AMENDMENT No. 1
�Dly9TRACT NO,
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Dal - Tech
Engineering, Inc. , (ENGINEER) made and entered into City
Secretary Contract No. 42129, (the CONTRACT) which was
authorized by M&C C-25064 on the 26th day of July, 2011 in the
amount of $120,000 .00; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Water Main and Sanitary Sewer Replacement contract 2010,
STM-B; and
WHEREAS, it has become necessary to execute Amendment
No.1 to the CONTRACT to include an increased scope of work and
revised fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
April 20, 2015, a copy of which is attached hereto and
incorporated herein. The cost to the City for the additional
design services to be performed by Engineer totals $14,324 . 00 .
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
'70 an amount of $134,324 .00.
M
M
M
c 3 .
M
0
v All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
za
0o effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -1-
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth Dal-Tech Engineering, Inc.
,LYJ
Fernando Costa Sedi Tou.aani, P. E.
Assistant City Manager President
DATE: 2 DATE: e1123
APPROVAL _RECOMMENDED:
'-PG
Andrew T. Cronb _g, P.E.
Assistant Direc or Water Department
APPROVED AS TO FORM AND LEGALITY: M&C : N/A
&Z& Date: N/A
Douglas W. Black
Senior Assistant City Attorney
ATTEST: ��O° °�L
0
0
14ar r
City Secretary °
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -2-
1 �
ENGINEERING, INC.
CONSULTING CIVIL ENGINEERS/SURVEYORS
CONSTRUCTION MANAGERS
April 20, 2015
Mr. Soon Wong, PE
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, Texas 76102
RE: Scope of Work Revision Request
WATER AND SEWER REHABILITATION CONTRACT 2010 STM-B
City Project Number 01495
DAL-TECH Project Number 1011
Proposed Amendment Number 1
Dear Mr. Wong,
This letter is our formal request for a Scope of Work Revision for engineering
services.
Justification
The City of Fort Worth has requested that DAL-TECH extend the water
rehabilitation work within Gaston Avenue from Brazos Avenue to SH 183 and
add this to the current City Project Referenced above. See the attached project
location map.
Changes to the project Scope of Work is as follows:
1. Perform topographic survey along Gaston Avenue from Brazos Avenue to
SH 183 for a total distance of approximately 880 LF
2. Prepare base maps along Gaston Avenue from Brazos Avenue to SH 183
(2 sheets)
3. Coordinate with utility companies along Gaston Avenue from Brazos
Avenue to SH 183
4. Prepare 60%, 90% and Final plan and profile sheets for a new 8-inch
water line along Gaston Avenue from Brazos Avenue to SH 183 (2 sheets)
5. Participate in 60% and 90% review meetings with the City of Fort Worth
for the water line along Gaston Avenue from Brazos Avenue to SH 183
6. Provide construction services in accordance with the current contract for
Gaston Avenue from Brazos Avenue to SH 183
17400 DALLAS PKWY.1 STE.1101 DALLAS,TX 752871972-250.27271 FAX 972.250.4774
www.dal-tech.com
Mr. Soon Wong, P.E.
April 20, 2015
Page 2 of 2
Based upon the changes to the project Scope of Work, the additional proposed
design cost for Amendment Number 1 is $14,324.00. Please see attached Level
of Effort (LOE) spreadsheet.
Proiect Fee Details
Contract Item Description Fee
Original Contract Water and Sewer Rehabilitation
Contract 2010 STM-B $120,000.00
Amendment No. 1 8"Water Line Rehabilitation in
Gaston Avenue from Brazos Avenue
to SH 183 $14,324.00
REVISED TOTAL PROJECT FEE $134,324.00
Please let me know if you have any questions or need any additional information
concerning this request.
Sincerely yours,
DAL-TECH Engineering, Inc,
H. Wa a Barton, PE
Production Manager
Enclosure
WE
¢iI>s'.'ssz+a e? a'7tE Rs 17 ^T.�.t'JF.
• mommor'
IMERMOM
Ems]•...•..f"'^T�TR"�7r^1.. ...R^^7iF'!'!f—_r-ri'•.c9ra=:�.it.7F����i���i-3 �."i', .-?
��I�^.T:�.T!1'."!f'!T.•�iZ'!"7—GSL'e.:�'lT����i1Ff��'iF"'.'IE'.7���f51�i6`3T?
vlww��I—mIIIYffi'1�'1�';8 '1 '1
ix•�I.T•.!S�f}!'!1�Rw„!T.�-- S��f�rf]lS�ti���l�'1�'7�']�'d�9E1�'1
..Q�f7A.!•.'�-- iF-'t��'��, '-�EFF.7t��'7^.7�'1�7�'1�7i1�'.:t7�!"1
�a[?!.!A,=RR�•.'�RCi7f�— —��F�iTi����'R:.I—��!d��l MENIE?7'�1
t�� Mwmmw'7fE'd '7�'1�7�:7®l-7
t��•��',1����mmlmmlrl�
[IF�ES'.�dT!".!fel!!1T^7—®�T87t�t�t�t�t��•��'.•1—���—'d maimmorn
��tTSE'SF��'TiEFF�i:'i�1E!iF���ESCF%�I�'l�'I�:I�Tf7�R'1�!FI']
ommmorT
M
®®