"Storm Line 0241 14 LF 350 $14.56 _ $5,096.00 3 0241.4001 Remove 10'Curb Inlet 0241 14 EA 1 $651.25 _ $651.25 4 0241.4301 Remove 2'Grate Inlet 0241 14 EA 1 $508.75 $5_08_.75 5 3305.0112 Concrete Collar 3305 17 EA 2 $411.25 $822.50 6 3305.0114 Manhole Adjustment,Major w/Cover 3305 14 EA 1 $2,312.50 _ $2,312.50 7 3341.0202 21"RCP,Class IV 3441 10 LF 86 $84.29 _ $7,248.94 8 3349.0001 4'Storm Junction Box 3349 10 EA 1 $6,506.25 _ $6,506.25 9 3349.0101 3'Round Manhole Riser 3349 10 EA 1 $1,437.50 $1,437.50 10 3349.0106 Manhole Steps 3349 10 EA 1 $200.00 $200.00 11 3349.5001 10'Curb Inlet 33 49 20 EA 3 $4,103.75 $12,311.25 12 3305.0109 Trench Safety 3305 10 LF 86 $16,35 $1,406.10 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $38,770.10 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 god Street Extemion Denoett fil;l,S �fi BLOCK 2W 5 BLOCK 26R1 B crff CRIv7E7P D. s CITY CENTER ADDITION ORIG VOL SM-149. PG B[-B2 fS VOL. 366-190, PG. 60 P,ST.C.r. s�;E r P•R.TC.T- wwrw�i�mLp.. ; i FOR i .name—mm,.na- tom•------- ----. =x--•- ®`" EAST 2ND STREET b.veww � ..... ... ... lMW.o w1�fR(rT • Y � i ; � i� .. C I BLOCK 39 B ORIGINAL TOWN OF FORT WORTH ORIGINAL TO �y (uNRecolrDEv) �+• lr UJ oc m '!77ff OPOSED STREET -- �4� j HT (TYPICAL) • Y Q) lV � 1 w05� _ z JQ) 0. ---------------- - - b m4wR b a •s x -�—° EAST 3RD STREET I. ........................................................................` ................................. BLOCK 53 BLOCK 54BL ORIGINAL TOWN ORIGINAL TOWN ORIG OF OF b FORT WORTH FORT WORTH FOR (UNRECORDED) (UNRECORDED) b a 0 s s E. 2nd St. Extension Exhibit C RE.2nd St. &Calhoun St. rin A evo v n g° Fort Worth'Texas SCALE: DATE: SHEET: s civil cnginccg.planning 1� :. 60' 02/04/2014 tr,42 41 DAP-BID PROPOSAL. Pie�of 4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Aid Value No. Section No. MeasureQuantity UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3011 2"CONDT PVC SCH 40(T) 26 05 33 LF 1827 $13.75 $25,121.25 2 2605.3021 3"CONDT PVC SCH 40(T)Should be on,gplal 26 05 33 LF 290 3 2605.3022 3"CONDT PVC SCH 40(B)Should be on signal 26 05 33 LF 320 4 3441.3021 Omamental Assmbly,Simple 3441 20 EA 26 $8,125.00 $211,250.00 Ornimental foundation type 7 26 $3,125.00 $81,250.00 Furnish/Install Electrical service pedestal 1 $6,875.00 $6,875.00 Ground Boxes 8 $1,062.50 $8,500.00 Remove and salvage street light 2 $1,000.00 $2,000.00 NO 8 AWG 5481 $1.56 $8,550.36 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $343,546.61 CITY OF FORT NORTH STA-ND.ARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 2nd Street Extension Dennett I I I I I I I I i i I I I BLOCK 25R i:oF a BLOCK 26RI BL CITY CENTER ADD. � VOL. sae—/48, v CITY CENTER .ADDITION , ORIC PC e/ VOL. 388 190, PG. 60 ply . . . s:a; m. s y P.R.T.C T Ra m FOR ac°comm s�o (UN _IJ EAST 2ND STREET O 4s- LU •s. BLOCK 39 B ORIGINAL TOWN OF