HomeMy WebLinkAboutContract 43599-CO4 Fol RT WORTH City of Fort Worth CITY gECRU/11c w wx IMW � Change Order Request Project Namel Sanitary Sewer Rehabilitation Contract 55,Part 5 City Sec No. 43599 Project No.(s) P258-708170043189 I DOE No. 6160 City Pro.No. 00431 Project The rehabilitation of a sanitary sewer transmission main on Trinity Park Drive,Crestline Rd,Cottonwood Dr,Foch St, Description I Westover Dr,Hidden Creek Rd&University Dr Contractorl S.J.Louis Constraction of Texas,Ltd. Change Order# ® Date: 14/21/2015 City Project Mgr,I Roberto C.Sauceda City Inspector David Johnson Phone Number: 817-392-2387 Phone Number: 817-392-8455 Dept. Sewer Totals Contract Time (Calender days) Original Contract Amount $2,416,891.31 $2,416,891.31 230 Extras to Date $212,234.50 $2.12,234.50 140 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,629,125.81 $2,629,125.81 370 Amount of Proposed Change Order -$1.53 -$1.53 Revised Contract Amount $2,629,124.28 $2,629,124.28 370 Original Funds Available for Change Orders $47,496.00 $47,496.00 Remaining Funds Available for this CO Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 8.78% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,021;114.14 The change order will provide for the following: ■ Full width mill and overlay for the segment of Westover Drive that was impacted by sewer installation on the street ■ The deletion of pay item quantites that are no longer needed on the project � V 0 Ji. A77 PV 8 OFFICIAL. RECORD oY 4. 4s,er, CiSeentaryCITY SECRETARY �� FT.WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and StUSTaction ana represen s payment rn in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. n rT1 ttt Wr Name _Date C m S.J.Louis Constraction of Texas,Ltd. Pete Stahl 1 4, 0 a Date PM, 4 _ z.� k--1Z�f S �sa/l�c 2t (S' ao Date rx Date. N TS. S fmA fLate Assistant 4L K zW �s 14 /S Cokeff Act<orr fif i M&C Number N(A M&C Date Approved A FORT WORTH City of Fort Worth Change Order Additions Project Name Sanitary Sewer Rehabilitation Contract 55,Part 5 City Sec No. 43599 Project No.(s) P258-708170043189 DOE No.F-6-1-6-0-1 City Pro.No. 431 Project The rehabilitation of a sanitary sewer transmission main on Trinity Park Drive,Crestline Rd,Cottonwood Dr,Foch St, Description Westover Dr,Hidden Creek Rd&University Dr Contractor S.J.Louis Constraction of Texas,Ltd. Change Order# ® Date: 4/21/2015 City Project Mgr. Roberto C.Sauceda City Inspector David Johnson ADDITIONS ITEM DESCRIPITION DFP"[ Oty Unit Unk Cast Total 86 Mobilization Sewer 1.00 EA $3,600.00 $3,600.00 87 Full Width Asphalt Mill Sewer 4209.00 SY $4.98 $20,960.82 88 Milled Butt Joint Sewer 4.00 EA $996.00 $3,984.00 89 2"HMAC Type D Overlay Sewer 4209.00 SY $12.30 $51,770.70 Sewer $80,315.52 Additions Sub Total $80,315.52 Page 2 of 4 Fc>nx Wcmwrm City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation Contract 55,Part 5 City Sec No. 43599 Project No.(s) P258-708170043189 DOE No. 6160 City Pro.No. 1 00431 Project Description The rehabilitation of a sanitary sewer transmission main on Trinity Park Drive,Crestline Rd,Cottonwood Dr,Foch St, Westover Dr, Hidden Creek Rd&University Dr Contractor S.J.Louis Constraction of Texas, Ltd. Change Order#® Date 4/21/2015 City Project Mgr. F7Roberto C.Sauceda City Inspector David Johnson DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost r$6,300.00 13 6"DIP Sewer Service Sewer 1.00 EA $1,800.00 0.00 16 4"Sewer Service Sewer 7.00 EA $900.00 19 8"Sewer Pipe, Point Repair Sewer 102.00 LF $30.00 0.00 22 5'Manhole Sewer 1.00 EA $3,900.00 $3,900.00 25 5'Extra Depth Manhole Sewer 18.25 VF $155.00 $2,828.75 26 4'Manhole Sewer 1.00 EA $2,700.00 $2,700.00 28 4"Extra Depth MH Sewer 37.90 VF $110.00 $4,169.00 34 Epoxy Manhole liner Sewer 42.50 VF $151.00 $6,417.50 35 Manhole Vacuum testing Sewer 20.00 EA $100.00 $2,000.00 37 Grouted Stone Riprap Sewer 99.00 SY $80.00 $7,920.00 42 Remove 4"Sewer MH Sewer 10.00 EA $1,900.00 $19,000.00 43 Remove 5"Sewer MH Sewer 5.00 EA $1,500.00 $7,500.00 50 Block sod Placement Sewer 1462.00 SY $2.50 $3,655.00 56 8"Wide Asphalt Pvmt Repace Sewer 212.00 LF $40.00 $8,480.00 64 6"Cone Curb and Gutter Sewer 32.60 LF $18.00 $586.80 Sewer $80,317.05 Deletions Sub Total 1$80,317.05 Page 3 of 4 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00