Loading...
HomeMy WebLinkAboutContract 42129-A1 CITY SECRETARY, ��-� AMENDMENT No. 1 �Dly9TRACT NO, TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Dal - Tech Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 42129, (the CONTRACT) which was authorized by M&C C-25064 on the 26th day of July, 2011 in the amount of $120,000 .00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water Main and Sanitary Sewer Replacement contract 2010, STM-B; and WHEREAS, it has become necessary to execute Amendment No.1 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 20, 2015, a copy of which is attached hereto and incorporated herein. The cost to the City for the additional design services to be performed by Engineer totals $14,324 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be '70 an amount of $134,324 .00. M M M c 3 . M 0 v All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and za 0o effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Dal-Tech Engineering, Inc. ,LYJ Fernando Costa Sedi Tou.aani, P. E. Assistant City Manager President DATE: 2 DATE: e1123 APPROVAL _RECOMMENDED: '-PG Andrew T. Cronb _g, P.E. Assistant Direc or Water Department APPROVED AS TO FORM AND LEGALITY: M&C : N/A &Z& Date: N/A Douglas W. Black Senior Assistant City Attorney ATTEST: ��O° °�L 0 0 14ar r City Secretary ° OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- 1 � ENGINEERING, INC. CONSULTING CIVIL ENGINEERS/SURVEYORS CONSTRUCTION MANAGERS April 20, 2015 Mr. Soon Wong, PE Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Scope of Work Revision Request WATER AND SEWER REHABILITATION CONTRACT 2010 STM-B City Project Number 01495 DAL-TECH Project Number 1011 Proposed Amendment Number 1 Dear Mr. Wong, This letter is our formal request for a Scope of Work Revision for engineering services. Justification The City of Fort Worth has requested that DAL-TECH extend the water rehabilitation work within Gaston Avenue from Brazos Avenue to SH 183 and add this to the current City Project Referenced above. See the attached project location map. Changes to the project Scope of Work is as follows: 1. Perform topographic survey along Gaston Avenue from Brazos Avenue to SH 183 for a total distance of approximately 880 LF 2. Prepare base maps along Gaston Avenue from Brazos Avenue to SH 183 (2 sheets) 3. Coordinate with utility companies along Gaston Avenue from Brazos Avenue to SH 183 4. Prepare 60%, 90% and Final plan and profile sheets for a new 8-inch water line along Gaston Avenue from Brazos Avenue to SH 183 (2 sheets) 5. Participate in 60% and 90% review meetings with the City of Fort Worth for the water line along Gaston Avenue from Brazos Avenue to SH 183 6. Provide construction services in accordance with the current contract for Gaston Avenue from Brazos Avenue to SH 183 17400 DALLAS PKWY.1 STE.1101 DALLAS,TX 752871972-250.27271 FAX 972.250.4774 www.dal-tech.com Mr. Soon Wong, P.E. April 20, 2015 Page 2 of 2 Based upon the changes to the project Scope of Work, the additional proposed design cost for Amendment Number 1 is $14,324.00. Please see attached Level of Effort (LOE) spreadsheet. Proiect Fee Details Contract Item Description Fee Original Contract Water and Sewer Rehabilitation Contract 2010 STM-B $120,000.00 Amendment No. 1 8"Water Line Rehabilitation in Gaston Avenue from Brazos Avenue to SH 183 $14,324.00 REVISED TOTAL PROJECT FEE $134,324.00 Please let me know if you have any questions or need any additional information concerning this request. Sincerely yours, DAL-TECH Engineering, Inc, H. Wa a Barton, PE Production Manager Enclosure WE ¢iI>s'.'ssz+a e? a'7tE Rs 17 ^T.�.t'JF. • mommor' IMERMOM Ems]•...•..f"'^T�TR"�7r^1.. ...R^^7iF'!'!f—_r-ri'•.c9ra=:�.it.7F����i���i-3 �."i', .-? ��I�^.T:�.T!1'."!f'!T.•�iZ'!"7—GSL'e.:�'lT����i1Ff��'iF"'.'IE'.7���f51�i6`3T? vlww��I—mIIIYffi'1�'1�';8 '1 '1 ix•�I.T•.!S�f}!'!1�Rw„!T.�-- S��f�rf]lS�ti���l�'1�'7�']�'d�9E1�'1 ..Q�f7A.!•.'�-- iF-'t��'��, '-�EFF.7t��'7^.7�'1�7�'1�7i1�'.:t7�!"1 �a[?!.!A,=RR�•.'�RCi7f�— —��F�iTi����'R:.I—��!d��l MENIE?7'�1 t�� Mwmmw'7fE'd '7�'1�7�:7®l-7 t��•��',1����mmlmmlrl� [IF�ES'.�dT!".!fel!!1T^7—®�T87t�t�t�t�t��•��'.•1—���—'d maimmorn ��tTSE'SF��'TiEFF�i:'i�1E!iF���ESCF%�I�'l�'I�:I�Tf7�R'1�!FI'] ommmorT M ®®