FORT WORTH i ORIGI AL TOv (UNRECORDED) 3 PROPOSED STREET o Z LIGHT (TYPICAL) V) O rc - W o I I§ a ° ° EAST 3RD STREET BLOCK 53 BLOCK 54 RI. ORIGINAL TOWN ORIGINAL T00-V ORIGI OF OF FORT WORTH FORT WORTH FOR (UNRECORDED) (UNRECORDED) (UN 3 E. 2nd St. Extension Exhibit C • E. 2nd St. & Calhoun St. Street Light #1 evo I v i n g Fort Worth, Texas SCALE DATE SHEET q civil engineering.pla,ning V- = 60' 02104 2014 I I I I BLOCK 33 BLOCK 22 IONORIGINAL TOFYN ORIGINAL TOWN 60 _ `:� OF OF FORT WORTHFORT WORTH °0F« (UNRECORDED) (UNRECORDED) EAST 2ND S TREE T a' 7 d' BLOCK 43 WORTH ORIGINAL TOWN OF FORT WORTH (UNRECORDED) BLOCK 37 ORIGINAL TOWN PROPOSED STREET FORT WORTH Q) (UNRECORDED) LIGHT (TYPICAL) Z O Q I a. .. ...�. _ EAST 3RD S TREE T O BLOCK - - BLOCK OR/G'1N--1L T'TOWN ,�� ORORIGINALTO'TOWN OF OF FORT NORTH �, FORT WORTH (UNRECORDED) (UNRECORDED) E. 2nd St. Extension Exhibit C • E. 2nd St. & Jones St. Street Lighting #2 evolving Fort worth, Texas SCALE: DATE: SHEET. ci,il enginee rin g•plon ning 1" = 60' 02/04/2014 2 00 42 43 DAL'•-13ID PROPOSAL. 6ofS SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS 1 2605.0131 Salvage Electrical Equipment 2605 10 LS 2 $1,875.00 $3,750.00 2 2605.2101 Conduit Box 26 05 33 EA 1 $1,062.50 $1,062.50 1 3441.1001 3-Sect Signal Head Assmbly 3441 10 EA 9 $1,062.50 $9,562.50 2 3441.1011 Ped Signal Head Assmbly 3441 10 EA 10 $687.50 $6,875.00 3 3441.1220 Furnish/Install Model 711 Preemption Detector 3441 10 EA 4 $3,750.00 $15,000.00 4 3441.1221 Furnish/lnstall Model 712 Preemption Detector 3441 10 EA 1 $3,750.00 $3,750.00 5 3441.1224 Furnish/Install Preemption Cable 3441 10 LF 310 $2.81 $871.10 6 3441.1314 10/C 14 AWG Multi-Conductor Cable 3441 10 LF 125 $5.00 $625.00 7 3441.1315 20/C 14 AWG Multi-Conductor Cable 3441 10 LF 360 $7.50 $2,700.00 8 3441.1318 8/C 16 AWG Multi-Conductor Cable 34 41 30 LF 210 $3.13 $657.30 9 3441.1409 NO 8 Insulated Elec Condr 3441 10 LF 1820 $1.56 $2,839.20 10 3441.1414 NO 8 Bare Elec Condr 3441 10 LF 785 $1.56 $1,224.60 11 3441.1503 Ground Box Type D,w/Apron 3441 10 EA 5 $1,062.50 _$5,312.50 12 3441.1603 Fumish/Install 10'-14'Ped Pole Assmbly 3441 10 EA 1 $1,875.00 $1,875.00 13 3441.1611 Furnish/histall Type 41 Signal Pole 3441 10 EA 4 $11,250.00 $45,000.00 14 3441.1623 Furnish/Install Mast Arm 16'-36' 3441 10 EA 4 $6,250.00 $25,000.00 15 3441.1701 TY 1 Signal Foundation 3441 10 EA 1 $3,750.00 $3,750.00 16 3441.1703 TY 3 Signal Foundation 3441 10 EA 4 $6,062.50 $24,250.00 17 3441.1711 Signal Controller Foundation 3441 10 EA 2 $2,365.00 $4,730.00 18 3441.1910 Paint Sig Pole and MA 16'-36' 3441 10 EA 4 $7,500.00 $30,000.00 19 3441.2001 Salvage Traffic Signal 3441 13 EA 1 $6,875.00 $6,875.00 20 3441.3411 Reconnect Conductor 34 41 20 EA 2 $1.87.50 $__375.00 21 3441.3501 Salvage Street Light Pole 3441 20 EA 1 _ 22 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 3441 30 EA 5 $687.50 $3,437.50 23 3441.4005 Install Alum Sign Mast Arm Mount 34 41 30 EA 4 $687.50 $2,750.00 24 3441.4109 Remove Sign Panel 34 41 30 EA 3 $93.75 $281.25 25 _ 3471.0001 Traffic Control 3471 13 MO 3 $2,500.00 $7,500.00 26 9999.0004 12 pair 19 AWG Interconnect cable(Communicati00 00 00 LF 1070 $13.13 W $14,049.10 2605.3021 3"CONDT PVC SCH 40(T)Should be on signal 26 05 33 LF 290 $25.00 $7,250.00 2605.3022 3"CONDT PVC SCH 40(B)Should be on signal 26 05 33 LF 320 $62.50 _ $20,000.00 Furnish/Install Electrical service pedestal Traffic Signal EA 1 $6,875.00 $6,875.00 _ _ _ Furnish/Install Traffic Controller&Cabint EA 1 $20,62500 - _- _-- . _ $201,625.00 Install HWY TRF sig(Isolated) EA 1 $14,385.00 $14,385.00 TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS1 $288,425.05 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 2nd Street Extension Dermot DO 42 43 DAP-BID PROPOSAL Page 7 of 8 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidder's i=sys3u Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT VII:MISCELLANEOUS IMPROVEMENTS 1 0241.0600 Remove Wall<4' 0241 13 LF 255 $13.78 $3,513.90 2 3110.0101 Site Clearing 31 1000 LS 1 $26 936.25 $26,936.25 3 3110.0103 12"-18"Tree Removal 31 1000 EA 8 $1,005.00 $8,040.00 4 3123.0101 Unclassified Excavation by Plan 3123 16 CY 800 $29.60 $23,680.00 5 3125.0101 SWPPP 2:1 acre 31 25 00 LS 1 $9,227.50 _ $9,227.50 6 3217.0501 24"SLD Pvmt Marking HAE(W) 32 1723 LF 103 $15.26 $1,571.78 7 3217.1002 Lane Legend Arrow 32 1723 EA 3 $338.75 $1,016.25 8 3217.4402 Remove Lane Legend Arrow 32 17 23 EA 1 $197.50 $197.50 9 3291.0100 Topsoil 3291 19 CY 12 $40.00 $480.00 10 3292.0100 Block Sod Placement 32 92 13 SY 222 $5.95 $1,320.90 11 3293.0103 Plant 3"Tree 32 93 43 EA 51 $815.00 $41,565.00 12 3305.0110 Utility Markers 330526 LS 1 $1,161.25 $1,161.25 13 9999.0005 Relocate Exisitng Signs 00 00 00 EA 1 $800.00 $800.00 14 9999.0006 Remove Exisitng Signs 00 00 00 EA 7 $800.00 $5,600.00 UNIT VII:MISCELLANEOUS IMPROVEMENTS $125,110.33 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 2nd Sheet Extension Deme" 00 42 43 DAP-BID PROPOSAL Page 8 of 8 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM-2ND Street Extension UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Descnphon Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I:WATER IMPROVEMENTS $3_6,96_8.5_0 UNIT II:SANITARY SEWER IMPROVEMENTS $5,233.75 UNIT III:DRAINAGE IMPROVEMENTS $38,770.10 UNIT IV:PAVING IMPROVEMENTS $456,819.76 UNIT V:STREET LIGHTING IMPROVEMENTS $343,546.61 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS_ $288,425.05 UNIT VII:MISCELLANEOUS IMPROVEMENTS $125,110.33 Total Construction Bid $1,294,874.10 Contractor agrees to complete WORK for FINAL ACCEPTANCE within #days calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foam Version April 2,2014 2nd Street Extension Dennen